| Summary Bugs of task imageanalysis Total bugs: 6 Open bugs: 5 Fixed bugs: 1 Brain-computer interface 0 (0) Biology 14 (194) Chemistry 80 (876) Data acquisition 52 (214) Data acquisition development 8 (87) Data management 53 (480) Devices 6 (105) Distributed computing 64 (559) Economics 32 (117) Electrophysiology 19 (74) Engineering 90 (983) Engineering-dev 43 (460) Financial engineering 3 (0) Geography 73 (475) Geometry 4 (21) High energy physics 6 (90) High energy physics (devel) 20 (227) Image analysis 5 (60) Image analysis development 33 (206) Linguistics 96 (386) Logic 39 (261) Machine learning 53 (450) Mathematics 246 (2050) Mathematics-dev 177 (1706) Meteorology 76 (517) Meteorology-dev 189 (764) Nanoscale physics 324 (2399) Nanoscale physics development 134 (1323) Cognitive neuroscience 26 (131) Neuroscience datasets 0 (0) Modeling of neural systems 6 (69) Numerical computation 130 (1033) Physics 83 (930) Physics-dev 34 (347) Presentation 91 (750) Psychophysics 19 (198) Robotics 118 (504) Robotics-dev 24 (240) Simulations 38 (382) Social 0 (0) Statistics 61 (416) Tools 19 (120) Typesetting 292 (1941) Viewing 297 (1694) Viewing-dev 55 (510) Workflow 28 (207)
| Summary bugs page of task Image analysisLooking into bugs of this task is recommended* Open bugs in dependent packages 1 serious, 1 important, 1 normal, 2 minor
Open bugs in suggested packagesDone bugs
*To estimate the overall status of the packages in the dependencies of a metapackage a weighted severity is calculated. Done bugs are ignored and bugs in dependent and recommended packages are weighted by factor three compared to suggested packages. Release critical bugs have a much larger weight than important, while the contribution of normal bugs is even smaller and minor bugs have a very small weight. Wishlist bugs are ignored in this calculation. The resulting sum is compared to some boundaries to find a verbal form. The actual numbers need some adjustment to make real sense - this evaluation method is in testing phase. The severities of bugs are weighted as follows:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||