Share this: List of Projects using Atmega Microcontroller with advance view: 1. INFRA RED REMOTE CONTROLLED ROBOCAR USING AVR (ATMEGA32) MCU The present PROJECT describes a design and implementation of an infrare remote controlled RoboCar which can be used for various automated unmanned control applications. I have designed remote controlled RoboCar(left right/front-back motion). The entire system is based on microcontroller (Atmega32) that makes the control system…... Listed under: LED Projects 2. Using a Quadrature Encoder With an ATtiny 2313 and an OLED Display In this instructable you'll learn how to use a rotary encoder (see http://en.wikipedia.org/wiki/Rotary_encoder ) with a microcontroller and how to display the numeric value as a bar and a numeric value on an OLED d See the video below for the project in action. The…... Listed under: LED Projects 3. 2cm Height 7 Segments 6 Digits AVR Clock With 4 Digits Thermometer This project is explaining how to create yourself a 6 digits 7 segments clock with microcontroller Step 1: Prepare the Parts for This Project We need to prepare a parts for this project, 6x 7 Segments Common Anode 6x PNP transisto driver, I…... Listed under: Clock Projects 4. Temperature Control System Using Labview (Atmega32) This work describes a framework of ON/OFF, proportional and linear temperature control syst design and implementation of this process is done using LABVIEW, virtual workbench software. The project involves includes data acquisition, data pro and the display of data. At the initial stage Data…... Listed under: Temperature Measurement Projects 5. Firmware Upgrade for USBASP Clone – Fixing Error Setting USBASP ISP Clock USBASP is one of the most popular programmer for AVR Microcontroller by Thomas Fischl. It is one of the oldest programmer for AVR. And very common being used with AVRdude software. There are many GUI based on AV such as: embedXcodeAVR8 Burn-O-MatAVRDUDESSBitBurneravrdude-guikhazamaeXtreme Burnerand many more In this…... Listed under: Clock Proje 6. Low Speed AVR Oscilloscope V2.00 (Is Updated on 19 Mar 2011) >> The firmware was updated on 19 Mar 2011 << A few months ago a friend of mine -car mechanical at profes me that he had problem with some car sensors. He couldn't check, with a simple multimeter, if a sensor was working properly.…... Listed under: LCD Projects 7. Learn About Microcontrollers This Instructable was designed to answer the question: how do I get started in microcontrollers? Now, in clear, simple En can learn what a microcontroller is, and how to use one. You will learn how to make everything that you need to get started.…... Listed under: Microco Programmer Projects 8. Homemade Battery Monitor Using AVR I want to share my experiment with voltage divider, ADC and AVRHomemade battery monitor using AVRIt's pre the sensor are only two resistors and zener diode with capasitor, I don't buy them, I've found it in my box.We can use it for monitoring our…... Listed u Battery Projects 9. Measuring Tempurature Using Sensor(LM35) and Atmega32 A digital thermometer is a good project in microcontrollers because it provides an opportunity to learn using sens measure the real world signals that are analog in nature. I am trying to describes a similar project based on a Atmega32 microcontroller and an LM35…... Listed under: Temper
Measurement Projects 10. Temperature Sensor(LM35 ) Interfacing With ATmega32 and LCD Display| Automatics Fan Control Step 1: In this project, You will learn How to interfac Temperature Sensor(LM35 ) with AVR ATmega32 Microcontroller and LCD display. Before This Project you have to need Learn about following articles h add lcd library in avr studio| avr microcontroller tutorial introduction…... Listed under: Temperature Measurement Projects 11. Debugging AVR Code in Linux With Simavr I recently started programming AVR chips, namely the ATTiny85.  They can be programmed using C, compile readily available in Ubuntu, and you can do a LOT with them - just search for avr on this site!  Anyway, I was having some trouble with my…... Listed un Projects 12. Interfacing PS2 Controller With AVR -Bit Bang Hey friends in this instructable I will show you how to interface sony PS2 controller with AVR microcontro will be your handy code which you can  be used in future to control robots .You can get analogue value from joystick  which can be used…... Listed und Projects 13. Swiss AVR Knife The Swiss AVR Knife bundles a number of AVR programming projects together in a single convenient Altoids Gum Tin. Because of the flexibility afforded by microcontroller programming, it also provides a starting point for any number of projects based on LEDs and sound output. The…... Listed under: Microcontroller Programmer 14. How to Use the Dragon Rider 500 With Your AVR Dragon This instructable is a crash course in how to use some of the features of the Dragon Rider 500 Ecros Technologies. Please be aware that there is a very detailed User's Guide available on the Ecros website. The Dragon Rider is a interface board….. under: LCD Projects 15. AVR Microcontroller. Pulse Width Modulation. Сontroller of DC Motor and LED Light Intensity. Pulse Width Modulation (PWM) is a very common technique in telecommuni power control. it is commonly used to control the power fed to an electrical device, whether it is a motor, an LED, speakers, etc. It is basically a modulationtechnique, in wh width…... Listed under: Motor Projects 16. Introduction to ADC in AVR Microcontroller | for Beginners In thid tutorial you will know everything ADC in avr microcontroller Step 1: What Is an ADC? or Analog to Digital Converter, allows one to convert an analog voltage to a digital value that can be used by a microcontroller. There are many…... List Microcontroller Programmer Projects 17. Getting Started With Atmel AVR and BASCOM I have seen plenty of Instructables showing how to work with microprocessors, but they all assume that worked with them before and know what you are doing. I have not seen an Instructable that takes you from nothing and builds on each step.…... Liste Battery Projects 18. Cheap STK500 AVR Programmer for Atmel Studio Atmel Studio is a powerful tool for making AVR programs, but writing a program is the first step. To u program, you must make a circuit and transfer your code into the microcontroller. You can program your AVR from Atmel Studio by the use…... Listed Microcontroller Programmer Projects 19. AVR Microcontroller Fuse Bits Configuration. Creating and Uploading in the Flash Memory of Microcontroller the LED Blinking Program. https://youtu.be/6rkRAnkuqM0 In this case we will create simple program in C code and burn it into the memory of the microcontroller. We will write o program and compile the hex file, using the Atmel Studio as the integrated development platform. We will configure fuse bits and…... Listed under: LE 20. AVR Microcontroller. Toggle LED’s Using a Push Button Switch. Push Button Debouncing. https://youtu.be/YIZiwaXxtco In this section, we will learn How program C code for ATMega328PU to toggle the status of the three LED’s according to the input from a button switch. Also, we have explored a solutio problem of is ‘Switch Bounce‘. As…... Listed under: LED Projects
21. Density Based Traffic Signal System using Microcontroller Nowadays, controlling the traffic becomes major issue because of rapid increase in automob also because of large time delays between traffic lights. So, in order to rectify this problem, we will go for density based traffic lights system. This articl you how to…... Listed under: Microcontroller Programmer Projects 22. Microcontroller Projects: Home Automation System In this era of digital revolution, we are surrounded by smart devices that are capable of making de their own without much human intervention. Our home can also be made smart by implementing a real-time home automation system that monitors parameters like power consumption…... Listed under: Home Automation Projects 23. Line Follower Robot using Microcontroller Have you ever made your own robot? Here is a very simple and easy robot. In this project, I will explain how and build a Line Follower Robot using microcontroller. The Line Follower Robot is a basic robot that follows a specific path…... Listed under: Robotics - Automation Projects 24. Temperature Controlled DC Fan using Microcontroller A Temperature Controlled DC Fan is a system which automatically turns on a DC Fan when the a temperature increases above a certain limit. Generally, electronic devices produce more heat. So this heat should be reduced in order to protect the d There are many…... Listed under: Temperature Measurement Projects 25. Microcontroller Projects: Sonar Water-Level Meter Three-fourths of the earth is water, out of which 97 per cent is saline (in oceans, seas and groundwa remaining 2.5 per cent to 2.75 per cent is fresh water, out of which 1.75 per cent to two per cent is frozen in glaciers,…... Listed under: Battery Projects 26. RFID based Attendance System Most educational institutions’ administrators are concerned about student irregular attendance. Truancies can affect s overall academic performance. The conventional method of taking attendance by calling names or signing on paper is very time consuming and insec inefficient. Radio Frequency Identification (RFID) is an interesting solution in…... Listed under: Radio Projects 27. Ultrasonic Radar Model Using Microcontroller ATmega128 The circuit described here demonstrates the working of a radar system. It uses ultrasonic w detect an object and measure its distance and angular position, and displays the same on a 20x4 LCD screen. -- Ashutosh M. Bhatt is an M. Tech in embedded…... Listed under: Motor Projects 28. AT90S1200 D.D.S. FUNCTION GENERATOR The presented project is a function generator for sinusoidal and square signals production. The output freq covers the range from 10 Hz to 100 KHz with a step of 2 Hz. The waveform synthesis... Electronics Projects, AT90S1200 D.D.S. Function Generator "avr microcontroller projects, " The presented project is…... Listed under: Sensor - Transducer - Detector Projects 29. GAS DETECTOR CIRCUIT ATTINY45 Gas sensors are employed in a wide range of applications in the fields of safety, health, instrumentation etc… Comm examples are domestic/commercial alarms for explosive or toxic gases or in automotive application, as gas... Electronics Projects, Gas Detector Circuit ATtiny45 "avr project, microcontroller projects, " Gas sensors are employed…... Listed under: Sensor - Transducer - Detector Projects 30. UNINTERRUPTIBLE POWER SUPPLY UPS AT90S8515 PWM with AT90S8515 a good practice to understand the logic can give 200w Power should be dev more The driver circuit method used in section H-Bridge driver integrated HIP4080 I have in the... Electronics Projects, Uninterruptible Power Supply U AT90S8515 "avr project, microcontroller projects, " PWM with AT90S8515…... Listed under: Battery Projects 31. MICROCONTROLLER GSM ALARM AND CONTROL CIRCUITS Now quite a popular topic with Cell Phone Control with Microchip pic series for those who do these types of projects that could give clues will limp a few projects, including projects... Electronics Projects,Microcontroller GSM Alarm and Contro Circuits "avr project, microcontroller projects, " Now quite…... Listed under: Clock Projects
32. MICROCONTROLLER CONTROLLED DIGITAL POWER SUPPLY CIRCUITS ARCHIVE NXP80C31, PIC16F876, PIC12F629, PIC18F452, PIC16F876, PIC16F870, P HC908QT4 made with integrated power sources in various voltage and power MCU of microcontrollers in power electronics used always been interest Unfortunately this type MCU, PIC,... Electronics Projects, Microcontroller Controlled Digital Power Supply Circuits Archive "avr project, microcontroller p NXP80C31, PIC16F876,…... Listed under: Circuits 33. MICROCONTROLLER CONTROLLED BATTERY CHARGING CIRCUITS PIC Series Microcontroller ATMEL etc. Battery battery charger integrated circuits ma the PIC16F819, PIC16F84, PIC16F876, ATMEGA32, AT90S4433-PCR, AT90S1200-P, based on the ATmega8’s 7units applications Microcontroller controlled charging circuits all files: microcontroller-controlled-battery-charging-circuits.rar alternative... Electronics Projects, Microcontroller controlled battery c circuits "avr project, battery charger circuit, microchip projects,…... Listed under: Battery Projects 34. MICROCONTROLLER CONTROLLED ROBOT PROJECTS Multi-robot projects have been realized with the microcontroller. In addition to professional prac ‘projects have simple robot Most of the projects in the PIC16F series microcontrollers used ATMEL series over with no project varieties... Electronics Projects, Microcontroller Controlled Robot Projects "avr project, microcontroller projects, " Multi-robot projects have been…... Listed under: Robotics - Automation Projects 35. OLD CD ROM TRACK PLAYER WITH MICROCONTROLLER Old Cd Rom in handy if you want to make a Track Player PIC16F877 and AT89C51, AT89S52 con are made with good projects. Add to My Cdrom the features of the project with PIC16F877:... Electronics Projects, Old Cd Rom Track Player with Microcontroller "avr project, microchip projects, microcontroller…... Listed under: Other Projects 36. AVR TEMPERATURE MEASUREMENT SYSTEM Atmel AVR, Atmel microcontroller series with a super “Temperature Control Measurement System” 16 sensor inputs 4 alarm input computer’s connection. Temperature measurement, alarm, an exemplary application in the PC communication This measuring... Electronics Projects, A Temperature Measurement System "avr project, microcontroller projects, " Atmel AVR, Atmel microcontroller…... Listed under: Temperature Measurem Projects 37. MONITOR AUDIO RADIO SPECTRUM ATMEGA8 Atmega8-16 ac circuits with LEDs monitor the spectrum vu-meters of the advanced state of our LCD an spectrum analyzer circuit looks very nice variety of testing everything in the middle video There are...Electronics Projects, Monitor Audio Radio Spectru Atmega8 "atmega8 projects, avr project, microcontroller projects, " Atmega8-16…... Listed under: Radio Projects, Sound - Audio Projects 38. WHEELS BIKE LIGHT CIRCUIT ATTINY2313 a flashy accessory for your bike 74LS595N 25LC080P a good practice based on the software with all the deta pcb diagram hex code schema (schema) and PCBs (br) Latest eaglecad prepared by...Electronics Projects, Wheels bike light circuit "avr project, microco projects, " ATTINY2313 a flashy accessory…... Listed under: LED Projects 39. ATMEGA162 LCD OSCILLOSCOPE CIRCUIT A very nice project cost is a bit high in our country, even hard to find parts Atmel AVR microcontroller series with this type of project is ideal for those who want to... Electronics Projects, ATMEGA162 LCD Oscilloscope Circuit "avr project, microcontroller project nice project…... Listed under: LCD Projects 40. ATMEGA8 AT90S4433 WIRELESS RF TEMPERATURE TRANSMITTER And a beautiful project with ATmega8 AT90S4433 your computer from a remote loca the location’s wireless RF system temperature data come Mailbox temperature measured in the test program with garden-temperature condition is displayed... Electronics Projects, ATmega8 AT90S4433 Wireless RF Temperature Transmitter "atmega8 projects, avr project, microcontroller projects, "… under: Medical - Health based Projects, Temperature Measurement Projects 41. LM3886 TDA7318 DIGITAL AMPLIFIER AT90S8535 AT90S8535, TDA7318 and LM3886 have been realized with digital amp system LED Indicator-signal in selection can be made, unfortunately explanations could not solve in a language but ATMEL microcontroller dealing with people a... Electronics Projects, LM3886 TDA7318 Digital Amplifier AT90S8535 "audio amplifier circuits, avr project, ic amplifier,…... Listed under: Sound - Audio Projects 42. ATMEGA168 MOOD POLY CONTROLLED INTERACTIVE LED LIGHT “Polycontrolled Interactive LED Mood Light” is based on Atmel ATMEGA168/88 quite a RGB LED application design professional as well as various modes, speed, the program’s options. I hope I know the main parts... Electronics Projects, ATMEGA168 Mood Poly Controlled Interactive LED Light "avr project, microcontroller projects, " “Polycontrolled…... Listed under: LED Projects 43. SPEED INDICATOR CIRCUITS TACHOMETER ATMEL ATMEGA8 Atmel ATmega series of projects have been realized with the speedometer and LCD display are the different in used circuits. Display circuit used Used atmega8l-8P. Hex file and prepared by Proteus. Dns file there.... Electronics Projects, Speed Indicator Circuits Tachometer Atmel
atmega8 "atmega8 projects, avr project, microcontroller projects, "…... Listed under: Metering - Instrument Projects 44. AT89S52 THERMISTOR CIRCUIT THERMOMETER LCD DISPLAY NTC Thermistor Thermometer based on AT89S52 circuit and HIH 3160 humidity sensor h and temperature information is given. Display LCD display circuit and there are two versions of the C source code and schema... Electronics Projects, A Thermistor Circuit Thermometer LCD Display "avr project, microcontroller projects, " NTC Thermistor…... Listed under: Circuits 45. MODEL AIRCRAFT PROJECTS Different models of the project Model Aircraft Model airplane models, drawings, model details, sample circuits, fan motor as well as stock control circuit microchip PIC16F microcontrollers made with a variety of serial... Electronics Projects, Model Aircraft Projects "avr projec microcontroller projects, " Different models of the project…... Listed under: Other Projects 46. COMPUTER CONTROLLED 8-CHANNEL DIMMER CIRCUIT AT90S2313P 200 watt dimmer circuit is controlled from RS232 port with MOC3021 opto isolat driver control program running on xp pretty simple hex to asm code pcb diagram AT90S2313P There have also dosyalarıda... Electronics Projects, Com Controlled 8-Channel Dimmer Circuit 200W AT90S2313P"avr project, microcontroller projects, " AT90S2313P…... Listed under: Circuits 47. WAV PLAYER CIRCUIT WITH ATMEL ATTINY2313 ATtiny2313 microcontroller circuit with MAX232 PC connection can be established based on the pc pro wav file loading the output of the power amplifier TDA2003 integrated amp Atmel Wav Player Circuit Test The... Electronics Projects, Wav Player Circuit Atmel ATtiny2313 "avr project, microcontroller projects, " ATtiny2313 microcontroller…... Listed under: Radio Projects, Sound - Audio Projects 48. USB TO LPT CONVERTER CIRCUIT WITH ATMEL ATMEGA8 Converter from USB to LPT parallel port (25 pin SubD receptacle) with hardware virtualization input/output instruction level Supports all parallel port modes named SPP, EPP and ECP, 16 Byte FIFO depth USB Low... Electronics Projects, USB to LPT Converter Circuit with Atmel ATMEGA8 "atmega8 projects, avr project,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 49. ATMEGA128 ATMEGA32 PC CONTROLLED LED MATRIX ANIMATION LED SIGNS Serve to control the 128×64 graphic LCD with a preview of the contents array and menu graphics. The heart of the controller is Atmega 128 CPU for communication with the PC corresponds... Electronics Projects, ATMEGA1 ATMEGA32 PC Controlled LED Matrix Animation LED Signs "avr project, microcontroller…... Listed under: LED Projects 50. AT89S52 8051 RF DC MOTOR SPEED CONTROL Wireless within a certain area with a control circuit for controlling the speed of DC Motor. Work, should reach my goal I began to identify materials. These materials AT89S52 microcontroller, our... Electronics Projects, AT89S52 8051 RF DC Motor Speed Control "8051 example, avr project, keil…... Listed under: Motor Projects 51. 89C51 8051 VOLTMETER THERMOMETER DS1621 ADC0808 ADC 0808 standard data acquisition systems many components on a single chip host is a m ADC 0808 8-bit flip makes the process and addresses from input latch 8-channel data selection (multiplexer) and...Electronics Projects, 89C51 8051 vo thermometer DS1621 ADC0808 "8051 example, avr project, keil example,…... Listed under: Metering - Instrument Projects 52. CALCULATION OF BODY LENGTH WITH 8051 AND DS89C430 In this project, which is designed using DALLAS DS89C430 microcontroller (in simulation AT89C51RC2) circuit and a marching band, calculated on the length of the body, the LCD display was performed. Circuit consists of three... Electronics Projects, Calculation of Body Length with 8051 and DS89C430 "8051 example, avr project,…... Listed under: Calculator Projects 53. AT89C51 8051 GRAPHIC LCD ANIMATION GLCD Animation circuit voltage is applied to the currently displayed map of Turkey comes first. Subsequently Turkish flag and a picture of Mustafa Kemal Atatürk, the next step is to come. Art world... Electronics Projects, AT89C51 8051 Graphic LCD Animation "8 example, avr project, keil example, microcontroller…... Listed under: LCD Projects 54. AT89C51 L293D DC MOTOR WITH DOOR CONTROL CIRCUIT The main purpose of the circuit is to control the gate of the house. This DC motor and pro two limit switches is provided by mechanical parts. The two buttons open and close... Electronics Projects, AT89C51 L293D DC Motor with Door Contro Circuit "8051 example, avr project,…... Listed under: Motor Projects 55. AT89C51 SQUARE WAVE SIGNAL GENERATOR Signal generator test is often the recipients of the amplifiers used in the test and repair of this equipmen the signal source. Wave detector, radio frequency used in places such as bridges.... Electronics Projects, AT89C51 Square Wave Signal Generator "8051 avr project, keil example, microcontroller…... Listed under: Radio Projects, Sound - Audio Projects
56. DISEQC TESTER CIRCUIT WITH ATMEL ATTINY13 This device is designed to help define the way DiSEqC-switches to the working protocols 1.0 and 1.1 an number of entrances to 4 – x. It feeds the unit from the source of... Electronics Projects, DiSEqC Tester Circuit with Atmel ATtiny13 "avr project, microco projects, " This device…... Listed under: Circuits 57. MONITOR TEST CIRCUIT WITH ATMEGA88 color image of a classic test circuit will monitor the audio output of this circuit in addition to the music in the from the old ateri amp could work in the test... Electronics Projects, Monitor Test Circuit with atmega88 "avr project, microcontroller projects, " color im of…... Listed under: LCD Projects 58. ATMEL ATMEGA8 IR DETECTOR CIRCUIT 8-channel approach to IR detector sensor circuit is realized with ATmega8 microcontroller. I2C bus (TWI, SMBu measuring through the obstacle detection, designed for mobile robot. Approach reflects the beam of infrared light detector... Electronics Projects, Atm ATMEGA8 IR detector circuit "atmega8 projects, avr project, microcontroller projects, " 8-channel…... Listed under: Circuits 59. AT89C51 MICROCONTROLLER ANALOG CLOCK FOR GRAPHIC LCD Analog Clock GLCD We use 128×64 pixel graphical LCD having “HY-12864K” is. This a file extension of the LCD connections are provided in PDF. 128 × 64 graphic LCD s have the same... Electronics Projects,AT89C51 Microcontroller Analo Graphic LCD "8051 example, avr project, keil…... Listed under: Clock Projects 60. AT89C51 ANIMATED BMP GRAPHIC LCD DISPLAY AT89C51 microcontroller controlled Animated BMP project usnig Graphic LCD Display 128×64 project source code and proteus isis simulation schematic files Graphic LCD Animated BMP Schematic project files: at89c51-animated-bmp-graphic-lcd-displa author: Cihangir Kılıç... Electronics Projects, AT89C51 Animated BMP Graphic LCD Display "8051 example, avr project, keil example, microcontroller pro Listed under: LCD Projects 61. 8051 PS2 KEYBOARD WITH LCD WRITING TEXT PS / 2 protocol used text via a keyboard microcontroller applications that perform printing text on the L keyboard microcontroller to print text on the LCD. Through keyboard microcontroller...Electronics Projects, 8051 PS2 Keyboard with LCD Writing Text " example, avr project, keil…... Listed under: LCD Projects 62. ATMEGA32 10A 2-CHANNEL METER WITH LCD DISPLAY   PID Temperature Controller Max232 PC via RS232 serial port connection can be made Accordi information I found PID Temperature Controller is accurate temperature control system i AT90S2313 control system with high mains voltage... Electron Projects, AT90S2313 Computer Supported PID Temperature Controller "avr project, microcontroller projects, " PID…... Listed under: Temperature Meas Projects 63. ATMEGA32 10A 2-CHANNEL METER WITH LCD DISPLAY 10 Ampere circuit Ampere meter based on ATmega32 128×64 large LCD display it measures 10 channel AC DC used sed1330 Automatically Detect This project is a 2 channels amp meter. Those...Electronics Projects, ATmega32 10A 2-channel mete LCD display "avr project, microcontroller projects, " 10…... Listed under: Metering - Instrument Projects 64. ATMEGA128 MMC CARD SUPPORTED 3-COLORS LED SIGN MESSAGE BOARD ATmega128 microcontroller based on the ATmega128 a quality marquee p instead of text information stored on the MMC card codes shared resources At the beginning this project was to buy a led sign to...Electronics Projects, ATmega128 MMC Card Supported 3-Colors LED Sign Message Board "avr project, microcontroller…... Listed under: LED Projects 65. ATMEGA8 MOTORCYCLE ALARM CIRCUIT Separate power supply. Signalling on mobile phone call.This function has only a few hundred euros more exp equipment. motorcycle into the phone by calling The digital alarm input is a normally closed contact. The... Electronics Projects, ATmega8 Motorcycle a circuit "atmega8 projects, avr project, microcontroller projects, " Separate power…... Listed under: Sensor - Transducer - Detector Projects 66. 8051 ROBOT ARM STEPPER MOTOR CONTROL In this 8051 Robot ARM application I use for robot arm 3 stepper motor design, study and is to be infor about the expulsion. Stepping motors to provide work, applied to the ends of... Electronics Projects, 8051 Robot ARM Stepper Motor Control "avr proje microcontroller projects, " In this…... Listed under: Robotics - Automation Projects 67. 8051 ELEVATOR PROJECT STEPPER MOTOR CONTROL This application step (step) motor control, input and output ports through 8051 will examine the providing lift. We use our stepper motor circuit. As we know, certain steps of the stepper motor,... Electronics Projects, 8051 Elevator Project Stepper M Control "avr project, microcontroller projects, " This application…... Listed under: Motor Projects 68. MICROCONTROLLER CONTROLLED METAL DETECTOR PROJECTS Result of displays in the form of two scales, which are estimated to judge the materia addition, the screen is small scale level of response and the current supply voltage. PIC18F252 The program... Electronics Projects, Microcontroller Con Metal Detector Projects "avr project, microcontroller projects, " Result of displays…... Listed under: Sensor - Transducer - Detector Projects
69. AT89C51 L293D MOTOR CONTROL PROJECT AT89C51 L293D Motor Control Circuit Operation, Our project name and the name suggests, the treadmill motor control is required. When designing this project, I saw fit to use DC motors. Because the...Electronics Projects, AT89C51 L293D Motor Control Pr project, microcontroller projects, " AT89C51 L293D Motor…... Listed under: Motor Projects 70. ATMEGA168 JAVA GUI INTERFACE NIMH CHARGE CIRCUIT Source files are Java and C Diff communication with the computer via the RS232 port is made 2 × 16 LCD display also got on the circuit with... Electronics Projects, ATmega168 Java GUI Interface NIMH Charge Circuit "avr project, battery charger ci Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 71. AT89C51 5X7 LED MATRIX APPLICATION Circuit Operation: This practice of over 5 × 7 matrix LED A… Z characters are intended to be created. Provision characters in source code LEDs (table) was created and when necessary with the... Electronics Projects, AT89C51 5X7 LED Matrix Application "8051 exa project, keil example, microcontroller…... Listed under: LED Projects 72. AT89C51 LCD DISPLAY FREQUENCYMETER PROJECT Frequency in all matters relating to the definition based on frequency is required. In the same way numeric (digital) Frequency frequency to do the same as the description of the circuit should be... Electronics Projects, AT89C51 LCD display Frequency Project "8051 example, avr project, keil example, microcontroller…... Listed under: LCD Projects 73. AT89C51 KEYPAD CONTROLLED SCROLLING LED DOT MATRIX TEXT AT89C51 Scrolling LED Circuit Operation: Keypad’t the values entered the program continually monitored, “*” key is pressed unless the display of the first letter that section required all letters appear, but the... Electronics Projects, AT8 Keypad Controlled Scrolling LED Dot Matrix Text "8051 example, avr project,…... Listed under: LED Projects 74. AT89S52 LCD DISPLAY STEPPER MOTOR CONTROL EXAMPLE AT89S52 Stepper Motor Control Stepper motor, the motor angular position is changing in This engine is moving into specific steps, according to the windings is controlled by sending signals. Any stimulus that would... Electronics Projects, AT8 Display Stepper Motor Control Example "8051 example, avr project, keil…... Listed under: LCD Projects 75. 8051 CALCULATOR CIRCUIT 8051 Calculator Circuit Operation As seen at half one has to use the keypad and an LCD with 8051. The keypad consists of columns. When the button is pressed certain keys combined... Electronics Projects, 8051 Calculator Circuit "8051 example, avr project, keil example, microcontroller projects, " 8051…... Listed under: Calculator Projects 76. 8051 ADC0808 LCD DISPLAY VOLTMETER ADC0808 analog / digital converter of the 8 analog inputs (IN0-IN7) and 8-bit digital output (OUT0-OUT7) are Entries will be transferred to the digital output of the converter which converted to 3-bit ADD,...Electronics Projects, 8051 ADC0808 Lcd Display Voltme example, avr project, keil example, microcontroller…... Listed under: LCD Projects 77. LED DISPLAY SPEED METER CIRCUIT WITH AT89C51 Speed Meter Circuit consists of four parts. These Supply solid floor Sensor sensor, microcontroller microcontroller solid hexadecimal numbers we obtained from the 7-segment display technology with time code converter solid. Program Keil µVision3... Electronics Projects, LED Display Speed Meter Circuit with AT89C51 "8051 example, avr project, keil…... Listed under: LED Projects 78. 8051 STOPWATCH CIRCUIT WITH LCD DISPLAY Stopwatch Circuit 8051 on behalf of the programming of integrated compiler program that is used too m left with only the easiest to use and most advantageous for... Electronics Projects, 8051 Stopwatch Circuit with Lcd Display "8051 example, avr project, example,…... Listed under: LCD Projects 79. USB CONTROLLED WEB SITE HIT COUNTER ATMEL ATTINY25 WITH DELPHI Web site counts the number of inputs to the circuit .. Circuit attiny25 an inte and MAX7219 section based on the indicators used for the 7-segment display 8 hunting and Delphi source code are... Electronics Projects, USB Contro Site Hit Counter Atmel Attiny25 with Delphi "avr project,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 80. EMBEDDED RTL8019AS WEB SERVER PROJECT ATMEGA103 I quickly was able to appeal to the network card via a 8-bit data bus. The connectivity of the card and thus the RTL8019AS chip via two 8-bit ports of the processor and... Electronics Projects, Embedded RTL8019AS Web Server Project ATMega10 project, microcontroller projects, " I quickly…... Listed under: Internet - Ethernet - LAN Projects
81. USB PORT RELAY CONTROL WITH ATMEL ATMEGA8 6 relay control units can be made via the usb port usb drive computer program code and schema fi pcb circuit to regulate the supply 9-12 volt ac section there on the SPI... Electronics Projects, USB Port Relay Control with Atmel Atmega8 "atmega8 pro project, microcontroller…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 82. AT89C51 DS1621 THERMOMETER CIRCUIT AT89C51 Operation of the thermometer circuit DS1621 temperature sensor circuit using a digital thermome tell if I made . As a simple circuit operation is as follows; The numerical value obtained from the temperature... Electronics Projects, AT89C51 DS1621 Thermometer Circuit "8051 example, avr project, keil example, microcontroller…... Listed under: Temperature Measurement Projects 83. PC CONTROLLED AT90S2313 LED ANIMATION CIRCUIT Why I write about it? This system uses two ready rolls 5 x 8 LED matrix, 89C2051, is a programm serial port and it can be very easy to adapt to the needs of... Electronics Projects, PC Controlled AT90S2313 Led Animation Circuit "avr project, microco projects, " Why I…... Listed under: LED Projects 84. AT89C2051 WITH DOT MATRIX DISPLAY APPLICATIONS 4 Piece AT89C2051 microcontroller project has been realized with matrix display isis proteus sim and asm files available in hex code Atmel AT89C2051 • Compatible with MCS®-51Products • 2K Bytes of Reprogrammable Flash Memory... Electronics Projects, AT89C2051 with Dot Matrix Display Applications "avr project, microcontroller projects, " 4 Piece…... Listed under: LED Projects 85. ANALOG LED CLOCK CIRCUIT AT89C2051P 301 LED Analog Clock Project Schema Files of PCB and C51 Compiler Source Code has been prepared by th The clock circuit is made of 301 LEDs with a diameter of 3mm... Electronics Projects, Analog LED Clock Circuit AT89C2051P "avr project, led projects, microcontroller projects, " 301…... Listed under: LED Projects 86. PC CONTROLLED FLOWER WATERING CIRCUIT WITH ATMEGA8 As far as I understand an interesting project information via computer is determined irr required time data exchange via RS232 com port has made the source code and diagrams...Electronics Projects, PC Controlled Flower Watering Circuit ATmega8 "atmega8 projects, avr project, microcontroller…... Listed under: Sensor - Transducer - Detector Projects 87. ATMEL ATMEGA8 MULTIMETER CIRCUIT (LED DISPLAY) Hello, “Multimeter” was the only title that first came to my mind to. Voltmeter (positive DC volta 0.00 to 9.99 V and 10.0 – 30.0 V with automatic range switching. Frequency counter 0... Electronics Projects,Atmel Atmega8 Multimeter Circuit (led display) "atmega8 projects, avr project, microcontroller projects, "…... Listed under: LED Projects 88. 8051 PROGRAMMABLE POWER SUPPLY Circuit Operation: Circuit diagram appears in the 0-5 the entered value from the keypad circuit, which is conne port P1 applied to the integrated DAC 0808 DAC output is obtained from the analog...Electronics Projects, 8051 Programmable Power Supply "8051 ex project, keil example, microcontroller projects, "…... Listed under: Circuits 89. DS1302 RTC 8051 DIGITAL CLOCK CIRCUIT (LCD DISPLAY) 8051 keil example application circuit LCD Display Digital Clock using DS1302 RTC 8051 Digital Schematic 8051 Digital Clock Circuit keil source code and proteus isis simulation schematic files: ds1302-rtc-8051-digital-clock-circuit-lcd-display.rar au @Aytan ASLAN... Electronics Projects, DS1302 RTC 8051 Digital Clock Circuit (LCD Display) "8051 example, avr project, keil…... Listed under: Clock Proje 90. 89C51 DIGITAL CLOCK CIRCUIT From the incoming data encoded in Port0 integrated 7-segment display with 7447 microcontroller integrated ulaşır.744 code from the 7-segment display is used to show. So when it comes to 0000 a, b, c,...Electronics Projects, 89C51 Digital Clock Circuit "8051 example, av keil example, microcontroller projects, "…... Listed under: Clock Projects 91. AT89S52 DS1620 THERMOMETER CIRCUIT (LCD DISPLAY) This project gave ds1620’n given as a result of the digitally using AT89S52 microcontroller is a display of temperature information of the LCD screen. Moreover, the circuit ambient temperature when it reaches a...Electronics Projects, AT89S52 DS Thermometer Circuit (LCD Display) "8051 example, avr project, keil example,…... Listed under: Circuits 92. LCD DATE TIME TEMPERATURE AT89C52 DS18B20 DS1302 Atmel microcontrollers with a good example for the use of DS18B20 DS1302 circuit 2 × 16 L with 4 buttons in circuit adjustments can be made The first button is a long hold... Electronics Projects, LCD Date Time Temperature AT89C52 DS18B20 DS1302 "8051 example, avr project, keil…... Listed under: LCD Projects
93. 8051 MICROCONTROLLER UP DOWN COUNTER CIRCUIT (KEIL) With 8051 DOWN COUNTER The basic principle of this circuit based on the number ent the keypad is left counting down or up. # On the keypad to make counting down and counting... Electronics Projects,8051 Microcontroller Up Down Co Circuit (keil) "8051 example, avr project, keil…... Listed under: Circuits 94. PS2 KEYBOARD KEYLOGGER CIRCUIT ATMEL AT89C2051 KeeLog has decided to release an early version of it's hardware keylogger family to the public software source code, keylogger hardware electrical schematics, and documentation. This PS/2 key logger is a 100% operational and tested device, ass and used by hundreds of…... Listed under: Other Projects 95. RTL8019 ISA WEB SERVER CIRCUIT ATMEGA32 RELAY CONTROL CAMERA CONNECTION Very detailed and complicated project all of the resources to be for different applications feyza can give example might now mikrocontroller.co my site ATmega32 web server project shared resources of the project the... Electronics Projects, RTL8019 ISA Web Server Circuit ATmega32 Relay Control Camera Connection "avr project,…... Listed under: Circuits 96. ADC0831 8051 LM35 TEMPERATURE CONTROL WITH LCD SCREEN Adc 0831 with 8051 lm 35 temperature sensor, and a detailed project examples for inverters. author :Özer Deniz Objective: LM 35 temperature sensor dealt with 0831 ADC analog-to-digital conversion of knowledge,... Electronics Projects, ADC0831 8051 LM35 Temperature Control with LCD Screen "avr project, microcontroller projects, "…... Listed under: LCD Projects, Temperatu Measurement Projects 97. 8051 SRF04 ULTRASONIC DISTANCE METER CIRCUIT 8051 srf04 ultrasonic distance measurement application also contains information about the diffe controllers and this information can be useful for applications 8051 microcontroller distance measurement using ultrasonic transceiver done. Studies microcontrollers 8051 with... Electronics Projects, 8051 SRF04 Ultrasonic Distance Meter Circuit "avr project, microcontroller projects, " 8051 srf04…... L under: Metering - Instrument Projects 98. NIMH NICD BATTERY FAST PWM CHARGER CIRCUIT ATMEL AVR Battery charging circuit atmel attiny26lp based on switched PWM works as a fast charg the switching circuit 100UH coil and irf5305 irl3803 MOSFETs used charging current of 300 mA, 600 mA …...Electronics Projects, NiMH NiCd Battery Fas Charger Circuit Atmel AVR "avr project, battery…... Listed under: Battery Projects 99. USB JOYSTICK CONVERTER FOR ATARI, AMIGA, COMMODORE 64 Old atari, commodore-64, amiga joystick you can use on your computer usb converte circuit based on Atmel ATmega8-pin adapter does not require power from the USB port in addition to working with 5Volt...Electronics Projects, USB Joy Converter for Atari, Amiga, Commodore 64 "avr project, microcontroller projects, "…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 100. 27 MHZ WIRELESS KEYBOARD SPY CIRCUIT ATMEL ATMEGA64 In an article “Symantec warns: each word or phrase that you enter on the wireless keybo be tracked!” Was called I knew it was true, but such a project would never have thought... Electronics Projects, 27 MHz Wireless Keyboard SPY Circuit A ATmega64 "avr project, microcontroller projects, "…... Listed under: Circuits 101. DIGITAL AUDIO CONTROL CIRCUIT NOKIA 3310 LCD ATMEL ATMEGA8 TDA7439 My old chassis while stirring an old stereo on the chassis tda7439 foun integrate these with making an application decided and ultimately such a nice application appeared application If we are talking...Electronics Projects,  Audio Control Circuit Nokia 3310 LCD Atmel ATmega8 TDA7439"atmega8 projects,…... Listed under: Sound - Audio Projects 102. TV OSCILLOSCOPE CIRCUIT WITH ATMEGA8515 ATTINY12 Attiny12 ATMEGA8515 a very interesting project based on digital solid-source software and schema files, PCB’s drawin people working with Atmel series microcontrollers can give different ideas can be useful in different projects analogue... Electronics Projects, TV Oscilloscope Circuit with ATme ATtiny12"avr project, microcontroller projects, " Attiny12 ATMEGA8515 a…... Listed under: LCD Projects 103. ATMEL ATMEGA PROJECTS THERMOMETER LM35, DISPLAY, KEYPAD Atmel ATMEGA series made with micro-controller’s three projects which can delive bahramelectronic. site manager of @ Bahrain thanks to my brother. 1 – ATMega16 LCD display temperature measurement (LM35) 2 – 7 segment... Ele Projects, Atmel ATmega Projects Thermometer LM35, Display, Keypad "avr project, microcontroller projects, " Atmel…... Listed under: LCD Projects 104. DIGITAL TONE CONTROL CIRCUIT ATMEL ATTINY2313 LM1036 Recently a similar application I’ve done, but ds1844 integrated can not be found had be problem AVR reviewing ATtiny2313 `fame four PWM channels, saw direct this practice came to my mind bass treble...Electronics Projects, Digital Tone Circuit Atmel ATTINY2313 LM1036 "avr project, microcontroller projects, " Recently…... Listed under: Sound - Audio Projects
105. 8051 BASCOM AVR PROJECTS ATMEL CIRCUITS ARCHIVE With Atmel series (AT89C2052, AT90S2313, AT89S8252, etc..) Was very spacious with quality ar series microcontroller atmel version of the circuit can find a lot. Usb, alarm, LCD, nokia 3310, nokia 6100, display, LED,... Electronics Projects, 8051 Basc Projects Atmel Circuits Archive "avr project, microcontroller projects, " With…... Listed under: LCD Projects 106. USB UART CONVERTER PIC16F88 CIRCUIT ATTINY2313 Recently circuit on the web I’ve seen perform this southern been applying If we are talking appl atmel’s famous ATtiny2313 achieves with USB UART converter further circuit 8bit I / O 128-byte EEPROM 32-byte...Electronics Projects, USB UART Conv PIC16F88 Circuit Attiny2313 "avr project, microchip projects, microcontroller projects,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 107. ATMEL AT90S2313 COMPUTER-CONTROLLED SCROLLING LED TEXT All details were shared with the marquee circuit computer control program atmel a source software image format PCB, schematics and drawings have OrCAD source. The marquee on the circuit The marquee circuit 350 leds... Electron Projects, Atmel AT90S2313 Computer-Controlled Scrolling LED Text "avr project, microcontroller projects, " All details…... Listed under: LED Projects 108. HDD CLOCK CIRCUIT ATMEL ATMEGA128 DS1307 TDA5410 MOTOR DRIVER Before “Broken HDD Evaluate under the heading” corrupted hard disks to a few apps I’ve used on the web with the sandpaper I I told you about that time had projects now hardisk... Electronics Projects, HDD Clock Circuit Atme ATmega128 DS1307 TDA5410 Motor Driver "avr project, led…... Listed under: Clock Projects 109. 100WATT PV PANEL CONVERTER ATMEGA8 100W DC TO AC ICL7667 ETD34 The use of solar energy will be the topic for a long time an active electronic used a lot in this business at one of these inverter dc to ac converters. Ac... Electronics Projects, 100Watt PV Panel Converter Atmega8 100W DC to AC ETD34 "atmega8…... Listed under: Solar energy projects 110. POWER LED DRIVER CIRCUIT LED CURRENT SOURCES ATMEGA8 PWM Power LED driver circuit based on Atmel ATmega8 is working with 12 volt 3 1 watt Luxeon power LEDs wi buck converter is operated ATmega-8 a good example source code to solve logic... Electronics Projects, Power LED Driver Circuit LED Current Sources A PWM "atmega8 projects, avr…... Listed under: LED Projects 111. PCB PRINTING WITH EPSON CX4200 INKJET PRINTER MODIFIED Prepared by: Volkan Sahin – First of all you need to know when the project was challen if there is the possibility worthwhile CX4200 Epson inkjet to print text by modifying the... Electronics Projects, PCB Printing with Epson CX4200 inkje Modified "avr project, microcontroller projects, "…... Listed under: Other Projects 112. MICRO ROBOTIC FLY SCREEN CLEANER AT90LS8535 ROBOT BUG A very interesting robot project ratchet içintasarl been cleaning the flapper cleaner ro of the system microcontroller atmel at90ls8535 source software given c. Uygulayamasa sections of the circuit on the robot project source... Electronics Projects, Micro Robotic Fly screen cleaner AT90LS8535 Robot BUG "avr project, microcontroller projects, "…... Listed under: Robotics - Automation Proj 113. CNC DRILLING MACHINE CONTROL DIRVE BOARD ATMEL AT89C2051 L297 L298 Printed circuit board drilling machine on the Atmel AT89C2051 microc L297 L298 motor drivers.. software does not open hex code provided free computer control program, but other parts of the circuit (motor drives, serial... Electronics Projects, CNC Drilling Machine Control Dirve Board Atmel AT89C2051 L297 L298 "avr project,…... Listed under: CNC - Printing Machi Projects 114. 2.4 GHZ SPECTRUM ANALYZER CIRCUIT NOKIA 3410 LCD ATMEGA8 Mobile phones with Nokia 3410 LCD screens often used microcontrollers Atmel AT and cywm6935 nokia 3410 LCD modules made with a 2.4 GHz spectrum analyzer circuit Handheld 2.4 GHz Spectrum Analyzer Circuit After visiting... E Projects, 2.4 GHz Spectrum Analyzer Circuit Nokia 3410 LCD ATmega8 "atmega8 projects, avr…... Listed under: Circuits 115. ATMEL ATMEGA8 VIA USB CONTROL CIRCUIT Hi, I have done recently attiny2313’l usb application (ATTINY2313 PIC16F88 USB UART converter circuit) th needs at this time on I did with ATmega8. RS232 portion of the circuit 15 disuse I /... Electronics Projects, Atmel Atmega8 via USB Control Circuit "atmeg projects, avr project, microcontroller projects, "…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects
116. LIGHT FOLLOWING ROBOT WITH ATMEL ATTINY25 Light following robot circuit board on attiny25v not very complicated circuit Lithium-polymer batter provided with the circuit feeding the tiny H-bridge output (2N3904) drive motors are controlled with two LDR light is perceived. As... Electronics Project Following Robot with Atmel ATtiny25 "avr project, microcontroller projects, " Light following…... Listed under: Robotics - Automation Projects 117. TRANSISTOR TESTER CIRCUIT ATMEGA8 LCD DISPLAY Transistor very useful for testing the circuit, but I do not know more pic programming with atmel seeing this type of advanced applications get confused Transistor test circuit, BJT, MOSFET, triac,...Electronics Projects, Transistor Tester Circuit ATM Display "atmega8 projects, avr project, microcontroller projects, "…... Listed under: Circuits 118. ATMEGA8 PROGRAMMABLE CONTROLLER BOARD ELECTRONIC PLC CIRCUIT Tiny Basic Controller (TBC) is a simple device that can operate as a PLC (p automation, control, etc. For example, this one can dial-up by modem to the remote computer and control the system, can control some processes, temperature regulation, battery charging,…... Listed under: Development Board - Kits Projects 119. FOR ALL THE TELEVISION REMOTE CONTROL (JUST OFF) 90% of all leisure joke circuit television (including plasma, LCD) is said to work 30 … 50 meters space closes the television. Circuit made ATTINY85V-10 micro-controller circuit with two 1.5v AA battery...Electronics Projects, For all the television rem control (just off) "avr project, microcontroller projects, "…... Listed under: Other Projects 120. AT89C52 APPLICATIONS EXAMPLES PROTEUS ISIS CIRCUITS (10 PROJECTS) AT89C52 examples of applications can be helpful for beginners of all sample prepared with simple 3 .5 source lines of code. Bass. Hex, bin, etc.. isis proteus have codes and simulation files. 0-255 binary...Electronics Projects, AT8 Applications Examples Proteus isis Circuits (10 projects) "avr project, microcontroller projects, "…... Listed under: Circuits 121. ATMEL AT89C2051 CLOCK CIRCUIT WITH LED DISPLAY Pretty stylish digital clock circuit of the display to show information on the hours, but around kıl with 120 LEDs in display attracts attention also has an alarm feature. Microprocessor AT89C2051 LED clock...Electronics Projects, Atmel AT89C2051 Clo with LED Display "avr project, led projects, microcontroller…... Listed under: Clock Projects 122. STEREO 64LEDS VU METER CIRCUIT ATMEGA8 Lately, when I went deeper into programming, I was fascinated by precise A / D converters in microcontrollers. And so I decided to make a 2x32 LED VU meter with the ATmega8 microcontroller, which can be bought for example in GME for only so…... Listed under: LED Projects 123. 3-20V 01-10A POWER SUPPLY CIRCUIT ATMEGA8 LCD AMMETER, VOLTMETER What cannot do more than one radio amateur? What can not be more than one radio amateu right - without a GOOD power supply, or even better, a GOOD TWO-CHANNEL power supply. That's right - without a GOOD power supply, or even better, a…... Listed under 124. OPERATED WASHING MACHINE CONTROL CIRCUIT WITH ATMEGA32 ATmega32 microcontroller based on the project is already quite interesting and a professional I see this type of advanced projects ATMEL series Some sections of the circuit MOC3043 opto diac, MOC3023 isolated with LCD... Electron Projects, Operated Washing Machine Control Circuit with ATmega32 "avr project, microcontroller projects, " ATmega32 microcontroller…... Listed unde 125. THERMOMETER CIRCUIT DS1820 ATMEGA32 SIEMENS S65 LCD Thermometer circuit board ATmega32 used on the LCD display DS1820 sensor used in Siemens S65 mobile phone graphic LCD LS020 ATmega32 project’s source code S65 LS020 bitmap bmp files for graphic LCDs and... Electronics Projects, Thermometer Circuit DS1820 ATmega32 Siemens S65 LCD "avr project, microcontroller projects, " Thermometer…... Listed under: Circuits 126. TANK ROBOT ATMEGA48 BLUETOOTH JAVA PROJECT Introduction After two more complex robots ( Eurobot2008 and Robot2 ), I decided to build a small and simple car. The ch on a plastic tune, which was controlled by two AA pencil monoculars - similar toys can be found in toy shops, on soils or in bazaars. Others are…... Listed under: Robotics - Auto Projects 127. ATMEL ATMEGA8 NOKIA6100 LCD PCF-8833 APPLICATION Nokia 3310 screen already had several applications with bi-color LCD at this time I decided t experiment with it. Heavily on the market, the Nokia 6100 LCDs and their controllers for microchip using Atmel...Electronics Projects, Atmel Atmega8 N LCD PCF-8833 Application "atmega8 projects, avr project, microcontroller projects, "…... Listed under: LCD Projects
128. TFT LCD OV7660 ATMEL ATMEGA32 APPLICATION EXAMPLE ILI9325 DRIVER Emerging technologies on the market with LCD prices quite fell microcontr applications proliferate mobile phone, mp4 and graphic LCDs became available, especially Atmel series with enhanced graphics LCDs can be used ATm 320... Electronics Projects, TFT LCD OV7660 Atmel ATmega32 Application Example ili9325 Driver "avr project, microcontroller…... Listed under: LCD Proj 129. TFT LCD DIGITAL PHOTO FRAME ATMEGA128 SD CARD TSC2046 Digital Photo Frame TFT ATmega128 TFT source C code of practice are used to SPFD54 LCD 3.2 inch 320 × 240 size images displayed in the SD card. Source: ourdev.cn/ Digital Photo Frame... Electronics Projects, TFT LCD Digital Photo Fram ATmega128 SD Card TSC2046 "avr project, microcontroller…... Listed under: LCD Projects 130. ATMEGA16 TOUCHSCREEN PROJECT TFT APP AVR GCC ILI9325 Touch TFT application based on ATMega16 processor used in the 16 MHz frequency driv ILI9325 OTM3225, source C code (AVR GCC)’s. Source: ourdev.cn 2.4-inch TFT LCD, point-screen work notes Alternative link: atmega16-touchscreen-pro app-avr-gcc-ili9325.rar... Electronics Projects,Atmega16 Touchscreen Project TFT App AVR GCC ILI9325 "avr project, microcontroller projects, " Touch….. under: LCD Projects 131. ATMEGA128 AVR GRAPHIC LCD APPLICATION SIEMENS S65 LS020 Siemens s65 using the Atmel ATmega128 caption to display graphics on the LCD all t resources an application prepared S65 LCD driver library, sample text and detailed graphics shared C code. S65 application is... Electronics Projects, AT AVR Graphic LCD Application Siemens S65 LS020 "avr project, microcontroller projects, "…... Listed under: LCD Projects 132. AT89C2051 DIGITAL SCALES CIRCUIT ATMEL This is a kitchen scale with a maximum weight of 2.5kg and an accuracy of 10g. Exceeding the range is ind an acoustic signal and an LED. Weight is displayed on a four-digit LCD display. The weight also includes a weight-zero reset button. The power is solved Listed under: Circuits 133. PROGRAMMED DOOR ALARM CIRCUIT ATTINY24 ATTINY13 CONTROLLED This simple mini-burglar alarm on the ATtiny 13 microcontroller is designed t apartments, offices, summer cottages ... When the reed switch opens, the alarm beeps or, with a little refinement, you can send an SMS from a mobile phone. The alarm control is carried out…... Listed under: Circuits 134. ADC EXAMPLE ATMEGA8 DIGITAL VOLT METER AMMETER AVR PROJECT ADC - analog-to-digital converter (ADC-Analog-to-Digital Converter). Converts a analog signal to digital. Bitrate ADC determines the accuracy of the signal conversion. Conversion time - respectively, the speed of the ADC. The ADC is embedded in many microcontrollers of the AVR family and simplifies the use of the microcontroller in any regulation schemes…... Listed under: Meter Instrument Projects 135. ATMEL APPLICATION NOTES AND SOURCE C ASM CODE Atmel’s products and practices related to application notes prepared for the asm code source language prepared by the majority of the samples. 138’s application List: 1-Register and Bit-Name Definitions for the AVR... Electronics Projects, Atmel application notes and source c asm code "avr project, microcontroller projects, "…... Listed under: Development Board - Kits Projects 136. RF TRANSCEIVER EXAMPLE WATER GUN PROJECT CIRCUIT TX434 ATMEGA8 RX434 The RF transceiver with ATmega8 prepared samples prepared with C software has all the source code for the application circuit used joke handmade by remote control a water gun at school students...Electronics Proj Transceiver Example Water Gun Project Circuit TX434 ATMega8 RX434"atmega8 projects,…... Listed under: Game - Entertainment Projects 137. ATMEL ATTINY15 MICROCONTROLLER EXAMPLE DC TO DC CONVERTER CIRCUIT Atmel ATtiny15 Microcontroller DC to DC converter circuit 3.6 Li-Ion ba voltage of 5 volts raises a more detailed circuit attiny15 not a good example for software power control with microcontroller assembly language prepared... Electronics Projects, Atmel ATtiny15 Microcontroller Example DC to DC Converter Circuit "avr project, dc…... Listed under: Circuits 138. REMOTE-CONTROLLED DIGITAL TIMER CIRCUIT WITH ATMEL ATTINY2313 Based on Atmel ATtiny2313 microcontroller circuit with the remote control fo reverse control can be done over time led display are viewing. ATtiny2313 by the time specified number 9 which is connected to...Electronics Projects,  Controlled Digital Timer Circuit with Atmel ATtiny2313 "avr project, microcontroller projects, " Based…... Listed under: Clock Projects 139. ATMEGA8 BIPOLAR STEPPER MOTOR DRIVER CIRCUIT L293B Bipolar stepper motor control circuit 6v … 35v inter able to run power 1 amp on the circui program, sensor, PWM, UART has links ATMega8 output used in motor drive l293b circuit of... Electronics Projects,ATMega8 Bipolar Stepper Motor Driv L293B "atmega8 projects, avr project, microcontroller…... Listed under: Motor Projects
140. 220V SOLDERING IRON TEMPERATURE CONTROL WITH AT89C2051 LED DISPLAY Sold in the market potency heat settings with TRIAC 220v temperatur controlled soldering iron more advanced version control AT89C2051 microcontroller is provided by heat setting 2 button is made with indicators, one display... Electronics Projects, 220V Soldering Iron Temperature Control with AT89C2051 LED Display "avr project, microcontroller…... Listed under: Tem Measurement Projects 141. ACTIVE ELECTRONIC LOAD CIRCUIT ATMEGA88 100W DUMMY LOAD In each electronic device in one form or another there is a power supply unit (PSU course, because no one will work for free. Before connecting to the circuit, it would be nice to see how the PSU works at different loads. Personally, I a Listed under: Circuits 142. STAR LED EFFECTS CIRCUIT ATTINY13 PROJECT Stars in the shape of hard work to prepare printed circuit board design for SMD LEDs to be mounted lik deal of attention and effort, but finally emerged quite nice circuit noncontiguous... Electronics Projects, Star LED Effects Circuit ATTINY13 Project "avr p projects, microcontroller projects, "…... Listed under: LED Projects 143. ELECTRONIC PIANO CIRCUIT ATTINY2313 SIMPLE AUDIO PROJECT Atmel ATtiny2313 two 1.5V AA batteries powered electronic piano circuit connected (3V) can be operated. PB3 – PB4 16 on pins 15 and 32 ohm speaker connected to these pins as exit.... Electronics Projects, Electronic Piano Circuit Attin Simple Audio Project "avr project, microcontroller projects, " Atmel…... Listed under: Game - Entertainment Projects 144. How to build alarm security system using motion sensor with PCB Prototyping Introduction Security is important for everyone from our homes to plac work. You need to feel safe when you are sleeping at night. You might have important documents that you need to keep private. Sometimes you have in your house that must be…... Listed under: Security - Safety Projects, Sensor - Transducer - Detector Projects 145. CNC PROJECT ATMEGA16 X-Y-Z MOTOR CONTROL CIRCUIT ATMega16 microcontroller based on a detailed cnc project with computer com RS232 on po communicating project’s source C code, schematics eagle CAM (graphic printout is used to direct the CNC circuitry and sent to)... Electronics Projects, C Project ATMega16 X-Y-Z Motor Control Circuit "avr project, microcontroller projects, " ATMega16 microcontroller…... Listed under: CNC - Printing Machi Projects 146. DSPIC33FJ128GP NOKIA 6100 LCD DRIVER CIRCUIT ATMEGA168   @ Erhan brother Atmega8 prepared with the application had shared (Atmel Atmega8 6100 LCD (pcf8833) application) I In addition to the helpful one more example’ll share the codes and microchip dspıc33fj128gp both the... Electronics Projects, dsPIC33FJ128GP Nokia 6100 LCD driver circuit ATmega168 "avr project, dspic projects,…... Listed under: LCD Projects 147. AT90S8535 SG2524 PWM SOLAR PANEL PV INVERTER CIRCUIT Solar Energy PV inverter systems used in energy production a detailed study about all th about the project (in English) is. PV conversion control is provided by Atmel microcontrollers at90s8535 (source software has... Electronics Projects, AT9 SG2524 PWM Solar Panel PV inverter Circuit "avr project, microcontroller projects,…... Listed under: Solar energy projects 148. NOKIA LCD MODELS PROTEUS ISIS EXAMPLES CIRCUITS LIBRARY Nokia lcd screens, pic, atmel microcontrollers used in this project, with a lot of other j popular as talking about the proteus simulation model for the program, set up a virtual environment, try... Electronics Projects,Nokia LCD Models Prot Examples Circuits Library "avr project, microcontroller projects, "…... Listed under: LCD Projects 149. FREQUENCY METER CIRCUIT LCR METER ATMEGA328 I have been thinking about building an LC meter for a while since I do not have a multimeter that capable of measuring inductance and while the multimeters I have can measure capacitance, they are not able to give accurate readings for small capacitance…... Listed under: Metering - Instrument Projects 150. SMART REMOTE ATMEGA88 CIRCUIT COPY THE TWO BUTTONS This fun project lets you take control away from the person holding the remote control by intercepting the invis signals as they travel through the air so you can play them back to the TV or video machine. You can also "train" your Remote Hijacker…... Listed unde Development Board - Kits Projects 151. 24V 48W DIGITAL SOLDERING STATIONS ATMEGA8 After a year of using my assembled Microfibers according to the Jendy documents23 , I decided to b another (third) microfuel. I wanted to reduce the dimensions, use the 24V AC heating power, to adjust the temperature better and to add additional fu Features of micro-drives : temperature range 80 °…... Listed under: Other Projects
152. FAST FOURIER TRANSFORMATION FFT CIRCUIT ATMEGA8 SCT2024 LED DRIVER ATmega8 (TQFP32 package) based on FFT Circuit applied the entry sign led display (SCT2024 serial-interfaced LED driver 256 LEDs), you can see in the FFT circuit source C, hex codes have... Electronics Projects, Fast Fourier transformation FFT Circuit ATmega8 SCT2024 LED driver "atmega8 projects, avr…... Listed under: LED Projects 153. LED ANIMATION CIRCUIT ATMEGA168 Last year in one of my classes we were required to make an 'artefact' or something that reflects the interests of Most people make posters and the past two quarters that's what my class did too. Posters however are static, usually boring, and…... Listed under: LE 154. ILI9325 TOUCH-SCREEN PROJECT TFT ATMEGA644 ELT240320ATP Atmel is a great project with a series of applications can be made super graphics use project Atmega644 the ELT240320ATP GLCD (320 × 240) driver ILI9325 Simple as iPhone menu has pacman...Electronics Projects, ILI9325 Touch-Screen TFT Atmega644 ELT240320ATP "avr project, microcontroller projects, " Atmel is…... Listed under: Game - Entertainment Projects 155. LABORATORY ADJUSTABLE 0-24V DIGITAL POWER SUPPLY CIRCUIT ATMEGA8 Power supply circuit two separate sections consisted primarily power sol based on the current settings for the tl082 opamp used current voltage display section Atmel ATmega8 microcontroller used optionally this section ma not... Electronics Projects, Laboratory Adjustable 0-24v Digital Power Supply Circuit ATMega8 "atmega8 projects, avr project,…... Listed under: Developm Board - Kits Projects 156. CURRENT MEASUREMENT DATA LOGGER CIRCUIT ATMEL AVR, PIC Very high current of the current transformer and with microcontroller sensitive way to be recorded will be useful for source code with 2 sample application circuits one of the Atmel AVR ATMEGA48 88/168-P...Electronics Projects, Curren Measurement Data Logger Circuit Atmel AVR, PIC "avr project, microcontroller projects, "…... Listed under: Metering - Instrument Projects 157. AUTOMATIC RABBIT FEEDING SYSTEM ATMEGA8 TIMER In fact, feeding, feeding various timing circuits used for business. Generally puzzling, time-consuming mechanical p getting no special circuitry to rabbits in this project but the authors have used to feed rabbits :)... Electronics Projects, Automatic Rabbit Feeding System ATmega8 Timer "at projects, avr project, microcontroller projects, "…... Listed under: Sensor - Transducer - Detector Projects 158. LED HEART CIRCIUT ATMEGA88 Atmel atmega88 PCB LEDs circuit drawing heart looks great, especially boxing PCAD pcb drawings and diagrams and d code files have a heart-shaped 22 pcs SMD LED flashes with... Electronics Projects, Led Heart Circiut ATmega88 "avr project, led projects, microcontroll projects, " Atmel atmega88 PCB LEDs…... Listed under: LED Projects 159. LED PROPELLER CIRCUIT AT90S2313 ATINY2313 Printed circuit board layout pcb design effects with LEDs been a good practice to work in the dark whe with an ultra bright LEDs looks very nice. Atmel AT90S2313 64 LEDs instead of... Electronics Projects, Led Propeller Circuit AT90S2313 ATINY2313 "avr p projects, microcontroller projects, " Printed…... Listed under: LED Projects 160. ATMEGA16 LEDS SNOW EFFECT CIRCUIT LED SNOW CRYSTAL It really is a great led light application LEDs so fluently is moving a profit crystalline with m been excellent ATMega16 microprocessor 32 Edet output used to all the LEDs griplar connected software...Electronics Projects, ATMega16 LEDs Snow Circuit LED snow crystal "avr project, led projects,…... Listed under: LED Projects 161. 15A MOTOR SPEED CONTROL CIRCUIT ATTINY45 PWM Used in motor speed control circuit microcontroller atmel attiny45p exit number 5 Kubla conne pin opto pc817 pc817 output while the engine is controlled as isolated MOSFETs have bs170 and irlz34 Attiny45 Pb4... Electronics Projects, 15A Motor Control Circuit Attiny45 PWM "avr project, microcontroller projects, pwm…... Listed under: Motor Projects 162. LED EFFECT CIRCUIT ATTINY2313 MULTI FUNCTION Led effect circuits, including myself, a lot of people might be interested, especially this sort LEDs an circuits have great interest in blue, white, LED prices now old and not so expensive LED... Electronics Projects, Led Effect Circuit Attiny2313 Multi Funct project, led projects, simple circuit…... Listed under: LED Projects 163. RGB LED EXAMPLE CIRCUIT ATMEGA88 ATMEGA8 ATMEGA48 White LEDs, blue LEDs, ultra bright LEDs RGB LEDs saying quite a lot in the sample applic popular microcontrollers are used in this circuit, atmega8 ATMEGA48 Atmega88 ATmega output MOSFETs are driven by... Electronics Projects, RGB Led Circuit Atmega88 Atmega8 Atmega48 "atmega8 projects, avr project, led…... Listed under: LCD Projects 164. HDD BRUSHLESS MOTOR DRIVER CIRCUIT ATMEGA8 Brushless motor drive circuit used in computers hard drive with Atmega8 checked the engine ATm output MOSFET (IR4427, IRFZ44) strengthened engine with A, B, C, D, attached to either end. Software is written... Electronics Projects, HDD Brushless driver Circuit Atmega8 "atmega8 projects, avr project, microcontroller projects, "…... Listed under: Motor Projects
165. ATMEGA32 LED CUBE CIRCUIT 74HCT238 On the Internet, atmel, microchip series microcontrollers with a lot Led cube has a project in this application them, but diagrams, photos, supplemented with a detailed description there thanks to this project...Electronics Projects, Atmega32 LED Cube Circuit 74HCT238 "avr project, led projects, microcontroller projects, " On…... Listed under: LED Projects 166. USB POWERED INDUCTANCE METER CIRCUIT ATMEGA8 Coil measurement “Inductance Meter” circuit based on Atmega8 microcontroller LCD HD44780 driver and the system’s supply is taken from the USB port on the computer or adapter operated with the circuit. Circuit of... Electronics Projects, USB Powered Inductance Met Atmega8 "atmega8 projects, avr project, microcontroller projects, "…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Metering - Instrument 167. ATEMGA168 TLC5940 PWM RGB LED CYLINDER 95 pieces made using RGB LEDs Led cylinder project quite professional printed circuit board, software circuit that is used quite ATEMGA168 microcontroller with integrated LEDs TLC5940 LED driver plowed. Installation was very difficult... Electronics Projects, ATEMGA168 TLC5940 PWM RGB Led Cylinder "avr project, led projects, microcontroller projects,…... Listed under: LED Projects 168. MULTIFUNCTION DIGITAL AMPLIFIER PROJECT TDA7294 ATMEGA32 TDA7313 A lot of work in the ATmega32 occur when project featuring a beautiful ro amp volume control on the floor in the TDA7313 TDA7294 is used in the upgrade process. Digital FM radio... Electronics Projects,Multifunction Digital A Project TDA7294 ATmega32 TDA7313 "avr project, microcontroller projects, tda7294…... Listed under: Sound - Audio Projects 169. FT232R USB I-O CIRCUIT ATMEGA88 USB I / O circuit ATMEGA88 based on the usb connection FT232 is done via detailed ir project ( German explanatio source code, circuit diagrams and PCB drawing of the picture... Electronics Projects,FT232R USB I-O Circuit ATMEGA88 "avr project, microcontroller pro USB I /…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 170. 0-30V REGULATED DIGITAL SWITCHING POWER SUPPLY ATMEGA8 LM2576ADJ Very high quality design of the digital power supply circuit. Voltage curre 16 lcd display of the beauty and power of the switching mode operation switching DCDC Madden LM2576 ADJ (adj... Electronics Projects, 0-30V Regula Switching Power Supply ATmega8 LM2576ADJ "atmega8 projects, avr project,…... Listed under: Development Board - Kits Projects 171. TOY CAR MODIFICATION MADE SIMPLE ROBOT PROJECT ATTINY2313 Simple robot project ATtiny2313 microcontroller used robot body for a cheap rem controlled toy car is made up of the robot’s four sides LED sensors placed somewhere when it hit the back çekliy direction...Electronics Projects, Toy Ca Modification Made Simple Robot Project ATtiny2313 "avr project, microcontroller projects, "…... Listed under: Car Projects, Robotics - Automation Proje 172. REMOTE CONTROLLED PROPELLER CLOCK CIRCUIT AT90S2313 Before air time, “Propeller Clock” projects I shared in this project control and mode sele be achieved in both analog clock and digital clock view modes control for the Sony control protocol used... Electronics Projects, Remote Controlled Pro Clock Circuit AT90S2313 "avr project, microcontroller projects, " Before air…... Listed under: Clock Projects 173. LIPO LI-ION BATTERY CHARGER CIRCUIT BALANCING ATTINY26 Attiny26 microcontroller based on the charging circuit has a lot of features in a single p 12.6V LiPo batteries and Li-ion batteries and battery charging voltage edebiliry balanslıy regulate temperature, timing, voltage and... Electronics Projec ion Battery Charger Circuit Balancing ATtiny26 "avr project, battery charger circuit,…... Listed under: Battery Projects 174. ZENER DIODE TEST CIRCUIT VOLTAGE INDICATOR ATMEGA8 Interestingly circuited actually zener diode test measuring instruments should have a prop you are secure, a voltage see better, but so far no measuring instruments equipped with this feature I... Electronics Projects, Zener Diode Test Circuit V Indicator ATmega8 "atmega8 projects, avr project, microcontroller…... Listed under: Metering - Instrument Projects 175. REMOTE CONTROLLED ROBOT CIRCUIT RC5 AT90S2313 The robot’s control AT90S2313 microcontroller provided with the processor 4MHz is operated control rc5 protocol that uses a control used robot çalışmala for 4 pcs 2200mAh NiMH batteries used for the experiment alkaline... Electronics Projects Controlled Robot Circuit RC5 AT90S2313 "avr project, microcontroller projects, " The robot’s…... Listed under: Robotics - Automation Projects
176. LINE FOLLOWING ROBOT PROJECT ULTRASONIC SENSOR CIRCUIT ATMEGA16 CNY70 SFR05 Quite a different line following robot project was already in competition designed for the author as he could a nice job exposes the robot’s appearance sumo robots similar to healthy controls ATMega16 microcontroller... Electronics Projects, Line Following Robot Project Ultrasonic Sensor Circuit Atmega16 CNY70 SFR05 "avr project,…... Listed under: Ro Automation Projects 177. NI-MH BATTERY CHARGER CIRCUIT ATMEL ATTINY26   Ni-MH Battery Charger circuit 4 AA batteries can be charged in the circuit is more complex, but in attiny26 microcontroller circuits BD140 transistors and a few passive components consist of batteries connected to... Electronics Projects, Ni-MH Batte Charger Circuit Atmel ATtiny26 "avr project, battery charger circuit,…... Listed under: Battery Projects 178. ROBOTIC DOG PROJECT, 16 CHANNEL SERVO CONTROL PROGRAM Prepared with great effort as a hobby project “robot dog” very detailed, especially t mechanical portion control, etc. rc5 remote control computer. has features such as control solid Atmel ATmega32 and ATMEGA8515 based on... Electr Projects, Robotic Dog Project, 16 Channel Servo Control Program"avr project, microcontroller projects, "…... Listed under: Robotics - Automation Projec 179. 64 LED PROPELLER EFFECT CIRCUIT ATMEGA8 Led effect circuit 64 leds LEDs on the printed circuit board disposed in the impeller has a very different e plurality of circuit components used SMD type. Effects displacement, velocity pcb solder buttons...Electronics Projects, 64 Led Propeller Effect Circuit ATmega8 "atmega8 projects, avr project, led projects,…... Listed under: LED Projects 180. BLUETOOTH JOYSTICK CONTROLLED DISCOVERY ROBOT PROJECT Very detailed advanced robot project for many of us not be implemented, but the co schematics, methods different robot project can be used in reconnaissance robot via mobile phone blutut can be manipulated by...Electronics Projects, Bluetooth Joystick Controlled Discovery Robot Project "avr project, microcontroller projects, " Very detailed…... Listed under: Robotics - Autom Projects 181. MCP4725 DAC AVR ATmega library The MCP4725 DAC is a pretty common and cheap single channel 12 bit buffered voltage DAC, it also has an onboar EEPROM. To drive this chip we can use I2C interface. The ATmega8 used for my implementation has an embedded I2C interface, so we just can use tha interface. The…... Listed under: Development Board - Kits Projects 182. Switch debounce library Contact bounce (ref. https://en.wikipedia.org/wiki/Switch#Contact_bounce) is a common problem with mechanical switches a contacts are usually made of springy metals. When the contacts strike together, their momentum and elasticity act together to cause them to bounce or more times before making steady…... Listed under: Development Board - Kits Projects 183. ATmega32 ADC for Light and Temperature Sensors This tutorial shows how to implement the Analogue to Digital Converter (ADC) function on ATMega code. It consists of code examples, and the meaning of some nomenclature such as sampling rate, and resolution. However before we get to the code start from the…... Listed under: Sensor - Transducer - Detector Projects, Temperature Measurement Projects 184. RTTTL Player for the ATmega32 Ring Tone Text Transfer Language (RTTTL) is a simple text-based code for recording monophonic musical tones. The script is usually loaded in mobile phone, which is able to convert the code to equivalent musical notes. Many early phones had an integrated RTTTL player, which played…... Listed under: Game - Entert Projects 185. Connecting Piezo Speaker to ATmega32 An ATMega32 sound generator code is extremely simple to implement. Almost any GPIO pin can drive a piezo and the output quality is fine for producing some beeps. The code shown here is the simplest one I remember using basic physics, and since it…... List Sound - Audio Projects 186. PHONE CONTROLLED MOBILE ROBOT CIRCUIT MT8870 ATMEGA16 Wireless, remotely controlled applications quite popular in this project through the phone robot control is done the robot on the Nokia 1100 mobile phone used phone signals from the MT8870 receiver DTMF decoder... Electronics Projects, Phone Controlled Mobile Robot Circuit MT8870 ATMega16 "avr project, microcontroller projects, "  …... Listed under: Robotics - Automation P 187. 4 CHANNEL PWM CONTROL CIRCUIT VISUAL BASIC RS232 AT89C2051 PWM control project software source code in Visual Basic and are prepared (linu windows) via RS232 serial port (19200 Baud) AT89C2051 microcontroller based on the 4-channel PWM control circuit can be made. PWM output... Elec Projects, 4 Channel PWM Control Circuit Visual Basic RS232 AT89C2051"avr project, microcontroller…... Listed under: Development Board - Kits Project
188. NOKIA5110 LCD LOGIC ANALYZER CIRCUIT ATMEGA8 Built on the atmega 8 microcontroller Logic Analyzer circuit for nokia 5110 display lcd display kullanılanılıyor crafted with AVRstudio Software four. source software insurance settings schema, pcb, etc. files. Frequency capture 400 kHz, Max... Ele Projects, Nokia5110 LCD Logic Analyzer circuit ATmega8 "atmega8 projects, avr project, microcontroller projects, "…... Listed under: LCD Projects 189. ADJUSTABLE POWER SUPPLY CIRCUIT 0 30V LCD Power supply circuit consists of a few sections 04 to 0 30v power supply based on solid TL081 op amp 2N3055 power transistor quite popular and a classic by many people applied. LCD... Electronics Projects,Adjustable Power Supply Circuit 0 30V LCD "at projects, avr project, microcontroller…... Listed under: LCD Projects 190. SYNTHESIZER CIRCUIT AT89S53 AT89S52 Musicians use a variety of sound-producing device “Synthesizer” When you are setting a very good quality wo making. AT89S52 and AT89S53 Synthesizer used in the project on the LFO, ENV FILTER, OSC, MIX...Electronics Projects, Synthesizer Circuit AT89S53 AT8 project, microcontroller projects, "   Musicians use a…... Listed under: Sound - Audio Projects 191. WAVE READER CIRCUIT AT89S52 FLASH MEMORY PIC24, 32, MSP430 is progressing rapidly but AT89S52 time, I still made sure that what is in use by 80 project, kingston 8gb flash memory is read in the wav files (wav... Electronics Projects, Wave Reader Circuit AT89S52 Flash Memory "avr project, microc projects, "   PIC24,…... Listed under: Sensor - Transducer - Detector Projects 192. WITH PELTIER MINI REFRIGERATOR CIRCUIT ATMEGA8 DS18S20 Peltier Thermoelectric Cooler Is how it works with 12-Volt Feed information and 50W P Fridge built on the lcd display after the ATmega8 microcontroller from a more advanced peltier control circuit. The value...Electronics Projects, With Pe Refrigerator Circuit ATmega8 DS18S20 "atmega8 projects, avr project, microcontroller…... Listed under: Home Automation Projects 193. S65 SIEMENS LCD EXAMPLES CIRCUIT ATMEGA16 ATMEGA32 Before “Siemens S65 LS020 glcd ATmega128 AVR” shared examples of implementation th lot of similar projects with ATmega16 ATmega32, microcontrollers. A few of them; Image via representation of FAT16 MMC card color, font... Electronic Projects, S65 Siemens LCD examples Circuit ATmega16 ATmega32 "avr project, microcontroller projects, "  …... Listed under: LCD Projects 194. PT100 SENSOR THERMOSTAT CIRCUIT ATMEGA8 Thermostat circuit for 2 pt100 temperature measurement used atmega8 mikrüdenetleyici sensor pt1 sensors gives the circuit output is being used according to the information received. The thermostat is located on the circuit board led... Electronics Projects, PT100 Sensor Thermostat Circuit ATmega8 "atmega8 projects, avr project, microcontroller projects, " Thermostat…... Listed under: Sensor - Tr - Detector Projects 195. EXCELLENT LED BALL CIRCUIT ATMEGA88 Great design has been providing birthday gifts as does not prepare mention Led to control atmega88 microc is used ports çoklayıp LEDs milk to 74HC595 used LEDs effect has been very welcoming approximately 256... Electronics Projects, Excellent Led Ball Cir ATmega88 "avr project, led projects, microcontroller projects, " Great…... Listed under: LED Projects 196. USB PASSWORD GENERATOR CIRCUIT ATTINY85 Attiny85 not found on the USB module to work, but as software optimized circuit when connected to computer mouse USB HID is known as pull-up resistors on the circuit has very few ingredients... Electronics Projects, USB Password Generator Circuit ATtiny85 "avr project, microcontroller projects, "   Attiny85 not found…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 197. MECHANICAL CLOCK CIRCUIT ATMEGA8 In fact, what lies At the forefront of the digital but mechanics should have been a wonderful project:) is an inte time in the atmega8 microcontroller time and when the mind comes to the... Electronics Projects, Mechanical Clock Circuit ATmega8 "atmega8 project project, microcontroller projects, " In fact,…... Listed under: Clock Projects 198. DIGITAL RADIO CIRCUIT TEA5767 AT89S8253 TEA5767 is a digital radio, especially mp3 and fm radio module @ETE before “TEA5767 Pic16f628 Digital PLL-controlled FM radio re system” article is controlled with the Pic16f628 microcontroller used in this project, the radio... Electronics Projects, Digital radio circuit TEA5767 AT89S project, microcontroller projects, " TEA5767 is a…... Listed under: Radio Projects 199. ULTRA SONIC CLEANER ROBOT CIRCUIT L298 AT89C2051 AT89C2051 microcontroller used in robot motor drive for cleaner L298 dual H-bridge driver I 40 kHz ultra sonic senrörler (multicomp sq-40-t-10b) to detect and to change direction with the bodies, continues to...Electronics Projects, Ultra Sonic C Robot Circuit L298 AT89C2051 "avr project, microcontroller projects, " AT89C2051…... Listed under: Robotics - Automation Projects
200. USB BUSINESS CARD WITH ATTINY85 Attiny85 Atmel microcontroller with USB Business Card project established quite interesting circuit with very few attiny85 16.5 MHz internal RC oscillator frequency used. USB connector on the USB socket on the PCB designed... Electronics Projects, USB Business C attiny85 "avr project, microcontroller projects, "   Attiny85 Atmel…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 201. ATMEGA88 IR2184 DC SERVO MOTOR DRIVER CIRCUIT DC Servo motor driver circuit based on the microcontroller atmel atmega88 outputs half bridge Ir2184 is being used with this integrated works at a frequency of 16MHz DC servo Irf540 MOSFETs atmega88... Electronics Projects, Atmega88 IR2184 D Motor Driver Circuit "avr project, dc dc converter…... Listed under: Motor Projects 202. LINE FOLLOWING ROBOT SUMO ROBOT, CONTROL CIRCUITS Sumo, Line following and robot control card project open source design and very high qu resources provided PIC microcontroller code and eagle diagram pcb drawings are especially line following robot prepared for... Electronics Projects, Li following Robot Sumo Robot, control circuits "avr project, microcontroller projects, " Sumo,…... Listed under: Robotics - Automation Projects 203. ATMEL LED MULTI-FUNCTION DISPLAY ATMEGA32U4 WATCHES Atmel microcontroller Board with Led indicator wristwatch ATmega32U4 project there connection and SD card connection, the advanced charging system, piezo sensor, etc. are included in the design of printed circuit boards... Electronics Projects, Atmel LED Multi-Function Display ATmega32u4 Watches"avr project, microcontroller projects, "   Atmel…... Listed under: LED Projects 204. SIM900 MODULE PCB AVR APPLICATIONS Simcom Sim900 GSM module produced by the company prepared for the PCB module and ATMEGA32 micro based on Nokia 3310 lcd display GSM module for remote control application SIM900D (place of origin: CN; proteus... Electronics Projects, SIM900 Mod AVR Applications "avr project, microcontroller projects, "   Simcom Sim900…... Listed under: Phone Projects 205. GUITAR TUNING PROJECT WITH ARDUINO UNO Arduino Uno kit on the Board at the entrance of the TL082 opamp used Guitar Tuning circuit audio aud and frequency to detect the “Arduino-Frequency-Detection” software used. According to the LEDs light at... Electronics Projects, Guitar Tuning Project w Arduino Uno "arduino projects, avr project, microcontroller projects, "…... Listed under: Sound - Audio Projects 206. ARDUINO UNO WITH INTERESTING CLOCK PROJECT I’ve shared this with different time interesting projects carried out with the Arduino Uno this time, the most interesting thing isn’t debatable kullanışlımı project but the idea as a different kind of... Electronics Projects, Arduino Uno With Interesting Clo Project "arduino projects, avr project, microcontroller projects, "…... Listed under: Clock Projects 207. ATMEGA32 PCB DRILL MACHINE This document describes the construction of a PCB drill machine driven by a master-controller board and three stepp driver boards. These four single sided PC boards each contain an Atmega16/32 microcontroller. Communication between... Electronics Projects, ATME drill machine "avr project, microcontroller projects, " This document describes the…... Listed under: CNC - Printing Machines Projects 208. PORTABLE RF JAMMER CIRCUIT ATMEGA48 So far I have ever seen , tidy and with all the resources shared jammer circuit project design, it’s very smart pretty small pocket on the internet a lot jammer circuit ,... Electronics Projects, Portable RF Jammer Circuit ATmega48 "avr project, microcontroller proj far…... Listed under: Sensor - Transducer - Detector Projects 209. WINAMP REMOTE CIRCUIT BLUETOOTH AT90USB1287 NOKIA LCD LMX9838 A very detailed report of a project is already included in the schema, the a the thesis, the eagle pcb source code etc. everything. The circuit used the main parts AT90USB1287 LMX9838 (Bluetooth... Electronics Projects, Winam Circuit Bluetooth AT90USB1287 Nokia LCD LMX9838 "avr project, microcontroller projects, "…... Listed under: Other Projects 210. BATTERY ALARM CIRCUIT FOR MODEL HELICOPTERS ATTINY13 ATTINY13 Atmel microcontroller installed on the circuit model helicopter is checking the of the battery the battery (or battery) voltage circuit when the level set LEDs, buzzer, giving the alam. ATTINY13 PB2, PB1,... Electronics Projects, Batter Circuit for Model Helicopters ATtiny13 "avr project, microcontroller projects, simple…... Listed under: Battery Projects, Circuits, Clock Projects 211. ATMEL ATTINY45 BLUETOOTH SCOREBOARD CIRCUIT The scoreboard circuit is based on Atmel microcontroller ATtiny45 circuit cell phone can be contr bluetooth, the bluetooth module used in the indicator circuit BTM400-6B is an LCD TV has VGA output of...Electronics Projects, Atmel ATtiny45 Bluetoo Scoreboard Circuit "avr project, microcontroller projects, " The scoreboard circuit is based…... Listed under: Circuits 212. ATMEGA8 USB EMAIL NOTIFIER CIRCUIT Market “USB Mail Notifier” ready devices are sold, but in practice, ileginç project also ATmega8 microcontroller and the email account t connects the program’s source code (C + + RAD studiox) or not different... Electronics Projects, ATmega8 USB Email Notifier Circuit "atmega8 projects, avr project, microcontroll
projects, "  …... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 213. MULTI-FUNCTION DIGITAL WRISTWATCH CIRCUIT ATMEL ATMEGA168PA Digital clock project PCB design is very good and prepared and used according coffers of small metal wristwatch. Except for a few digital Wristwatch circuit material including all the elements of SMD...Electronics Projects, Multi-fun Digital Wristwatch Circuit Atmel ATmega168PA "avr project, microcontroller projects, " Digital clock…... Listed under: Clock Projects 214. DIGITAL CLASS D AMPLIFIER PROJECT TAS5613 TDA9859 ATMEGA128 TDA9859 The main part of the preamplifier is an integrated circuit TDA9859, this integrated circuit is contr the I2C microprocessor Atmega128. Individual settings of the preamplifier through the keyboard are displayed on the... Electronics Projects, Digital Cla Amplifier Project TAS5613 TDA9859 ATmega128 "audio amplifier circuits, avr…... Listed under: Sound - Audio Projects, Uncategorized 215. DIGITAL CLASS D AMPLIFIER CIRCUIT TAS5706A PCM1850A ATMEGA128 TAS5706A Class D Amplifier was itself the signal processor. From this parts dep the other elements. Has an impact on the type of power supply, the control method of the type converter. That... Electronics Projects, Digital Class D A Circuit TAS5706A PCM1850A ATmega128 "audio amplifier circuits, avr…... Listed under: PWM Projects 216. 0-30V 0-3A ADJUSTABLE SWITCHING LABORATORY POWER SUPPLY DC-DC Laboratory Power Supply 0-30V 0-3A LT1074 is a switching regulator type ste (lowering) with a maximum current of 5 A. Can work with the value of the input voltage up to 60 V... Electronics Projects,0-30V 0-3A Adjustable Switchin Laboratory Power Supply "avr project, dc dc converter…... Listed under: Other Projects 217. 240W ELECTRONIC BALLAST CIRCUIT IR2104 ATMEGA48 CONTROLLED IR2104 240W Fluorescent tube Ballast Circuit. Work was designed an electronic starting six fluorescent lamps with a total output of 240W with integrated dimming-controlled analog input and button. Priority is set to... Electronics Projects, 240W Electronic Ballast Circuit IR2104 ATmega48 Controlled"avr project, microcontroller projects, power…... Listed under: Circuits 218. 1A 10A ADJUSTABLE BATTERY CHARGING CIRCUIT 100AH Atmel ATTINY24 microcontroller based automatic battery charger circuit can charge 12V batt different power on (1A…10A current setting range of the charging current with limitation 10Ah, 20Ah, 30Ah, 40Ah, 50Ah, 60Ah, 70Ah, 80Ah,... Electronic Projects, 1A 10A Adjustable Battery Charging Circuit 100Ah "avr project, battery charger circuit,…... Listed under: Battery Projects 219. 230V FAN REGULATOR CIRCUIT MOSFET MC33152 ATTINY25 Brushless asynchronous motors, with compact rotor windings, called short cages, are use different fans. Their advantages are durability and simple construction. The presented layout uses a certain characteristic of such a fan... Electronics Projects, 230V Fan Regulator Circuit Mosfet MC33152 ATtiny25 "avr project, microcontroller projects, power…... Listed under: Circuits 220. THERMOMETER HYGROMETER CIRCUIT USB DHT22 ATMEGA8 The presented layout is a snap on a computer for measuring DHT22 temperature and h measures the temperature from -40 to 80 ° C with a resolution of 0.1 ° C and accuracy... Electronics Projects,Thermometer Hygrometer Circuit USB DH ATmega8 "atmega8 projects, avr project, microcontroller projects, "…... Listed under: Metering - Instrument Projects 221. PROGRAMMABLE TIMER CIRCUIT ATTINY25 ATtiny25 Programmable Timer To describe the operation of the device, we will use an example – control of electromagnetic bolt mounted in the wicket. In the simplest version we require that the push... Electronics Projects, Programmable Timer Circuit ATtiny project, microcontroller projects, " ATtiny25 Programmable Timer To describe…... Listed under: Clock Projects 222. TINY USB PROGRAMMER AVR MICROCONTROLLERS AVRDUDE USB programmer There are few components – the ATtiny45 microcontroller, two Zener resistors. Of course, there are still connectors – USB plug and IDC-6 plug. Resistor R1 informs host... Electronics Projects, Tiny USB programmer AVR microcontrollers AVRDUDE "avr project, microcontroller projects, programmer circuit, "…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 223. ATMEGA48 TIMER TRIGGERED BY CURRENT FLOW ASM-010 ATMEGA48 Many devices may be in standby mode during downtime. They do not perform they are apparently disabled, but the control circuits are powered. To extract useful information from the point of...Electronics Projects, ATMEGA48 Tim triggered by current flow ASM-010 "avr project, microcontroller projects, power…... Listed under: Clock Projects
224. Ultrasonic Radar Model Using Microcontroller ATmega128 The circuit described here demonstrates the working of a radar system. It uses ultrasonic w detect an object and measure its distance and angular position, and displays the same on a 20x4 LCD screen. -- Ashutosh M. Bhatt is an M. Tech in embedded…... Listed under: Sensor - Transducer - Detector Projects 225. Digital Soil Moisture Meter A digital soil moisture meter is used for indicating the water content of a given soil sample. As crop production requires wa different stages and in different amounts, it is important to measure soil moisture from time to time to know its status. The…... Listed under: Metering Instrument Projects 226. NIXIE TUBE THERMOMETER CIRCUIT Nixie lamp Thermometer DS18B20 Circuit with ATtiny2313 The first Nixie lamps appeared in the mid-twentieth ce many years they have been used in a variety of apparatuses but have been supplanted by newer... Electronics Projects, Nixie Tube Thermometer Circu project, microcontroller projects, " Nixie lamp Thermometer DS18B20 Circuit…... Listed under: Metering - Instrument Projects 227. ATMEGA8 FT232R USB ESR METER CIRCUIT USB ESR Meter Circuit The main part of the meter is a ATmega8 microcontroller that controls the entire dev main the task is to process measured data and perform calculations so that the... Electronics Projects, ATmega8 FT232R USB ESR Meter Circuit "atmeg projects, avr project, microcontroller projects, "…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 228. ATMEL ARDUINO COLORED CONNECTION CHART Projects or schematics, drawings that will work when preparing pcb Atmel AVR Microprocessors Info directly on Atmel microcontrollers. Colored linking expansions are more comprehensible for those dealing with Atmel Series... Electronics Projects, Atm Arduino Colored Connection Chart "arduino projects, " Projects or schematics, drawings that…... Listed under: Circuits 229. AUTOMATIC FEEDING MACHINE WITH CD-ROM MECHANIC For the author, the automatic feeding machine for the wedge is the easiest mechanical par application. they insert a plastic container all of which is placed on the CD present on the... Electronics Projects, Automatic Feeding Machine With CD-R Mechanic "avr project, microcontroller projects, " For the…... Listed under: Phone Projects 230. Avr Atmega8 Microcontroller – An Introduction In my previous article, I’ve discussed about ATmega32. Now, let me introduce another member of AVR microcontroller fami ATmega8. This member has many features similar to that of ATmega32. But it has reduced number of features and capabilities, yet it has enough features to…... Listed und ATmega Projects 231. Handling the Digital Input Output in AVR Micro Controllers I have already discussed about a few chapters necessary to get into AVR programming. Now the first article that deals with programming.  Let us start with the basics. Digital input output (I/O) is the basic feature supported by  AVR micro contro facilitate…... Listed under: LED Projects 232. Standard Library & String Formatting for AVR Here in this article, I am planning to brief you through the Standard library of AVR-GCC. By the term “Stan Library” we mean the “Standard header” files like “stdio.h”, we commonly see in C programming language. Have you ever used String Formatting in AN Listed under: AVR ATmega Projects 233. Frequency counter circuit Simple Frequency Counter You may have already seen various projects over many websites named Frequency counter, Digit Frequency Counter etc. I’m posting just another of them. Showing the use of timer/counter of AVR micro controller (Atmega8) in one of it’s form. This c be…... Listed under: LCD Projects 234. How to Work With 32K crystal and AVR Microcontroller This article teaches you how to add 32K external crystal source to  AVR micro controller (Atmega8 ) with circuit diagram program. Introduction Timing-is one of the basic function, performed by the micro controllers. Every microcontroller has at least one timer/counter module in its…... Listed und
ATmega Projects 235. How to work with the ADC unit of an AVR Micro-controller Introduction The first step to digital signal processing is to convert a signal into digital data, the Analog to Digital Converter devices comes into action. Some of the AVR micro controllers include ADC unit in their features. This is a very useful un Listed under: Security - Safety Projects 236. Interfacing LCD Module with AVR in 4-Bit Mode This article is another step forward in learning more about AVR microcontrollers. We have demonstrated interfacing of LCD mo ATmega328 microcontroller, which will help you to learn its basic concepts. ATmega328 is an eight bit AVR (Advanced Virtual RISC) based microcontroller. It is a…... Listed unde Projects 237. Bluetooth Home Automation using AVR and Android App DIY-Bluetooth based Home Automation Project In this project, let’s see how to design a Blue based home automation project.This article explains the steps involved in the designing of a Bluetooth home automation kit, starting from the configu a Bluetooth module. The article also explains…... Listed under: Android Projects 238. Keypad Door Lock using AVR Microcontroller – Atmega16 Password Based Keypad Door Lock  In this article, a digitally secured lock based on password verification is expla system uses a seven segment display array to show the password, a matrix keypad to enter the numbers/password and operates a relay (to activate the solenoid…... Listed Security - Safety Projects 239. MultiPurpose Atmel Development Boards Project Atmel series microcontrollers series to prepare for the software quality testing to ensure ease in you circuit has 3 different test circuit. ATmega8, ATMega16, atmega162, ATtiny2313 and ATTINY13 made to the circuit RS232... Electronics Projects, MultiPu Atmel Development Boards Project "avr development board, "…... Listed under: Development Board - Kits Projects 240. ATmega16 Analog-Looking Digital Clock Project Atmega16 microcontroller in our circuit monitor 7 inch in size. Screen “3 inch” or “4 inch” may be, it doe matter. We have the biggest screen by controlling the foot links we could find.... Electronics Projects, ATmega16 Analog-Looking Digital Clock Project "a microcontroller projects,…... Listed under: Clock Projects 241. Make Your Own WiCard WiFi Module on a Breadboard Like Arduino you can make your own WiCard on a breadboard. All you need are resistors, capac breadboard, wires, ATmega8, and ESP8266. Story Like “Arduino," you can make your own WiCard on a breadboard. If you want to make WiCard on a b before making…... Listed under: AVR ATmega Projects 242. Interfacing HC-05 Bluetooth module with AVR Microcontroller In this tutorial let us learn How to interface HC-05 Bluetooth Module with AVR ATmega8 microcontroller. We will establish communication between Android mobile and Atmega8 through Bluetooth module which takes place through UART communication protocol. In this project we will control a LED using Bluetooth…... Listed under: Phone Projects 243. Interfacing RF module with Atmega8: Communication between two AVR Microcontrollers Making our projects Wireless always makes it to look cool an extends the range in which it can be controlled. Starting from using a normal IR LED for short distance wireless control till an ESP8266 for worldwide H control, there are lots of ways…... Listed under: LED Projects 244. Interfacing GSM Module with AVR Microcontroller: Send and Receive Messages GSM modules are interesting to use especially when our project requir could make all actions that our normal mobile phone could do, like making/receiving a call, sending/receiving a SMS, connecting to internet using GPR can also connect a normal microphone…... Listed under: Phone Projects 245. UV Sensor ML8511 AVR Atmega library Ultraviolet (UV) is an electromagnetic radiation with a wavelength from 10 nm to 400 nm. The ML8511 is an ultraviolet sensor that outp analog signal correlated to the amount of UV light detected. By datasheet the sensor detects wavelength from 280nm to 560nm. Here…... Listed under: Sensor - Transducer - D
Projects 246. Using AVR Studio – My first C++ code This is an extremely simple "Hello World" C++ code for the ATMega32 that you can follow using AVR Studio. You d need any hardware such as the chip or even the ISP programmer cable because AVR Studio simulates the inputs and outputs, and you…... Listed unde Projects 247. Power factor measurement using Atmel AVR Micro-Controllers To learn about the power factor measurement, you should have a basic knowledge of p factor. There are three types of loads. Resistive  Inductive Capacitive When we apply AC voltage to resistive loads it will not change the current wave fo inductive loads will…... Listed under: LCD Projects 248. Auto No Break Power Supply Control The major aim of this no break power supply project is to supply continuous energy supply to a load, by picking t from any spring out of the four like – generator, mains, inverter and solar robotically in the lack of any of the…... Listed under: LCD Projects 249. RFID Based Toll Collection System We know in offices, shopping malls and in many other places where only the person with authorization card is allow enter the room. These systems use RFID communication system. RFID is used in shopping malls to stop theft as the products are tagged with RFID chi Listed under: LED Projects 250. DC motor interfacing with AVR ATmega16/ATmega32 DC motor converts electrical energy in the form of Direct Current into mechanical energy. In case the mechanical energy produced is in the form of rotational movement of the motor shaft. The direction of rotation of the shaft of the motor can be… under: Motor Projects 251. ATmega8 Line Follower Robot (LFR) Project – Part 2/2 Now that the mechanical assembly part is over,and we have completed the construction of left a (L&R) infrared sensor cards. Since the MCU (ATmega8) cannot drive the dc motors directly, a dedicated motor driver circuit is used. The motor driver c is based…... Listed under: Robotics - Automation Projects 252. A digital DC powersupply Introduction In 2002 I wrote a linuxfocus.org article about a Microcontroller based DC powersupply (LF November2002 articl article received a lot of interest as I noticed from emails which I received on this subject. The design of this powersupply was however something for advanced…... Listed under: LED Projects 253. An NRF24L01+ and FTDI Ready Atmega 328P-PU (3.3V, 500 MA) Microcontroller With Dual Power Capability, Undervoltage, Hysteresis, and Thyristor-Crowbar Overvoltage Prote board is designed to safely drive a 3.3V microcontroller and connected accoutrements. It supports primary and backup power sources and provides n over and under voltage safeguards. The microcontroller here is a bare-bone, no-frills Atmega 328P-PU with no leds, driven by a 16 MHz…... Listed und Projects 254. AVR-based Sensor Keyboard A modern microcontroller has almost everything that's needed to implement a touch sensor matrix. There are several se technologies: IC manufacturers typically advise using certain tech, sometimes they offer ready to use hardware- or software-based solutions. I was cur try to implement a sensor…... Listed under: AVR ATmega Tutorial, Sensor - Transducer - Detector Projects 255. Arduino LFO Waveform Generator V2 Introduction This project uses an Arduino microprocessor and a MAX522 8 bit serial DAC to produce arbitrary lo frequency oscillator (LFO) waveforms. These waveforms are useful for driving a tremolo/vibrato circuit in a guitar amplifier such as the Lil Tiger or the Hammonator 2RVT. This…... Listed under: Motor Projects 256. Programming ATMEGA32 (or Any Other AVR) Using Arduino IDE The Arduino is a very cool development board where you could create hundreds of pr it doesn't mean that for every project you create, you would need an Arduino board dedicated to that project alone. A hundred projects and a hundre Arduinos? That's a…... Listed under: Android Projects, AVR ATmega Tutorial 257. AVR ATmega32 Mini Development Board – Interfacing LCD AVR ATmega32 Mini Development Board is interfaced with a LCD module (2×16) operating at 5V. The voltage at t pin of the LCD can be varied by potentiometer to adjust contrast. LCD can work either in 4 or 8 bit mode. Here, the circuit is…... Listed under: LCD Projects 258. Interfacing Ultrasonic Rangefinder with AVR MCUs – AVR Tutorial Obstacle detecting sensors are one of the most basic type of sensors that electronic hobbyists use. There several methods to make cheap obstacle sensors. These simple sensors are made using a IR Rx/Tx pair or Normal LED and LDR pair(this design is most basic…... Listed und Android Projects, Development Board - Kits Projects
259. How to control DC motor speed using PWM on Atmega32 Using PWM (Pulse Width Modulation) to control a device is a common practice in embedded for example, you can use it to control the light intensity of a LED or control the speed of a DC motor. In this article, we will explain how to…... Listed un Motor Projects, PWM Projects 260. Servo Motor Control by Using AVR ATmega32 Microcontroller Servo motors are a type of electromechanical actuators that do not rotate continuously or stepper motors, rather they used to position and hold some object. They are used where continuous rotation is not required so they are not used t wheels (unless…... Listed under: Microcontroller Programmer Projects, Motor Projects 261. Atmel ATmega Video generator with SDRAM This projects uses 8MByte SDRAM from a 168 pin DIMM SDRAM and generates videosignal for a VGA monitor with a resolution of pixels with 256 colors at 60Hz using mega8515. The project uses burst mode of SDRAM, which can feed up to 512 bytes…... Listed under: AVR ATmega Tutorial, Microcontroller Programmer Projects 262. How to make Automatic Charger for a 7Ah Battery 7Ah Sealed Lead Acid Battery  7Ah Sealed lead acid battery is a very popular battery which people u most places like fans, LEDs etc. The reason behind popularity of 7Ah battery is due to its medium size and medium Ah rating. By medium means,…... L under: Battery Projects 263. hd44780 Character LCD Displays – Part 2 Introduction This tutorial continues from Character LCD Displays – Part 1. In this part we will connect the LCD module to an Atme microcontroller, then write some code to drive it. The Circuit Our first task is to build the circuit. We will be using…... Listed under: LCD Projects 264. First steps with micro controllers (ATMega8) Purpose of this article: 1) to learn how to connect the Micro controller in a simple circuit and how to powe see how to create a simple programmer (a device to connect the micro controller to a PC for uploading software) 3)…... Listed under: AVR ATmega Tuto Development Board - Kits Projects, LED Projects 265. Minimal Arduino with ATmega8 Like me, you may have a few old Arduino boards or ATmega8 chips (in the boards) laying around from when you were playing with Arduino. Those chips can still be really useful as the heart of a tiny “Minimal Arduino” setup. A normal Arduino…... Listed under: Android P Circuits, Other Projects 266. Atmega8 based Voltmeter Ampmeter v2 Low power consumption Better Amperes display resolution while using low value drop resistor. Much smalle only 5cm x 5cm. Still no SMD components. Easy calibration, only one voltage adjust and one ampere adjust preset, no voltage out detection. Voltage s my 12Volt…... Listed under: AVR ATmega Tutorial, Microcontroller Programmer Projects 267. Micro-controller Programming on a Bread Board In playing around with DIY electronics, Pugs has developed enough confidence to share his knowledg juniors. So, in one such occasion, he decided to give a try to program a micro-controller, as part of the electronics hobby club. There have been many hobbyist…... Listed under: Battery Projects 268. Nokia5110 graphical display interfacing with AVR ATmega16/ATmega32 Introduction Nokia5110 is a graphical display that can display text, images and patterns. It has a resolution of 48x84 and comes with a backlight. It uses SPI communication to communicate with a microcontroller. Data and comma be sent through microcontroller to the display…... Listed under: Phone Projects 269. Configuring and using XBEE wireless modules Xbees are some of the most powerful wireless modules you can find and they’re also very easy to config use. The only thing is they cost about Rs.1000 to Rs.2500 depending on the range and other parameters. If you’re like me and only bought…... Listed u ATmega Tutorial, LCD Projects, Microcontroller Programmer Projects 270. The simplest digital voltmeter with AVR This is probably the simplest possible digital voltmeter with Atmel AVR microcontroller. The circuit is controlled by a microprocessor IO AVR ATmega8 (ATmega8, ATmega8L), a program to download and configuration bits setting is below. (ATmega8 may seem too "big", but was chosen be Listed under: AVR ATmega Tutorial, Clock Projects, Electronics News Updates, LED Projects
271. Input Devices Measure something: add a sensor to a microcontroller board that you have designed and read it. This week I decided to make ATMEGA board. ATMEGA 328 Some of the Features of ATMEGA 328 are 1.8-5.5V operating range Up to 20MHz 32kB Flash program memory…... Listed under: AV Tutorial, Microcontroller Programmer Projects, Sensor - Transducer - Detector Projects 272. PIR motion sensor interface with AVR-microcontroller ATMEGA32 Passive Infra red sensor also known as PIR sensors is capable of detecting motion or movement within a certain range. These type of sensors have wide range of applications in our daily life and it is essential to learn the interfacing met article is…... Listed under: AVR ATmega Tutorial, Sensor - Transducer - Detector Projects 273. Analogue to Digital Conversion on an ATmega168 Many AVR microcontrollers are capable of doing Analogue to Digital Conversion. The ATmega168 ha (8 ports on the SMD packages) that can be used for analogue input. This tutorial shows you how. The circuit The Breadboard layout is based on the At breadboard…... Listed under: Android Projects, AVR ATmega Tutorial, Microcontroller Programmer Projects 274. How to make an Arduino Pro Mini bare bones with Real-time Clock Recapitulation One thing I didn’t find clearly over the internet is how to make an Ar Mini bare bones, that is, from the scratch, and how to make one on the breadboard. This is really useful if you want to make a custom pcb/smd…... Lis Clock Projects, LED Projects 275. How to drive 595 shift registers with AVR hardware SPI Driving a shift register using an AVR chip’s built-in hardware is really quite easy. Most of their of have an SPI module, or Serial Peripheral Interface. A shift register is exactly that, a peripheral device that communicates via a serial line. All we need to under: AVR ATmega Tutorial, Clock Projects 276. Make your own AVR JTAG debugger Tired of putting LEDs every time you want to check some value in the microcontroller? Well, its time to build yours debugger. A debugger is a device which helps you run through your code in the microcontroller step by step and also gives you…... Listed under: LED P Robotics - Automation Projects 277. Introduction to Arduino UNO (uses AVR ATmega328) Overview Arduino is an Open Source embedded development platform which is easy-to-use. It comprises of Hardware bo Software tools. Examples of some of the most popular Arduino Hardware boards are , Arduino Uno This board is designed around the ATmega328 AVR microcontroller. It is….. under: Android Projects, Microcontroller Programmer Projects 278. An AVR microcontroller based Ethernet device Ethernet has traditionally been a quite complex interface. All Ethernet chips until today had 100 pins or where difficult to find in small quantities and difficult to use from a small microcontroller with little memory. Microchip has changed the world with th ENC28J60…... Listed under: Other Projects 279. Fastest Finger First Quiz Project using ATmega16 Most of you must have watched quiz games in TV shows or at your schools where few contestants ar to press a switch if they know the answer to the question. An electronic system is required to find out exactly which one of then…... Listed under: LED 280. Making a LED Message Display with Keyboard Interface LED signage has become the choice in modern days to convey message to visitors of a venue. corporate office, shops, restaurants or any kind of social functions like marriages. Some big and complicated display needs dedicated control PCs and to build contents…... Listed under: LED Projects 281. LED Dot Matrix Room Temperature Display using P10 and ATmega8 Room temperature display on big screen is a common requirement from industria Used in server rooms, PLC rooms, storage rooms and many other places in an industrial units. Traditionally seven segment displays of big size (say fou height) were used. But now a…... Listed under: LED Projects
282. P10 LED Display Panel Interface with AVR ATmega8 Making LED displays and signage is a complete industry in itself serving all sorts of clients like bank stations, factories, airport and more. In earlier days display units were made using individual LEDs carefully placed and soldered to make matrix of dis this…... Listed under: LED Projects 283. Control Electrical Appliances from Android Smart Phone using Bluetooth : Project Construction Connecting Bluetooth Module with Development Boar Bluetooth module has seven interface pins of which two are NC (not connected) pins. The table below shows how you can interface with it our low cos development board. Bluetooth Module Dev Board GND GND RST PD2…... Listed under: Phone Projects 284. Control Electrical Appliances from Android Smart Phone using Bluetooth : Project Construction Connecting Bluetooth Module with Development Boar Bluetooth module has seven interface pins of which two are NC (not connected) pins. The table below shows how you can interface with it our low cos development board. Bluetooth Module Dev Board GND GND RST PD2…... Listed under: Phone Projects 285. Home Appliance Control over Mobile Network You can call up on your colleague's mobile number and ask him/her to turn on or off the lights or other of your office. You may be any where in the world at that time, as mobile network allows to to talk to anyone…... Listed under: Phone Projects 286. ATMega328 Board The ATMega328 board is a microcontroller board based on the ATmega328, The board contains everything needed to support the m 5VDC to power it. Simply connect the power connector to a computer with a USB cable or power it with a AC-to-DC adapter or…... Listed under: Batter 287. ATTiny 2313 BOARD his board is a development board on which you can build your projects. It is suited for educational use, experiments or prototypin board uses the ATTiny2313 microcontroller with a 20Mhz clock. The board contains the ISP 10-pin connector for in circuit serial programming. It…... Lis under: LCD Projects 288. LED Mood light In this projects 8 different colors are displayed with the use of a RGB LED. The microcontroller that is used is the ATMega8. An RGB LED which has three LED's integrated in one packaging. These LED's have the colors red, green, and…... Listed under: LED Projects 289. servo motor controller In ths project you can learn how to build a servo controleer motor with the ATMEGA328 board. The position of the servo motor controlled by the software (sweep back and forth) or by a potentiometer. The position of the servo motor is set by…... Listed under: Motor Projects 290. LED Driver MAX7219 – clock Below is the schematic that shows how the IC is wired to the ATMEGA328 microcontroller and the 4 digit 7-segment displa comon cathode.   Besides the MAX7219 you need only three other external components: two capacitors and one resistor. The capacitors are here to… under: LED Projects 291. Using Push Button Switch with Atmega32 and Atmel Studio This tutorial is meant for beginners in the field of Atmel AVR programming. I hope that you read my first tutorial Blinking LED using Atmega32 and Atmel Studio. In most of the embedded electronic projects you may want to use a push button Listed under: LED Projects 292. Build Your Own Microcontroller Based PID Control Line Follower Robot (LFR) – Second Part One of the interesting parts in building the Line Follower Robot is; you could sta very simple version by using just two transistors with the LED and LDR for sensor (Build Your Own Transistor Based Mobile Line Follower Robot – First Part)…... Listed unde Robotics - Automation Projects 293. Basic User’s Experiment Notes The “Basic User’s Experiment Note” is based on the popular 8-bit Atmel AVR ATmega328P microcontroller using AVRJazz 28PIN development This e-book covering most of the Atmel AVR ATmega328P microcontroller important features. With almost 140 pages, this e-book is organized similar to many of the…... Lis under: Sensor - Transducer - Detector Projects
294. Basic Servo Motor Controlling with Microchip PIC Microcontroller The servo motor is widely used in model hobbyist such as airplane R/C model for moving the rudder, ailerons elevators and acceleration control or in the car R/C model for steering and acceleration control. In this tutorial we will learn how to control the servo… under: Motor Projects 295. OH HAI! on Windows 10 IoT Core Story Oh, Hai Hai ('hi') is an integration point for several stand alone smart home technologies.  Hai runs on the Rasp and can be adapted to optimize electricity consumption (lighting/HVAC) and water usage (irrigation/rain collection) in a number of ways. Hai was origi envisioned…... Listed under: Home Automation Projects 296. ThiDom Home automation Story This project uses Arduino, Raspberry and Attiny, it allows you to control nd monitor your home (AC outlet, shutters, h light, opening detector, temperature ...). The raspberry is the web server allowing control all arduino These can be controlled from any web browser a Listed under: Home Automation Projects 297. Cellular Data Logger Story I have been collecting data from Raleigh's trails and parks for the last couple years.  My primary platform has been a custom board I developed for low-cost (hey, these things may get damaged or stolen) and long battery life.  I wanted a connected…... Listed under: Sensor - Tr Detector Projects 298. Physical computing with ATtiny Story I have a nice "carranca" (or wall mask) from Chile that stands in my corridor. It's a very beautiful decorative mask liked from the very first moment I saw it at the shop. Few weeks ago I wondered if I could bring…... Listed under: Sensor - Transducer - Detector Projec 299. POV Cylinder with Arduino Due Story Introduction This is my first Arduino project. My work was inspired by several maker projects that created Persist Vision Displays [2,3,4]. Persistence of vision (POV) refers to the optical illusion whereby multiple discrete images blend into a single image in the huma and believed to…... Listed under: LED Projects 300. OLED on the Cheap! Things used in this project Hardware components: OLED 128x64 SPI-capable Available on Aliexpress or eBay for $4 to $20 × 1 For Arduino platforms, use the unmodified Adafruit libs × 1 Story I like cheap electronics for playing. Cheap is good for budget conscious…... Listed under: Projects 301. Tinker's Word Clock – REVISITED! NOW 110% more AWESOME I have been tinkering with Word Clocks for years. There is only one thing I like more than word clocks… it’s designing them so that they are easy to put together. This tutorial will go through my latest version (5!!!!!). By the end of…... Listed un Projects, Home Automation Projects 302. nRF24L01+ with ATtiny85 3 Pins Story This would be the continuation of my previous project Programming ATtiny85 with Arduino Uno. Now with cheaper ATtiny85 in place I wa for cheaper ways to transmit the sensor data. Which brought me to nRF24L01+ a cheap, low power RF transceiver. This seemed…... Listed under: Other Projects 303. Programming ATtiny85 with Arduino Uno Story I am working on a project which requires reading multiple sensor data on different locations. These re few PWM pins so using multiple Arduino Uno would be expensive and unnecessary. So I decided to use ATtiny85 microcontroller in place of Arduino U development…... Listed under: PWM Projects 304. Franzino is a low cost Arduino standalone board Hardware components: Atmel ATmega328P × 1 16 MHz Crystal × 1 Capacitor 22 pF × 2 Capacitor 100 (generic) × 2 Linear Regulator (7805) × 1 Capacitor 10 µF × 2 1N4007 – High Voltage, High Current Rated Diode × 1…... Listed under: Development Boar Projects
305. Arduino Without External Clock Crystal on ATmega328 Story An Arduino consists of many components like: a linear regulator, USB to Serial microcont debug LED, power LED, reset button, RX & TX LED, crystal oscillator, etc. But a minimal circuit can have just the brain of the Arduino UNO, that is, an ATmega328p…... Listed under: Clock Projects 306. Reducing Arduino Power Consumption Story When it comes to portable electronics, one of the most important features is how to maximize the batter ATmega328P, used on popular boards like the SparkFun RedBoard, Arduino Uno, and Pro Mini are actually quite power hungry. The RedBoard and Ard …... Listed under: Other Projects 307. Gimmick on Barebones Arduino 16MHz Story Did you see this 8MHz no-crystal Arduino? Arduino on Internal Oscillator Crystal as Clock Source by Nam Chauhan is a great project if you can live with 8MHz using the internal RC oscillator of the Atmega328P chip. I really like Naman's project; I did…... Liste Other Projects 308. Tri-Mode Digital Clock with ATtiny85 and RTC Story Hello everybody, This is my first project using ATtiny85 microcontroller and also including a Real Tim (RTC) working with it. The use of ATtiny85 is a very interesting way to shrink your Arduino projects in a final tiny version. The Three-Modes Digital Clock Listed under: Clock Projects 309. Bootload Your ATtiny85 Story What is a Bootloader? Microcontrollers require a programmer to install firmware on them. A programmer is a device, that when combined with s loads firmware to the microcontroller. There are many programmers available. I won't go into to detail about them, but I will…... Listed under: LED Projects 310. SSD1306xLED Tinusaur ATtiny85 Library for SSD1306 Story SSD1306xLED is a C library for working with the SSD1306 display driver to control dot matr OLED/PLED 128×64 displays. It is intended to be used with the Tinusaur board but should also work with any other board based on ATtiny85 or simila microcontroller. The…... Listed under: LED Projects 311. 3D-Printed RGB Wallet Stand out from the crowd with this unabashedly ostentatious excuse for a wallet. It's got plenty of space, RGB lights, and you ca put your name on it for added vanity. Interested? Keep reading!In the files section of this build you can find two…... Listed under: Other Projects 312. Open Source IoT Platform The Project Intended as open source for those who want to build their own dosimeter with their own tools, this is an IOT de can take several sensors and have the data centralized online. The readings are accessible via a RESTful API, or by…... Listed under: Home Automation 313. Light-Up Poker Chip Spice up your poker games with these cool blinking chips. They can be programmed on the fly to have a certain number of the LE illuminated to indicate value, or you can have the lights blink in a cool pattern. They make great playing chips…... Listed under: Game - Entertainment 314. Scrumtato: Make Daily Stand-Ups Agile Again Story The following was originally published in my blog. At Delphi in Gothenburg, where I am currently e we create all kinds of cool products for the automotive industry. To organize our development process, we use SCRUM and abide by the Agile principle morning,…... Listed under: Other Projects 315. Goldilocks Analogue – Prototyping 3 Following my initial design article, and the follow up design article, I’ve put quite a lot of thought into how I can make this Goldilocks A device best achieve my stated goals. Pictured is the new 3rd Goldilocks Analogue Prototype. I'm now working on the 4th Goldilocks Analogue…... Listed under: LCD Projects 316. Playing Simon On A Hacked Farm Toy About My kids have a plastic farm toy. It neighs, it baas, and frankly, it grates. But since I tricked it out with a microcontroller brain, at least it can play Simon. One of the marvels of parenthood is the sheer volume of noisy plastic junk…... Listed under: Phone Pr
317. Taiko Trainer High level Design Overview/Rationale This idea was inspired by team member Gabriel Soares who is part of Cornell’s Taiko Drum Club (Yamatai). Through his p and performing with others, he recognized the opportunity to design a drum trainer that can help students better learn to…... Listed under: LED Projects 318. Coil Winding machine counter with Atmega8 and Reed relay Connectors Everything has been mounted on a test board, including the headers for: ISP programmer (USBAsp), the 5110 Nokia LCD, the power supply (5V in, fed to the 3.3V regulator), the Reed relay connector, the reset button connector a another 2 pins connector, used to…... Listed under: Motor Projects 319. Bluetooth remote controllable (Lego) cars How it started It started with the idea to make a technical proof of concept combining the Physical Web and WebBluetooth. The Physical Web is an effort by Google to allow interacting with "things" without fiddling around with installing apps or setting anythin The…... Listed under: Car Projects 320. Markov Music Box markov summary Traditional music boxes play one or two tunes very well, but are not very interactive. Put differently, they have a h quality of synthesis, but a fixed-pattern note sequencer and fixed tonal quality. I wanted to build a device which would play an…... Listed under: PWM Sound - Audio Projects 321. DIY Canon IR Remote Hardware components: Atmel ATtiny13a CHF 1.25 × 1 Osram SFH409 IR Diode CHF 0.75 × 1 Battery holder CR1220 CHF 0.65 × 1 Battery CR1220 3V × 1 Push Button CHF 0.25 × 1 Resistor 15Ω CHF 0.07 × 1 Micro Slide Switch…... Listed under: How To - DIY - Projects 322. wozItDo: Tiny IQ puzzel, BIG challenge Hardware components: Atmel ATTiny85 × 1 LED (generic) × 3 Resistor 221 ohm Or similar, I used 220 ohm × 3 S Pushbutton switch 12mm or similar × 1 Coin Cell Battery Holder × 1 Coin Cell Battery CR2032 any 3v cell that fits is…... Listed under: LED Projects 323. The Tinusaur Project About The Tinusaur What is it Briefly, the Tinusaur is a minimal micro-controller hardware configuration based on Atmel AVR ATt of products and more specifically those with DIP-8 case such as ATtiny25/ATtiny45/ATtiny85, ATtiny13 as well as their variations. The goal of the Tinusa project…... Listed under: Other Projects 324. Yet Another Z180 (YAZ180) Project I’m thinking about a new project, something a little unusual but still with a rich history of information upon which to base the build. On Tind the RC2014 project which is a build of a Z80 platform but based on some modern components.…... Listed under: LED Projects 325. Goldilocks Analogue Synthesizer For the past year, I’ve been prototyping an Arduino clone, the Goldilocks Analogue, which incorporates advanced ana output capabilities into the design of the original Goldilocks with ATmega1284p AVR MCU and uSD card cage. Recently the design scope crept up to inc SPI memory…... Listed under: Other Projects 326. Arduboy Solar Charge Controller, Inverter, PowerBank, Lamp About this Project I have a few solar panels, 12 Volt batteries, transformers and few more laying around for a while crying out aloud to make some good use of them. Thus the birth of this device - complete small PV solution on a…... Listed u Solar energy projects 327. Sigfox Talking Plant Hardware components: Arduino UNO & Genuino UNO × 1 Atmel ATA8520D (EVK arduino) × 1 Software apps and online services: S Twitter Story What is Sigfox Talking Plant? It is a simple project based on Sigfox network to make a plant talk on Twitter. The…... Listed under: Other Projects
328. Make your own remote temperature/humidity sensor Hardware components: Atmel atmega 328p-pu × 1 ControlEverything.com SI7020-A20 I²C Humi Temperature Sensor ±4%RH ±.4°C × 1 433 MHz transmitter / Receiver kit × 1 AMS1117-ADJ voltage regulator × 1 Capacitor 100 µF × 1 Capacitor 100 nF Resistor 1k ohm ×…... Listed under: Sensor - Transducer - Detector Projects 329. XBee Walkie Talkie Hardware components: Goldilocks Analogue Still as prototype currently, but functionality can be recreated with MCP4822 DAC, Mic Amplifier, and Headphone Amplifier, together with Arduino Uno. × 1 MAX9744 × 1 MAX9814 × 1 MCP4921 DAC × 1 Arduino UNO & Genuino UNO × 1 Arduino…... Listed under: Other Projects 330. Bionic Organs/Devices/Limbs Wireless Charging Hardware components: IDT Qi 5W Transmitter Prototype Kit × 1 IDT Qi 5W Receiver Prototype Kit × 1 A Atmega328p × 1 HC-SR04 Ultrasonic Sensor × 1 Hand tools and fabrication machines: Arduino cc Schemeit PCBWeb Story Bionic devices/organs has a lifetime where its…... Listed under: Other Projects 331. Personal Home Assistant Hardware components: Arduino UNO & Genuino UNO × 1 Atmel ATMega328 × 1 Linear Regulator (7805) × 1 Jumper wires (generic) × 20 Resistor 10k Resistor 1k ohm × 5 Capacitor 22 pF × 6 16 MHz Crystal × 3 SparkFun Pushbutton…... Listed under: Home Automation Projects 332. Darby's not dead. Hardware components: Particle Spark Core × 1 atmega168 × 1 pn532 breakout board/ adafruit × 1 Story In the future there is a bar the dead punk rockers hang out. They are each given a MiFare classic card programmed with their name and…... Listed under: Other Projects 333. Digital Thermometer using AVR, LM35 and 16×2 LCD Thermometers are the device we use to measure the temperature in any desired scale and we al quite familiar with the analog thermometers. There are some disadvantages in analog thermometers and this can be overcome by using this digital thermometer using avr. The…... Listed under: LCD Projects 334. AVR Serial Communication (UART) Programming tutorial This tutorial focuses to teach you how to program AVR Serial Communication (UART). UART p important role in almost every embedded applications which we see in our day to life and hence it was considered to be very important concept in ev Microcontroller. The…... Listed under: Other Projects 335. Tutorial on printing image in Graphical LCD (GLCD) using Atmega32 Graphical LCD’s known as GLCD are display devices which are capable of displayin graphical images, customized characters, etc. This paves way for any system to present information to the end user by means of interactive graphics s printing image. Bored of using the old…... Listed under: LCD Projects 336. Creating Pac man custom patterns and animation in LCD display LCD modules are widely used to display calculated data’s, user references and much addition all character based LCD which uses HD44780 controller consists of a special RAM known as CGRAM which allows user to create custom patte tutorial will teach you to…... Listed under: LCD Projects
337. LCD Interface with Atmega32 AVR microcontoller for beginners LCD’s are quite familiar module when comes interfacing with microcontrollers. We can find these display modu plenty of instances where a specific info is need to be displayed for the viewers. This article explains LCD interface with Atmega32 a AVR family Microcontroller and display…... under: LCD Projects 338. Digital Clock using AVR Atmega16 Microcontroller Digital clocks revolutionize the way we live our daily life as it helps people to stick with their schedul article will teach you to build your own Digital clock using DS1307 RTC Chip with Atmega16 microcontroller. As we all know that DS1307 is a…... Listed Other Projects 339. Volt-Amp meter using AVR microcontroller Voltage and current are two most important parameters of electricity. This project teaches you to build a si amp meter using avr microcontroller. This project may not enable you to build a high end measurement tool but will be a good diy project which gives Listed under: Metering - Instrument Projects 340. Door/Window alarm circuit Door or Window alarm circuit have been used widely in many homes to detect intrusion. A simple search in internet might lot of alarms for you to buy. But making your own alarm will be something special and that’s the purpose of this…... Listed under: Other Projects 341. Automatic plant watering system using AVR(Atmega16) Microcontroller Plant watering system evolved through various stages where primitive irrigatio possess many drawbacks as it fails to conserve water and human energy. So introducing Automation in it can help us to overcome these drawbacks a way to conserve water. This can be done…... Listed under: Other Projects 342. ATmega32 Switch Toggle Program ATMega32 switch code is extremely simple to implement, and this article looks into how to write the code to make a light up when a switch is pressed. The atmega32-switch-code.c program tests the switch input to the ATMega32 Development System. There are many Listed under: LED Projects 343. ATmega32 blinking LED Lights Using the ATMega32 microcontroller to flash or blink some LEDs is extremely simple and this tutorial shows how to mak blinker circuit including the example program code to blink eight LEDs. In this tutorial, you will learn how to make a program to blink…... Listed under: Projects 344. Intelligent temperature monitoring and control system using AVR microcontroller Controlling temperature has been a prime objective in various appli including refrigerators, air conditioners, air coolers, heaters, industrial temperature conditioning and so on. Temperature controllers vary in their com and algorithms. Some of these use simple control techniques like simple on-off control while others use…... Listed under: Temperature Measurement 345. GSM Based Home Automation GSM based home automation, project allows you to control electrical appliances using your mobile phone SMS. It consists of ATmega8 microco SIM300 GSM modem, Relays. There are many Home Automation Systems available in our market. Most of these are simple home appliances controlli systems like DTMF controlled…... Listed under: Home Automation Projects 346. GSM Based Fire Alarm System GSM, Microcontroller Based Fire detection and SMS Alert system, it uses LM35 Temperature Sensor and MQ2 for Smoke and 16x2 LCD is used to display temperature and Smoke Level, Over limit set points are set inside the program you can modify it as per…... Listed und Security - Safety Projects 347. Password based door locking system Password based door locking system, uses Matrix keypad to enter the password, This project is extended to ope Remote RC-604, In this project all required data is given Circuit diagram, C code, PCB design and All related data, This project is based on…... Listed un Security - Safety Projects
348. AVR Microcontroller based Temperature Monitoring and Control System AVR Microcontroller based Temperature Controller, it uses LM35 Temperature for measurement of temperature and 16x2 LCD is used to display temperature set point, Heater Status and current temperature, It controls temperat turning on and off of the heater using relay. This project is…... Listed under: Sensor - Transducer - Detector Projects, Temperature Measurement Proje 349. Bluetooth based home automation Bluetooth based home automation, project allows you to control electrical appliances using your android mobile p consists of ATmega8 microcontroller, HC-06 Bluetooth module, Relays. There are many Home Automation Systems available in our market. Most of th simple home appliances controlling systems like DTMF controlled…... Listed under: Home Automation Projects 350. Fingerprint based security system This AVR microcontroller based project demonstrates Finger print based access control / security system, in this pro have provided all required data, PCB, Code, Circuit Diagram, Proteus Simulation. This project operates a relay based on valid finger detection. It is prov 6-Keys for…... Listed under: Security - Safety Projects 351. Token number display system using microcontroller Bank token number display project is build using ATmega8 Microcontroller and ULN2003 for drivi LED display, PCB layout, Circuit diagram are self explanatory. It is capable to display three digits, its simple project using microcontroller. Token issue s are ideal for banks, airports, public…... Listed under: LED Projects 352. 16×2 LCD interface with microcontroller Interfacing with Hitatchi 44780 The purpose of this page is to give a brief tutorial on how to interface with Hita 44780 based LCDs. I have tried to provide the all the data necessary for successfully adding LCDs to your application. The most common connector….. under: LCD Projects 353. DS1307 RTC Interfacing with AVR microcontroller In this tutorial we will learn How to interface RTC DS1307 with AVR microcontroller. We are using Atm the demo. GENERAL DESCRIPTION The DS1307 serial real-time clock (RTC) is a low-power, full binary-coded decimal (BCD) clock/calendar plus 56 bytes SRAM. Address and data are…... Listed under: Clock Projects 354. Analog to Digital Converter AVR C Programming One of the important features in today’s modern microcontroller is the capability of converting the analog signal to the digital This feature allows us to process the analog world easily such as temperature, humidity, light intensity, distance, etc; which usually captured by electro sensor…... Listed under: Microcontroller Programmer Projects 355. AVRJazz Mega168/328 Learning and Development Board The AVRJazz Mega168 board from ermicro is designed to be used both as the AVR microcontr learning and development board. The AVR Jazz Mega168 board is stand alone microcontroller module equipped with the latest Atmel high performan power technology AVR ATMega168 or ATMega328 microcontroller…... Listed under: Development Board - Kits Projects 356. Introduction to AVR Microcontroller Pulse Width Modulation (PWM) PWM is used in many industrial mostly for controlling the motor speed. The PWM because it’s the most efficient method comparing to the analog one. That’s why most of the modern microcontrollers today have this features build in does this PWM works…... Listed under: PWM Projects 357. Atmel AVR ISP Microcontroller Programmer Project One of the frustrating part in learning AVR microcontroller for the beginners is the AVR microcontr programmer. The question is how to program my AVR mircrocontroller; actually if you googling on the internet and search for AVR ISP Programmer th plenty information; start from…... Listed under: Microcontroller Programmer Projects 358. AVR Twinkle Twinkle Using PWM Project Would be interesting if we could make our microcontroller to sing for us not just beeping or blinking; this proj about using the powerful AVR ATmega168 16-bit PWM feature to produce accurate musical notes such as playing the child’s favorite Twinkle-Twinkle L Star…... Listed under: PWM Projects 359. AVR LCD Thermometer Using ADC and PWM Project Sometimes we need our microcontroller to interact with more human readable information. It wi better for us if we could make it display the words not just blinking the LED. Today most modern gadget such as mobile phone and PDA, use LCD (Liqu Crystal…... Listed under: PWM Projects 360. Controlling DC motor with AVR ATtiny13 PWM and ADC Project It’s interesting to explore what we can do with this tiny 8 pins; 8-bit microcontroller. The is the smallest and cheapest Atmel AVR 8-bit microcontroller families but yet, it’s loaded with sophisticated peripherals such as two 8-bit PWM channe channels 10-bit ADC.…... Listed under: PWM Projects
361. Build Your Own Microcontroller Based PID Control Line Follower Robot (LFR) – Second Part One of the interesting parts in building the Line Follower Robot is; you could sta very simple version by using just two transistors with the LED and LDR for sensor (Build Your Own Transistor Based Mobile Line Follower Robot – First Part)…... Listed unde Robotics - Automation Projects 362. Transforming your AVR Microcontroller to the I2C or TWI Slave I/O Expander Project The I2C bus (read as I squared C) is one of the most important em system serial bus interface first introduced by Philips in 1980; using just two lines called SCL (serial clock) and SDA (serial data) respectively make the I perfect…... Listed under: Other Projects 363. Developing Embedded Application with BASIC Language on the Microchip PIC18F Microcontroller using the Amicus18 Development system The BASIC (Beginners’ All-purpose Symbolic Instruction Code) language has been known as one of the popular high level language choice in embedded system to fact the born and development of the personal computer (PC) we use today has been influenced by the used of…... Listed under: Development Board Projects 364. Build your own stopwatch using Maxim MAX7219 Serially Interfaced, 8-Digit LED Display Drivers One of the basic usage of the TIMER peripheral on ev microcontroller is to provide the accurate timing mechanism. Using the TIMER peripheral as the basic timing, we could easily develop a stopwatch and to the 8-Digit seven segment numeric LED display. Thanks…... Listed under: Clock Projects 365. Building the I2C Smart DC Motor Controller with Atmel AVR Microcontroller – Part 1 The idea of building my own I2C (read as I square C) smart DC motor controller is came when I was learning and playing together with my son on his LEGO® MINDSTORM® NXT 2.0 about a year ago. The NXT sophisticated controller also…... Listed under: Moto 366. Telepresence Robot using Microchip PIC16F1829 and Atmel AVR ATmega168 I2C Smart DC Motor Controller Microcontroller – Part 2 The I2C (read as I square C) smart DC m controller is designed using the Atmel 8-bit AVR Atmega168 microcontroller and configured to act as the I2C slave device where it could be controlled by other microcontro microprocessor through the I2C SDA (serial data)…... Listed under: Robotics - Automation Projects 367. The LED Chasing Effect Project using Atmel AVR Microcontroller One of the interesting projects for most of the embedded beginners enthusiasts or ho to build the LED chasing effect. In this project we are going to use both the Arduino IDE and Atmel AVR Studio to program the AVR ATMega168 microco therefore you…... Listed under: LED Projects 368. How to use I2C-bus on the Atmel AVR Microcontroller I2C (read as I Squared C) bus first introduced by Philips in 1980, because of its simplicity and flex I2C bus has become one of the most important microcontroller bus system used for interfacing various IC-devices with the microcontroller. The I2C bu only…... Listed under: Other Projects 369. Interfacing GSM Module with Atmega32 AVR microcontroller GSM (Global System for Mobile Communication) technology lets user to communicate wi across mobile networks hence it offers a vast area of coverage. Interfacing GSM technology with microcontroller will enable us to extend the commun cover large area. This tutorial will teach you…... Listed under: Other Projects 370. Integrating Wiznet W5100, WIZ811MJ network module with Atmel AVR Microcontroller The rapid penetration of the internet networks into many of tod modern homes and personal gadgets (e.g. smart phone and smart pads) opening a tremendous useful and interesting embedded system application be integrated into our house or known as the intelligent house. For…... Listed under: Internet - Ethernet - LAN Projects 371. Using Serial Peripheral Interface (SPI) Master and Slave with Atmel AVR Microcontroller Sometimes we need to extend or add more I/O ports to our microcontroller based project. Because usually we only have a limited I/O port left than the logical choice is to use the serial data transfer method; wh usually only requires from one up to…... Listed under: Other Projects 372. Working with the Comparator Circuit Sometimes in the embedded system world we need to process the analog world and sending the signal to the m signal exceed some predetermine limit we’ve set. Some example of this situation is to send the interrupt signal to the microcontroller operation…... Lis under: Development Board - Kits Projects 373. Using Transistor as a Switch Most of microcontrollers work within 5 volt environment and the I/O port can only handle current up to 20mA; therefore to attach the microcontroller’s I/O port to different voltage level circuit or to drive devices with more than 20mA; we need to…... Listed under: Other Pr 374. Working with AVR microcontroller Communication Port Project Back in the old days the COM port or known as RS-232 (EIA-232 standard) is one of the communications protocol and hardware use in many computer system installation start from small UNIX machine to the mainframe. The RS-232 proto used by terminal such…... Listed under: Other Projects
375. Microwave Controller using ATmega8 – AVR Project The user interface has the following parts. Output Device: A 16×2 alphanumeric LCD Module is used as the main output can display numbers, alphabets and few symbols. It can show two line and each line can have 16 characters. The backlight enables the…... Listed under: LCD Projects 376. Stepper motor control with an ATmega8 microcontroller This note provides basic implementation details and procedural information to design and as stepper motor system. The controller discussed here is the ATmel mega8, an 8-bit microcontroller (MCU). The note consists of a general description an highlights of implementing a basic stepper motor…... Listed under: Motor Projects 377. Interfacing Servo Motor with Atmega32 Microcontroller Servo Motor is a DC Motor equipped with error sensing negative feedback to control the exact position of the shaft. Unlike DC Motors it will not rotate continuously. It is used to make angular rotations such as 0-90°, 0-180° etc. Stepper Motors ca Listed under: Motor Projects 378. Interfacing DC Motor with Atmega32 Microcontroller In some of your electronic projects you may want to control a DC Motor with Atmega32 Microcon We can’t connect a DC Motor directly to a microcontroller due to following reasons. A microcontroller can’t supply the current required for the working Motor. ATmega32 Microcontroller can source or…... Listed under: Motor Projects 379. Interfacing LCD with Atmega32 Microcontroller using Atmel Studio As we all know LCD (Liquid Crystal Display) is an electronic display which is commo used nowadays in applications such as calculators, laptops, tablets, mobile phones etc. 16×2 character LCD module is a very basic module which is co used by electronic hobbyists and is used in…... Listed under: LCD Projects 380. Blinking LED using Atmega32 Microcontroller and Atmel Studio Similar to printing ‘Hello World’ in C or C++, the very first step towards programming a microcontroller is Blinkin with a delay. Atmega32 is a very popular high performance 8 bit AVR Microcontroller. For this example project we need to use two registers…... Listed under: LED Projects 381. Interfacing rotary encoder to Atmega32 Recently I was working on a project that involved rotary encoder. I thought I'd share some thoughts on how ro encoder can be interfaced and programmed. Actually it is easy to work with rotary encoders - interfacing is simple – only three wires are required…... L under: LCD Projects 382. Graphical LCD Text Display The Graphical LCD Text Display is complete!   I've used the same Atmel ATMega8 controller that I used in the Composite Vid Display.   The interface is the same as well; an 8 bit parallel port with a strobe input and a busy output.  …... Listed under: LCD Projects 383. An advanced energy saver project with DTMF capabilities to use electricity efficiently by reducing the unwanted uses. INTRODUCTION:   A lot of electri wasted due to ignorance or fault of the user. Sometimes a person in the room turns on all the electric equipments which is of no use to them. As an e supposedly a person enters in the hall or conference…... Listed under: Other Projects 384. Analog to Digital Converter of ATmega32 with LED Display Microcontrollers are capable of detecting binary signals: is the button pressed or not? These digital signals. When a microcontroller is powered from five volt, it understands zero volts (0V) as a binary 0 and five volts (5V) as a binary 1. But the re Listed under: LED Projects 385. 4X4 Keypad Interfacing with ATmega32 and LED Display Keypads are parts of HMI or Human Machine Interface and play really important role in a sma embedded system where human interaction or human input is needed. Matrix keypads are well known for their simple architecture and ease of interf this project, we will…... Listed under: LED Projects
386. 4X4 Keypad based Password with ATmega16 and LED Display Security is a prime concern in our day-today life. Everyone wants to be as much secured possible. Keypad based password is one of the many method and the most common and easy one to provide security to any system. In this project, w Listed under: LED Projects 387. 4X4 Keypad based Password with ATmega32 and LCD Display Security is a prime concern in our day-today life. Everyone wants to be as much secured possible. Keypad based password is one of the many method and the most common and easy one to provide security to any system. In this project, w Listed under: LCD Projects 388. 3-axis Accelerometer Sensor-ADXL335 Interfacing with ATmega32 ADXL335 accelerometer sensor is a MEMS (Microelectromechanical systems) sensor which can measure stat acceleration of gravity in tilt-sensing applications, as well as dynamic acceleration resulting from motion, shock, or vibration. The accelerometer senso in mobile devices, gaming systems, disk drive protection, image stabilization,…... Listed under: Sensor - Transducer - Detector Projects 389. Accelerometer based Hand Gesture Controlled Wheel Chair with ATmega32 for Physically Handicapped In this project, we will learn How to design an Accelerometer based Hand Gesture Controlled Wheel Chair with AVR ATmega32 Microcontroller for Physically Handicapped. Here, we will use our han gestures as input signals to drive the wheel chair in different direction and we will…... Listed under: LCD Projects 390. DS1307 RTC based Digital Clock Designing in 12 Hour Format with ATmega32 and 7-Segment Display A digital clock is a type of clock that displays the t digitally (i.e. in numerals or other symbols), as opposed to an analog clock, where the time is indicated by the positions of rotating hands. The clock/ca provides seconds, minutes, hours information. The clock…... Listed under: Clock Projects 391. AVR uartConfig – an atmega and arduino eeprom config library Update to version 2014-06-13 AVR uartConfig is a small footprint library you can use to your micro eeprom through uart communication. AVR uartConfig is a set of tools running on Windows, Linux and Mac, made up or: a avrgcc firmware commandline utility…... Listed under: AVR ATmega Projects 392. Accelerometer and Relay based Hand Gesture Controlled Wireless Home Automation System with ATmega32 using 433MHz RF In this project, we will to design an Accelerometer and Relay based Hand Gesture Controlled Wireless Home Automation System with AVR ATmega32 microcontroller using 4 RF. Here, we will use different hand gestures as input signal to control the appliances i.e 2 bulbs…... Listed under: LCD Projects 393. Password Protected BT136 Triac based Keypad Controlled Wireless Home Automation System with ATmega32 using 433MHz RF-I In this project, we wi How to design a Password Protected BT136 Triac based Keypad Controlled Wireless Home Appliances System with AVR ATmega32 microcontroller usin 433MHz RF Part-I. Here, we will use the 4X4 keypad as the input device to enter the password and…... Listed under: Home Automation Projects 394. LM35 Temperature Sensor Interfacing with ATmega32 and LED Display LM35 series is a low cost and precision Integrated Circuit Temperature Sensor w output voltage is proportional to Centigrade temperature scale. Thus LM35 has an advantage over other temperature sensors calibrated in Kelvin as t don’t require subtraction of large constant voltage to obtain…... Listed under: LED Projects 395. Atmega 32u4 Based Wireless USB Keyboard How a generic keyboard is made has been already explained in the Atmega 32u4 Based Generic USB Keyb Project. In this project a wireless keyboard will be designed. For making a wireless keyboard, there will be two circuits involved in the project - a transm Listed under: Other Projects 396. Atmega 32u4 Based LED Status In the Atmega 32u4 Based USB Controlled LED Series Project, it was demonstrated how to use control transfer to rece peripheral. In this project, it will be demonstrated to transfer data from microcontroller to the host computer. For this, the…... Listed under: LED Proje 397. Atmega 32u4 Based Wireless USB Mouse How a generic mouse is made was explained in the Atmega 32u4 Based Generic USB Mouse Project. In this p wireless mouse will be designed. For making a wireless mouse, there will be two circuits involved in the project - a transmitter circuit which…... Listed u Other Projects
398. Atmega 32u4 Based USB Speaker A speaker is a device that produces sounds from the electrical signal having audio encoded. The speakers usually ha mm jack for audio output from the computer. Nowadays USB interface is also gaining popularity for interfacing audio devices with the computer. A lo under: Other Projects 399. Atmega 32u4 Based USB Musical Keyboard The music keyboard is one of the most common musical instruments. The electronic musical keyboards ha around for a long time. The electronic music keyboards synthesize musical sounds electronically according to MIDI (Musical Instrument Digital Interfac standards. Fortunately, the USB protocol does have provision…... Listed under: Other Projects 400. Atmega 32u4 Based USB EEPROM Reader External memories are frequently used to store and carry computer data. The USB flash drives are quite com nowadays. This project is an attempt to demonstrate making of USB storage devices. The project converts an external EEPROM which basically has I2C to an USB…... Listed under: Other Projects 401. Atmega 32u4 Based USB Controlled LED Series Throughout this USB series, different types of USB devices have been designed and developed. These were enumerating with the host computer and then were using Class Specific transfers for further USB communication. Like the Keyboard, Mouse and devices were using interrupt transfers for…... Listed under: LED Projects 402. Atmega 32u4 Based USB Controlled Servo Motor In this project, a device will be designed which will allow controlling a servo motor from the desktop on USB interface. For controlling a servo motor, PWM output needs to be generated from the microcontroller. The length of the ON time of the PWM… under: Other Projects 403. Atmega 32u4 Based USB Digital Voltmeter In this project, a digital voltmeter will be designed which will show the voltage reading on a desktop applica device will read analog voltage with respect to the ground, digitize the reading and send the reading to personal computer on USB interface. The devic Listed under: Other Projects 404. Attiny85 As a Step/Dir Stepper Motor Controller Somewhere in Greece, someone did something never done before... Seen those things before? Thing: Thing: 3 Oh, you have! You bought one of them you say? Oh... Don't worry, I did too. They did the job, yeah. But we paid for them…... Listed under: Mo Projects 405. Custom PCB for Lights, Temperature, Video OSD and VTX PSU upgrades to HKing Rattler RC Car I’ve had the HobbyKing Rattler for some time now and I’ve been making small modifications here and there which have accumulated over time and has gotten to the point where it would be nice to have everything on a custom PCB. Here’s how everythin Listed under: Temperature Measurement Projects 406. Open Programmer – USB programmer for PIC, EPROM, ATMEL, SPI Open Programmer – An open source USB programmer for PIC micros, I2C-SPI-MicroWire-OneWire-UNIO EEPROMs, some ATMEL micros, generic I2C/SPI devices and (soon) other devices. Completely free and Open Source (including firmware) Programs PIC10-12-16-18-24, dsPI EEPROMs type 24xxxx (I2C), 25xxx (SPI), 93xx6 (MicroWire), DS24xx (OneWire), 11xxx (UNIO),…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 407. Updating electricity meter to communicate via WLAN A while ago Farnell sent email to me and offered one (inexpensive) product  as a sample in excha mentioning it at this blog. I browsed for a while for an interesting part and settled with Microchip MRF24WB0MA/RM WiFi module (Order code 182314 module…... Listed under: Home Automation Projects 408. Using Maxim DS1307 Real Time Clock with Atmel AVR Microcontroller Using Atmega32 Building our own digital clock is one of the dreamed project by the hobbyist or anyone that want to learn or involve seriously in the embedded system world; the ability to integrate time, day and date to the embed system is one of…... Listed under: Clock Projects 409. Single Chip Computer: Easy to Produce AVR BASIC Co This instructable will document and explain my latest project, a standalone computer system ba a single chip (IC); the ATmega 1284P. The 1284P is responsible for all aspects of the system, including running the BASIC interpreter, generation RCA vi signals and reading keyboard input.…... Listed under: Android Projects 410. Doppler Radar for Collision Avoidance Introduction My project uses Doppler radar sensors in order to provide the user with movement, speed, and di information of their environment. An array of Doppler radar sensors are placed on the user�s head and vibration motors are placed on the user�s c neck, back,…... Listed under: Sensor - Transducer - Detector Projects
411. Drums Anywhere: solution to making a great drum beat Using 3D-printed boxes Introduction "The sound and experience of drums... Any time, anywh any object." -Project Soundbyte It's Friday night and you're hanging with your friends at home. There are no parties tonight and you have seen everyth Netflix already - you're bored out of your…... Listed under: Sound - Audio Projects 412. Ultrasonic range-finder with haptic feedback Introduction "An ultrasonic range-finding hat with variable haptic feedback for obstacle detection." -Proje Bite For our ECE 4760 final project, we designed and implemented an ultrasonic range-finding hat that uses haptic feedback to alert its wearer about o in his or her path. The…... Listed under: Sensor - Transducer - Detector Projects 413. Autocross/Track day Data Logger for BMW E36 M3 Customer's Voice “Hello, I am interested in a race car logger than will be able to display and log cru information during autocross and track events. I am interested in tracking vehicle speed, RPM, engine coolant temperature and lateral g-forces. Ideally can be…... Listed under: Car Projects 414. Touchpad Figure Recognition Our project implements a touchpad input system which takes user input and converts it to a printed character. Currently letters of the alphabet, but our training system could be easily generalized to include any figure of completely arbitrary shape,…... Listed under: LCD P 415. Capacitive Touch with Atmel’s AT42QT1070 Touch Sensor IC Rather than using an out-of-the-box capacitive touch solution for my projects, I thought I’d attempt making my breakout board. The idea is to use a sensor capable of triggering normal digital input pins using touch. This post covers the selected touch sensor IC,…... Listed under: Sens Transducer - Detector Projects 416. AVR ATtiny USB Tutorial Part 2 This is the second part of my USB tutorial for ATtiny2313 and V-USB library. In the first part we learned how to get 3.3V to power our circuits. In this part, we will expand our setup with following parts: Larger breadboard and additional…... Listed under: Interfacing(USB - -ISP) Projects 417. AVR Atmega audio input RMA using FFT Radix-4 audiogetradix4 is a simple library you can use to interface with a ac audio input. It reads data from an and returns the RMS value of the input using DFT Radix-4 algorithm. The discrete Fourier transform (DFT) converts a finite list of equally-spaced…... Lis under: Sound - Audio Projects 418. Irradiance/Illuminance Meter using TLR235R sensor with AVR Atmega The TSL235 is a light-to-frequency converter. This library reads TSL235 output fr and convert it to irradiance, and then to illuminance. Irradiance is the power of electromagnetic radiation per unit area (radiative flux) incident on a su expressed in watt per square metre, the…... Listed under: Metering - Instrument Projects 419. An AVR Atmega LCD Menu builder library lcdmenu1 is a simple and small lcd menu builder for AVR Atmega. It works with only 4 buttons (up, down, rig additional buttons can be added. It can also store values to eeprom User can use button up and down to list menu categories, right…... Listed under: L Projects 420. An optical dust meter that uses the GP2Y1010AU0F sensor library made with AVR Atmega This project is a dust detector that use the GP2Y1010AU0F s Attached you can also find the GP2Y1010AU0F sensor library for AVR Atmega.GP2Y1010AU0F is a dust sensor by optical sensing system. An infrared e diode (IRED) and an phototransistor are diagonally arranged into this device.…... Listed under: Sensor - Transducer - Detector Projects 421. AVR Atmega dehumidifier controller board, update This project is an update to the previous dehumidifier based you can here: http://davidegironi.blogspot.it/2013/04/avr-atme dehumidifier-controller.html This update adds some usefull functions. The main issue that i've fixed is the microcontroller crash, that happens sometimes. I've noticed that so the controller stop running, crash or doesn't works as…... Listed under: Sensor - Transducer - Detector Projects 422. A simple brushless sensorless motor driver for AVR Atmega Brushless electric motor (BLDC motors) are synchronous motors that are powered by a DC source via an integrated inverter/switching power supply, which produces an AC electric signal to drive the motor. For an introduction to BLDC motors look at my sensored motor driver…... Listed under: Motor Projects
423. An AVR Atmega based PID magnetic levitator This is a magnetic levitator implemented using Atmega8 microcontroller. Magnetic levitation is a method an object is suspended with no support other than magnetic fields. To make a magnet levitate, an hall sensor is attached to a coil. The coil acts as an… under: Sensor - Transducer - Detector Projects 424. A led matrix Mask built on AVR ATmega8 AVR Mask1 is a led mask built around 74hc595 shift register and 8x8 led matrix. The "Dylan Dog" comics deco conjunction with his stands, make it good looking.t has 4 8x8 led matrix, 2 for the mouth, and 2 for eyes. When the user…... Listed under: LED Projects 425. A simple Sound Pressure Level Meter (SPL) dB audio meter using AVR ATmega A sound level meter or sound meter is an instrument which measures s pressure level. Sound pressure level (SPL) or sound level is a logarithmic measure of the effective sound pressure of a sound relative to a reference va measured in decibels (dB)…... Listed under: Sound - Audio Projects 426. SD card logger library with log rotation that fits on ATmega8 This library implements an SD card Data Logger that runs on ATmega. It has a small footp can be loaded on an ATmega8, leaving space for user code. It supports SD and microSD cards formatted with FAT16. It also features log rotation.The "P FAT…... Listed under: Memory - Storage Projects 427. A Pickup Winding machine built on an ATmega8 The core of this project is an ATmega8. It features: wind counter slow startup automatic stop configura motor speed configurable winds 2 directions If you are looking for a CNC version: you can find it here: http://davidegironi.blogspot.it/2016/06/a-cnc-p winding-machine-built-on.html This winder has an LCD display that will show…... Listed under: Motor Projects 428. USB AVR programmer I’ve already had a programmer for Atmel’s AVR microcontrollers, but I couldn’t use it in my lab, because my laptop doesn’t have a LPT port. So I decided t new programmer with USB connection. I’ve found an open source programmer AVR doper, and…... Listed under: LCD Projects 429. RSS Reader using AVR mega8 I spent part of an afternoon developing a hardware RSS reader (most of my time was spent on the python side of things pretty simple and uses an AVR microcontroller connected to a computer via a serial cable Hardware I am using the Dragon…... Listed under: LCD Proje 430. Veronica – VRAM I considered subtitling this article, “adventures in breadboard noise”, since that’s what I spent most of my time dealing with. In any case, let’s recap where Veronica’s video generator was generating a stable VGA signal. In addition, a test pattern was being displayed…... Listed under: LCD Projects 431. RFID based security system using AVR ATmega32 microcontroller RFID technology brought a great revolution in our life as it simplifies the machine communication. RFID’s are used almost everywhere today Schools, hospitals, industries and much more. This article teaches you to build a simple RFI security system using AVR microcontroller which is reliable…... Listed under: Security - Safety Projects 432. AVR HVSP Fuse Resetter description in working w/ 8 or 14 pin avr devices, i would sometimes want to use the RESET pin as io as the io pin count is low doing so will disable further programming via SPI. i do not need a full blown HV…... Listed under: AVR ATmega Projects
433. AVR Thermostat This thermostat is built around an ATMega164 and a TC1047A temperature sensor. It controls your furnace and air conditioner. It is n programmable, although it has a clock and is capable if some additional code were written (any volunteers?). The unique feature is that instead of a b of buttons…... Listed under: Temperature Measurement Projects 434. Week 11: Networking with ESP8266 For this week I set out to make a board that will show realtime MBTA bus arrival times using the ESP8266 wifi mod LCD. Seemed doable. People of the internet have been excited about the ESP8266 lately. Here is a snapshot of google…... Listed under: LCD Projects 435. Building a Wifi Radio – Part 7, Building an LCD Display This is the seventh part of an ongoing series about building a low cost, open source streaming internet radio.  If you already, check out the previous parts (see the links at the end of this article) for some background about the project. In part…... Listed under: LCD Projects 436. CT Sensor on AVR ATmega A CT (Current Transformers) sensor is a device used to measure alternating current. A CT sensor, like other current transformers is made by a prima winding, a magnetic core and a secondary winding. The primary winding is often a single wire passing through the main…... Listed under: Sensor - Tra Detector Projects 437. Reading temperature on AVR Atmega using a thermistor with NTCtemp library 02 A thermistor is a type of resistor whose resistance varies significantl temperature, more so than in standard resistors. NTCtemp is a simple AVR library to read temperature from a thermistor connected to an atmega mic library implements three models convert adc value read from analog…... Listed under: Temperature Measurement Projects 438. CMR Robot Arm Our project was mainly designed for the Cornell Mars Rover project team (CMR), which will be using the robotic arm for competition t complete many different tasks in the deserts of Southern Utah. For our ECE 4760 final project, we created the control systems for…... Listed under: Ro Automation Projects 439. AVR 16bit Stereo Wave Player Introduction This project aims to implement a cost-effective wave player based on AVR (ATmega / ATiny Series) with CD-A Quality, which can play 8-bit/16-bit Mono/Stereo standard RIFF (Resource Interchange File Format) wave files.  This project can be applied into many applications such as bus /…... Listed under: Sound - Audio Projects 440. Drive a stepper motor with acceleration and deceleration using an Allegro driver on ATmega8 The stepper motor is an electromagnetic device that con digital pulses into mechanical shaft rotation.Most common types of stepper motor can be bipolar or unipolar, depending on the winding. To make a s motor move, motor windings must be loaded in the correct order. A…... Listed under: Motor Projects 441. InLinea01: A PID controlled line following robot build on an ATmega 8 InLinea01 is a simple PID controlled line following robot. This is not speed orient follower, this is just a prototype I built to experiment with this type or machines, though it can be the first step to build a faster one. The goal of a…... L under: Robotics - Automation Projects 442. A DIY A4 Laser Engraver made from a scanner and a printer on ATmega328 This "Get Ready For Win98" Laser Engraving Machine it's built using an old and an old printer. A laser engraving machine is a tool that uses lasers to engrave an object. I've an old broken scanner and an old printer lying aroun by this instructables…... Listed under: CNC - Printing Machines Projects 443. CT Sensor on AVR ATmega A CT (Current Transformers) sensor is a device used to measure alternating current. A CT sensor, like other current transformers is made by a prima winding, a magnetic core and a secondary winding. The primary winding is often a single wire passing through the main…... Listed under: Sensor - Transducer - Detector Projec
444. A web configurable Xively logger, build on AVR ATmega328 Xively (formerly Cosm and before that Pachube) is a platform devoted to simplifying the interconnection of devices and data with applications on the Internet of Things. It is an on-line database service allowing developers to connect senso data (e.g. energy and environment data from objects,…... Listed under: Sensor - Transducer - Detector Projects 445. Cheap CO2 meter using the MQ135 sensor with AVR ATmega MQ135 is an Air Quality Sensor suitable for detecting of NH3, Alcohol, Benzene and othe The description below, is what i derive from the poor datasheet of this sensor, it may be uncorrect, so if you have suggestions please leave me a feedb The…... Listed under: Sensor - Transducer - Detector Projects 446. A simple brushless sensored motor driver for AVR Atmega Brushless electric motor (BLDC motors) are synchronous motors that are powered by a DC source via an integrated inverter/switching power supply, which produces an AC electric signal to drive the motor. Additional electronics control the in output amplitude and waveform (and therefore percent of…... Listed under: Motor Projects 447. PWM Motor Driver with MOSFET H-Bridge and AVR ATmega8 Here is a very simple project of controlling a small DC-motor (taken from an old personal player) with ATmega8. The ATmega8 is having three PWM channels, out of which two are used here. PWM waveforms are fed to MOSFET (RFD3055) H- Here, direction is…... Listed under: Motor Projects, PWM Projects 448. Atmel AVR ATMega16 Interfacing WIth 16×2 char LCD An alphanumeric low cost LCD Display is very essential for may small and big projects to Display type of information. Hitachi HD44780  Chipset based 16x2 char LCD is Really very cheap and easily available in the local market. Project Description:-   project we are going to…... Listed under: LCD Projects 449. An AVR-Based Microstepping Bipolar Chopper Stepper Motor Driver (STMD) Features Open Source - The schematic, parts list, and software are all free downloadable! Hobbyist-friendly - No surface mount parts means allows this drive to be easily repaired! DMOS driver chips rated at 55V and 3 Amps. availability - Electronic parts are all…... Listed under: Motor Projects 450. LCD Interfacing with AVR Interfacing LCD Display in 8bit Mode I’ve already discussed about the LCD display in a note here in this website. You can read on character LCD Display here. Now let us come to the interfacing side of LCD. Let us see the 8bit…... Listed under: LCD Projects 451. How to Establish A PC-Micro controller USART communication Introduction USART is one of the primitive inter-device communication protocols. It is not used in modern comp still, a few mother boards come with the module necessary for an USART communication. Here, in the case of PCs, the port is known as COM port…... Listed under: AVR ATmeg 452. How to Interface an External EEPROM with AVR Atmega32 In this article, we will explain how to communicate to an external EEPROM from the AVR Atm MCU using the I2C communication protocol. So let’s begin our tutorial on how to interface an EEPROM (AT24C16A) with AVR Atmega32. You will usuall external EEPROM…... Listed under: Sensor - Transducer - Detector Projects 453. Worry-Free Automatic Timed Plant Feeder Description Do you often forget to irrigate your plants? Do you have to ask your neighbors to take care of th your whole families are out for a vacation? Don’t worry any more! Here is a solution. This embedded system, worry-free automatic timed plant…... List LCD Projects 454. Week 11: Networking with ESP8266 For this week I set out to make a board that will show realtime MBTA bus arrival times using the ESP8266 wifi mod LCD. Seemed doable. People of the internet have been excited about the ESP8266 lately. Here is a snapshot of google…... Listed under: LCD Projects, S Transducer - Detector Projects
455. Color Video Game on AVR Introduction Our project is to make a color video game that runs primarily on the ATmega 1284P. To do this, we adhered to standard for color video. The sync signals used for NTSC are generated on the ATmega 1284P itself, and all game…... Listed under: Game - Entertainme Projects 456. Working with Atmel AVR Microcontroller Basic Pulse Width Modulation (PWM) Peripheral Pulse Width Modulation (PWM) is a technique widely used in modern switching ci control the amount of power given to the electrical device.  This method simply switches ON and OFF the power supplied to the electrical device rapidly. The average amou energy received…... Listed under: PWM Projects 457. How to interface RFID with AVR ATmega32 microcontroller RFID is most arguably a evolutionary wireless technology which boosted working of embed devices up to great mark. And there is plenty of systems and devices working based on this technology. This article is focused to teach you how to inte with AVR microcontroller.…... Listed under: AVR ATmega Projects 458. Remote Temperature Monitoring using GSM – AVR Project Temperature monitoring have wide application in daily life. In modern day keeping an eye on temperature of pla as server rooms, hospital rooms, warehouses and green houses can help solve many problems. But with the use of normal temperature sensors, someone needs to go….. under: Temperature Measurement Projects 459. ATMega16 AVR Microcontroller Seven Segment Digital Clock The ATMega16 Seven Segment Digital Clock In this ATMega16 AVR project we will be designing and implementing a clock with the aid of a Atmel AVR ATMega16 microcontroller and Seven Segment Displays. As such before going through this digital clock AVR project it is…... Listed under: Cloc 460. Servo motor control using AVR Servo motors are so called “closed feedback” systems. This means that motor comes with control circuit, which senses mechanism is in desired location and if not it continuously corrects an error until motor reaches proper point. Servo motors are widely used in robotic Listed under: Motor Projects 461. Running TX433 and RX433 RF modules with AVR microcontrollers Sometimes in embedded design you may want to go wireless. Might be you will wan various readings of remotely placed sensors, or simply build a remote control for robot or car alarm system. Radio communications between two AVR microcontrollers can be easy when…... Listed under: Robotics - Automation Projects 462. Obstacle Avoiding Robot using AVR ATmega32 – Part II Hello and Welcome back to the second part of Obstacle Avoiding Robot Tutorial. In the last part we studied the drive and the mechanical construction of our robot. In this part we will make the sensor part. The sensors will help our robot detect…... Listed under: Robotics - Automation Proj 463. Weeks 11-12: AVR USB Devices and Programming One of the relatively unexplored topics in this week’s lecture was USB, the ubiquitous protocol that a computers to communicate with peripheral devices (containing microcontrollers). Creating a USB device allows any computer to talk to it without the specialized software and hardware we’ve been using…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 464. Lab: DC Motor Control Using an H-Bridge Introduction Contents [show] In this tutorial, you’ll learn how to control a DC motor’s direction using an H-br reverse a DC motor, you need to be able to reverse the direction of the current in the motor. The easiest way to do this is…... Listed under: Motor Proj 465. Final Project: built a sous-vide immersion cooker For my final project I built a sous-vide immersion cooker: Sous-vide is a method for cooking food in a temperature-controlled water environment for longer than normal cooking times, at an accurately regulated temperature. Sous-vide cookers are often high-end restaurants. In the past few…... Listed under: Temperature Measurement Projects 466. Arduino Robotic Arm In this tutorial, we design an Arduino Uno Robotic Arm. Entire arm will be designed from some scrap material and servos. Entire of construction has been explained in detail below. The arm has been built with cardboards and the individual parts have been locked to…... Listed un Robotics - Automation Projects 467. LED Blinking with ATmega32 Microcontroller Blinking LED is the first step you would like to take to get started with electronics. In this tutorial we are g connect an LED with ATmega32, which is an AVR series microcontroller. We are going to blink the LED at half a second rate.…... Listed under: LED Projects
468. Interfacing LCD with ATmega32 Microcontroller To establish a good communication between human world and machine world, display units play an important role. And so the important part of embedded systems. Display units - big or small, work on the same basic principle. Besides complex display units like graphic display Listed under: LED Projects 469. Power LED Dimmer using ATmega32 Microcontroller In this project we are going to use one of the features of ATmega32A to adjust the brightness of 1 The method that is used to adjust the speed of  LED is PWM (Pulse Width Modulation). The method of PWM is explained here. Consider…... Listed und Projects, PWM Projects 470. Automatic Staircase Light We all know that one of the places where power wastage happens most in homes and offices is at staircases. We usually tur at stairs and leave it in a hurry. In this project we are going to design a stair case lamp which…... Listed under: Home Automation Projects 471. Microcontroller Based Electronic Voting Machine Whenever we go to vote for elections we come to see electronic voting machines. In this project we a to design and develop a simple voting machine by using ATmega32A microcontroller. Although we can use the controller to get more than 32 people v machine, to…... Listed under: AVR ATmega Projects 472. RFID Based Toll Plaza System We know in offices, shopping malls and in many other places where only the person with authorization card is allowed to the room. These systems use RFID communication system. RFID is used in shopping malls to stop theft as the products are tagged with RFID chip…... L under: AVR ATmega Projects 473. 0-99 Counter using AVR Microcontroller In this tutorial we are going to design a 0-99 counter by interfacing two seven segment displays to ATMEGA32A Microcontroller. Here we count events based on number of times button is pressed. Before moving ahead, let's understand what is a seven segment d seven segment display…... Listed under: LED Projects 474. Temperature Measurement using LM35 and AVR Microcontroller In this project we are going to design a circuit for measuring temperature. This circuit developed using “LM35”, a linear voltage sensor. Temperature is usually measured in “Centigrade” or “Faraheite”. “LM35” sensor provides output based of centigrade. LM35 is three pin transistor…... Listed under: Temperature Measurement Projects 475. RFID Based Voting Machine We know in offices, shopping malls and in many other places where only the person with authorization card is allowed to room. These systems use RFID communication system. RFID is used in shopping malls to stop theft as the products are tagged with RFID chip…... Liste AVR ATmega Projects 476. 0-25V Digital Voltmeter using AVR Microcontroller In this project we are going to design a 25V range digital voltmeter by using ATMEGA32A microcontr ATMEGA, we are going to use 10bit ADC (Analog to Digital Converter) to build a digital voltmeter. Now the ADC in ATMEGA can not take a input…... Liste Metering - Instrument Projects 477. Distance Measurement using HC-SR04 and AVR Microcontroller In this tutorial we are going to discuss and design a circuit for measuring distance. This circuit is developed by i ultrasonic sensor“HC-SR04” with AVR microcontroller. This sensor uses a technique called “ECHO” which is something you get when sound reflects back after striking with…... L under: Calculator Projects 478. Touch Keypad Interfacing with ATmega32 Microcontroller In this tutorial we are going to interface a 4x2 (8 key) touch keypad with ATMEGA32A microco We all know keypad is one of the most important input devices used in electronics engineering. This module does not have actual keys, but have spec designed capacitive metal pads,…... Listed under: LED Projects 479. 4×4 Keypad Interfacing with ATmega32 Microcontroller In this tutorial we are going to interface a 4x4 (16 key) keypad with ATMEGA32A microcontrolle know that keypad is one of the most important input devices used in electronics projects. Keypad is one of the easiest ways to give commands or instr an electronic…... Listed under: AVR ATmega Projects 480. Flex Sensor Interfacing with AVR Microcontroller In this tutorial we are going to interface FLEX sensor with ATMEGA8 microcontroller. In ATMEGA8, we use 10bit ADC (Analog to Digital Conversion) feature to do this job. Now the ADC in ATMEGA cannot take a input more than +5V. [caption id="attachment_34862" align="aligncenter"…... Listed under: Sensor - Transducer - Detector Projects
481. Joystick Interfacing with AVR Microcontroller In this tutorial we are going to interface a joystick module with atmega8 microcontroller. A JOY STICK is an module used for communication. It basically makes easy the user machine communication. A joystick is shown in below figure. [caption id="attachme align="aligncenter" width="600"] Joystick Interfacing with AVR Microcontroller[/caption]…... Listed under: AVR ATmega Projects 482. Anti-Theft Alert System using ATmega8 Microcontroller In this project we are going to make a vibration alert system with ATMEGA8 microcontroller. Th be used as a theft alert system, for that we are going to interface tilt sensor with ATMEGA8. A tilt sensor is shown in below figure. [caption id="attachment_34853" align="aligncenter"…... Listed under: Sensor - Transducer - Detector Projects 483. 100mA Ammeter using AVR Microcontroller In this project we are going to make a low range ammeter using ATMEGA8 microcontroller. In ATMEGA8, w going use 10bit ADC (Analog to Digital Conversion) feature to do this. Although we have few other ways to get the current parameter from a circuit, we under: AVR ATmega Projects 484. Light Intensity Measurement using LDR and AVR Microcontroller In this project we are going to interface LDR with ATMEGA8 microcontroller, and with can measure LIGHT INTENSITY in the area. In ATMEGA8, we are going to use 10bit ADC (Analog to Digital Conversion) feature to measure the light inte LDR is a transducer…... Listed under: AVR ATmega Projects 485. Fire Alarm System using AVR Microcontroller In this project, we are going to make a Fire Alert System using ATMEGA8 microcontroller and fire sensor.  sensor can be of any type, however we are using IR (Infrared) based Fire Sensor. Although IR based Fire Sensors have some disadvantages mostly of in it…... Listed under: Security - Safety Projects 486. Alarm Clock using ATmega32 Microcontroller In this project we are going to design a simple Alarm clock using ATMEGA32 timers. ATmega32A microcontroller has a 16 bit timer will be using that timer to count the seconds and develop a digital clock. [caption id="attachment_34830" align="aligncenter" width="650"] AVR Microcontroller Based Digital Al Listed under: Clock Projects 487. Introduction to Octocoupler and Interfacing with ATmega8 In this tutorial we are going to interface an Optocoupler with ATMEGA8 microcontroller. Octocouplers are fascinating devices used to isolate the electronic and electrical circuits. This simple device isolates the sensitive electronics from robu electronics like motors, yet keeping the load in control over the source. [caption…... Listed under: AVR ATmega Projects 488. How to establish UART communication between ATmega8 and Arduino Uno? Here we are going to establish a communication between an ATmega8 microcontroller and Arduino Uno. The communication established here is UART (Universal Asynchronous Receiver Transmitter) type. It’s serial commu By this serial communication data can be shared between two controllers, which is a required in various embedded system…... Listed under: Android 489. 8×8 LED Matrix Interfacing with AVR Microcontroller In this session we are going to design an 8x8 LED display with 8x8 LED matrix and ATmega8 micro which can show alphabets or names. [caption id="attachment_34818" align="alignnone" width="650"] LED Matrix Interfacing with AVR Microcontroller A 8x8 LED matrix contains 64 LED (Light Emitting Diodes) which…... Listed under: LED Projects 490. Make Your Own Homemade Arduino Board with ATmega328 Chip Arduino is an open-source development platform for engineers and hobbyists to de electronics projects in an easy way. It consists of both a physical programmable development board (based on AVR series of microcontrollers) and a p software or IDE which runs on your computer and used to write and upload…... Listed under: Arduino Programmer Projects 491. Scrolling Text Display on 8×8 LED Matrix using AVR Microcontroller In this tutorial we are going to design an 8x8 LED Matrix Scrolling Display using ATM which will show scrolling alphabets. 8x8 LED Matrix contains 64 LEDs (Light Emitting Diodes) which are arranged in the form of a matrix, hence the na matrix. We are…... Listed under: LED Projects 492. Atmega 32u4 Based USB Data Logger (Part 23/25) In this project, a device will be designed that will read analog data from any analog sensor and will s digitized form of that data to a personal computer on USB interface. On PC, a desktop application will store the data in an excel…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 493. Controlling a BLDC Motor with an ESC REQUIREMENTS: 1. Microcontroller (AtMega 16) 2. A Brushless DC motor (BLDC) 3. An Electronic Speed Controll Power source to drive the motor (LiPo battery) DESCRIPTION: Brushless motors have much more satisfying results as compared to brushed motors. T difference between them is…... Listed under: Motor Projects
494. AT89C2051 Development Stick 89C2051 Development Stick kit offers an easy way of interfacing 89C2051 compatible MCU’s. Slim design with plug in type approach Voltage reg board for stable and regulated supply to the MCU RESET switch for resetting the MCU 0592 MHz Crystal 4K external EEPROM Power-On…... Listed under: Development Board - Projects 495. EGYDuino – Arduino compatible board EGYDuino is a DIY Arduino clone made on a single sided PCB board. It’s simple and cheap to build using home PCB fabrication meth it’s 100% compatible with Arduino. Description ATmega8 takes care of the USB to serial communication and should be burned with…... Listed under: Android Projects 496. ATmega64 Development Board This project is a development board for Atmel ATmega64 microcontroller and can be used to easily develop custom AV firmware or as an introduction board to microprocessors and programming. A development board is better to be used instead of a breadboard setup facilitates…... Listed under: Development Board - Kits Projects 497. DigiPot – Rotary Encoder Digital Potentiometer Description The “potentiometer” is actually a rotary encoder (TW-700198) connected to a microcontroller that reads the sig and convert it to a value that is displayed on 7-segment displays. The value also is sent via i2c/spi/serial/usb to the host. Also 3 LED and…... Listed under: AVR ATmega Proje 498. Atmega168 TV-B-Gone Yes, I know what you are thinking: "oh no, please not another TVBGone..." Anyway, this instructable is for the newbies as me w still experimenting with Arduino, and prefer to program an Atmega168 in Arduino than an AtTyny85 with other methods. This circuit is…... Listed unde Automation Projects 499. Arduino atmega644/1284 clone This project is about to DIY an Arduino board wth an ATMEGA644P or 1284P to have more INPUTS/OUTPUTS than on atmega328P. You can buy an arduino mega but it's more expensive. The microcontrollers will be bootloaded with Sanguino and the project seems to b Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 500. Small Footprint ATMega328P Board For my Word Clock project, for which I built a custom 8 x 8 LED Matrix with controller, I needed a much smaller foo DIY-Duino (board for an ATMega328P microprocessor), one that would have all of the main functionality of my previous DIY-Duino boards (such…... Lis under: Development Board - Kits Projects 501. Flames effect with a 8×8 LED Matrix and ATMega328 A while ago I found some blog posts explaining how to use a LED matrix as a pendant (http://hackaday.com/2013/01/10/8x8-led-matrix-pendant-sealed-in-a-block-of-epoxy/ and https://sites.google.com/site/tinymatrix/ ). The 8x8 matrix p looked cool, but it was missing detailed information on which parts to use and how to solder everything together.…... Listed under: LED Projects 502. Remote controlled switch using Atmega 328p Ever dreamt of controlling an appliance like a CFL or a fan at your finger tips and thinking for a cheap so Well, then you are looking at the right instructable!! This instructable will provide you with a cheap and best possible solution to control…... Listed und Automation Projects 503. Easy Technique for Bootloading Atmega328pu and Atmega328p-pu# Xolcano it is very difficult to bootload Atmega chips when you don't have proper knowledge about device ! each chips are associated with its own Signature.at the beginning I found very difficult in uploading bootloader file to Atmega 328pu and Atmega 328p-pu , although their…... under: Interfacing(USB - RS232 - I2c -ISP) Projects 504. Digital Wall clock Using Atmega-8 and RTC Clock is one of the most essential house hold things. There are various types of clocks like good old Pendulu Analog clocks and the now trending modern Digital clocks. Digital clocks has many advantages over the analog clocks like the Accuracy in time, easy…. under: Clock Projects
505. Running an HD44780 Display off the ATmega on a Gertboard There was a thread on the Raspberry Pi forums about running a 16x2 HD44780 based di the ATmega chip on the Gertboard.  I normally use a shift register to run my display, so I wasn't much help to them.  I decided to try and…... Listed und Projects 506. How to fix dead atmega and attiny avr chips Atmega fusebit doctor, as name says it, device for repairing dead Atmega and Attiny family AVRs by writin fusebits. Most common mistakes or problems are a wrong clock source (CKSEL fusebits), disabled SPI programming (SPIEN fuse) or disabled reset pin fuse). This simple…... Listed under: How To - DIY - Projects 507. Getting Started With the ATMega328P In the Internet of Things movement, people across the globe are connecting their stuff – TVs, pets, even housep the internet and transmitting all sorts of data. If you’re going to be a part of that movement, or want to dabble in creative…... Listed under: Interfacing RS232 - I2c -ISP) Projects 508. ATmega DIP40 Minimal Board After I wrote several articles about using ATmega microcontrollers (DIP40) in Arduino environment I had some feedback asked how to be effectively put into operation this project. As I came into the Arduino world from classical microcontrollers development world, I have Listed under: Development Board - Kits Projects 509. Program an ATmega168/328 with codebender If you want to use an inexpensive ATmega168 or ATmega328p for your project, but you want the simplic arduino code and codebender, this tutorial will guide you through! A brand new ATmega microcontroller does not come preconfigured to use with Ard code. So…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 510. Alarm clock Using Atmega-328 and RTC Hi everyone! This is my first instructable! After reading hundreds of instructables, I decided to make one myself. Clock is one of the mo essential house hold things. There are various types of clocks like good old Pendulum clocks, Analog clocks and the now trending…... Listed under: Clock Projects 511. Atmega Alarmclock & Thermohumidity meter First, let me introduce you my project. I made an Alarm clock with extended functionality & thermomete humiditymeter. Everything started when my friend (who used to bring me some old electronic rubbish and I used to check if there's not something us brought me…... Listed under: Clock Projects, Metering - Instrument Projects 512. Interfacing Analog Joystick with AVR ATmega32 If you have played games on console you must be knowing what a joystick is. In games a joystick is gen used to control the motion of character or a vehicle (like plane or car). Joystick give a very realistic two dimensional control! Joystick are…... Listed unde Interfacing(USB - RS232 - I2c -ISP) Projects 513. Working with TWI (I2C) sensors / Devices Introduction The I2C is a multimaster, multislave serial single-ended computer bus and was invented by Phili 1982. The atmel microcontrollers use a compatible  to I2C serial bus that is named TWI (Two Wire Interface). The  TWI supports serial communication and 400 kHz. The…... Listed under: Sensor - Transducer - Detector Projects 514. Boolean Algebra Calculator Power Supply: It can be defined as a device that supplies electrical energy to one or more electric loads. The term is most c applied to devices that convert one form of electrical energy to another, though it may also refer to devices that convert…... Listed under: Calculator P 515. Automatic Railway Gate Controller with High Speed Alerting System The main aim of this project is to operate and control the unmanned railway gate proper manner in order to avoid the accidents in the unmanned railway crossing. In a country like ours where there are many unmanned railway cros accidents are increasing…... Listed under: Security - Safety Projects 516. Interfacing 16X2 LCD to AVR Microcontroller   Well this is not different from the way interfacing the LCD to 8051 or PIC microcontroller. The crystal oscillator will provide the clo microcontroller. The capacitors connected to the crystal will act as filters and help the crystal to resonate and oscillates…... Listed under: LCD Projects
517. Water Level Indicator The Water Level Indicator employs a simple mechanism to detect and indicate the water level in an overhead tank or any other w container. The sensing is done by using a set of nine probes which are placed at nine different levels on the tank…... Listed under: Sensor - Transducer Detector Projects 518. DTMF Controlled Home Automation System Circuit Generally, appliances used in our home are controlled with the help of switches. These days, you c automation of these appliances using many technologies. This article presents the controlling of home appliances using DTMF technology. DTMF is ac Dual Tone Multi Frequency. So, just…... Listed under: Blog, Home Automation Projects 519. 2 Digit Up/Down Counter Circuit Generally, one can see the digital displays which display the score when buttons are pressed on score boards. The ma of this score board is 2 digits up/down counter circuit. The 2 digits are displayed on two 7 segment displays. This article describes 2…... Listed under: C Projects 520. Digital Temperature Sensor Circuit Temperature sensors are widely used in electronic equipments to display the temperature. You can see the digital c displaying the room temperature value. It is due to the temperature sensor embedded in it. Generally, temperature value is analog. It is converted to d value and…... Listed under: Temperature Measurement Projects 521. RFID Based Attendance System – Circuit, Working, Source Code Attendance in colleges is generally paper based which may sometimes cause errors. Taking attendance ma consumes more time. So the proposed attendance system uses RFID technology to take attendance. In this system, each student is issued an RFID tag. Controlling unit is i institute.…... Listed under: Sensor - Transducer - Detector Projects 522. Auto Intensity Control of Street Lights treet lights are controlled manually in olden days. These days automation of street lights has emerged. But one observe that there is no need of high intensity in peak hours i.e. when there is no traffic and even in early mornings. By reducing the…... Listed under: Transducer - Detector Projects 523. Street Lights that Glow on Detecting Vehicle Movement Street lights are switched on depending on the intensity of the Sun light on LDR. If the intensity Sunlight on light dependent resistor is low, its resistance value is high. This value increases and becomes high when it is completely in dark. This resist Listed under: Sensor - Transducer - Detector Projects 524. Sun Tracking Solar Panel As the non renewable energy resources are decreasing, use of renewable resources for producing electricity is increasing. So are becoming more popular day by day. We have already read a post about how to install solar panel for home. Solar panel absorbs the energy…... Lis under: Sensor - Transducer - Detector Projects 525. Line Follower Robot using Microcontroller When robot is placed on the fixed path, it follows the path by detecting the line. The robot direction of moti depends on the two sensors outputs. When the two sensors are on the line of path, robot moves forward. If the left sensor moves…... Listed under: Ro Automation Projects 526. Density Based Traffic Signal System using Microcontroller Nowadays, controlling the traffic becomes major issue because of rapid increase in automobiles and also because of time delays between traffic lights. So, in order to rectify this problem, we will go for density based traffic lights system. This article explains you how to…... Listed under: Car Pro
527. PWM Based DC Motor Speed Control using Microcontroller In many applications, it is important to control the speed of DC motor where precision and protection are essence. Here we will use a technique called PWM (pulse width modulation) to control the speed of DC motor. We can achieve speed co DC motor…... Listed under: PWM Projects 528. Biometric Attendance System Circuit Biometrics is the emerging technology used for identification. Biometric refers to automatic identification of a pe based on biological characters such as finger print, iris, facial recognition, etc. In this article finger print based attendance system is proposed. Attenda educational institutions, industries will require…... Listed under: Sensor - Transducer - Detector Projects 529. Temperature Controlled DC Fan using Microcontroller Generally, electronic devices produce more heat. So this heat should be reduced in order to pro device. There are many ways to reduce this heat. One way is to switch on the fan spontaneously. This article describes a circuit that automatically, swit fan…... Listed under: Temperature Measurement Projects 530. GSM Module SIM300 Interface with AVR Amega32 A GSM/GPRS Module like SIM300 can be used for any embedded application that requires a long ra communication, like a robot in Chennai controlled by a person sitting in New Delhi! Or simply a water pump in a rice field turned on in the morning….. under: Interfacing(USB - RS232 - I2c -ISP) Projects 531. Ultrasonic Rangefinder HC-SR04 Interfacing with ATmega8 In this article I will describe how to interface a Ultrasonic Range Finder Module with a AVR A microcontroller. I will provide a HEX file which you can burn into your ATmega8 directly to quickly test this whole setup. Ultrasonic range finder modul find…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 532. Microwave Controller using ATmega8 – AVR Project Pause Function You can press STOP/Clear button during countdown phase to pause the timer and to switch of the asso relay of selected function (microwave or grill). This will enable you to open the door of oven and have a look at the food being…... Listed under: Home Automation Projects 533. Simple Single Motor Control using AVR ATmega16 Microcontrollers are good when it comes to brain, but to do anything in real world they need muscles too ! Their muscles are electromechanical actuators like motors. Their are several types of motor available to do various type of motion. The simplest of them are…... Listed u Motor Projects 534. Microwave Controller using ATmega8 – AVR Project The user interface has the following parts. Output Device: A 16×2 alphanumeric LCD Module is used as the main output can display numbers, alphabets and few symbols. It can show two line and each line can have 16 characters. The backlight enables the…... Listed under: Home Automation 535. AVR Dual RGB Matrix Driver Multiplexing LEDs can be tricky, but we're working with RGB LEDs, so think of each RGB as three individual LEDs. For an 8 that is 192 total LEDs on a single matrix. Even though there are only 32 connection pins, it is…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projec 536. AVR Chronograph from concept to PCB A chronograph is a device used to measure the speed of a passing object.  In it's simplest form, this involves tw of some kind that 'see' the object, some device that can measure time, and some output to deliver the data to the user.…... Listed under: Developmen Kits Projects 537. Clock/temperature LED display This project is based on the timer/counter 0 example. It shows time, date and temparature on 7 segment displays. Inst LCD display the time is shown on a four digit 7 segment display with common cathode. The date and temparature is shown on…... Listed under: Clock LED Projects, Temperature Measurement Projects 538. Running LED bicolor This is a good project for beginners. It is easy to build.This running LED light uses seven bicolor led's red and yellow, they light up pattern that can be made within the program code.The program code is written in assembler. ATMELs AVR STUDIO…... Listed under: LED Projects
539. LED thermometer his project shows the temperature on a three digit 7-segment display, it measures the temperature from -9.5 to 99 degrees Celcius steps, or from 0 to 210 degrees Fahrenheit in 1.0 degrees steps. Because of the LED display the temperature is also…... Listed under: LED Projects, Tem Measurement Projects 540. LCD interface This example is based on a LCD module with the Hitachi HD44780 LCD-controller.You can get these displays in various kinds, from 1 to 4 lines and from 8 to 40 c per line. A display with 16 characters per line and 2 lines is used in…... Listed under: LCD Projects 541. RGB LED color mixer Page 1 of 4 An RGB LED is a LED which has three LED's integrated in one packaging. These LED's have the colors Red, Green, and RGB LED used here is a hyperflux LED with common cathode, which can draw 20mA current. Such a…... Listed under: LED Projects 542. Stepper motor driver With this circuit you can drive a unipolar stepper motor. It operates in full step mode. The AVR attiny2313 micro controller contro pulses for the stepper motor. The pulses are amplified by the ULN2003 driver. The driver accepts 5V inputs, the output for the…... Listed under: LED P 543. LED VU meter Schematic and build Below is the schematic of the LED VU meter. The circuit is builds with the ATMega328 board an two LED boards con it. You can also build it on a breadboard. For more detail:  LED VU meter... Listed under: LED Projects 544. Temperature indicator This project uses a Dallas DS1621 temperature sensor which indicates the temparature of the device. The temperature sensor thermal alarm output, which becomes high when the temperature of the device exceeds a user defined value. When the temperature drops below a u defined…... Listed under: Temperature Measurement Projects 545. Running LED's using ATTiny2313 This running LED or LED chaser is a good project for beginners in the microcontroller technology. It is easy to build, a assembler program code can be easily adapted. This running LED light has 15 red 3mm LED's. The 15 outputs of ports B and…... Listed under: LED Pro 546. Running LED's This small project let you make running leds. For this project you need a attiny2313 microcontroller and 8 leds and 8 resistors. The leds programmed so that they show differrent patterns. Hardware The leds are connected to PORTB of the microcontroller via the…... Listed under: LED Pr 547. PC stepper motor driver With this circuit you can control two unipolair stepper motors in full step mode via the RS232 serial port of your PC. A terminal program such as Hype can be used to control the stepper motors. The stepper motors can be driven one at a…... Listed under: Motor Projects 548. Photocell or LDR A photocell or photo resistor is a Light Dependent Resistors (LDR). LDR's are sensors that detect light. They are small, inexpensive, low easy to use and don't wear out. Overview A photocell or photo resistor is a Light Dependent Resistors (LDR). LDR's are sensors that…... Listed under: S Transducer - Detector Projects
549. Electronic cricket his electronic cricket is a fun project. A real crickets chirp at night and faster in warmer temperatures. A cricket chirp is composed of three sinus waves of a single frequence of about 5kHz. occurring in rapid succession. Introduction This electronic cricket is…... Listed under: Game - Entertainment Projects 550. Relais Driver Board This is a peripheral board with 4 relais, rated at 5A/250V each. The board has a ML10 output connector for connection with the AT Project board. It has also 4 LED's for indication which relais is switched on. Hardware The circuit is simple, it consists…... Listed under: Development Bo Projects 551. Dot matrix display This is a Dot Matrix Scrolling Sign. A Dot Matrix Display has an 5x7 led matrix with 5 columns and 7 rows. The display is controlled b ATMega328 microcontroller board. The rows are controlled by PORTB of the microcontroller, while PORTD puts the data…... Listed under: LED Projects 552. Clock/temperature LED display This project is based on the timer/counter 0 example. It shows time, date and temparature on 7 segment displays. Inst LCD display the time is shown on a four digit 7 segment display with common cathode. The date and temparature is shown on…... Listed under: Clock 553. LCD/switch interface Page 1 of 2 This board can directly connected to the STK 500 board or the ATTiny2313 ISP program board with a 10 pole flatcable pin header of the STK500 and the 10 pin header of the LCD/Switch board. The display has…... Listed under: LCD Projects 554. Digital Book Cricket with ATtiny 85 The project described here is a digital implementation of “book cricket game” which students normally use to play i childhood time. The heart of the project is 8 bit MCU from AVR family called ATtiny85. ATtiny85 are small and cheap microcontrollers which are conven Listed under: Game - Entertainment Projects 555. Attendance System using AVR and RFID This project aims to automate the process of taking attendance on pen and paper and prevent any fraudulent entry. It uses RFID tags t attendance. Each student is assigned a unique tag, which he/she is required to swipe over the reader to give his/her…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Project 556. Interfacing Serial Bluetooth Modem with Computer using ATmega16 This article would give you a general idea about how to setup and interface any B modem with your computer. There are many types of Bluetooth modems available in market, which vary in quality, cost, range, etc. Some of the well k Serial Bluetooth modems…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 557. Smart Home Automation using AVR in this technological world, automatic systems are being preferred over manual system. In this series Home Autom plays an important role for humans. In this unit we talk about basic needs to understand the project well and also for its future advancements. We are Listed under: Home Automation Projects 558. Interfacing 4-wire Resistive Touchscreen with ATMega16 Microcontroller Touch screens are two dimensional input devices. Nowadays most of the elec gadgets use them. Laptops, smart phones, tablets and even some home appliances like washing machines & microwave ovens also use a touch scree nowadays. Why Touch screens? Touch screens are preferred over keypads…... Listed under: LCD Projects 559. How to Interface a GSM (SIM 300) Modem with ATmega32 to Send and Receive SMS What is a GSM Modem? GSM stands for Global System for Mobile Communications.It is a standard set developed by the EuropeanTelecommunications Standards Institute (ETSI) to describe protocols for second gener digital cellular networks used by mobilephones. A Modem is a device which modulates and…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects
560. AVR I/O Ports AVR microcontrollers are the advanced microcontrollers. From 1996 onwards these are come into existence. In AVR family there are so m controllers are available. Mainly the AVR family is sub grouped as ATmega, ATtiny, Xmega, UC3, SAM3 and SAM4. In these form 8 to 32…... Listed under Interfacing(USB - RS232 - I2c -ISP) Projects 561. Fastest Finger First Circuit using ATMega16 Fastest Finger first circuit is basically used in quiz type games where the reaction speed of a participant is s The circuit enables us to identify who responded first to the question by triggering a visual and audio indication. Components Required 1 x ATMega16 development…... Listed under: Game - Entertainment Projects 562. DIY: Retro Style Analog Volt Meter using Servo Motor Digital equipments have rapidly replaced Analog equipments in the long run. Well that is becaus former has lot of advantages over the latter. But do you miss those retro style analog measuring instruments? Those pointy indicators and graduated Well I do and so…... Listed under: Metering - Instrument Projects 563. embRACE: The Embedded Race embRACE, a game developed on the embedded platform, entirely coded in assembly language. The game has been programmed on an ATMega16 micro-controller, interfaced with a 16x2 LCD display module. The game possesses an interactive user interface and exc features like: -Main Menu -Pause Menu -Real…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 564. Latitude & Longitude Display System Using GPS & AVR Microcontroller This project is a reference to budding engineers or a helping hand to those who work and interface a GPS Receiver with microcontrollerand making their own channel to communicate with satellite, seeking for some useful informat satellite to make a effective and…... Listed under: GPS Based Projects 565. Controlling RGB LED colour using Atmega16 This tutorial will give you a brief introduction to the concept of colors and how different colors can be pro using RGB LED. The color would be controlled using an ATMega16 microcontroller. RGB LEDs are basically the combination of the 3 LEDs (Red, Green a Listed under: LED Projects 566. Speed and Direction Control of Stepper Motor using AVR Microcontroller Stepper motor can be termed as digital motor because it operates on pulses AC or DC motor that rotates continuously, stepper motor rotates in steps. It rotates in number of steps as per applied number of pulses. Stepper mot in many applications…... Listed under: Motor Projects 567. Accelerometer Based Hand Gesture Controlled Robot In many application of controlling robotic gadget it  becomes quite hard and complicated when comes the part of controlling it with remote or many different switches. Mostly in military application, industrial robotics, construction vehicles in civil medical application for surgery. In this field…... Listed under: Robotics - Automation Projects 568. Digital Clock using Seven Segment Display and ATMega16 In this ATMega16 AVR project we will be designing and implementing a digital clock with the a atmel AVR ATMega16 microcontroller and seven segment display. Before going through this digital clock AVR project it is recommended to complete tutorial on Interfacing a Seven Segment Display with…... Listed under: Clock Projects 569. LED Light Bulb Controller using AVR Microcontroller Previously before 10-15 years the majority of electrical lights were either light bulbs (with yellow li tube-light sticks (with white light). The major disadvantage of these lighting devices was they consume more electrical energy (in terms of Watt) and gi luminance (brightness). Light…... Listed under: LED Projects 570. Speed and Direction Control of DC Motor using AVR Microcontroller Controlling direction and speed of DC motor is very essential in many applications Robotic application – to change direction and speed of moving robot ·         Industrial application – to change direction and speed of rotating machiner Domestic application – to vary speed…... Listed under: Motor Projects 571. Interfacing 16X2 LCD to AVR Microcontroller Well this is not different from the way interfacing the LCD to 8051 or PIC microcontroller. The crystal oscillator will provide the cloc microcontroller. The capacitors connected to the crystal will act as filters and help the crystal to resonate and oscillates to…... Listed under: Home Automation Projects
572. 4 Wire Touch Screen Based Digital Magic Slate Ever played with magic slates in your childhood? Well this project will show you how to make a digital m using a PC, a touch screen and few other components.   Components Required      1.      4-wire resistive touch screen with connector      2.      ATMega16 Listed under: LCD Projects 573. Intelligent LED light controller using AVR Now a days LED light bulbs are becoming more and more popular because they have several advantages. Som advantages are listed below ·         Their energy (electrical) consumption is much more less ·         Their luminance is more ·         Their intensity can be v ·        …... Listed under: LED Projects 574. DC Motor Control with Joystick & AVR Microcontroller In many of the applications it is required to alter the direction of DC motor instantly. Like in wash machine, mixer, drilling machine winding – rewinding machine etc. Changing the direction of DC motor using joystick is most suitable and handy meth Joystick Control for…... Listed under: Motor Projects 575. GSM Based Intruder Alerting System Did you know that most of the thefts at home happen when it is empty? But not everyone is rich enough to hire a for their house and at the same time they themselves cannot be at home 24x7. Now what if there is…... Listed under: Phone Projects 576. GSM Based AC Appliance Control This project would show you how to control an AC appliance remotely from anywhere using your mobile phone. This project is useful in various applications. Say for example a farmer can switch ON or OFF the motor pump present near his field remotely.…... Listed un Phone Projects 577. Cell Phone Controlled Pick and Place Robot Conventionally, wireless controlled robots uses circuits, which have a drawback of limited working range, l frequency range and limited control. Use of mobile phones for robotic control can overcome these limitations. It provides the advantages of robust co working range as large as the coverage…... Listed under: Robotics - Automation Projects 578. Light Tracker Demonstration Electricity is the most required and important element of human life. We cannot imagine our day to day life without elect Electricity is generated using conventional (coal, diesel) and non conventional (water, wind, sunlight) energy sources. The recent and latest trend is to g electricity…... Listed under: Metering - Instrument Projects 579. Variable Power Supply with LCD Are you an electronic hobbyist? Then an adjustable power supply is a must for your various needs. This project explai make a LM317 based adjustable power supply unit with a digital display. Components Required 1.     LM317 IC 2.     Resistor – 240 Ohms 3.    …... Listed LCD Projects 580. Interfacing Triple-Axis Accelerometer with AtMega16 Requirements AtMega 16 IC/development board 3-Axis accelerometer LCD screen 16X2 (for displ and Z data) Description This project makes use of three out of the eight ADCs present in AtMega16 IC to display the corresponding digital data of X, Y a outputs…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 581. Atmega32 avr based Drone Quadricopter atmega32 avr based Drone Quadricopter: Introduction Our project is a novel hand held controller in which w accelerometer to wirelessly control the motion of a Parrot AR Drone Quadricopter. Rationale: The main idea of our project was building a cool glove co for…... Listed under: Drones 582. Audio Tone Generator using AVR Microcontroller The circuit presented here demonstrates how to generate Audible Frequency from an AVR Microcont output of Microcontroller is always digital so to generate audible sound at the outset first it needs to be converted into Analog. A DAC (Digital to Analo Converter) is used…... Listed under: Sound - Audio Projects 583. Stepper Motor Angle Control using AVR Microcontroller There are many applications in which it is required to set the position of an object at a desire angle. Some of the examp 1.      Satellite Dish Antenna positioning  The Satellite Dish Antenna should be in straight alignment with Satellite in Space to receive…... Listed under: Motor Projects
584. Bluetooth Controlled Portable LED Display The aim of the project is to make a portable LED display from SMD LEDs and to display the custom program patterns at our command. The core application of the project is to act as a portable display for event organisers or exhibitionists or consultants to…... under: LED Projects 585. Coin Operated Timer Control Power Supply Box to Control AC Appliances Saving electricity is a major concern for domestic and industrial units. We alw hard to save electricity in many ways to reduce our electricity bills, but due to some known and unforeseen circumstances our efforts do not normally transform in saving electricity. Adding to…... Listed under: LCD Projects 586. Sleeping Security – Smart Keypad Lock using AtMega16 This project is just a smart version of any keypad lock. What’s smart about it is that it can detec it is needed by the user or not and accordingly switches itself to take a sleep. Making a microcontroller to sleep reduces power consumption…... Listed Security - Safety Projects 587. DIY – Waveform Generator using AVR Microcontroller To interface 8-bit DAC with AVR microcontroller ATMega32 and generate different waveforms like Wave, Sine Wave, Triangular Wave, Staircase Wave and Saw-tooth Wave. Instruments ·         AVR Development Board ·         ADC – DAC card ·         Digita Oscilloscope (DSO) ·         Power Supply Apparatus ·         Connecting…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 588. Fully Customized Device On/Off Timer Timers are used in many different applications for example in Industrial Applications, to switch ON or switch OFF any device or a machin a specific period of time. In the same way the timers are used in Domestic Appliances like in Air Conditioners,…... Listed under: Clock Projects 589. Mobile – Gesture Controlled Car REQUIREMENT: AtMega 16 microcontroller L293D motor driver IC Bluetooth module (HC05) Chassis Motors & Wheels phone (Android + Bluetooth compatibility) Battery (for car section) DESCRIPTION: Have you ever wondered of operating a toy car with you own mobile Yes I have made such…... Listed under: Car Projects 590. Un-interruptible Bench-top DC Power Supply With Display This tutorial explains how to make your own power supply unit for all your electronics ande system experiments. It also has a backup battery which will be used in case of power cuts and a display. Components Required 1.     SLA 12V battery 2 Banana Jack…... Listed under: LCD Projects 591. Fingerprint Detection using Microcontroller REQUIREMENTS: AtMega 16 Microcontroller (development board) Fingerprint scanner module (R305) 16X2 Alphanumeric LCD (for user display) DESCRIPTION: In today’s secure world biometric safety is on the top. Unlike other techniques which make use of p and numbers, that are needed to be remembered, biometric techniques…... Listed under: LCD Projects 592. Controlling a BLDC Motor with an ESC REQUIREMENTS: Microcontroller (AtMega 16) A Brushless DC motor (BLDC) An Electronic Speed Controller (ESC) source to drive the motor (LiPo battery)   DESCRIPTION: Brushless motors have much more satisfying results as compared to brushed motors. The ba difference between them is that in a…... Listed under: Motor Projects 593. How to display text on 16×2 LCD using AVR microcontroller (ATmega16) This article is in continuation to the article Single character LCD display using A aforesaid article shows how to display a single letter on LCD. Moving forward towards learning to work with LCD, this article explains how to display a LCD. Displaying…... Listed under: LCD Projects 594. Display custom characters on LCD using AVR Microcontroller (ATmega16) This is the most interesting article to play with LCD. After going through the a can create any character/symbol which cannot be created using the ASCII values for example smiley. You can even create small games. Conventionally is use to display text…... Listed under: LCD Projects 595. How to use inbuilt ADC of AVR microcontroller (ATmega16) Microcontroller understands only digital language. However, the inputs available from the environment to the micro are mostly analog in nature, i.e., they vary continuously with time. In order to understand the inputs by the digital processor, a device called Analog to Digital Converter (ADC) i
Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 596. Serial communication (Data receive) using AVR Microcontroller (ATmega16) USART Communication between two entities is important for the informat take place. In general the information transport system can be parallel in which the complete byte of data is sent at a time, with each bit having a sepa dedicated line or it can…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 597. How to interface AVR microcontroller with PC using USART (RS232 protocol) This article covers data transmission using 8 bit USART. The readers shoul basic understanding of serial communication and how to receive the serial data output. More  details on these topics  are available on Serial commun using AVR Microcontroller USART. The registers of USART…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 598. Serial communication with AVR microcontroller using interrupts In our previous articles on serial data transmission using AVR microcontroller we have demonstrated serial communication using the polling method. In Polling, the microcontroller waits for the RXC flag (in the case of serial receiver) to go then moves to the next instruction.…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 599. How to interface RFID with AVR microcontroller (ATmega16) Knowingly or unknowingly the RFID technology is used by us in our day to day life. The mo example is seen in MNCs, schools and offices for daily attendance or automatic door opening system. The RFID contains two parts, namely, tag and re modem. When…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 600. RFID interfacing with AVR microcontroller (ATmega16) using interrupts This article covers how to extract and display the twelve byte unique tag ID rece RFID module on LCD using interrupt method. Before proceeding to this article readers must have knowledge of serial interrupt and LCD. In the previo of RFID, polling method…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 601. How to use internal ADC of AVR microcontroller using interrupts This article is in continuation to AVR interrupts. There are two types of interrupts exte internal in AVR microcontroller. The aforesaid article covers external interrupts. AVR microcontrollers have seventeen internal interrupts. These intern interrupts are generated by the internal peripherals of Microcontroller like Timer,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 602. How to use inbuilt analog comparator of AVR microcontroller Analog comparator is a device which compares two input voltages and generates output accordingly. The article on IR sensor explains the use of comparator in sensor designing. Comparators form an integral part of circuit designing in maj the applications.  AVR microcontrollers have in-built analog…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 603. How to disable JTAG of AVR microcontroller JTAG stands for “Joint Test Action Group” which was standardized as the IEEE 1149.1 Standard Test Access P Boundary-Scan Architecture in 1990. JTAG is generally used in IC debugging and device programming. Atmega16 consists of one JTAG port which share pins with PORTC. Until JTAG port…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 604. How to interface LCD in 4 bit mode with AVR microcontroller This article explains interfacing of LCD with ATmega16 using 4-bit mode. In this mode only four pins are used for s data and command instructions. This mode has the advantage over the 8-bit mode as it uses less number of pins. The remaining pins of…... Listed under: LCD Projects 605. SPI (serial peripheral interface) using AVR microcontroller (ATmega16) There are different protocols for serial communication between two deceives lik SPI, I2C etc. Before selecting any communication protocol, data transfer rate is an important parameter. SPI transfers data at high speed data. AVR microcontroller contains on chip SPI interface. This article will explore…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 606. How to use fast PWM (Pulse Width Modulation) Mode of AVR microcontroller Timer This article is in continuation of PWM generation using AVR timer. previous article, PWM generation using Phase correct PWM mode is described. However, there are some applications like DAC, power regulation and rectification etc. which require high frequency PWM wave. The PWM generation…... Listed under: PWM Projects
607. Phase Correct PWM (Pulse Width Modulation) Mode of AVR microcontroller Timer Pulse Width Modulation is well known technique for controlling pow electronics devices like SCR, IGBT etc. PWM is also used in motor speed controlling. Square wave generation by using AVR timers is explained in previo The AVR timers have feature of PWM wave generation…... Listed under: PWM Projects 608. Waveform Generation using AVR Microcontroller (Atmega16) Timers At times we come across applications or situations wherein we need to generate waves with the microcontroller. The square wave can be generated by programming a pin which toggles between 0 and 1 with a certain time delay. Alternatively, the inbuilt feature of AVR…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 609. Serial communication (USART) with different frame size using AVR microcontroller The previous article explains serial communication using 8-bit data AVR microcontroller also supports serial data transfer with frame size of 5, 6, 7 and 9 data bits. The size of data frame can be adjusted according to ap For example, consider a system that…... Listed under: LCD Projects 610. How to use External (Hardware) Interrupts of AVR Microcontroller (ATmega16) This article introduces the concept of interrupts and the different types interrupts in AVR Microcontroller (ATmega16). Interrupt as the name suggests, interrupts the current routine of the microcontroller. Microcontroller ex instructions in a sequence as per the programs. Sometimes there may be a need…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 611. How to interface LED with AVR Microcontroller (ATmega16) ATmega16 has 32 I/O pins to communicate with external devices.  Before interfacing with e devices, these pins must be cofigured as input or output pin. This article demonstrates the basic I/O operation of ATmega 16 using LEDs. All the four p be configured to…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 612. How to interface keypad with AVR microcontroller (ATmega16) Keypad is most widely used input device to provide input from the outside world to the makes an application more users interactive.  The concept of interfacing a keypad with the ATmega16 is similar to interfacing it with any other microco The article…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 613. How to interface Servo Motor with AVR Microcontroller (ATmega16) Servo motors find huge applications in industries in the field of automation, contro robotics. The servo motors are well known for their precise control and work on the principle of servo mechanism. The servo motors can be made to precise angle using…... Listed under: Motor Projects 614. How to use I2C / TWI (Two Wire Interface) in AVR ATmega32 This article explores the TWI interfacing between two ATmega32 controllers. Readers are a go through TWI Communication and TWI registers of ATmega32 before going further. TWI works in four modes: 1.        MASTER as a transmitter. 2.        as a receiver. 3.        SLAVE as a…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 615. How to take input from a particular pin of ATmega16 For understanding the human needs a system must be able to take input from user. The devices be used to take input for a system are keypad, touch screen, etc. In the article LED blinking, the microcontroller drives the LED or in embedded langua Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 616. How to interface serial ADC0831 with AVR microcontroller (ATmega16) ADC is an electronics device that converts the analog signals to digital number proportional to the magnitude of voltage. The ADC chips like ADC0804, ADC0809 etc., give 8-bit digital output. The controller device needs eight pins t the 8-bit data (For more details about…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 617. How to configure Watchdog Timers of AVR Microcontroller (ATmega16) Some high end applications require multiple or critical calculations to be done microcontroller. This may lead to cases when the controller enters into wrong or infinite loops. As a result of this, the system either hangs up or gets c The solution to…... Listed under: Clock Projects 618. How to interface GPS with AVR microcontroller (ATmega16) GPS modem is a device which receives signals from satellite and provides information abo latitude, longitude, altitude, time etc. The GPS navigator is more famous in mobiles to track the road maps. The GPS modem has an antenna which rec satellite signals and transfers…... Listed under: GPS Based Projects 619. Interfacing SD Card with AVR Microcontroller This project explains how to interface the SD card with an AVR microcontroller. In this project an ATMEGA16 microcontroller is use microcontroller runs on 5V power supply with a built in crystal frequency of 8 MHz. A 2GB SDSC card from Transcend is used in this particular project,…... Listed under: Memor
Storage Projects 620. How to Program in Boot Loader Section In the AVR microcontroller the flash memory is divided into two parts, namely Application Section and Boot Lo Section.  A code can be programmed into either the Application Section or the Boot loader Section (BLS). The code programmed into the Application s runs normally and…... Listed under: LCD Projects 621. How to Initialize Peripherals from Boot Loader Section In almost all the microcontroller codes the peripheral initialization functions like uart initializati initialization are written along with the different application codes. These initialization functions are actually repetitions of the original initialization fun The same is the case with the external hardware initialization like…... Listed under: LCD Projects 622. How to Use SPM for Flash to Flash Programming The Self Programming Mode (SPM) is a feature which enables a microcontroller to program its own fl memory. Using the SPM a microcontroller can program itself with an SPM code. The SPM is commonly used with the microcontroller Boot-Loader cod help to program the…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 623. How To Use SPM To load Application from EEPROM In any microcontroller the Boot-Loader is the first code which executes before the application cod The major function of the Boot-Loader is to load the application code into the flash memory of the microcontroller and execute it. In AVR microcontro Self Programming Mode…... Listed under: LCD Projects, Memory - Storage Projects 624. How To Write a Simple Bootloader For AVR In C language The BootLoader is a code which executes when a microcontroller is powered ON or reset. It b sets an environment for the application code to execute. It is the Boot-Loader that sets the hardware and loads the application code from any storage or received…... Listed under: LCD Projects 625. LCD Scrolling Display Module A microcontroller is a device which has an inbuilt processor surrounded by few dedicated hardware modules. Once the microcontroller initializes them they start operating on their own. In case of an ADC it will do the sampling and digital to analog conversion all by itself under: LCD Projects 626. Electronic Voting Machine using Internal EEPROM of AVR The microcontroller based voting machines made the process of voting and counting the voted lot easier than before Previously the votes were marked in paper which are then stored safely in a box and inside a well secure room for days. The process of separating…... Listed under: LCD Projec 627. Setup Arduino Software for Atmega328P with Internal Crystal on Breadboard A breadboard Arduino will require an Atmega328P controller for these instructions. Note the end of the name. You cannot use an Atmega328 because it has a slightly different device id number. It will require a different board configuration. Instructions for that are under: Development Board - Kits Projects 628. Playing video on nokia color LCD using an ATmega32 video Playing video on nokia color LCD using an ATmega32 Hi, I am introducing my new video player made using an atm microcontroller and nokia color LCD. I got a 65K color LCD from an old nokia 6030 mobile phone.  I directly soldered 10 thin…... Listed under: LCD Projects 629. Make yourself a homemade clock with thermometer using ATMEGA128 In this step by step I wanna share my experiment with ATMEGA128 timer and using DS1307 and NTC to display homemade clock and thermometer. It displays hour,minute,second, day of week, day of month, month, and year, an temperature in celcius Enjoy the project...…... Listed under: Clock Projects, Home Automation Projects 630. MultiFunction LED Game Using An ATmega32 Microcontroller First are my answers to the Make-To-Learn Contest: What did you make? I made a multi- LED Array Program, like my previous one with Arduino UNO, but this time I made it with an ATmega32 microcontroller. I used regular C code to progra and…... Listed under: LED Projects
631. Setup Arduino Software for Atmega328P with Internal Crystal on Breadboard A breadboard Arduino will require an Atmega328P controller for these instructions. Note the “P” at the end of the name. You cannot use an Atmega328 because it has a slightly different device id number. It will require a d board configuration. Instructions for that are…... Listed under: Microcontroller Programmer Projects 632. Burn Arduino Bootloader on Atmega-328 TQFP and DIP chips on Breadboard Parts required (Hardware) Arduino Uno Board (1) TQFP 32 to DIP 28 Ada Link Atmega TQFP 32 pin chip (1) Atmega DIP 28 pin chip (1) 10K resistor (1) 16MHz crystal (1) 18pf - 22pf capacitor (2) Tact Switch (1) Jumper wires (few Listed under: Other Projects 633. Burn BootLoader into Atmega328P using Arduino Diecimila I have an old Arduino Diecimila and some new Atmega328P-PU chips. Shouldn't have but I brounght some without bootloader to save some dollars. What next? search instructables to see if I can burn bootloader to ths chips. Unluckily not working. An error message "avrdude: stk500_getsyn Listed under: Other Projects 634. Create yourself ATMEGA128 a simple tone generator Hello guys, In this project I want to share my experiment on ATMEGA128 generating a simple ton created 8 tones ( 1 octave ) Let's get started!! Step 1: Prepare the components Let's prepare the components, We need : 1. Speaker, just buy…... Listed Sound - Audio Projects 635. Bootloading and Mounting Arduino Atmega328 – I made it at TechShop This Instructable shows how to bootload and mount an Atmega328, Atmega32 Atmega328p-pu for any project. This is a great way to save money by purchasing Atmega328 DIP package microcontrollers instead of using the Arduin development board itself. I put this together at techshop to…... Listed under: Other Projects 636. Use ATmega328 Chip as a Storage Device and Store Text and Images in it Hi everyone! In this instructable, I am going to show you how to store text an in a small ATmega328P chip. Lets get started! This article is also available on Jordan's Lab Notebook! Step 1: Things Needed Things Needed: - Arduino U ATmega…... Listed under: Other Projects 637. Create yourself a message flasher with ATMEGA128 Guys, I wanna share my experiment on creating a message flasher with ATMEGA128 and LCD 16x2 done on your weekend.... Step 1: Prepare the components I prepare all the components below, The most importants are ATMEGA128 TQFP 64 and LC Another…... Listed under: Other Projects 638. Atmega16/32 Development Board With LCD This instructable shows, how to do your own development board for Atmega16 or Atmega32 processors.T Internet is full of home made development boards, but I think that, there is room left for another one. This board have been very useful on my project Listed under: Development Board - Kits Projects 639. RGB Rotary Encoder with PWM and ISRs Using an ATmega328 Description A long time ago I bought a couple RGB rotary encoders from Sparkfun beca were cheap and I was already spending a bunch on other stuff.  I thought they would be neat for some interfaces since it includes a push button.  The service routine…... Listed under: PWM Projects 640. Make yourself a speaking ATMEGA128 Guys, In previous weekend, I made myself a speaking ATMEGA128. I used ATMEGA128 and LM386 as an amplifier, Let's get started Step part I need for this project These parts are needed for this project : 1. LM386 2.ATMEGA128 3.USBISP 4.AVRStudio 5. Small…... Listed under: Sound - Audio Projects
641. I2C Bus for ATtiny and ATmega I love the Atmel AVR microcontrollers! Since building the Ghetto Development System described in this Instructable, I'v with the AVR ATtiny2313 and the ATmega168 in particular. I even went so far as to write an Instructable on using switches…... Listed under: Other Proje 642. Interfacing GY 26 with atmega640 Hello friend once again with new instructable in this I will show you how to interface GY 26 with UART when I started on this very less resource where availble over internet .Thus i thought to share my piece of work .GY 26 is…... Listed under: Interfacing(USB - RS232 - I2 Projects 643. Using Atmega32 with Arduino IDE Over time I have used all kinds of Atmel microcontrollers in various projects. One of the most suitable was ATmega3 a small collection of development boards for Atmega32/16, some bought as-is, some made on stripboard. Although the original Arduino boards offers pleasant…... Listed under: Other Projects 644. Standalone Arduino / ATMega chip on breadboard Step 1: Parts needed I bought my parts from Digikey and Sparkfun Electronics - they're 2 of my favo places to buy components. Anyway, here's the list: #1 - (Qty: 1) - ATMega328 chip with Arduino bootloader pre-installed ($5.50) #2 - (Qty: 1) - 5VDC Swi Listed under: Development Board - Kits Projects 645. Burning atmega328-pu and atmega328p-pu bootloader Burning the boot loader in an atmega328 could be somewhat tricky but if u follow these steps youll be able to bootload any type of atmega328 micro controller .. Step 1: "setting up the hardware" -List of stuff you'll need: - An Arduino board…... L under: Other Projects 646. Homemade singing ATMEGA128 Hello guys, After experimenting with 8 octave tone generator, Now, I'm continuing on creating a singing ATMEGA128 started, no more delay.... Step 1: Prepare all the parts needed... Let's prepare the part we need, 1. ATMEGA128 2. The board itself, I created my…... List Home Automation Projects 647. Speech Synthesis on Atmega128 I had this one project where the device was supposed to speak out the output. And I was too Lazy to actually go and build a PC based applicat not that lazy to make it on a micro controller. So here is some of…... Listed under: Other Projects, Sound - Audio Projects 648. Standalone Atmega328 We all have a deep fondness to our Arduino with its familiar shades of blue/green, but the time has come to explore other pro options. One that involve fewer pieces, fewer parts, and fewer dollars. Building a standalone Atmega328 is far simpler than you might…... Listed unde Projects
649. The Bat Hat Using Atmega1284 Introduction "An ultrasonic range-finding hat with variable haptic feedback for obstacle detection." -Project Sound Bite ECE 4760 final project, we designed and implemented an ultrasonic range-finding hat that uses haptic feedback to alert its wearer about obstacles in h path. The…... Listed under: Sensor - Transducer - Detector Projects 650. Ultrasonic Pathfinder Using Atmega1284 Introduction: Our final project for the ECE 4760 course consists of a wearable device to provide aid for the vis impaired. An ultrasonic distance sensor located on a hat collects data of the surrounding environment scanning the area ahead of the user, and uses Listed under: Sensor - Transducer - Detector Projects 651. Acoustic Wayfinder Using Atmega1284 Our acoustic wayfinding device utilizes ultrasonic range finders and haptic feedback to facilitate indoor navigation for the visually impai technique of acoustic wayfinding uses auditory cues, such as sounds from the natural environment or sounds created artificially, to determine an individual's surrounding phy space…... Listed under: Sensor - Transducer - Detector Projects 652. Clap-E acoustic tracking robot using atmega1284 An Introduction For the ECE 4760 final project, we designed and built a sound follower robot named its name implies, Clap-E receives a clap sound and moves toward the source of clapping. It has the ability to change its position after multiple claps….. under: Robotics - Automation Projects 653. Acoustic Impulse Marker Using Atmega1284 Introduction "A device that tracks sound impluses with a three microphone array" We designed and build dimentional Acoustic Impulse Marker system which is capable of detecting a sharp sound anywhere in its vicinity and precisely marking its source vect servo based pointer.…... Listed under: Sensor - Transducer - Detector Projects 654. Rock-Paper-Scissors-Spock-Lizard Game Using Atmega1284 Introduction This project implements rock-paper-scissors game that displays on the TV sc camera to capture human gesture and doing image processing. Rock-paper-scissors-spock-lizard game is very popular among teenagers. Our idea com a very popular American comedy: Big Bang! In this TV show we…... Listed under: Game - Entertainment Projects 655. Automobile parking simulator Using Atmega1284 1. Introduction The game consists of two levels. In each level, a LCD TV screen displays the 2-D top v a parking lot, and the player needs to park the car into the proper parking spot by operating on a fake steering wheel,…... Listed under: Car Projects, G Entertainment Projects 656. Infrared Theremin Using Atmega1284 Introduction A modern-day twist on the classic theremin musical instrument. This project uses two IR sensors a ATMEGA1284P microcontroller to create an inexepensive, easy-to-use theremin. The theremin is a musical instrument which is controlled by the electromagnetic field your body body produces naturally. One…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects
657. GPS Running Watch Using Atmega1284 Runners who have moved to a new city may get lost trying to remember the route they carefully planned at ho Instead of stopping the run to pull out a phone, wait for the map to load, find where you are, and determine where you…... Listed under: GPS Based P 658. DJ Party: A Collaborative Music Teacher using Atmega1284 Introduction "This device allows friends to learn songs, create their own songs, and collaboratively merge them." Ou project for ECE 4760 is a fully customizable button keyboard that has a variety of features to allow for collaborative music-making between friends. Each keyboard has eight….. under: Sound - Audio Projects 659. Wireless Pedometer Using Atmega1284 Introduction There’s a simple question asked by runners, walkers, joggers, and anyone who moves. How fast a going? Runners want to pace themselves, athletes are trying to train for events, and even on a day to day basis you might wonder how far you…... Liste Radio Projects 660. Stabilized Gimbal System Using Atmega1284 This webpage describes the development of a Stabilized Gimbal Control System for the CUAir team, Corn University's Unmanned Air Systems Team. The Stabilized Gimbal Control System will help the CUAir team compete at the Association for Unmanned V System International (AUVSI) Student Unmanned Air Systems…... Listed under: Security - Safety Projects, Sensor - Transducer - Detector Projects 661. Laser Tag with wireless logging using Atmega644 Introduction "A new spin on Laser Tag with Wireless Real-Time Updates" For our ECE 4760 final proje designed and built our own laser tag system. We included many traditional laser tag features, but then added our own 4760 twist. For the purposes of Listed under: Other Projects 662. Gesture Based Security Lock Using Atmega1284 Introduction Our final project is to design a security system which can be unlocked by means of a stor gesture pattern. The idea is to create a box like assembly, in which the user places his hand, makes a defined gesture and unlocks the system.…... Liste Security - Safety Projects 663. Pushup Trainer Using Atmega1284 For our ECE 4760 final project, we choose to develop an electronic push-up trainer that could monitor people's mo provide training package to optimize their push-up exercise and body health. A distance meter will be used to figure out whether the posture of the pe Listed under: Medical - Health based Projects, Sensor - Transducer - Detector Projects 664. ColdRunner – A Temperature Feedback Running Band Using Atmega1284 For our ECE 4760 final project, we designed and built a running band that provides feedback to users temperature and vibration. This provides an unique way to monitor running habits with temperature feedback. The running band attaches to a user's upper arm and counts… under: Temperature Measurement Projects 665. Servo-Controlled Fire Extinguisher Using Atmega1284 Introduction We have created an autonomous, servo-controlled fire extinguisher that is capable photo sensors and a water nozzle along two axes to detect and extinguish candle fires a short distance (about 1 ft.) away using a small burst of water. inspiration originally…... Listed under: Sensor - Transducer - Detector Projects
666. The Webcam Mouse Using Atmega1284 For our ECE 4760 final project, we designed and built a pointing device with webcam-color-tracking based mo control.  Our implementation allows the user to wear a set of finger-sleeves complete with buttons for clicking and scrolling and a red LED for color-tra cursor control to…... Listed under: How To - DIY - Projects 667. Automated Drink Mixer Using Atmega1284 Abstract The automated drink mixer takes orders from a push-button menu, and moves a regular 16-ounc under a series of inverted bottles while dispensing specified amounts of mixers to make perfect non-alcoholic beverages. Introduction             If you’ve been to a crowded bar or…... Listed under: Home Automation Projects 668. A Touchscreen Chinese Chess App Using Atmega1284 With the increasing popularity of smartphones and tablet computers, touchscreen has become most common user interfaces encountered today. The idea of this project came from some apps on the smart phone. It is very interesting to play a vi Chinese chess on…... Listed under: Game - Entertainment Projects 669. Beacon: A Zero Instruction Navigation Device Using atmega1284 Introduction to the Device Beac0n allows us to explore the tacit human understandin technological feedback. The Beac0n is a gps pathfinder that is designed to be completely intuitive to the user. The goal is for the user to pick up the de with…... Listed under: GPS Based Projects 670. Acoustic Modem Using Atmega1284p Data transmission over sound is used in many communication protocols, the most common being Dual-Tone M Frequency signaling (DTMF). It is used to dial phone numbers and the frequency combinations chosen for the digits are very familiar to the general pu was also used in…... Listed under: Sound - Audio Projects 671. A Moving Alarm Clock Using Atmega1284 Introduction We implemented a prototype for a moving alarm clock which runs away from the user when th all the features of a “regular” alarm clock: settable time and alarm, snooze, and alarm on/off. The alarm clock displays…... Listed under: Clock Projects 672. Precision Cooker: A Temperature Controlled Cooker Using Atmega1284 Precise time and temperature control are critical when cooking. Slight deviatio either temperature or cooking time can ruin delicate ingredients. Despite this fact, most modern day stovetops provide no data regarding their curren temperatures and do not have built in timers. The stovetops that…... Listed under: Home Automation Projects 673. Eye Mouse Using Atmega1284 Our final project moves and clicks a mouse cursor on a computer screen by tracking where the user's eye-movements u infrared eye-tracking technology and a gyroscope. The motivation for this project came from thinking about applications of infrared technology. We na our ideas down to…... Listed under: Sensor - Transducer - Detector Projects 674. Scan-E: An optical blood pressure sensor Using Atmega1284 Introduction For this project, we created a noninvasive heart rate and blood pressure measurement tool with the intention of gathering data for large-scale analysis for the automatic prediction of heart disease. In modern society, patien have access to a wealth of electronic data concerning…... Listed under: Sensor - Transducer - Detector Projects 675. Low-Budget Laser Projector Using Atmega1284 Introduction For our ECE 4760 final project, we designed a low-budget laser projector system. The proj broken into main sections: the custom hardware designed and fabricated to make up the projector, the circuitry controlling the hardware, and the cus software controlling the circuitry. We…... Listed under: CNC - Printing Machines Projects
676. Autonomous Air-Hockey Goalie Using atmega 1284 This project is intended to perform the role of a goal-keeper in the popular arcade game Air Hocke project, the robot shown below senses a puck coming toward it and moves in the direction of the puck's motion so as to stop it.…... Listed under: Gam Entertainment Projects, Home Automation Projects 677. NFC Transmitter and Receiver Using Atmega1284 Introduction Our project is building one set of NFC module including a NFC transmitter and a NFC re both using ATmega1284p microcontroller. We will be using coupled coils to transmit message modulated by a high frequency carrier, whose frequenc standard frequency for Near…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 678. Remote Controlled POV Display Using Atmega1284 Introduction For our ECE 4760 final project, we designed and implemented a remote controlled persistence-of-vision (POV) that is able to display multiple patterns based on remote input. The primary components of the display are a rotor and a motor. The rotor is mainly consisted…... Listed under Projects, Sensor - Transducer - Detector Projects 679. POV Magic 8 Ball Using Atmega1284 1.Introduction In our final project of ECE 4760, we designed a magic 8 ball, which is a rotating POV (persistence of display controlled by voice commands. In our design, users can ask yes/no based questions via a small speaker, and the rotating POV part…... Listed u Game - Entertainment Projects 680. The Air Mouse Using Atmega1284 Introduction "A wireless mouse unit that requires no flat surface by using ultrasonic positioning." For our ECE 4760 fi project,we have designed a surface-less mouse interface using ultrasonic transmission as our final project in this class. The idea is to have a ultrasonic transmitter as…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 681. EEG Magic Cat Ears Using Atmega1284 Kang Li(kl694) and Zhenxuan Qiu(zq39) For our ECE 4760 final projec, we built a pair of toy “cat ears” using electroencephalography (EEG) with the AVR microcontroller. The basic function of it is that it can change the gesture of the “Ears” based on the particip Listed under: Game - Entertainment Projects 682. Drumming Teaching and feedback device Using Atmega1284 For our ECE 4760 final project, we designed and built a drum trainer that can be attached Japanese drum surface and will detect and wirelessly transmit different drum hit types to other players’ drum trainers. The trainer is able to determin the…... Listed under: Sound - Audio Projects 683. Thermistor Respiratory Monitor Using Atmega1284 Our final project for ECE 4760 is a respiratory monitor that was designed for low-resource environ The device calculates a patient's breathing rate by detecting changes in temperature when the patient breathes through a mask. Features of the devic an alarm through a piezoelectric…... Listed under: Medical - Health based Projects 684. Glove Mouse Using Atmega1284 For our ECE 4760 final project, we designed and built a wireless computer pointing device with accelerometer based movement control. Our implementation allows the user to wear a set of hardware (a glove and connected armband) and control a cursor through diff hand orientations and…... Listed under: Sensor - Transducer - Detector Projects 685. Hand-Motion Chess Using Atmega1284 An Introduction "A glove embedded with accelerometers to play a hand motion-controlled chess game" projec soundbyte For our ECE 4760 final project, our team designed and built a system with the ability to play the game of chess using embedded gloves. Eac wears a…... Listed under: Sensor - Transducer - Detector Projects 686. Color to Sound Player Using Atmega1284 Introduction We created a device that determines the RGB content of a surface and then speaks the color or musical tone at the sound frequency mapped to the color. The device can convert the color to sound directly or function as a cassette…... Listed unde Audio Projects 687. Multi-functional Music Box Using Atmega1284 Our final project is to build a multifunctional music box. This music box can generate different songs in different instrument sou piano, organ, by FM synthesis. The theme and harmony are in two different channels. Besides, the music box can also be electrical piano…... Listed un Sound - Audio Projects
688. Muscle music control Using Atmega1284p Introduction For our ECE 4760 Final Project, we use an infrared LED and phototransistor armband to detect inflections in arm and wrist movement which are used to manipulate the volume and speed of pre recorded songs. By pumping your fist, you will cha the…... Listed under: Sound - Audio Projects 689. Digital Reversi board using Atmega644 Introduction For our final project in ECE 4760, we designed and implemented a Reversi board consisting of har microcontroller, and a touch screen. Sixty-four bicolor (red and green) LEDs were implemented as the black and white pieces of the game. Players cou light…... Listed under: Development Board - Kits Projects 690. Audio Spectrum Analyzer Using Atmega644 Our ECE 4760 final project was an audio spectrum analyzer that would display a histogram-style visualizat audio signal. We were able to successfully display the frequency spectrum content of an audio signal in real-time using a black and white histogram visualization with bins…... Listed under: Sound - Audio Projects 691. Virtual Archery Using Atmega644 Introduction We decided to create a virtual archery game for our ECE 4760 final project. This game consists of an ATmega1284P microcontroller, a TV for display, and multiple pieces of hardware. All of these devices communicate together to simulate a three-round archery with…... Listed under: Game - Entertainment Projects 692. Optical microphone and spectrum analyzer Using Atmega1284 We implemented an optical microphone which converts distant vibrations, including so an audio signal. Measuring the reflection of a laser beam from windows or glass, it possible to hear sounds near the target. The system also includes f spectrum analysis with a real-time display…... Listed under: Radio Projects, Sound - Audio Projects 693. IFF System for Infantry Using Atmega1284 Introduction "An encrypted laser-based friend-foe identification system to prevent friendly fire in battle" This project implements an Identification Friend-or-Foe (IFF) system for use by soldiers to prevent friendly-fire. The inspiration for the project is derived from Identification Friend-or-Foe (IFF) transponder currently used on fighter…... Listed under: Sensor - Transducer - Detector Projects 694. GPS and compass guided car Using Atmega644 For our final project, we built a self-driving car that takes in inputs for a final destination and drives its its initial location to the final destination. The idea for this final project requires an LCD to display the location that the car is…... Listed under: Car Proje 695. Persistance of Vision Clock Using Atmega644 The goal of our project was to create a persistence-of-vision (POV) analog clock using an LED display. The a visual alarm system which lights up the entire display for two seconds if it reaches an alarm time. The current time and alarm times…... Listed under Projects 696. Virtuoso: A Touchscreen Music App Using Atmega644 n our final project, we designed an electronic multifunction instrument with a LCD touch screen microphone. The user can play three kinds of instruments on it -- xylophone, flute and piano. Each instrument has a different interface and timbre. Th part has…... Listed under: Sound - Audio Projects
697. NFC Secure Data Storage Using Atmega644 Summary "Enabling secure storage capabilities for sensitive data through standardized methods of encryp multiple agent distribution." Our group chose to implement a secure form of storage for sensitive information such as passwords or identification num This is modeled after Shamirs secret sharing algorithm. It…... Listed under: RFID - NFC Projects 698. Ultrasound Gesture Detection Using Atmega644 Introduction In this project, ultrasound around 24kHz was used to detect movement near an object. W hand or other solid object near the source of the ultrasound (speaker) causes a shift in the frequency of the sound, which is then detected by a microp Listed under: Sensor - Transducer - Detector Projects 699. Wireless, voice-controllable, household system Using Atmega644 Motivation We design a smart home control system which allow people control their devices by voice command at home. This is a wireless, voice control system. People could control almost all the facilities at home including lights, fans back ground music. Right…... Listed under: Sound - Audio Projects 700. Solar Powered Pulse Oximeter and Heart Rate Meter Using Atmega644 Introduction Pulse Oximeter is a non-invasive medical diagnostic device used t the blood. Heart rate meter detects the number of beats per minute of the patient, normally referred to as bpm. The pulse oximeter is designed using infrared and…... Listed under: Medical - Health based Projects 701. RoboSLR Using Atmega644 Introduction Robo-SLR provides a remotely controllable stand for a Canon EOS 550D DSLR camera, allowing for adjustable pan functionality along with the ability to remotely view through the camera's viewfinder and take photos. An ATmega1284 microcontroller is used to c camera functions as…... Listed under: Robotics - Automation Projects 702. Radio Station Tracker Using Atmega644 Our project is inspired by the commercial product, PicoDopp, which uses a similar scheme for foxhunting. Fox a contest where participants try to locate a transmitter, called the fox, simply by monitoring the signals it transmits. Typically this is done using highly antennas…... Listed under: Radio Projects, Sensor - Transducer - Detector Projects 703. OBD-II Autocross/Track Data Logger for BMW E36 M3 Using Atmega644 Customer's Voice    top “Hello, I am interested in a race car logger than will be display and log crucial information during autocross and track events. I am interested in tracking vehicle speed, RPM, engine coolant temperature and forces. Ideally, the data can…... Listed under: Car Projects 704. Brain-Computer Interface Using Atmega644 Introduction Our goal was to build a brain-computer interface using an AVR microcontroller. We decided t least invasive way of measuring brain waves would be using electroencephalography (EEG) to record microvolt-range potential differences across loca the user's scalp. In order to accomplish this,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 705. Digital Saxophone Using Atmega644 Abstract My final project was the design of a digital saxophone which can reproduce the sound of an actual saxop through digitally synthesized electrical waveforms. The digital saxophone consists of a microphone to sense the user blowing into a mouthpiece, push to control the note…... Listed under: Phone Projects 706. Virtual Saxophone Using Atmega644 Our ECE 4760 final project was to create a virtual saxophone that uses Direct Digitial Synthesis (DDS) to synthesize the output notes. Push are connected to a PVC pipe to mimic the saxophone's mechanical structure, and a microphone that detects noise is used to determine…... Listed under: Phone Projects, Senso Transducer - Detector Projects
707. Auto-composing keyboard Using Atmega644 Project Overview We designed an electric piano that automatically composes a piece of music for the ECE final project. All the user need to do is to select a mood of the music and play two notes upon which the music is based, and…... Listed under: Develop Board - Kits Projects, Sound - Audio Projects 708. MicroKart 644 Using Atmega644 The Micro Kart 644 is a mobile device that provides additional capability to the traditional RC car experience. Allowab functions are recording multiple tracks, which consist of all user controls sent to the car over a 25 second interval, and replaying the tracks so the…... L under: Car Projects 709. Touchpad Figure Recognition Using Atmega644 Our project implements a touchpad input system which takes user input and converts it to a printed c Currently, the device only recognizes the 26 letters of the alphabet, but our training system could be easily generalized to include any figure of comple arbitrary shape,…... Listed under: Development Board - Kits Projects, LED Projects, Sensor - Transducer - Detector Projects 710. Battle video game Using Atmega644 Introduction Our project is a simple game where two players control tanks in a stage with the ultimate goal of de each other. User input is achieved through the use of keypads, which are used to both control the tanks and fire missiles at one…... Listed under: Gam Entertainment Projects 711. Sign language translator Using Atmega644 Introduction "A portable Glove Based Sign Language Translator with LCD Display, Speech Synthesis, and Sig Language Education Software" Sign language is a language through which communication is possible without the means of acoustic sounds. Instead, language relies on sign patterns, i.e., body language, orientation…... Listed under: Sensor - Transducer - Detector Projects 712. Evolutionary Altitude Control for a Helicopter Using Atmega644 Overview For our ECE 4760 project, we developed a self learning 1 degree of freedom helicopter using a neural network learning algorithm and infrared (IR) distance measurement. The primary goal is to increase the helicopter height to level in the quickest amount…... Listed under: Game - Entertainment Projects 713. Digital Stethoscope Using Atmega644 "A digital stethoscope that can amplify, play, and record heart signals in real-time." Project Soundbyte The purpo project was to design and implement a digital stethoscope to serve as a platform for potential computer aided diagnosis (CAD) applications for the de cardiac…... Listed under: Medical - Health based Projects 714. Power Manager: Remote Power Control Through LAN using Atmega644 Introduction Overview PowerManager is a remote power management system be controlled through a web browser on a local area network (LAN). Devices plugged into PowerManager's outlets can be turned on or off with the clic button on a webpage. PowerManager runs…... Listed under: Internet - Ethernet - LAN Projects 715. Heliowatcher solar tracker Using Atmega644 Documentation HelioWatcher: Automatic Solar Panel Control Jason Wright (jpw97) and Jeremy Blum (jeb3 Introduction We designed and built a system to automatically orient a solar panel for maximum efficiency, record data, and safely charge batteries. Us module and magnetometer, the HelioWatcher allows the…... Listed under: Sensor - Transducer - Detector Projects 716. Cooking Assistant for Automatic Temperature Control Using Atmega644 In some cooking scenarios, it is desirable to achieve a specific object tempera keep the object at that temperature. However, it is difficult to maintain a constant temperature without constant attention. To aid cooking in this scen created a device that can be…... Listed under: Temperature Measurement Projects
717. SousVide immersion cooker using Atmega644 About What is this thing? For our ECE4760 Spring 2012 (Microcontrollers) Final Project at Cornell Univer decided to create a sous-vide cooker (a type of immersion cooker) that can maintain a set temperature for extended periods of time. It can auto-calcu appropriate time…... Listed under: Home Automation Projects 718. BrainMap: fNIR imaging of the brain Using Atmega644 Introduction Our project records and extracts event-related features from a 36-point relative bl oxygen concentration sensor array from the surface of the brain. We chose this project because of a combined interest in brain-computer interfaces. attempt to balance cost, complexity, and sensor density, we…... Listed under: How To - DIY - Projects, LED Projects 719. MAD-DOG Kick-Awesome Wi-Fi Audio Streamer Using Atmega644 Introduction "We developed a wireless receiver capable of receiving and playing aud transmitted over an 802.11 Wi-Fi network" project soundbyte For our ECE 4760 final project we developed a wireless receiver capable of receiving and audio transmitted over an 802.11 Wi-Fi network. Our system…... Listed under: Radio Projects 720. Remote Controlled DMM With Minimum Mass Wireless Coupler Using Atmega644 Introduction In this project, we built a digital multi-meter utilizing ne communication concept. The system established a bidirectional wireless communication between the measurement unit and the base unit. The meas unit is in charge of measurement and transmitting the result to the base, while the…... Listed under: Sensor - Transducer - Detector Projects 721. Seven day alarm Using Atmega644 Introduction The variability of a college student’s class and school work schedule gives way to an abnormal sleep/w experienced any other age group. Few lucky students have the pleasure of having all their classes start at the same time every day.…... Listed under: C Projects 722. A Budget Pachinko Machine Using Atmega644 Pachinko is a game in which a ball drops down through a large quantity of pegs and the objective is to c ball in a fixed basket. The concept behind our machine is novel in that it was built using mostly discarded and salvaged…... Listed under: Game - Enter Projects 723. Quadcopter Using Atmega644 Introduction Many embedded systems use sensors that combine an accelerometer and a gyroscope. Quadcopter is on examples of that. Already-built cheap toy-like quadcopters are available on e-bay around at $25~$30, but many hobbyists and avid AVR programmers own quadcopters. We thought…... Listed under: Game - Entertainment Projects 724. Ultrasonic Security System Using Atmega644 Introduction We were inspired to build an ultrasonic security system for our final project by our housing this summer. Security is an important part of home, especially if we are going to share a house with prior strangers without a lock on our room…... Lis Security - Safety Projects 725. Smart Trash system Using Atmega644 Introduction top For our final project, we have designed and built a 'proof of concept' prototype for Project Gre Stations, an externally funded student group with the following mission statement: Project Green Stations is all about changing the way people see th environment. Imagine the…... Listed under: Other Projects 726. GPS Tracking Device for Cornell Engineering Quad Using Atmega644 Introduction "A GPS tracking devices capable of telling the user his/her approxima distance to buildings and attractions on a map downloaded from a remote station" -Project Soundbyte For our final project in ECE4760, we designed a tracking device that has a capability of downloading…... Listed under: GPS Based Projects
727. Autonomous Board Erasing Robot Using Atmega644 Abstract -A Roomba for boards For our ECE 4760 final project we created a board climbing robot capable of cleaning the b autonomously. The robot uses neodymium magnets to stick to the board and moves across it with two continuous servo motors. It has bumper…... Li under: Robotics - Automation Projects 728. Self-Reliant Power and Data Management System Using Atmega644 Introduction The tags used to monitor wildlife can either be passive or active. Pas simply identify an individual, whereas active tags may send out a radio beacon or even collect data. These active tags, more commonly referred to as “ loggers”, are typically battery powered,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 729. A Wireless Programmable Pace Clock Using Atmega644 For our ECE 4760 final project, we designed and built a wirelessly programmable digital pace c a large format LED display and Android smartphone control and programming. This original design achieves the functionality of commercailly availabl clocks but with an intuitive user interface…... Listed under: Clock Projects 730. Rock Band Vocal Bot Using Atmega644 We have created a device that interprets the NTSC video signal from the video game Rock Band and outputs au signals via a pair of speakers to simulate a human singer playing the vocalist part. We chose to pursue this project since we were interested…... Listed Game - Entertainment Projects 731. DJ Multitouch — A FTIR Touchscreen Device Using Atmega644 Overview The DJ Touch is a portable turntable touchscreen and interactive LED display. goal was to produce a low cost touchscreen device, and demonstrate its application in a common consumer application. Out of an interest in electron and with the knowledge of…... Listed under: LCD Projects 732. FaceAccess — A Portable Face Recognition System Using Atmega644 We created a standalone face recognition system for access control. Users enroll system with the push of a button and can then log in with a different button. Face recognition uses an eigenface method. Initial testing indicates an 88 successful login rate with…... Listed under: Sensor - Transducer - Detector Projects 733. Voice decoder for vowels Using Atmega644 Introduction In our final project, we created a smart voice decoder system that is capable of recognizing vo human speech. The audio input is sampled through a microphone/amplifier circuit and analyzed in real time using the Mega644 MCU. The user can re analyze…... Listed under: Other Projects 734. Ahhhh…BIU! video game Using Atmega1284 Introduction EVERYONE LOVES GAMES! In this project, I built a video game controlled by people’s voice. The game is about jet fight People can play the game by themselves or with friends. The system recognize the command by distinguish “ahh” and “Biu”. The fighters shoot…... Listed under: Game - Entert Projects 735. Wireless, web-based, cardiac monitor Using Atmega644 Introduction "A composite personal health monitor solution bridges the gaps between patient doctors." ---Engineering Goodwill This project creates a portable device implementing wireless technology and taking full advantage of the wide-sprea Internet to provide a convenient solution to monitor human health. The health information…... Listed under: Other Projects 736. A Portable, Automated, web-based Bird Trapping Mechanism Using Atmega644 Background We designed and implemented an automated, portable b trapping mechanism, along with an associated system which is scalable Every year between early May and mid-June large amounts of tree swallows m Ithaca, NY area to mate. The study of these birds invariably require a…... Listed under: Motor Projects
737. Autonomous visually steered car Using Atmega644 Introduction For our final project, we re-engineered a remote control car to autonomously navigat a track by detecting lanes and centering itself between them as well as detect objects in front of it and avoid collision. The RC car detects lanes throug input…... Listed under: Car Projects 738. Step Sequencer Drum Machine Using Atmega644 Overview [top] As avid audiophiles, we wanted to apply our newly acquired knowledge of microcont build a fun consumer electronic device. Our project is a step sequencer drum machine. The user is able to program a 16-step percussion pattern using wide…... Listed under: Other Projects 739. LED-Following K'NEX Car Using atmega644 Introduction In a Nutshell Our ECE 4760 final project was a car made of K'NEX that follows a LED strip. What We Did For this project a K’NEX car that follows a path made by a LED strip. We used two phototransistors to…... Listed under: Car Projects, LED Projects 740. Rock-Paper-Scissors Sensor Gloves Using atmega644 For our ECE4760 final design project, we designed and built a two player game system for rock-p scissors. Our implementation involved the use of two sensor gloves (one for each player) that tracked bends in the user’s fingers, to determine the sym out by each…... Listed under: Game - Entertainment Projects 741. Ear Trainer Using Atmega644 Introduction Our project is a self-contained system that helps people develop the musical skills of perfect pitch and relat Push buttons allow the user to navigate a graphical user interface (GUI) on a liquid crystal display (LCD). In perfect pitch training mode, a note…... Liste Sensor - Transducer - Detector Projects 742. TI Calculator Wireless Chat Using Atmega644 INTRODUCTION: Our project is a wireless communication link which interfaces to the serial ports on the TI-84 calculators. SUMMARY: Our group created a wireless communication system for the widely popular TI 83/84 calculators. The system interfaces to calculator through their 2.5mm serial…... Listed under: Calculator Projects 743. Sonar SensCap Using Atmega644 SensCap is a device that guides the visually impaired around obstacles. Introduction We designed and built a device worn on the head and around the hip to aid the visually impaired maneuver around obstacles. It provides information about obstacles near and arou Listed under: Sensor - Transducer - Detector Projects 744. A Keyboard Synthesizer Workstation using Atmega644 Our Keyboard Synthesizer project aims to create a multi-instrument keyboard that can record s different synthesized instruments and play back the track simultaneously. We took a children’s toy keyboard and adapted the printed circuit board wit play a range of notes from various musical…... Listed under: Sound - Audio Projects 745. Ultrasonic Spheroid Levitation Device Using Atmega16 Introduction The goal of this project was to design and build a gaming device capable of levitating a ping pong ball at va heights based on the proximity of the user to the device, utilizing a multi-tasking kernel on the ATMega16 platform. The project incorporates…... Listed under: Game - Entertain Projects
746. Compact Guitar Pedalboard Using Atmega644 Introduction For our ECE 4760 final project, we designed and built an electric guitar pedalboard that wi an analog audio signal from a guitar and add analog effects such as equalization, gain control, as well as digital effects such as distortion, compression Listed under: Sound - Audio Projects 747. Embedded Foot Pronation Detection Using Atmega644 Introduction and Rationale Our ECE 4760 design project integrates three different kinds of sen measurements to track a user�s movement speed, regularity of gait, force on impact, pronation of foot, as well as other information that may be use podiatrist. We believe there…... Listed under: Sensor - Transducer - Detector Projects 748. Human Tracking Fan System Using Atmega644 For our final project we decided to construct a human tracking rotating platform that supports a fan. T platform, using dual element Pyroelectric Infrared Sensors (PIR) sensors, rotates itself independently to direct air flow to whatever position a person m In addition, the fan…... Listed under: Sensor - Transducer - Detector Projects 749. Invisible band Using atmega644 Introduction The goal of this project is designing microcontroller operated drum set and guitar which are only consist sticks, pedals, and pick. This is done by implementing accelerometers which are connected to the microcontroller. By swinging the sticks and picking t in…... Listed under: Sound - Audio Projects 750. Sheet Music Notator Using Atmega644 Introduction We created a system that takes input from a piano and displays the musical notation for it on a television screen. The syste hardware amplification and filtering of a microphone output with code in C compiled on two Atmel Mega644 microcontrollers. The basic…... Listed under: Sound - Audio Projec 751. ToneMatrix Touch Sequencer Using Atmega644 ToneMatrix Touch by Jane Park, Michael Chin We can be reached at {jp624 | msc247} at cornell dot ed touch-based, interactive matrix that plays music corresponding to active grids and displays playback state using LEDs Introduction The ToneMatrix Tou aka Teenage Mutant Turtle)…... Listed under: LED Projects 752. Automated grapefruit segmenter Using Atmega644 Part I. High Level Design 1 Rationale and Problem Overview As regular grapefruit consumers, bot could appreciate the value in automating the cutting procedure. We saw the problem as suitable for a final project because it is [very] challenging whi requiring a combination of…... Listed under: Home Automation Projects
753. Motion Sensing PowerPoint Controller Using Atmega644 Introduction For our Final Project in ECE 4760, we built a controller that interfaces with a com running a PowerPoint display through USB. The device can control slide transitions based on hand motions or button presses as well as play MP3 files detects…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 754. Heat Control System Using Atmega644 Introduction This project was the first stage of developing a controller for a radiant floor heat system. The microcontroller will use inputs from thermostats, thermocouples, a flow meter, and pressure switches to control the operation of the pumps and valv achieve improved efficiency of…... Listed under: Temperature Measurement Projects 755. XBee RF Smart Energy Compliant Power Meter Using Atmega644 Motivation >A breaker-level power metering device for measuring energy on 4 different circuit lines and wir outputting that energy data onto Google PowerMeter. Useful Links Google PowerMeter Smart Energy Alliance DOE - SmartGrid Energy Efficient Products Similar Projects Zigbe Relay Control & Power Monitoring…... Listed under: Metering - Instrument Projects 756. 3D Paint Using Atmega644 "A 3D canvas on which the artist can draw using trilaterated coordinates from ultrasonic delays." Project Soundbyte For ou project in ECE 4760, we designed and implemented a three-dimensional paint program consisting of hardware, a microcontroller, and a PC running M three modules…... Listed under: Home Automation Projects 757. Hand controller for Parrot AR Drone Quadricopter Using Atmega644 Introduction Our project is a novel hand held controller in which we use an accele to wirelessly control the motion of a Parrot AR Drone Quadricopter. Rationale: The main idea of our project was building a cool glove controller for a fl platform, a quadrotor…... Listed under: Robotics - Automation Projects, Sensor - Transducer - Detector Projects 758. Human Tetris — Video object tracking Using Atmega644 We have created a real-time video object tracking / shape recognition device, and a fun game demonstrate its abilities. For our project, we wanted to push the video sampling and processing capabilities of the ATmega644 8-bit microcontroller. U high-speed analog-to-digital converter as…... Listed under: Sensor - Transducer - Detector Projects, Video - Camera - Imaging Projects 759. Auditory navigator Using Atmega644 Introduction Navigation in the past has primarily relied on the use of a map, compass or other devices that must interpreted visually. This project demonstrates the ability to navigate a user based on synthesized directional audio which allows the user to move to a Listed under: GPS Based Projects 760. USB wireless tilt mouse Using Atmega644 Introduction We created a handheld mouse device that measures its tilt and then wirelessly transmits the d base unit, which is connected to a PC through a USB cable and can be recognized by certain modern computers as an actual mouse. The purpose…... under: Interfacing(USB - RS232 - I2c -ISP) Projects 761. Automated Rock Band player Using Atmega644 Introduction For our final design project, we built an automated Rock Band player that can beat any R song by decoding the Xbox 360 video output and sending the appropriate button push and strum signals to a modified Xbox controller. This project w particularly…... Listed under: Sound - Audio Projects 762. Automated Pavlovian Classical Conditioning of Insects Using Atmega644 Introduction Several studies have shown that various insects possess learning memory abilities. One approach researchers use to demonstrate such abilities is to "teach" the insect to exhibit a specific behavior in response to a st This "teaching" process is called Pavlovian conditioning. Such studies…... Listed under: Sensor - Transducer - Detector Projects 763. CMOS Camera Rock Paper Scissors Game System Using Atmega644 Introduction We created a rock paper scissors game that utilizes a CMOS camera t determine what hand the human player plays. The player is required to wear a glove that has black tape taped on each finger. When the player plays t the camera…... Listed under: Game - Entertainment Projects 764. RFID sales checkout system Using Atmega644 Introduction The Elevator Pitch We successfully implemented a prototype RFID checkout system that wi consumers to instantly pay for their entire purchase upon arrival at the register, increasing customer satisfaction, reducing retailer costs, and ultimate lowering consumer prices. Summary Shopping in the present day…... Listed under: RFID - NFC Projects
765. RFID based Mobile Payment System Using Atmega644 Introduction and Rationale We used our ECE 4760 final project as a platform to develop a proof concept for Mivo. Mivo is a low-cost, stripped down mobile payment system. Our prototype combines Radio Frequency Identification (RFID), Security P Authentication and Ethernet Data Transfer to…... Listed under: RFID - NFC Projects 766. Talking voltmeter Using Atmega644 The Handy Lab Buddy is a tool every ECE should have. The four features of this tool include a talking voltmeter, logic probe, voltage averag frequency measurer. As a cheap and accurate device that outputs whatever being measured through speakers, it's one of its…... Listed under: Meterin Instrument Projects 767. Heart Rate Display LED T-Shirt Using Atmega644 Introduction We have designed and built a LED t-shirt capable of displaying the heart rate of the wea pulsing LED heart. Largely, our project consists of two components: the plethysmograph and the LED display. How we came up with the Idea We had… under: LED Projects, Medical - Health based Projects 768. Gesture Based Touchpad Security System Using Atmega644 Introduction The purpose of the project is to present a new approach on the design of sec systems by using a touch sensitive device. Security is a permanent concern in a variety of environments ranging from physical access restriction in hom industrial settings to…... Listed under: Security - Safety Projects 769. Flexicopter Using Atmega644 Introduction The purpose of our project is to control a toy helicopter using flex sensors attached to a glove. The flex sen intended to replace the remote control that is generally used to fly the helicopter. Additionally we also created another mode which will…... Listed und - Transducer - Detector Projects 770. Acoustic Data Modem Using Atmega644 Introduction For our final design project, we designed and built a prototype acoustic modem to serve as a ph transport layer for digital communications. It converts between a digital communications scheme (RS-232) and an acoustically coupled communicatio of our own design. Our project consists…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Other Projects 771. Adaptive Alarm Clock Using Atmega644 Introduction Elevator Pitch / 1-second Description An adaptive alarm clock that chooses the optimal time to w the user using an accelerometer that detects his/her body movements. Goals The goal of our final project was to create an alarm clock that is able to… under: Clock Projects 772. Zigbee Wireless Relay Control and Power Monitoring System Using Atmega644 Introduction We designed a system for wirelessly controlling relays and monitoring current. This is used for a home load simulation. By wirelessly turning relays on and off by sending commands from a PC to a microcontro can change the total load (current) to our…... Listed under: Metering - Instrument Projects 773. Low-Cost Portable Potentiostat for Biosensing Applications Using Atmega644 Introduction This project involves the design and construction of a low-c portable potentiostat capable of performing cyclic voltammetry on three-electrode electrochemical systems. A potentiostat is an instrument used in c and biological tests that controls the voltage between two electrodes, working and reference, at a…... Listed under: Other Projects 774. Point of Sale Terminal Using Atmega644 Introduction Point of Sale systems typically can cost up to thousands of dollars we do it very simply for seven small stores, point of sale systems can be very expensive. One thousand dollars for a piece of machinery whose functionality is quintessentially simple Listed under: Development Board - Kits Projects 775. FM Radio Receiver Using Atmega644 Introduction The goal of our project was to design a low cost and user-friendly FM radio receiver. Our project use receiver integrated circuit to perform the pre-processing units that are needed before the desired audio signals can be heard. The radio frequency is… under: Radio Projects
776. Mister Gloves – A Wireless USB Gesture Input System Using Atmega644 Introduction Mister Gloves is a wireless USB gesture input system that enable to use a computer by performing intuitive hand and finger motions in the air. While wearing a glove controller on the right hand, the user can move th by forming…... Listed under: Robotics - Automation Projects 777. Accelerometer Based Hand Action Recognition using Atmega644 Introduction We created a wearable game controller that uses accelerometers to acq action of the hand and then maps an action to an arbitrary keystroke. The types of actions we are trying to recognize should be suitable as input contr video games. We placed…... Listed under: Robotics - Automation Projects, Sensor - Transducer - Detector Projects 778. Home energy managment Using Atmega644a Introduction Our project implements a smart algorithm in order to power a house with a photovoltaic, b or the power grid.  For this project, we worked closely with a research team whose goal is to power a home with minimal power from the power grid. … under: Home Automation Projects 779. Self-Adaptive Hybrid Electro-Magnetic Levitation and Active Balancing System Using Atmega644 Introduction In short, our project is just an isolated flo plate. Just as our title explained, it is mainly a floating plate that is segregated from all outside vibration using electromagnetic force. This purpose of t is to design a system that complements common…... Listed under: Metering - Instrument Projects 780. Digital Oscilloscope Using Atmega644 Introduction The goal of our project is to design a digital oscilloscope with 20 kHz bandwidth. The scopes that w ECE 4760 lab cost over one thousand dollars. The motivation of our project is to produce an affordable, easy to make oscilloscope for…... Listed under - Instrument Projects 781. Optical eye tracking Using Atmega644 Introduction We have endeavored to develop a means by which eye gaze can be detected. This goal was achieve the same principles learned in Lab4, where we recorded the motor speed of a small hub fan using the combination of IR emitter plus phototransistor, under: Sensor - Transducer - Detector Projects 782. Guitar Blocks Using Atmega644 Introduction We present to you, the ultimate guitar -- no strings attached (literally)! This guitar features an infrared str with physical buttons. It sounds like a real acoustic guitar and it works like a real acoustic guitar, but in the…... Listed under: Sound - Audio Projects 783. Haptic Exercise Coach Using Atmega644 Introduction The goal of this project was to assist the user in learning the proper technique for a physical exe our case a dumbbell bicep curl. As our understanding of biology and anatomy improves, the design of physical exercises is improved by the applicatio Listed under: Medical - Health based Projects 784. ATmega644 JTAG Debugger Introduction The purpose of this project was to design and implement a debugger for the ATmega644 that communicated its JTAG interface and was capable of controlling program execution by setting breakpoints and accessing registers and memory. We have three main o in this report:…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 785. Ultrasonic Haptic Vision System using Atmega644 Introduction The ultrasonic haptic vision system enables a person to navigate hallways and around objects without sight, through the use of an ultrasonic rangefinder that haptically interfaces with the user via tiny vibrating motors mounted on the us The idea behind this project…... Listed under: Sensor - Transducer - Detector Projects 786. Haptic appointment manager Using Atmega644 Introduction The Haptic Appointment Manager manages all of an individuals appointments, ensuring arrive on time and in the right location by subtly guiding them throughout the day. This system uses a GPS receiver and a compass to maintain aware absolute and rotational…... Listed under: GPS Based Projects, Sensor - Transducer - Detector Projects
787. 3D ultrasonic mouse Using Atmega644 Introduction Ultramouse 3D times the delay of high-frequency sound waves from the unit held by the user to e three receivers and passes this information along a serial cable to the computer. The accompanying open-source API provides easy functions that let Win32/C++ application…... Listed under: Sensor - Transducer - Detector Projects 788. 3D scanner Using Atmega644 Introduction This goal of this project is to make an effective, low-cost 3D scanner. Summary Our project implements the necessary for a laser triangulation 3D scanner as well as a PC user interface for controlling the scanner and acquiring data via an Ethernet connection under: Interfacing(USB - RS232 - I2c -ISP) Projects 789. Gesture Recognition Based on Scratch Inputs Using Atmega644 Contents Introduction High Level Design Program/Hardware Design Results of the Des Conclusions Appendix A: Commented Code Gesture Recognition Code PC Interface Code Appendix B: Schematics Appendix C: Cost Details Appendix D Appendix E: Gestures References Introduction Our project utilizes a microphone placed in a…... Listed under: Phone Projects 790. LED Sensor Piano Keyboard Using atmega644 Introduction Our project utilizes an array of LEDs that work as light sensors to generate a musical tone, simulating a piano keyboard. The basic idea is to use LEDs as both emitters and sensors. For our project specifically, we used a total of 63 LEDs,…... Lis under: Development Board - Kits Projects, LED Projects, Sensor - Transducer - Detector Projects 791. Touchpad/Infrared Music Synthesizer Using Atmega644 Touchpad/Infrared Music Synthesizer "Generate music with your laptop touchpad!" Wei-jiunn Kalina Jordanova The Touchpad Infrared Music Synthesizer uses a laptop touchpad and an infrared distance sensor to control tone, volume and decay musical notes. Operating in one of six modes, this…... Listed under: Sound - Audio Projects 792. Der Kapellmeister Using Atmega644 Introduction This project is implemented with a glove, resembling a conducting baton that analyzes gestures and them into musical elements. Der Kapellmeister is a simple tool that tests a user's ability in basic conducting, using a real conducting baton. As a user p a…... Listed under: Robotics - Automation Projects, Sound - Audio Projects 793. IR harp using Atmega644 INTRODUCTION Wouldnt it be cool to be this guy? Powerful laser shining into the audience, playing strings by sweeping you across the beams, rocking out in a room full of fog and fawning girls? We thought so. It turns out lasers are expensive, fog…... Listed under: LED Projec 794. Digital Receipts System Using Atmega644 Introduction Our final project is a conceptual prototype of a digital receipt system. The basic idea is when m purchase with a credit or ATM card, the transaction information is automatically packaged and sent to a webserver where it can be logged in a…... List Other Projects 795. ODB-II Automotive data interface using Atmega644 Our goal for this project was to build an OBD-II compliant device that would communicate with an enabled car and read back real time data as well as perform basic performance testing and diagnostics. If you've ever had to take your car into the…... under: Interfacing(USB - RS232 - I2c -ISP) Projects 796. Traction control system Using Atmega644 Introduction For our ECE 4760 Final project we have developed a traction control system that detects wheel adjusts the velocity of the wheels accordingly. Robotic vehicles are becoming increasingly complex and often need high levels of movement control. Sp when the wheels of…... Listed under: Sensor - Transducer - Detector Projects 797. ACL Research: Foot Acceleration Sensor Atmega324p Introduction This project was designed to aid a research study by Cornell Professors Bob Nafis a behind the higher rate of ACL injuries suffered by female athletes. This injury rate can be up to three to eight times higher than…... Listed under: Sens Transducer - Detector Projects
798. Fart Intensity Detector Using Atmega644 INTRODUCTION Our project is a fart intensity detector which ranks fart magnitude on a scale from 0-9 accord sound, temperature, and gas concentrations. The inspiration for this project was to determine who could generate the worst flatulence measurable in personally unbiased manner. To…... Listed under: Sensor - Transducer - Detector Projects 799. Dual-Channel Mobile Surface Electromyograph Using Atmega644 Introduction For our final project, we built a surface electromyograph to collect and data on muscle activity, which supports two channels, implements wireless transmission, and can be worn as mobile unit. Surface electromyography ( noninvasive technique to record the activation signals of…... Listed under: Phone Projects 800. Tissue Impedance Digital Biopsy Using Atmega644 Introduction Our project measures and analyzes the electromechanical properties of tissue using a containing a microarray of electrodes, to aid as a tool in predicting the health of the tissue sample. “Despite significant efforts to develop early detecti strategies for breast cancer, the diagnostic…... Listed under: Medical - Health based Projects 801. GPS Data Logger with Wireless Trigger Using Atmega644 Introduction The goal of this project was to create a portable GPS logger that could be wirele triggered by an external device, such as a camera. Our device that we have designed operates in two modes. The first works as a basic GPS logger, wh Listed under: GPS Based Projects 802. Self-Adjusting Window Shade Using Atmega644 Introduction The self adjusting window shade will automatically raise, lower, open, and close your blin itself. A computer terminal acts as a remote to broadcast instructions to the window shade via RF. These manual adjustments are stored into the microcontrollers system along with the…... Listed under: Home Automation Projects 803. Weather Canvas Using Atmega644 Introduction The Weather Canvas is a robust outdoor weather monitoring system coupled with an indoor LED display. The outdoor system of a microcontroller, temperature sensor, humidity sensor, home-made anemometer, a Hot Wheels radar gun modified to measure precipitation, and a solar panel to measur Listed under: LED Projects 804. Autonomous Self-parking car Using Atmega644 Introduction We created an RC Car that can identify a parking space and parallel park by itself. The RC down a street searching for a parking space to its right using a distance sensor. When the car has identified a space, the car…... Listed under: Car Proje 805. The Autonomous Tennis Ball Picker Using Atmega644 Introduction and Motivation In the tennis and sports equipment market, there are very few adva electronic devices assisting in the feeding and picking of tennis balls or any other kind of balls. Tennis players do not prefer picking up over five hundr after a…... Listed under: Sensor - Transducer - Detector Projects 806. BalanceBot Using Atmega644 Introduction The Balance Bot is a singular axis self balancing robot that is capable of adjusting itself to changes in weigh position. We developed the Balance Bot (BB or B2) from a single servo and a single accelerometer. This was very much a proof…... Listed under: Motor Projects
807. Multiple PID motor controller (with Wiimote!) using Atmega644 Introduction The main idea for our project was to implement an inexpensive solution t current CU Snake Arm motor-driving system by using a Mega644 microcontroller instead of multiple 3-Amp motor controllers as the snake arm was o intended to be driven. Since we used…... Listed under: Microcontroller Programmer Projects 808. Wireless Persistence of Vision Device with Realtime Control Using Atmega644 Introduction We set out to make an easy to interact with, highly custimiz display In deciding on a project we looked for a challenge that would have a good mix of hardware and software problems. We ended up primarily concentrating on looking at unusual…... Listed under: Microcontroller Programmer Projects, Radio Projects 809. Programmable RGB Spinning LED Display Using Atmega32 Introduction For our final project, we built a mechanism that spun a linear array of seven LEDs at a velocity that ma appear as if a message was being displayed using persistence of vision for the human eye. To accomplish this, we first had…... Listed under: LED Projects 810. Alarm clock with speech synthesis Using Atmega32 1. Introduction We designed an intelligent alarm clock which can be programmed from the compu speak custom messages and also detect whether the user is on his bed or leaving his room. Sensors are pervasive in industrial, aerospace, and medic Although they can…... Listed under: Clock Projects 811. Blackout game Using Atmega32  1       Introduction Black Out is an electronic puzzle game that is a derivative of Lights Out released by Tiger Toys in 19 with a few additional twists. The game consists of a 4 by 4 grid of LEDs with each LED having a…... Listed under: Game - Entertainment Projects 812. ESD Foam Touch Controlled Brick Blaster Using Atmega32 Introduction As technological devices become more advanced and a bigger part of our daily user interface of devices is becoming more important; intuitive and modern interface provides a real means of transferring the pure computational po device to the user experience.…... Listed under: Sound - Audio Projects 813. NES EMULATION USING ATMEGA32 OVERALL DESIGN GOAL The overall goal of our project was to recreate the Nintendo Entertainment System (NES) u Atmel Microcontrollers.  We decided early on the adding audio to the mix was likely going to be too much work in the time that we had to…... Listed un Sound - Audio Projects 814. Laser Audio Transmitter Using Atmega32 Introduction This project is a proof-of-concept device that transmits an audio signal using a laser beam, whil removing the need for the user to align the beam themselves. For our project, we created a mono-axial transmitter/receiver setup that converts an an audio signal, via a…... Listed under: Radio Projects, Sound - Audio Projects 815. Voice Tuner and its Effects Using Atmega644 Introduction Sound Bite Our project implements a tuner that continuously outputs the frequency of an in microphone signal with a high degree of accuracy. Project Summary This project's goal is to use a sensitive microphone, computer speakers and a pro designed circuit so that for…... Listed under: Sound - Audio Projects
816. Wireless Music Player Using Atmega32 Our wireless music player allows the user to listen to uncompressed digital audio streamed over a wireless link music player reads uncompressed audio data from an SD card in an immobile "base station." A pair of Xbee transceiver modules are used to stream d Listed under: Radio Projects 817. Multisensor Data Transmission Using Atmega32 Introduction For our final project we built a prototype of a circuit intended for a picosatellite that mea acceleration, sending the information wirelessly back to a base station receiver. The N-Prize is an amateur rocketry competition challenging groups to very small…... Listed under: Sensor - Transducer - Detector Projects 818. Heliostat Skylight Using Atmega644 Introduction With the increasing awareness of sustainable and green building, more and more people are concern the efficiency of energy use at home and at work. For our ECE 476 Final Project, we developed a microcontroller-based, interior illumination system - T Heliostat Skylight. By…... Listed under: LED Projects 819. Wii Conductor Using Atmega32 Introduction Our project can be described as a simplified implementation of Wii-Music, utilizing a Nintendo Wii Remot (Wiimote) to play a gesture-based music game with the player as a virtual music conductor.             We decided to do this project since it exploited two Wiimotes…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 820. Musical Blocks Using Atmel ATmega 644 ntroduction The purpose of this project is to create musical blocks that output music without requiring some musical talent. Musical Blocks tracks the position of the blocks on a flat surface in a range seen by the Wiimote. The path of the blocks…... Listed unde Audio Projects 821. Programmable Synthesized Guitar Using Atmega644 Introduction Our project recreates the experience of playing an acoustic guitar electrically using v sensors, push buttons and the Karplus-Strong algorithm. Our basic idea is to model an acoustic guitar as closely as possible and then implement addi functions not available to the conventional guitar.…... Listed under: Sound - Audio Projects 822. Robot Plotter Using Atmega32 Motivation Deciding a direction of the final project in ECE 4760 can be very difficult. With small Micro Controller Unit, w build anything and everything. We felt compelled to find something very creative and ingenious and had looked around our surrounding and have fou Listed under: Robotics - Automation Projects 823. PowerBox: The Safe AC Power Meter Using Atmega32 Introduction We designed a device that measures and graphs various aspects of AC power and a computer-controlled remote switch. With the recent push for green energy and environmental friendliness, more and more people are concerned abo personal daily power usage. We developed…... Listed under: Calculator Projects 824. Rhythm Ring: Interactive Rhythm Sequencer Using Atmega32 I. Introduction The Rhythm Ring interactive rhythm sequencer is an engaging musical de enables the user to create a plethora of rhythms and beat patterns with the touch of their own fingers. Besides being fun to play with, the Rhythm Rin provides a tangible…... Listed under: Sound - Audio Projects 825. Trumpet MIDI Controller Using Atmega32 The Trumpet MIDI Controller allows trumpet players the freedom of synthesizing from and composing on th instrument. The Trumpet MIDI Controller combines custom hardware and software with the Yamaha Silent Brass pickup mute to convert any standard into a fully functional MIDI controller…... Listed under: Sound - Audio Projects 826. Air Drums Using Atmega32 Introduction One Sentence Sound Bite Air Drums is an electronic drum kit played in the air that eliminates the need for tactile drum pads. Summar created an electronic percussion set with three upright percussion sounds and a floor bass drum sound. The upright instruments…... Listed under: So Audio Projects 827. Dueling Banjos Using Atmega32 Introduction Our project was to create two individual microcontrollers that can play banjo notes cooperatively to play songs using nothing but sound to communicate and synchronize. Humans have had the ability to synchronize musical instruments together to achiev coordinated multi-part song for…... Listed under: Sound - Audio Projects 828. Intelligent wireless pedometer Using Atmega32 Introduction For our ECE 476 Final Project, we have built an intelligent, wearable pedometer. This wire pedometer can calculate many useful statistics such as the number of steps a user has taken, the distance and the speed the person has walked/run, the…... Listed under: Internet - Ethernet - LAN Projects 829. Networked Biometric Authentication Using Atmega32 Introduction: Due to the increasing need for securing data and places, the biometric authentica industry is seeing large market growth.  We decided to build a scalable, small, and efficient device that can be used to secure doorways throughout a c We use a FingerPrint Cards…... Listed under: Calculator Projects, Interfacing(USB - RS232 - I2c -ISP) Projects
830. Virtual Keyboard Using Atmega32 Introduction It is becoming increasingly difficult for users to interact with the slew of portable gadgets they carry, es the area of text entry. Although miniature displays and keyboards make some portable devices, such as cell phones and PDAs, amazingly small, users do…... Listed under: Development Board - Kits Projects 831. 5x5x5 LED Cube – Orientation Independent 3D Display Using Atmega32 Introduction Our project, in one sentence, is an orientation independent 3D L display. We were inspired by various videos on youtube of similar cubes but also by the idea of creating an interactive 3-dimensional display. We built LED cube display and controller board…... Listed under: LED Projects 832. BordFree Using Atmega32 Introduction BordFree is a resurrection of the classic Microsoft hit SkiFree featuring an innovative tilt-control scheme. BordF places users in the boots of a snowboarder navigating a challenging ski slope. BordFree players will see their character on a color TV scrolling from bo top…... Listed under: Game - Entertainment Projects 833. High Speed Photography Controller Using Atmega32 The goal of this project was to build a versatile, yet easy to use, sensor-triggered camera controll speed photography. Dan Furie (djf35) Scott Linderman (swl28) High Level Design Inspiration Our motivation came from photographs that captured a v moment in time, such…... Listed under: Sensor - Transducer - Detector Projects 834. 3D Maze in a Box video game Using Atmega32 Introduction Maze in a Box is a portable game in which you tilt a TV to navigate your way around a 3D m though you were in it. We created Maze in a Box as a challenge to generate 3D looking graphics using the…... Listed under: Game - Entertainment Proj 835. 3D Video Game Control Using Atmega32 Introduction Our project is a 3-dimensional game control for a video game displayed on a black and white te set. Motivation and Overview In the recent push in technology, many new computer and game interfaces have been created, many of which include w control. Our…... Listed under: Game - Entertainment Projects 836. Gesture-driven Tetris Using Atmega32 Introduction Our project takes a classic video game and adds a twist with a handheld, gesture based controller. SUPER TERRIFIC AMAZING TETRIS EXTREEEEEEEEEEEME!!!!!!! We decided to undertake this project because the idea of combining the massive coding r for the Tetris game with the…... Listed under: Robotics - Automation Projects 837. Data Acquisition System With Controller Area Network and SD Card Using Atmega32 Introduction This project implements a high speed data acquisitio using Mega32 microcontrollers and a Controller Area Network (CAN). Recording data is essential to testing and developing a racecar. Recording what e sensor is doing can tell an engineering how the car is performing, and…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 838. Automotive On-Board Diagnostics Reader Using Atmega32 Introduction Our project is a hand-held device that is capable of communicating with any v that uses pulse-width modulation (PWM) data-link layer. Such devices are commonly referred to as On-Board Diagnostic scanners. Vehicles that typica into this category are Fords made between 1996 and…... Listed under: Car Projects 839. Adaptive 60 Hz Noise Cancellation Using Atmega32 An active noise canceler to eliminate the 60 Hz noise found in electrical signals due to AC power-lin contamination. 60 Hz noise is frustrating for anyone trying to make sensitive measurements of low voltage processes (eg. Electrocardiogram measure record audio from electrical instruments (eg. guitar…... Listed under: Sound - Audio Projects
840. Neural Net Helicopter Using Atmega32 Introduction and High Level Design Our project was to design a two degree-of-freedom stationary helicopter, autonomously controlled by an evolving neural network. A normal helicopter has six degrees of freedom, which makes any form of control exceptiona let alone autonomous control. What our design…... Listed under: Game - Entertainment Projects 841. Accelerometer Controlled R/C Vehicle Using Atmega32 INTRODUCTION In our final design project for ECE 476: Microcontrollers, we decided to build a accelerometers, by a remote control that wirelessly transmits, using RF technology, data to the vehicle to move in any direction. The accelerometers w mounted on a…... Listed under: Car Projects 842. ROBOT ARM Using Atmega32 Introduction Our project is a twenty four and half inch aluminum frame robotic arm with four degrees of freedom. In ou we made the arm the second player in the classic game of Tic-Tac-Toe to demonstrate its programmable repeatable motion.  The arm consists of…... L under: Robotics - Automation Projects 843. Help Quit Smoking Watch Using Atmega32 Introduction: The Help Quit Watch is a watch that smokers can wear to help them quit smoking. The Help Q contains a smoke detector that detects whenever the smoker smokes and plays an encouraging clip to help the smoker stop. It then records statistics under: Medical - Health based Projects 844. Electronic Impact Vest Using Atmega32 Our one sentence "sound byte"... *POP* Finally, a fair and balanced way to score Tae Kwon Do matches withou moaning and groaning of everyone. The Electronic Hogu system uses piezoelectric force sensors to determine how much force is delivered by the imp a…... Listed under: Sensor - Transducer - Detector Projects 845. TriWheeler robot Using Atmega32 Introduction The TriWheeler is a radio-controlled robot with three wheels. The lack of the fourth wheel is far from th thing that renders it distinctively different from typical radio-controlled units. In addition to the capability of being freely controlled with a remote cont The…... Listed under: Robotics - Automation Projects 846. Music Wand: Real-Time Optical Scanning of Sheet Music Using Atmega32 Introduction The Music Wand is a device that optically reads printed sheet m real-time and synthesizes the notes which are read from the page. The device uses a linear image sensor mounted on the end of a handheld wand to printed sheet music…... Listed under: Sound - Audio Projects 847. Teaching an old clock Using Atmega32 While exuding retro style, the alarm clock in its original state lacked many desirable features of today's alarm cl only controls consisted of a single on/off switch. It also lacked AM/PM indication, making it impossible to sleep for more than 12 hours. Our project….. under: Clock Projects 848. Shark Tag Microcontroller Platform Using Atmega32 Introduction The goal of this project was to develop a working bench-top microcontroller platform shark tag. It is to be used for on-animal, in-situ data logging applications involving sharks and potentially other large pelagics. For this project I used th Mega32 microcontroller…... Listed under: Sensor - Transducer - Detector Projects 849. Ghost Writing Robot Using Atmega32 Summary We used two stepper motors to drive a steel ball scavenged from a ball-bearing.  These motors were c by a PS/2 mouse wirelessly using the RCR-433 and RCT-433 receiver/transmission combination mentioned in lecture.  We then took the PS/2 protocol, compact, modified existing…... Listed under: Robotics - Automation Projects
850. Rocket Inertial Navigation System using Atmega32 Introduction Was that a ... projectile? a rocket? an [XXXXX] missile? That was a dynamically controlle parachute guidance system looking for its target. The purpose of this project was to design a dynamically controlled parachute guidance system using ATmega32 microcontroller. A set of…... Listed under: Sensor - Transducer - Detector Projects 851. Guitar Tuner Using Atmega32 Introduction: Motivation for Design The Mechanix is a motorized guitar tuner for a standard 6-string electric or acoustic bridge guitar.  Named in honor of Megadeth guitar legend Dave Mustaine, the Mechanix is a unique and innovative product which has numerous pate possibilities.  Traditional handheld…... Listed under: Sound - Audio Projects 852. SCHEME INTERPRETER USING ATMEGA32 Introduction The purpose of this project is to create a Scheme interpreter using C language and Mega32 microprocessor. Using limited resource and memory in the microprocessor, the interpreter should function and work for basic Scheme commands. Th target of the project is to use…... Listed under: Microcontroller Programmer Projects 853. Mini-Golf Simulator Using Atmega32 Introduction This project simulates 9 holes of a minigolf course using the TV to display the course (top down view anchored plastic ball containing two accelerometers, and a putter. Summary We used a hollow plastic ball containing two accelerometers for each pla with…... Listed under: Game - Entertainment Projects 854. Battle Tank – A 3d Atmega32 Based Video Game Introduction Our project is a wireframe 3D video game based on the classic Atari arcade game, Battle (Copyright Atari Corp, 1980). For those that have never heard of the game, Battlezone is a game in which the player maneuvers a tank through a flat environment,…... Listed under: Game - Entertainment Projects 855. LaserSimon – An Innovative Take On An Exciting Game Using Atmega32 Inspiration Our project was first inspired by our shared enjoyment of classic la We initially started out with a game in mind that entailed playing two player laser tag with remote-controlled helium blimps. Due to a number of logist that came up while…... Listed under: Game - Entertainment Projects 856. Snake Arm Glove Project Using Atmega32 Introduction For our project, we designed a glove that can be used to control the Cornell University robotic S surgeon to remotely operate the snakearm as a colonoscope in conjunction with a vision guide system (aka TV goggles). The glove allows…... Listed un Robotics - Automation Projects 857. Wiimote Crane Using Atmega32 I. Introduction We used the Wiimote’s IR tracking capability and Bluetooth to wirelessly control a robotic crane arm.  T Wiimote is a powerful gadget and we wanted to build a new hack with it.  Our crane is composed of three servo motors, one of which…... Listed under Entertainment Projects, Robotics - Automation Projects 858. Radio Frequency Beacon Finder Using Atmel Mega32 This project is a radio frequency receiver that will help the user the trace the direction and distan transmitter beacon(s) operating at 433MHz frequency. In this ECE 476 final project, we have built a radio frequency receiver unit with an LCD screen th Listed under: Radio Projects 859. A portable, color, tilt-controlled video game system Using Atmega32 Introduction The Weeboy is a portable color video game system that is not depen stationary displays or external power sources and features novel tilt-based control. Our purpose for designing this project was to demonstrate that a portable video game system could be implemented…... Listed under: Game - Entertainment Projects 860. TouchPad video game Using Atmega32 Content Page 1.               Introduction 1.1       Sound-Bite Our final project recreates Rush Hour as a video game played using a touchpad implemented using 2D electric-field (E-field) sensors. 1.2              Motivation Rush Hour appealed to us as one of the better pu there.  Its level of difficulty…... Listed under: Game - Entertainment Projects
861. Laser Pong Using Atmega32 Wall of Pong is a fast-moving, interactive, laser-based pong game playable on any flat surface. The system uses a digitally laser projection platform to draw a pong ball onto any flat surface. This allows for a large playing area that can be set up…... Listed under: Game - Ente Projects, LED Projects 862. Movement to Music: A Wearable Wireless Motion Sensor system Using Atmega32 Introduction In this digital age, new interfaces for musical expressio much broader musical possibilities than have ever existed before. There is a constant quest to be in harmony with one’s instrument so that music can freely from the imagination and take form effortlessly.…... Listed under: Sensor - Transducer - Detector Projects, Sound - Audio Projects 863. Music-controlled Puppet Using Atmega32 Introduction The purpose of this project was to design a dancing puppet which is musically controlled by the microcontroller. This is inexpensive dancing puppet, which can dance to any tune you want. For as little money as possible, you can bring Pinocchio to…... Listed under: Sound - Audio Projects 864. Line-following car Using atmega32 Introduction                     Our project is a battery-powered toy car that is able to follow a path against a background contrasting color. <>             The front of the car is fitted with an array of three photosensors, which allows the car to detect the path…... Listed under: Projects 865. PeanutBot, The Audio Homing Robot Using Atmega32 Introduction Sensing in autonomous vehicles is a growing field due to a wide array of military a reconnaissance applications. The Adaptive Communications and Signals Processing Group (ACSP) research group at Cornell specializes in studying var aspects of autonomous vehicle control. Previously, ACSP has examined video…... Listed under: Robotics - Automation Projects 866. Model retina: color tracker Using Atmega32 Objective and Background <> Objective: The gift of sight is precious; that is why we tried to model an artifi with the properties of color detection, saccades, and pursuit tracking. Structure of a Retina: A retina lies in the back of the eye and…... Listed under: Se Transducer - Detector Projects 867. Evolving neural robot Using Atmega32 Introduction Our final project in ECE 476 is a mobile robot with a developed neural network such that it evolves collisions into a circular vertical white wall while traveling at the fastest speed and straightest line possible without human intervention or external com …... Listed under: Robotics - Automation Projects 868. MCU MIDI synthesizer using Atmega32 Introduction Our final project is a music synthesizer that is capable of producing a variety of musical sounds, b the attack, decay, sustain, release times, and applying special effects such as a low pass filter or a halftone shifter. Our original interest for this…... List Sound - Audio Projects 869. AirJam: wearable air guitar Using Atmega2 Introduction Why a working, wearable air guitar? Bottom line, it's just that cool. Who doesn't want a machin take their jamming and turn it into rock they can hear? With just a glove, a pick and a little practice you can rock the…... Listed under: Sound - Audio Pr 870. UDP/Ethernet Controlled Temperature Regulator Using Atmega32 Introduction This project implements a microcontroller based temperature regulato Ethernet port on any common personal computer. As the world becomes more networked, the power of our ability to communicate with many differe systems instantly continues to prove it's worth…... Listed under: Temperature Measurement Projects
871. Morse code interpreter, with speech synthesis Using Atmega32 Introduction This project implements a system that translates Morse Code to text and and translates text to Morse Code. With our limited experience with Morse Code, our first task was to do some research on the components of Morse the standards associated…... Listed under: Sensor - Transducer - Detector Projects 872. Complex impedance analyzer Using Atmega32 Introduction Our device is an impedance analyzer that determines the complex impedance of any R-C within an impedance range. Our original plan for creating this device was to develop a body fat measurer, a portable device that could allow users to m their health…... Listed under: Other Projects 873. iPod controller Using Atmel Mega32 Introduction Have you ever imagined, "What does that cable I plug into my iPod every day actually do, and how d advantage of it for myself?" We did too, and that's what we aimed to do with our 476 project. The iPod is,…... Listed under: Interfacing(USB - RS232 - I2 Projects 874. USB Magnetic Mouse/Touchpad Using Atmega32 Introduction This project implements Hall effect sensors and a magnet to mimic the function of a typ mouse (similar to a tablet pens function). Many digital artists draw with mice on computer or use tablets. However, tablets are often very expensive. U mouse…... Listed under: Sensor - Transducer - Detector Projects 875. Braille reader using Atmel mega32 Introduction BlindAid is a portable tool that reads Braille and signals close objects. It is ideal for those unfortunate who just turned blind and have not mastered Braille reading and blind cane usage. It can also be used as a learning instrument that helps…... Listed u Home Automation Projects 876. Ultrasonic ParKontroller Using Atmel Mega32 Introduction Are you afraid that your brand new Hummer is going to get scratched while parking it in a t space?  Do you have trouble backing your large Mercedez S-class into your small garage?  Fear no more!  Our ultrasonic ParKontroller can sense how f Listed under: Car Projects 877. Retractable Alarm Clock (RAC) Using Atmel Mega32 1.1  Motivation: Alarm clocks are essential in almost everyones daily life.  For most of us, we start o the sweet noise of our alarms.  While some people wake up instantaneously to the first chirp of an alarm, some struggle everyday to get out…... Listed Clock Projects 878. Automatic pet feeder Using Atmel Mega32 Introduction Our project is an automated pet feeder that is controlled by a wireless infra-red remote control. As pet lovers, we unde that the responsibilities of life sometimes inhibit pet owners from properly caring for their pets. Pet care should be fun, not burdensome, and…... Listed under: Home Automat Projects 879. Programmable medication scheduler using atmel mega32 Introduction The Newest Innovation in Patient Compliance The Portable Programmable Me Scheduler (PPMS) is a modern solution to the century old problem of patient compliance, featuring four medication bins, audio/visual alarms, a graph and serial communication with a Java Swing PC GUI. The conjunction…... Listed under: Medical - Health based Projects 880. CalcParser Using Atmel Mega32 Introduction CalcParser is a command line calculator. Controlled by a serial connection, CalcParser parses and evalua arithmetic expression and has the capabilities to perform symbolic polynomial differentiation with respect to a user-defined variable. It can also evalu differentiated expression at a given constant…... Listed under: Calculator Projects 881. Firefly synchronization Using Atmega32 Introduction This project implements a 2D matrix of bidirectional LEDs to simulate how fireflies in a populatio synchronize their flashing. Fireflies are an extraordinary species of bioluminescent animals which are able to synchronize the timing of their light emis within a flashing population. In places…... Listed under: Development Board - Kits Projects 882. Graphing calculator Using Atmel Mega32 Introduction A perfect tool for high school students that will pursue a career in engineering, the graphing and statistics calculator com functionality of a scientific calculator with graphing capabilities as well as being able to compute simple statistics. The purpose of this calculator is…... Listed under: Calculator
883. Speech Recognition Jukebox Using Atmega32 Introduction For the Final Project in ECE 476: Designing with Microcontrollers, Robbins and Saha develop Speech Recognition Jukebox, comprised of a speech recognition system that activated a simple music player.   The speech recognition system was cap recognizing four commands and could cycle through…... Listed under: Development Board - Kits Projects 884. Sound Source Triangulation Game Using Atmega32 Introduction The goal of this project is to determine the time and location of a sound source in all dimensions (x,y,z) using an economical and easily reproducible setup. To accomplish this goal, we decided to try and triangulate the sound source usin Listed under: Game - Entertainment Projects 885. Touch Screen Controlled R/C Car Using Atmel Mega32 Introduction For our final design project, we chose to build a touch screen radio controlled car. Essentially, the RC car wi path drawn by the user on the touch screen as it is drawn in real time. Speed and direction of the car…... Listed under: Car Projects 886. AppleII emulator Using Atmel Mega32 The goal of this project was to develop a system capable of emulating an Apple II personal computer. This proje attempted to reconstruct a functional Apple II emulated on Atmel ATmega32 processors. Due to time constraints, a fully functional Apple II was not pr however,…... Listed under: Microcontroller Programmer Projects 887. HDD analog clock with LCD touchscreen Using Atmel Mega32 Introduction The clock is one of the oldest inventions in human history and has been us centuries as in instrument for measuring time. There are many ways to implement this ancient technology by simple and practical methods. However [caption id="attachment_18482" align="aligncenter" width="531"] HDD…... Listed under: Clock Projects, LCD Projects 888. CUAUV Voltage Sniffer Using Atmel Mega32 Introduction The Cornell University Autonomous Underwater Vehicle team (CUAUV) is an undergraduate engineering team that designs and builds a fully autonomous, robotic submarine. Over the past year, the team – of which both Manoj Lamba and Ian members – has had a stringent…... Listed under: Metering - Instrument Projects, Sensor - Transducer - Detector Projects 889. CUsat diagnostic board using Atmel mega32 1 Introduction Our final project is the CUSat Diagnostic Board (CUDB). This board will be used for monito system health as well as performing various functions allowing for easy integration and debugging of CUSat components. [caption id="attachment_18 align="aligncenter" width="600"] CUsat diagnostic board using Atmel…... Listed under: Development Board - Kits Projects 890. SearchBot Using Atmel Mega32 Introduction The SearchBot is a fully functional model car that can be controlled wirelessly through the PC or autonom search for red balls scattered on a flat surface. Autonomous vehicles are just now being realized in labs around the world and will soon have major….. under: Car Projects 891. Robotic Vacuum Cleaner Using Atmel Mega32 Introduction As our final project, we decided to design and build a robot capable of vacuuming the floo room or area without any human interaction other than just starting the unit. We realized the need for a cheap and convenient product that can…... Li under: Robotics - Automation Projects 892. Cooler-Bot Using Atmel Mega 16L Introduction Cooler-Bot is an autonomous vehicle that uses ultrasonic transducers to sense distance and direction t remote ultrasonic mobile unit that it is designed to follow. Our original goal was to design a vehicle that would carry a beverages for the user and follo Listed under: Car Projects
893. MCU/FPGA color video Game Platform Using Atmel Mega32 Overview: A system consisting of an ATMEL MEGA32 chip, Altera FLEX10K FPGA, and a library of source code for th processor to generate 256-color VGA video signals in real time optimized for game development. Introduction: The Nintendo Entertainment System sp of RAM…... Listed under: Game - Entertainment Projects 894. Musical Water Fountain Using Atmega32 Introduction: Our final project is a musical water fountain loosely based on the fountain in front of the famed hotel and casino. The basic idea of the project is to take an input from an iPod (or any sound source), sample the sound and…... Listed under: Sound - Projects 895. Machine de Karaoke Using Atmega32 Introduction Sound bite Our project is a karaoke recording machine which is capable of removing the voice com a music file and storing the users singing voice with the background music to an external compact flash memory.  It can also be used as a…... Listed un Sound - Audio Projects 896. Dual Control R/C Car Using Atmega32 The purpose of this project was to take a traditional remote controlled car and create our own control mechanis control the car, we used a dual-axis accelerometer and LEDs (light emitting diodes) configured as photo-detectors. The control mechanism was selecte single pole…... Listed under: Car Projects, Game - Entertainment Projects, Sensor - Transducer - Detector Projects 897. Guitar Synthesizer and Game Using Atmega32 Introduction Compose your own virtual guitar masterpiece or follow along with a preprogrammed class experience needed! We developed a guitar synthesizer with video component inspired by the popular video game Guitar Hero. The original game con only reproducing popular rock and roll songs…... Listed under: Game - Entertainment Projects 898. Self-powered solar data logger Using Atmel Mega32 Introduction: My project is a self-powered solar data logger. Put out in the sunlight, it will measure level and log this to memory to be later downloaded to a computer. The system is powered by a small solar panel and battery. Summary: The…... Liste Battery Projects 899. Lighting control system Using ATMEL Mega32 Loucetios™ is a state-of-the-art, self-configuring lighting control system solution for bedrooms, offices a perimeter areas. Under automatic operation, the system senses luminosity inside and outside a room, controls the angle of the blinds and dims the la maintain a prescribed level of illumination inside…... Listed under: Home Automation Projects 900. Intelligent Multimedia System Atmel mega32 Introduction This project implements a multi-function multimedia system that allows the user to sing wit music video and generate some fancy sound effects. In recent decades, multimedia becomes quite popular in our daily life. In fact, multimedia system existed for a long time.…... Listed under: Game – Entertainment Project Ideas, Sound - Audio Projects 901. Ultrasonic spotlight tracker using Atmel mega32 Introduction A spotlight that follows you on its own! The ultrasonic spotlight tracker is a system that u wireless beacon to track a targets location using both RF signals and ultrasound waves.  It then drives a light source to point at the location of…... Liste Sensor - Transducer - Detector Projects 902. Galvanic skin response meter using Atmel mega32 Introduction Our project measures the user's skin conductance for monitoring his or her mental st Summary Medical experiments have shown that the magnitude of the electrical conductance in a person's skin is directly correlated to their emotiona The short term changes in electrical conductances…... Listed under: Metering - Instrument Projects 903. RFID Security System Using Atmel Mega32 Introduction and Motivations: For our final project, we designed and built (and exhaustively tested) an RFID proximity security system for use with Cornell Identification cards, which have been RFID-embedded since fall of 2003. The idea for this project was so spawned from our general…... Listed under: RFID - NFC Projects, Security - Safety Projects
904. VOICE RECOGNITION SECURITY SYSTEM USING ATEGA32 When we think of programmable speech recognition, we think of calling FedEx customer serv center with automated voice recognition response systems. We also think of PC-based speech recognition Dragon NaturallySpeaking. Now we took th further. We are talking about speech recognition in…... Listed under: Security - Safety Projects 905. SecureLED: Better Access Control Using ATMega32 Introduction Overview SecureLED is an optical access control device which replaces current RFID or Strip technologies with a cryptographically secure, contact-less device which communicates over commodity Light Emitting Diodes (LEDs). Project Sum project started with one central premise: current physical access control systems…... Listed under: LED Projects 906. Capacitance sensor MIDI keyboard Using Atmel mega32 Introduction The objective of this project was to build a keyboard based on capacitive sensors use the MCU to create MIDI encodings for all notes played. The output from the sensors is detected by the MCU using its ADC capability. The sound is under: Sensor - Transducer - Detector Projects 907. The Grillzilla Using ATMega32 Introduction: One Sentence Sound Byte: “Grillzilla - A wireless meat grilling thermometer which alerts the user whether their entrée is cooked ac USDA recommendations via LCD and voice feedback.” Summary of what we did: As the weather starts to get warmer a common type…... Listed under: Home Automation Proje NFC Projects 908. Sign language coach Using Atmega32L  Introduction Objective The goal of this project is to design a useful and fully functional real-world product that translates the movement of the fingers into the American Sign Language. Background The American Sign Language (ASL) is a visual language based on gestures. It…... Listed under: LCD Projects, Robotics - Automation Projects, Sensor - Transducer - Detector Projects 909. Radial Chalker Using Atmel Atmega32 Introduction We developed a new way for student groups to chalk advertisements for events. This project is a ra printing device for drawing with chalk/markers on flat surfaces. High-Level Design dea Rationale and Sources Anyone who has done any sidewalk chal knows that it is…... Listed under: Motor Projects 910. GoConn Bicycle Computer Using Atmega 32 Introduction This project is a bicycle computer that includes velocity monitoring, calorie computation, an audio/visual alarm, and a wireless remote. Bicycles are great for transportation as well as exercise. Unfortunately, many bicycles across campus and a world are stolen everyday. We designed a computer…... Listed under: How To - DIY - Projects 911. Handwriting Recognition System Using Atmel Mega32 I.       Introduction Simply write; your computer will undersand! We have designed and impleme Handwriting Recognition System using a touch screen from a Palm Pilot m125, a black and white TV and a Mega32 microcontroller. Unfortunately, due lack of specifications regarding the built-in…... Listed under: LCD Projects, Sensor - Transducer - Detector Projects 912. Programmable remote control Using Atmega32 Introduction The goal of our project was to develop a remote control whose buttons would be readily programmable by recording the signal from another remote control. After revising several standards on infrared signals, we determined that the appr take was to record the signal…... Listed under: Sensor - Transducer - Detector Projects 913. Flat Bed Scanner Using Microcontroller Introduction     Quite possibly the slowest and lowest resolution of any scanner on the market today, but it sur mesmerizing to watch.. and it actually works!      That's about the best way to describe this behemoth of a project, which involved countless hours of b …... Listed under: CNC - Printing Machines Projects 914. Digital Stethoscope Using Atmega32 Introduction Our project is a digital stethoscope that displays your heartbeat on any television. It also calculates b minute and alerts you if your rate falls out of a specified range. [caption id="attachment_17908" align="aligncenter" width="234"] Digital Stethoscope U Atmega32[/caption] At the highest level, the…... Listed under: LCD Projects, Medical - Health based Projects, Sensor - Transducer - Detector Projects
915. TRISHUL -Autonomous navigating robot Using Atmel Mega32 Introduction We decided to do this project due to our keen interest in the robotics. We were also looking for a pro involved a perfect mix of hardware and software complexity. This project enabled us to use new hardware such as sensors, stepper motors…... Listed under: Robotics - Autom Projects 916. Nova Strike video game Using Atmega32 Introduction Nova Strike is a 2D space shooter game implemented with an Atmel ATmega32 microcontroller. inspiration came from our love of video games and fond memories of playing space shooters on our TI-89 graphing calculators in high school (instead attention in calculus…... Listed under: Game - Entertainment Projects 917. Digital Compass Using Mega 32 I. Introduction The goal of this project is to build a digital compass that displays both the direction and cardinal points television. Other functionalities were added to complement the sensor interface, such as, temperature display, magnetic declination input and disabil At the…... Listed under: Sensor - Transducer - Detector Projects, Temperature Measurement Projects 918. MiniGolf video game with putter Using Atmel Mega32 Our project is creating a miniature golf game, complete with a putter and golf ball to simulate a putting stroke. We chose to construct a mini golf game because not only is it interesting, but it has a large balance of computer programming as…... Li under: Game - Entertainment Projects 919. Electr-O-Sketch Using Atmega 32 Introduction We created a project in which a user could control the movement of an Etch A Sketch using a typical ser The public was introduced to the EAS in 1960 and since then it has stayed virtually the same.  This nostalgic toy is…... Listed under: Sensor - Transduce Detector Projects 920. Pong2 Using Atmel Mega32 Our final project is a portable, dedicated PONG2 video game unit for use with a home television. Introduction PONG, a vid that simulates a game of Ping-Pong between two players, has a long and pervasive history, and is said to be the first video…... Listed under: Game - Entertainment Projects, LCD Projects 921. Handheld Ultrasonic Rangefinder Using Atmel Mega32 Introduction Our ultrasonic rangefinder is capable of allowing the user to determine his or her from an object or wall. When deciding on what type of project to design and construct, we decided that we wanted to create something that would ha practical…... Listed under: LCD Projects, Sensor - Transducer - Detector Projects 922. Beverage Monitor Using Mega32 Introduction We created a wireless device to affix to the bottom of a pitcher that alerts the wait staff when the pitche empty. We used the a priori knowledge that when a pitcher is empty the pitchers bottom is perpendicular to the ground. By…... Listed under: Sensor - Transducer - Detector Projects 923. The Ultimate MP3 Radio Using ATMega32 Introduction Perusing through the impressive list of past projects, we decided to make our final project a co of two technologies—wireless technology and the MP3 player. Specifically, we decided to create an MP3 player that broadcasted the songs to an FM d this…... Listed under: Internet - Ethernet - LAN Projects, Sound - Audio Projects 924. SmartBlinds Using Mega32 Overview The SmartBlinds system uses a microcontroller to control the angle of a set of miniblinds used at home, in the cl or on the job. Using SmartBlinds, a user can more effectively control the light coming into the room, or have an alarm that…... Listed under: Home Aut Projects 925. Keypaw Using Atmel Mega32 1 Introduction The Keypaw is a 12-button input device that provides computer users with an ergonomic, fully-configurab alternative to the traditional QWERTY keyboard. The Keypaw is a microcontroller-driven device with 12 buttons mounted on two handsets; 1 button is for each finger, and 2…... Listed under: Development Board - Kits Projects
926. Home Security System Using Atmel Mega32 Introduction This is a digital home security system with voice feature which can monitor room temperatu motion, and windows & doors. The goal of this project is to utilize the after-market parts and build an integrated home security system. Besides tradit magnetic switch equipped…... Listed under: Security - Safety Projects 927. A Wand Based Barcode Scanner Using Atmel MEGA32 Introduction: Our project is a UPC-A Barcode Scanner complete with a pricing/description datab interface. Our original goal for this project was to build a standard barcode scanner from scratch, but as the project evolved so had to our specificatio project.  We initially sought…... Listed under: Metering - Instrument Projects, Sensor - Transducer - Detector Projects 928. Implementation of a (31, 16) BCH code on a Microcontroller Using Atmega32 Introduction: Error correcting codes are used throughout digital commun systems today. Cell-phones, CD players, satellites, digital pagers and many other communication devices all use varying amounts of error control to ac certain degree of accuracy in transmitting information. The idea behind error control codes…... Listed under: Radio Projects 929. The Breath-o-Matic Using Atmega32 Introduction Let us introduce the Breath-o-Matic alcohol sensor. The Breath-o-Matic is an electronic, non-invasive of measuring a human’s blood alcohol content (BAC). Its elegant, yet discombobulated design embodies a cheerful mix of mechanical and semiconduc components. Simply blowing into the mouthpiece causes the Breath-o-Matic…... Listed under: Sensor - Transducer - Detector Projects 930. TV/Keypad Interface for Winamp Using Atmel MEGA32 MP3 is presently a household term; the reader will likely own a few, barring any intervention fro RIAA. Since it's not always practical to sit in front of a monitor and keyboard when you want to listen to music (e.g. in a car, on…... Listed under: Interfa RS232 - I2c -ISP) Projects 931. Eye in the Sky Security System Using Atmel Mega32 Introduction We have used the Atmel Mega32 AVR microcontroller to construct an affordable, high security system designed to protect valuables in a single room of a house or property. According to national surveys conducted by the department of J property crimes are ten times…... Listed under: Security - Safety Projects 932. Xylophone Using Mega32 Introduction Our final project is a programmable, self-playing xylophone with random melody generation and a pitch detect interface. From early mechanical devices to todays musical greeting cards, history has seen numerous examples of automated music machines. This p represents a quick, modern take on…... Listed under: Sound - Audio Projects 933. Scorched Earth video game using Atmel Mega32 For our design project, we decided to replicate the video game known as Scorched Earth: The Mother Games where two tanks fire missiles at one another by adjusting angles and power while adjusting for variable wind. The objective of Scorched Earth Listed under: Game - Entertainment Projects 934. Wonderswan Development Cartridge Using Atmel Mega32 Introduction Short Summary This project allows a Wonderswan developer to upload 64 kB code/data and execute it on real Wonderswan handheld gaming hardware. Long Summary We started by opening up one of our Wonderswan cartridg identifying the various chips and circuitry found inside.…... Listed under: Game - Entertainment Projects 935. Star Duel video game Using Mega32 1.  Introduction 1.1  Project Summary Our project is a space dogfighting video game where two players attempt to each other using a variety of ships and weapons.  The battlefield is a 128x100 pixel area on a TV, and a small planet resides in the…... Listed under: Ga Entertainment Projects 936. The Big Red Guide Using Atmel AVR Mega32 If this is your first time on the Cornell Campus, you need not worry! Cause we have the best guide for you Introduction The Cornell Campus is quite large, and finding your way around can get a bit frustrating. The Big Red Guide is a…... Listed under: GPS Bas Projects, Security - Safety Projects 937. MISSILE COMMAND USING ATMEL MEGA 32 Introduction For my ECE 476 Design Project, I built Missile Command using the Atmel Mega 32 microcontroller.  My version of Miss Command is based on Ataris 1981 version.  After looking at some of the past ece476 final projects, I noticed no one had tried to…... Listed under: Game - Entertainment Projec
938. 3D gForce Mouse Using Mega32 Introduction "Our 3D gForce Mouse will enable use to move the curser in the air freely with the capacity of scrolling" T rationale for this design is two fold. We wanted to do this design because we wanted to make a zero-impact pointing device for…... Listed under: Senso Transducer - Detector Projects 939. Stationary Helicopter Using Atmel Mega32 Intro Summary Thinking about what a CDE (culminating design experience) should be, we devised a project combines the microcontroller programming principles learned in ECE 476: Microcontroller Design with the control theory concepts learned in ECE 472 Feedback Control Systems to create an academically viable…... Listed under: Motor Projects, Sensor - Transducer - Detector Projects 940. INFRARED TRACKING SYSTEM USING ATMEGA32 Introduction Infrared (IR) Our project is an infrared (IR) tracking system. A beacon, placed on the obje tracked, continuously emits infrared signals in all directions. The signals coming from the beacon are detected by 2 IR receivers mounted on 2 stepper which rotate…... Listed under: Featured, Game – Entertainment Project Ideas, Sensor - Transducer - Detector Projects 941. Arkanoid Video Game using Atmega32 Introduction [caption id="attachment_16604" align="aligncenter" width="224"] Arkanoid Video Game using Atmega32[/caption] High Level Design After working with the ATmega family of processors for the first six lab assignments, and working extensively w generating television screen images, we decided that a video game would be a viable…... Listed under: Game - Entertainment Projects 942. Reversi Video Game Using ATmega32 Introduction "Our project implements the game, Reversi, on TV with a smart artificial intelligence and a host of o features!" It's our childhood game. We were so excited when we found out that we can actually build it for our 476 final project. We looked…... Listed u Game - Entertainment Projects 943. Guitar Special Effects Using Atmega32 <Introduction> In the last few decades technology has constantly pushed music further and further into the dig Digital technology has infiltrated all aspects of music-making, from its creation to its recording, editing and production. We have decided to join this te movement by fitting…... Listed under: Sound - Audio Projects 944. Tap the Dance using Atmel Mega163 Introduction Nowadays in the video gaming industry, one of the most popular categories of game is music and m simulation game. There are games where players are required to play the drum according to the matching signals and the music of the game; there a Listed under: Game - Entertainment Projects 945. kaOS operating system and loader using atmega32 Introduction We have created a real-time, multithreaded, preemptive operating system called kaO Atmel Mega32 microcontroller, which loads and executes programs from a Secure Digital or MMC card. We wrote this OS and created the SD/MMC ca as a final project for Cornell's…... Listed under: RTOS - OS Projects 946. Keyboard mania using Atmega32 INTRODUCTION “Keyboard mania gives users an opportunity to learn and gain a unique taste of playing an electron music teacher.” Summary of our Project We designed an electronic musical instrument, called keyboard mania, able to play an octave of…... Listed und - Audio Projects 947. ECE 476 Spring 2005 by Arthur Zhang (ayz2) and Yewen Ying (ydy2) using atmega32 Introduction Soundbyte TV Jezzball with dangling mouse, created b ECE476 students Arthur Zhang and Yewen Ying, is a hot, new, cool, retro look back to when times were simpler, computers were slower, and TV’s were white. Overview From the beginning, because of…... Listed under: Game - Entertainment Projects
948. Duckhunt video game using Atmel Mega32 Introduction to Duck Hunt For our final project in ECE476, we implemented a multi-duck and multi-player v the Nintendo classic Duck Hunt on the Atmel Mega32 microcontroller. In 1985, Nintendo released a game for the Nintendo Entertainment System (NE Duck Hunt, and it…... Listed under: Game - Entertainment Projects 949. The Contender video game using Atmel Mega32 Introduction The pitch "The Contender" is an interacting boxing game in which the player actively par the game with real time punching, ducking, dodging, etc. The Description and Motivation This game is a twist of a popular arcade game called "Mocap short for…... Listed under: Game - Entertainment Projects 950. The Big Red Juicer using Atmel Mega32 Introduction The Juicer is a wirelessly controlled, programmable juice maker which will mix each ingredient of a the exact proportions every time. The Juicer will take a recipe selection serially via either the keyboard or the wireless remote and dispense the juices Listed under: Home Automation Projects 951. Color Tetris video game using ATMega32  Color TET Brief DescriptionThe project is a color "Tetris" based game compatible with NTSC TV. Summary an motivationThe project basically utilizes a Mega32 chip, along with a RGB-NTSC converter and a sync generator to produce color on a standard NTSC TV code for a…... Listed under: Game - Entertainment Projects 952. WeatherDog Using ATMega32 Introduction Our project was a real-time weather update system that accepted an airport code from the user via a keyb looked up the code on an internet database, and displayed the resulting weather information on a television screen. We used the PS/2 protocol, betw Listed under: LCD Projects, Metering - Instrument Projects 953. AirMouse using ATMega32 I. Introduction The Cornell University Airmouse Initiative is a motion sensing glove with buttons on it that plugs into your co to function as a mouse. Many tasks that are performed on the computer require the use of both a keyboard on the mouse, and…... Listed under: Sens Transducer - Detector Projects 954. Neural net robot using ATMega32 Introduction Our project consisted of an elementary eight neuron network that used Hebbian Learning to train a robot to respond intelligen input light stimuli. First, we decided upon a task that would accurately denote Hebbian learning. One of the most common examples of conditional…... Listed under: Robotics - Automation Projects 955. Wireless Electromyograph using ATmega32 Introduction This project implements a wireless surface electromyograph that displays the signal using a t as an oscilloscope. Electromyography detects the electrical signals that the human body generates to contract muscles. Detecting very low voltages in milliVolt range on the skin surface is not…... Listed under: Internet - Ethernet - LAN Projects, LCD Projects 956. Stepper Motor Indexer & Decoder ECE 476 Using ATmega32 1. Introduction For our final project we built an ATmega32 based stepper motor controller measures the angular position of the motor shaft using an optical encoder and quadrature decoder. Our system performs 3 basic functions: (1) Comm with a PC by means of a…... Listed under: Motor Projects 957. A Microcontroller Based Turbidity Meter using AtmelMega32 Introduction Low-Cost Turbidity Meter for Underdeveloped Countries Our project is a col with an independent research project being conducted by senior civil and environmental engineering student James Berg. The goal of this project is to low cost turbidity meter for use in under…... Listed under: Metering - Instrument Projects, Temperature Measurement Projects 958. A Motion Capture System Using Accelerometers using AVR Mega32 By: Kris Young and Dan Li See the results section for movie clips of the motion cap system in action. Abstract Human-Computer interface may perhaps be both the most limiting and liberating aspect of humans working with compute for instance, limit the input complexity…... Listed under: Metering - Instrument Projects, Video - Camera - Imaging Projects 959. Wireless Telemetry using Atmel Mega32 I.Introduction Soundbyte:A Wireless Data Telemetry system that receives acceleration, proximity and external temperature data from a remote vehicle and displays them on an NTSC television screen. The rationale behind this project is to provide the user with information regarding the vehicles acceleration, proximity to other…... Listed under: Metering - Instrument Projects
960. Portable Security System Using ATMega 32 Introduction Consider you are in a research lab that handles highly hazardous material. You don't want any enter the room, to even come close to the door. Or consider yourself doing something highly confidential in a room that you would like to know if…... under: Security - Safety Projects 961. Blood Pressure Monitor Using Mega32 Introduction Our final project is to design and build a portable blood pressure monitor device that can measur blood pressures and heart rate through an inflatable hand cuff. The device is consisted of three main parts: external hardwares (such as cuff, motor, v Listed under: Medical - Health based Projects 962. Missle Command video game using Atmega32 1. Introduction Brian Smith and Cem Ozkaynak, two Seniors enrolled in ECE 476 at Cornell University, s rekindle the mood of impending nuclear annihilation by distant ‘Evil Empires’ through the classic 1980’s video arcade sensation Missile Command. [ca id="attachment_16403" align="aligncenter" width="600"] Missle Command video…... Listed under: Game - Entertainment Projects 963. BlindBot usisng Atmel Mega32 MCU Introduction    Our project is an autonomous toy car that tracks a high pitched audio signal. Using two microphon microcontroller, and two DC motors on an existing remote controlled car and, we implemented our own control logic to detect high pitched 3.5kHz au signals…... Listed under: Game – Entertainment Project Ideas, Robotics - Automation Projects 964. Super Breakout using Atmel Mega32 Get ready for the next generation of the classic game Breakout which features a standalone device, interactive us control, and new and improved game modes including two player cooperative and competitive modes. Introduction Breakout is a game of speed, skill anticipation.  The player will…... Listed under: Game - Entertainment Projects 965. Connect Four with Programmable Infrared Receiver Atmel Mega32 We have designed a programmable infrared receiver which can utilize any pulse co signal to play Connect Four from a remote distance. The programmable infrared receiver device we have created can decode any pulse-width modula of an IR remote control, store it in…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Radio Projects 966. MIDI DRUM CONTROLLER USING MEGA 32 MICROCONTROLLER [ INTRODUCTION ] MIDI Drum Controller Our Final Project for ECE476 was to build a M machine using the MEGA 32 microcontroller. We wanted to make an actual product that can produce “good-quality” percussion sounds. Our drum ma would be played via a keyboard…... Listed under: Sound - Audio Projects 967. Inverted Pendulum Balancer Using Atmel Mega32 Introduction The goal of this project was to build and implement an inverted pendulum balancer, in vertical two dimensional plane, using Proportional-Integral-Derivative (PID) feedback control. [caption id="attachment_16620" align="aligncenter" widt Inverted Pendulum Balancer Using Atmel Mega32[/caption]           The inverted pendulum balancer is a radio controlled car…... Listed under: Game - Entertainment Projects 968. Vocal Trainer Using Atmel Mega32 Introduction With the Vocal Trainer, expect to resurrect your singing, and ultimately become a vocal expert! The pu this Vocal Trainer, designed by Anderson Lin and Jerry Chiang, is to train people in singing accurate pitches, and ultimately become a vocal expert. Also Listed under: Sensor - Transducer - Detector Projects, Sound - Audio Projects 969. Variable Traffic Controller Introduction Our project is a Traffic Controller that is sensible to traffic condition and adjust the traffic lights accordingly. Ou tries to simulate the traffic at an intersection, and with the use of sensors (Hall Effect in our case), we adjust the traffic of…... Listed under: Car Projects 970. RoboDog using ATMega32 Introduction The project, Robodog?is an autonomous car that follows sound. The car can follow almost any audible sound t human can create by using three onboard microphones. This project was possible because of the fact that the speed of the sound is relatively slow co Listed under: Game - Entertainment Projects, Robotics - Automation Projects 971. PC temperature control using Atmel Mega32 Abstract Our project is a standalone temperature and fan monitoring and control unit for the PC. It uses fan speeds in order to regulate temperature and noise. The system is flexible in that it can be configured to be either…... Listed under: Temperature Measurement Projects 972. MOS 6502 Emulation on an Atmel Mega32 ECE 476 - Spring 2003 Christopher Foster and Jeff Puchalski When Chris and I first started tossing around p ideas, I sputtered out: 'Hey! Wouldn't it be cool if we could emulate a Nintendo using some Atmel chips?' Chris replied 'Ooh, that'd be awesome, then… under: Other Projects
973. A Portable Battery-Powered Roguelike Video Game Using Atmel MEGA32 I. Introduction This project is a portable battery-powered video game based o 1984 cult classic PC game "Rogue". I designed a hardware-based roguelike video game because I am a long-time Rogue addict and thought it would be make a portable plug-and-play imitation.…... Listed under: Game - Entertainment Projects 974. Dual control RC car using Atmel Mega32 Introduction We have always liked playing with remote controlled (RC) cars, so we decided it would be fun to certain aspects of it. This led us to the idea of changing the remote control so that the car responds to different types of input.…... Listed under: Game Entertainment Projects 975. Digger video game using Atmel Mega32 Introduction Sound Bite We implemented a black-and-white video (TV) game adaptation of the old DOS classi as Digger, by Windmill Software. Summary On the Game Start screen, a choice between a multiplayer mode and an AI mode is offered. The multiplaye supports three…... Listed under: Game - Entertainment Projects 976. Digital voice recorder using Atmel Mega32 microcontroller Our project is a digital voice recorder with distortion abilities that stores multiple tracks ont DataFlash memory card. We programmed an Atmel Mega32 microcontroller to sample a microphone, and store the samples into an external memory We give the user the option of…... Listed under: Sound - Audio Projects 977. Digital Guitar Tuner Introduction We constructed an analog-to-digital guitar that captures an input signal and uses the waveform zero-crossings to det whether the note is at the correct frequency. The hope was that this frequency tuner could be used in a home setting where each of us can…... Listed Sound - Audio Projects 978. Voting Machine Using Atmel Mega32 Introduction Our project is an electronic voting system. The system allows for quick and accurate voting electron system uses a client/server architecture, which allows voters to cast ballots on the client terminal. Each client interfaces with the server, which keeps t entire…... Listed under: CNC - Printing Machines Projects, Home Automation Projects 979. Frequency Division Multiplexing for a Multi-Sensor Wireless Telemetry System Using Atmel MEGA32L Our System acquires several different sensor inputs, FM modulates each manipulating Direct Digital Synthesis increment values, transmits the resulting signal on a commercial FM radio band, and receives and decodes the original sensor levels. Intr The problem of encoding multiple input signals into…... Listed under: Sensor - Transducer - Detector Projects 980. CubeSat Diagnostics board using Mega128 Introduction Sound Byte This project is a proof of concept diagnostic & testing board for use with the powe the Cubesat Satellite and will be developed further to become a component of the CUSat Satellite. Summary of What We Did and Why This…... Listed u Radio Projects 981. Gauntlet of uComputation using Atmel Mega32 Introduction  The project involves an experiment in implementing a human-computer interface by tra finger and wrist motions. Brief: "Ever wish you could control a computer just by moving your fingers or your hand?" We did. The primary goal is to des build a functional…... Listed under: Sensor - Transducer - Detector Projects 982. Laser Communications System Using ATMega32 Introduction Laser communications systems are wireless connections through the atmosphere. They similarly to fiber optic links, except the beam is transmitted through free space. While the transmitter and receiver must require line-of-sight condition have the benefit of eliminating the need for broadcast rights…... Listed under: Internet - Ethernet - LAN Projects 983. Digital Mirror Message Machine Introduction For our final project, we decided to build a digital message machine which displayed on a mirror.  This is variation from other digital message machines we had seen in stores and in past final projects.  Instead of quickly moving a wand of LED's…... Listed u Projects 984. Memory Video Game Using Atmel Mega32 Introduction The main goal of this project was to write and develop a graphical version of the card game co referred to as Memory for use on an Atmel Mega32 microcontroller unit. Memory is a card game where the player tries to match pairs of…... Listed un Game - Entertainment Projects
985. TREASURE HUNT OF THE HIGH SEAS ATMEL MEGA32 INTRODUCTION Sail the high seas searching for treasure and protecting your ship from pirates in game in which a system of lasers discerns the direction of wind and you specify wind magnitude, sail height, and rudder position. Originally, we had th of…... Listed under: Game - Entertainment Projects 986. PacMan Video Game Using Atmel AT90S8515 microcontroller Introduction The goal of our project was to replicate the great arcade classic Pac-Man on in black and white. The inspiration for this project came from our love of video games and our introduction to NTSC TV signal generation in Labs 3 and Listed under: Game - Entertainment Projects 987. SpaceInvaders Video Game Using Mega32 Introduction Our final project is the classic Atari version of space invaders on the MEGA32. The story: A horde of space invaders are attempting to land on the planet’s surface. You play a heroic pixilated thing on the ground trying to stop them one bullet…... Listed under: Game - Entertainment Projects 988. Space Fighter Video Game Using ATMega32 Introduction Our project is a fighter game. The user controls a fighter, which moves around the TV screen starts the game with a defined number of lives. It has two kinds of enemies: the asteroids and the monsters. Asteroids drop randomly from the…... Lis under: Game - Entertainment Projects 989. Frogger Video Game Using Atmel Mega32 Introduction Sound Bite One word: FROGGER!! Why Frogger? We chose Frogger for several reasons. First, we that it is an entertaining game, which is complex enough to implement as a project. Second, Frogger allows us to use knowledge that we have acquire this…... Listed under: Game - Entertainment Projects 990. MIDI synthesizer Using Atmega32 Introduction: MIDI Synthesizer Our Final Project for ECE 476 was building a MIDI synthesizer using a MEGA 32 microcontroller.  At first we wanted to tear apart an old keyboard and use the MCU to decode directly from the sensors which detected key presses.  W then…... Listed under: Development Board - Kits Projects 991. Radio Control Car using Mega32 Introduction: We like car and we like to build our own Atmel Mega32 MCU based radio-controlled NSX.  We set three g the initial project proposal and they are as the following: (1)  Build a RC NSX with the same performance as the original car. …... Listed under: Car Proje 992. Sound Effects Processor Using Mega32 Introduction As you can see from the title, our project, in a nutshell, is a Sound Effects Processor (for the lack o name), which is capable of taking an audio input, adding effects to it digitally and passing an analog output to an…... Listed under: Sound - Audio Proje 993. BattleShip Game using Atmel Mega32 Introduction : For our final project, we decided to create the classic game of Battleship that was displayed on a T controlled by keypad inputs. We both enjoyed playing the board game when we were young and we occasionally would do battle against each…... Liste Game - Entertainment Projects 994. Wireless Keyboard Using Atmega32 Introduction: For our project, we designed a wireless keyboard that uses RF to transmit signals to the computer. In design, we use a regular, 102 key ps/2 keyboard and connect it to our transmitter circuit. On the computers side, we connect our receiver circuit…... Lis under: Internet - Ethernet - LAN Projects 995. TV Minesweeper Using Atmel MEGA 32 Introduction For our final project, we have decided to build a minesweeper game with a microcontroller and a PS/2 mouse to be display TV. Minesweeper is a famous game that comes with the MS-Windows operating system, and the objective of the game is…... Listed under: Game - Entertainment Projects
996. Vehicle Performance Meter Using Atmel Mega32 INTRODUCTION The DomMeter is a car performance meter that measures acceleration to compute v important to car enthusiasts. Specifically, the DomMeter calculates the 0-60mph time, 0-30mph time, 0-100mph time, quater mile, eighth mile time an time, the max acceleration during that interval, distance travelled…... Listed under: Metering - Instrument Projects, Temperature Measurement Project 997. Tetris Video Game Introduction For our 2003 ECE476 Design Project, we designed a Tetris game that was playable via a 16 button keypad and was disp a black and white television at a resolution of 128x100.� The heart of the hardware system consists of the ATMEL Mega32…... Listed under: Game - Entertainment Projects 998. Cornell Hockey Using Atmel Mega32 News April 27, 2003 The project is due for us tomorrow, since we have the Monday evening lab slot. We spent a li in the lab fixing the last few bugs, tweaking a little, and taking some pictures. We have an enclosure for the…... Listed under: Game - Entertainment Pro 999. Gray-scale Graphics: Dueling Ships A 4-bit gray-scale video system demonstrated by a multiplayer game Our project displays a 128-by-96-pixel image i gray-scale (16 intensities) by using a memory-map compression scheme. The equivalent uncompressed display would require 6-KB of memory (128 � � 4 bits/pixel = 6,144…... Listed under: Game - Entertainment Projects 1000. Laser Light Show Using Atmega32 Introduction Single sentence summary A programmable laser light show that allows the user to specify the pattern via three motor speeds and the length of time that this pattern is held. Project Summary For this project, we designed a system to guide a laser…... Lis under: Sensor - Transducer - Detector Projects 1001. Wireless Drawing Device Using Atmel Mega163 Introduction: For our final project, we want to build a wireless drawing device. The user uses a keypad mouse to draw on the TV through a wireless communication medium (RF - 433.92 MHz). The user should be able to move the drawing pointer…... Liste Internet - Ethernet - LAN Projects 1002. IntelliBOT Using Mega 32 Introduction For our final project we decided to build a robot that could navigate from one location to any given target and a obstacles in its way. The robot body used a very primitive design that included a cardboard box for the body and Minute…... Listed under: Robotics - A Projects 1003. Sheet Music Generator using Mega32 Microcontroller Introduction If you are a music buff, then our sheet music generator will be the answer to your dreams. You plug in the i of your choice and as you play the keys our system will create the sheet music that attests to your musical…... Listed under: Sound - Audio Projects 1004. Multi-Zone Fire Alarm System Using Mega32 Microprocessor Introduction We designed a multi-zone fire alarm system with a VT100-compatible user i The system is microprocessor controlled using the Mega32 microprocessor. The system communicates to the VT100-compatible user interface via a R connection. A fire is detectable by a number of fire detection devices…... Listed under: Security - Safety Projects 1005. PC-CONTROLLED SCANNING TUNNELING MICROSCOPE Using ATMega163 INTRODUCTION For our final project, we designed a scanning tunneling mic (STM) that could be used to gather information about the surface topography of metals and semiconductors at the sub-micron scale. The STM is cont from a graphical user interface running on a PC. The…... Listed under: Other Projects 1006. Tic-Tac-Toe on TV Using Atmel Mega163 Adventures in TV land             The goal of this project was to play a simple game outputted to a television via d signal generation into a composite video input of a television.  Obviously, the outputting of material to a television is the most challenging…... Listed u Game - Entertainment Projects 1007. Hard Drive Based AVR Programmer Using Mega163 The project which we are presenting is not the project we presented in our proposal. We initially p build a WWVB time-code receiver, which would demodulate a 60 kHz signal and extract an extremely precise time according to the National Institute o Standards and…... Listed under: Microcontroller Programmer Projects 1008. Autonomous Car Introduction Let us begin with one key observation: cars are cool.   From consumer transportation to manufacturing to childrens' toy in their many forms are some of today's most influential machines.   Autonomous vehicles are already in use in many manufacturing facilities, and the also…... Listed under: Car Projects
1009. Safety-sensor vehicle using Mega163 Introduction cars and vehicles have been integrated into society as one of the most efficient, easiest, accessible transportation available. But while it is a convenient and common means of transportation, it is also an incredibly dangerous mode of transport. Thou people die…... Listed under: Car Projects 1010. MP3 Player Using Atmel Mega103L Introduction Using MPEG Layer-3 compression, 40 MByte audio files have been compressed to approximately 3.5 M With the wide availability of MP3 files via the Internet, portable MP3 players have become increasingly popular. MP3 players are currently available tha either Compact Discs, SmartMedia, Compact…... Listed under: Sound - Audio Projects 1011. Digital Music Synthesizer Using Atmel 90s8515 chip Introduction: Our ECE 476 Spring 2002 final project is a musical synthesizer that mimics the sound produced by a piano and a clarinet.  We wanted to create a device that could produce different musical signals by direct digital synthesis.  Using Fourie of the signals,…... Listed under: Sound - Audio Projects 1012. The Rotating Globe Using Atmel Mega163 Introduction For years scientists and scholars alike have been plagued by one common obstacle which, until now, has proven to be i to overcome.  How do you find the country you want on a globe?  Sure, the easy answer is to just use the longitude…... Listed under: Motor Projects 1013. Spring 2002 Gmouse Using Atmel ATMEGA163 Introduction With all focus of computer technology advancement placed on processors and memory, s the most simple of components are overlooked.  This is especially the case with the mouse, a device that has changed very little since its conception b still retains its…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 1014. Laser Tag Introduction What is Snipertag? Snipertag is a variation upon the very popular ‘Lasertag’ game. In 1986, a company called Worlds of Wonder with the idea for a combat game that worked around a set of commercially produced toy laser guns and sensors. As…... Listed under: Game - Entertai Projects 1015. Fish: Video Controller Introduction: The basis of this project is to create the game fish on the Atmel board. In the game fish, the big fish eat the small fi your job is to eat the fish smaller than you while not getting eaten by those bigger…... Listed under: Game - Entertainment Projects, Video - Camera - I Projects 1016. Fertilizer Feed Rate Controller Abstract For a final project for EE 476 at Cornell University under the instruction of Bruce Land I designed and built a fe flow rate control unit tailored to the needs of Lin Davidson. Instead of conventional mechanical drive methods, the delivery rate was controlled…... Lis Home Automation Projects, Motor Projects 1017. gEECShip Introduction Sound byte For our final project, we are redesigning the classic battleship game to suit the needs of engineers. We are removin need for communication, but keeping the feel of battleship. So what are we really doing? Instead of having engineers mumble battleship…... Listed un - Entertainment Projects 1018. Final Project EKG Monitoring System Introduction Unexpected cardiac death, also known as sudden death is a frequently fatal form of arrhythmia whi more than a quarter of a million people each year in the United States. Confronted with the devastating effects of unexpected cardiac death and with pursuit…... Listed under: Medical - Health based Projects 1019. Larry Pellach and Brian Silverstein Introduction Imagine being able to monitor the status of a given room or area from anywhere in the world, at anyti today�s booming technological atmosphere, this dream doesn�t sound so far off.  However, imagine being able to do this cheaply, while not sacrific efficiency…... Listed under: Temperature Measurement Projects 1020. Analog Modem Design Project Introduction: We thought it would be interesting to try and construct a simple modem out of the ATMEL 8535. The main test some DSP theories about the effects of transmission power, noise, and modulation technique on the bit error…... Listed under: Phone Projects
1021. Security Entrance System Overview: Our security system is a stand alone device that allows access to registered users identified by their magnetic card project, "access" is represented by a lit LED, showing how the system could be used to control an external locking mechanism.)The system includes fea Listed under: Security - Safety Projects 1022. EE476 – Final Project Hummer RC Truck Introduction: For our final project, we decided to enhance the controls of a Hummer RC truck. Our main objec to demonstrate that an Atmel microcontroller together with basic hardware building blocks can replace all of the car's original circuitry. Improving the handling…... Listed under: Car Projects 1023. EE 476 Final Project Portable MP3 Player Introduction In the recent years, the MPEG Layer III (MP3) music compression format has become an extreme popular choice for digital audio compression. Its high compression ratio, and near CD quality sound make it a logical choice for storing and distributin especially over…... Listed under: Sound - Audio Projects 1024. Autonomous Vehicle INTRODUCTION As technology develops, computers are making people's lives progressively easier and safer. Someday they will b drive automobiles, resulting in reduced deaths and accidents. We decided to make a prototype of a self controlled car. We started with a Hot Shot II…. under: Car Projects, Radio Projects 1025. Design of a REE476 Final Project: eal-Time Digital Guitar Tuner Introduction The goal of this project is to design an algorithm for a real-time digital guit and implement it using an Atmel AT90S8535 microcontroller. Each of the six strings of a guitar has a unique fundamental frequency, and our goal is to this…... Listed under: Microcontroller Programmer Projects, Sound - Audio Projects 1026. Whack-A-Cap: miniature representation of a popular amusement game Introduction: Our final project code calls for the implementation of an amusem game often bannered as "Test-Your-Strength" or less accurately (but more commonly) known as "Whack-a-Mole." Our machine is in essence a minitur version of what can be found in most theme parks across the…... Listed under: Game - Entertainment Projects 1027. CU Organizer Introduction: One of the newest and fastest growing additions to the digital age in the 1990s has been the handheld personal computer little flash memory and a good LCD, anything is possible and commercial products like the 3Com PalmPilot� and IBM Workpad� are…... Listed under Projects 1028. Automatic Etch-A-Sketch Controller Introduction For our final project, we set out to write a Controller for the classic toy, the Etch-A-Sketch. What this basically means, is that we Atmel micro controller to control two stepper motors connected to the knobs of the Etch-A-Sketch. Thus, an order…... Listed under: Microcontroller Programmer Projects 1029. EE476 Final Project Real-time Debugger By Emre Tezel & Cagdas Ozgenc Objective: To design a debugger that is capable of tracing AT90S1200 user pro while the micro-controller is attached to external peripherals. The debugger will be able to display I/O activities, and dump the values of the registers. Required: Atmel STK-200 starter kit (kit includes…... Listed under: Microcontroller Programmer Projects 1030. Clifford Systems JI1000 Car Alarm System Introduction The design philosophy behind the JI1000 is a simple, yet powerful microcontroller based mobile system. At the heart of the JI1000 is the Atmel AT90S4414 8-bit RISC microcontroller. We used the 4414 for this design because a microcontroller is we for a security…... Listed under: Car Projects, Security - Safety Projects 1031. Eye Snake Soundbyte If you ever thought you couldn�t control things with your eyes, think again � here�s the game Snake that allows 4 modes of m game play with buttons or with your eyes, using electro-ocular potential. Project Summary While brainstorming for a 476 final project…... Listed under Entertainment Projects
1032. Hangman! Introduction For our final project, we used an Atmel AT90S8535 microprocessor to create a hangman game. The letters are displayed on a character LCD, and are input ("guessed") using a 16-button keypad. The 8 LED's on the Atmel development board are used as our "hanging…... Listed u Game - Entertainment Projects 1033. Programming the Game Simon Introduction Many of the simpler electronic games of the past decade can be easily programmed on the AVR microcon we are using this semester, using only the lights and switches available on the evaluation boards. For our final project we programmed the game Simo using…... Listed under: Game - Entertainment Projects 1034. A m -Controller Based Thermostat Using Atmel AT90S8535 microcontroller Introduction The goal of our final project was to design a thermostat using AT90S8535 microcontroller. The thermostat was to compute the current temperature once per second and then send an on/off signal to a heating dev would then regulate the temperature to…... Listed under: Temperature Measurement Projects 1035. Bar Inventory System: Drinking for Class Instead of Because of Class Introduction Project Summary Our project is an expandable bar inventory system implements wireless communication. The bar inventory system was an interesting project, because it involved both hardware and software together, are comprised of one analog designer and one computer programmer, both of…... Listed under: Arduino Programmer Projects 1036. RC Car Controller Using Atmel 4414 chip Overview: We decided to build transmitter and receiver modules for a radio-controlled (RC) car, as well as imp variable-speed motor control and a continuous steering function.  The simple speed controls included in most RC kits seldom offer more than three fo speeds and one reverse…... Listed under: Car Projects 1037. Sine Wave Synthesizer Introduction Every group wants their final project to be something that will be remembered long after they're gone. Some do h sophisticated and complex projects that entail upwards of a hundred hours to complete. Yet others go out of their way to develop something 'cool'….. under: Sound - Audio Projects 1038. Temperature and Pressure Control using the AT90S8535 Overview: This project involves the implementation of control and monitor for dual processes variables monitored are pressure and temperature. The input control is a 16 button keypad and the output is monitored in a 16 character LCD The de be widely deployed as…... Listed under: Temperature Measurement Projects 1039. Automated Juice Mixer Introduction Sound Bite The Automated Juice mixer is a juice mixing device that allows user to create desired drinks with up to different ingredients through a user friendly interface. Summary Mixing juices can be a very tedious job.  We have created a juice mixer…... Listed und Automation Projects 1040. Leonardo Arduino clone a single-sided PCB using ATmega32U4 DESCRIPTION This project is to make a clone of Arduino Leonardo in a simple way.That the distribution of the pin does not match the standard Arduino (have to make many jumpers on the motherboard or use both sides). However, most Leonardo characteristics are…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1041. Head-Controlled Keyboard And Mouse using ATmega32 Easy Input is a head-controlled keyboard and mouse input device for disabled users. The syste accelerometers to detect the user's head tilt in order to direct mouse movement on the monitor. The clicking of the mouse is activated by the user's e blinking through…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Sensor - Transducer - Detector Projects 1042. How to drive 595 shift registers with ATmega168 Driving a shift register using an AVR chip’s built-in hardware is really quite easy. Most of their offering SPI module, or Serial Peripheral Interface. A shift register is exactly that, a peripheral device that communicates via a serial line. All we need to…... Liste AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects
1043. HexiLogger, an Arduino based data logger using ATmega328 The purpose of this project was to create a simple, portable device that would periodicall sensor data so it could be retrieved later. The result is the HexiLogger, "hexi" because it can support up to six different sensor inputs…... Listed under: ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1044. Enhancing An FM Transmitter’s Firmware using ATmega48 This hack is about rewriting the firmware of PLL FM transmitters based on AVR microcontrollers to add more functionalities. They're commonly available on eBay from various sellers and for prices ranging from $40 to $80, depending mostly on the RF output power. If you don't….. under: AVR ATmega Projects, Radio Projects 1045. 4-key keyboard using ATtiny85 Introduction: A good while back, I made the 1-key-keyboard project. Ever since it has always been in the back of my min ATTiny microcontroller, which I used in this project, had still 3 IO ports which were unused. Only recently I’ve found the…... Listed under: AVR ATmega P Interfacing(USB - RS232 - I2c -ISP) Projects 1046. RSS Reader using ATmega8 microcontroller I spent part of an afternoon developing a hardware RSS reader (most of my time was spent on the python things). It’s pretty simple and uses an AVR microcontroller connected to a computer via a serial cable. Hardware I am using the Dragon…... Listed unde ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 1047. Virtual Archery using ATmega1284P Introduction We decided to create a virtual archery game for our ECE 4760 final project. This game consists of an ATmega1284P microcontroller, a TV for display, and multiple pieces of hardware. All of these devices communicate together to simulate a three-round archery with…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1048. Arduino – Modifying a Robot Arm using ATmega328 Essentially another tutorial involving controlling DC motors. In this post I’m going to first alter a ro had built previously from a beginners kit so that it can be controlled from Arduino. Then I’m going to write a series of posts on different…... Listed und ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Robotics - Automation Projects 1049. Honey I Shrunk The Arduino using ATmega328p As you might be able to tell from recent posts, I've been doing quite a bit of work with an Arduino. I've at least one project that I'd like to make a little more permanent, rather than it just being a bunch of…... Listed under: AVR ATmega Projects, Interfacing RS232 - I2c -ISP) Projects 1050. Homemade VGA Adapter using ATmega644 Introduction Motivation The goal of our project is to create a VGA video adapter. This “homemade video card” should be able to co any monitor that subscribes to VGA standards with a standard connector and display the desired material reliably. The challenges involved here…... Listed under: AVR ATmega How To - DIY - Projects, LCD Projects 1051. DIY Polygraph Mask using ATmega32 Introduction A polygraph (often and incorrectly called a 'lie detector') is a machine which plots in real time severa biological signals such as pulse rate, galvanic skin resistance (GSR), blood pressure, and breathing rate. This machine, in conjunction with a certified ex then…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1052. USB Sensors with ATtiny Microcontrollers Working with embedded electronics, you will eventually ends up with some sensor between your hands, her how to make a graph out of it! This project involves a light sensor, a tiny 8-pin AVR USB key with the V-USB stack, a GNU/Linux system…... Listed under ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Sensor - Transducer - Detector Projects 1053. An electronic dice using ATmega8 Abstract: Travel to outer space sounds very exciting but now we are here in our space ship and we have about 10 sq meters for 5 people. It will take another week until we reach the first space station. I took my mp3 player with…... Listed under: AVR ATmega Projects, O Projects
1054. Algorithmic 8-bit workshop using ATMega328 I was asked to give a workshop regarding sound art in Super Public Art School that is held at Titanik-galle Turku. As I have been working lately with microcontroller based sound synthesis I searched for a good topic around this area. So the idea…... Listed un ATmega Projects, Other Projects 1055. Watch controlled robot using AVR microcontroller Here is my Chronos watch controlled rover. The rover has a CC1110 minikit that receives SimpliciTI m from the watch and sends this to an Arduino (AVR) over serial. The Arduino controls the motors and the servo controlling the robot arm. I have called Listed under: AVR ATmega Projects, Robotics - Automation Projects 1056. Solar Power / Panel Inverter – Grid-Intertie Inverter using Attiny45 For the last year I've been working on a prototype for a Solar Inverter that can be G Intertied. A solar inverter takes the 12V DC (or other voltages) from the solar panels and converts it to 120V AC which is the power that most…... Listed AVR ATmega Projects, Battery Projects 1057. DigiThermo 0-100.0 °C using AT89C4051  Introduction The DigiThermo is a device designed for measuring time and temperature used in chemistry lab The circuit of Digithermo employs a 89C4051, 20-pin CMOS Microcontroller with built-in 4kB code memory. Temperature was measured by LM35D, Na Semiconductor Temperature sensor producing 10mV/°C. The CA3162, 3-digit…... Listed under: AVR ATmega Projects, Temperature Measurement Proje 1058. Clock ControllerV1.1 using AT89C2051 Builda digital clock that turns AC load on/off with preset time. sourcecode with sdcc for 8051. The Clock Controller V1.1was designed exemplary of using 'C' language to control timer0interrupt, 7-segment LED and keypad scanning. It provides 1-bit sink currentdriving output, for driving a…... Listed under: ATmega Projects, Clock Projects 1059. Night Light Saver V5.0 using AT89C2051 Introduction The Saver V5.0 runs simple clock emulation program, turns a night light on and off with preset tim 19:00 to 22:00 everyday. The design features low cost, easy installation, no battery backup and no EMI. The AT89C2051 uses external oscillator genera schmitt…... Listed under: AVR ATmega Projects, Home Automation Projects 1060. Experimenting the 2051 withC Programming using 89C2051 Learn yourself, how to write a simple program using Clanguage for the 89C2051/89C4051 source program, compile,and download the HEX code to the chip directly, connect DC adapter, seewhat happen after power up the board. No need IC circuit programmer,everything can be made…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1061. MakeYour Own Single-Side PCB for Easy-Downloader V1.1 using AT89C2051 The EasyDownloader V 1.1 , a Flash Writer for 89C2051/4051 which was d Wichit Sirichote, used  a Double-SidePCB. I think, it's difficult to make my ownPCB by myself. So that I decided to design a Single-SidePCB instead. My fi prototype board wasmade using hand-writing with…... Listed under: AVR ATmega Projects, Other Projects 1062. Easy-DownloaderV1.1 for ATMEL89C2051 Build your own a personal writer forprogramming HEX code into Flash based microcontroller AT89C2051(2k) andAT89C4051(4k). hardware and Easy use software in DOS and Windowversion. Single-side and double side PCB files included.sourcecode with sdcc version! Introduction The first version of Downloaderwas designed in 1997…... Listed under: AVR ATmega Projects, Other Projects 1063. Easy-Downloader V1.1 with SDCC using AT89C2051 Complete schematic, orcad pcb layout of Easy-Downloader V1.1 and modified firmware with sdcc. happy to use sdcc for writing firmware of my project. The compiled code is very compact and nice. After I succeeded writing a new firmware of xtimer downloader…... Listed under: AVR ATmega Projects, Other Projects 1064. AT89C2051 PROTO BOARD This single sided proto board provides an economical solution for developing and testing the projects around Atmel 20 pin controllers (89Cx051 & AVR) Figure 1 shows the circuit diagram of proto board. All port connections are available for user interface around the proto a Listed under: AVR ATmega Projects, Development Board - Kits Projects 1065. xTimer V1.0 using AT89C4051 microcontroller My wife asked me to find another timer for using in the kitchen. She got one already with analog setting needs one AA size battery. Digital setting may not easy for human interface. However I will make it for easy time setting. When…... Listed under: AVR A Projects, Clock Projects 1066. Night Light Saver V6 using AT89C2051 This new version has internal Ni-MH battery backup, reset button and simple time setting. Now the circuit board was embedded with lam Preset turn on period is from 18:00 to 22:00 everyday. You may let the saver turn on whenever you want. The period…... Listed under: AVR ATmega Projects, Home Automation
1067. AT89C4051 to work as a Real time Digital clock Its a digial clock which make use of AT89C4051 to work as a Real time clock. Figure 1 shows the circuit d for the digital clock. Port 1 of the controller (AT89C4051) is used as the data lines for the LCD (starting from pin 7-…... Listed under: AVR ATmega Projec Projects 1068. xTimer with 4094 using ATMEL89C2051 microcontroller The original version of xTimer used MAX7219 for driving 7-segment. This new design uses a ch CMOS shift register, 4094 for LED interface. Each 4094 drives a 0.5" 7-segment without the need of limiting resistor. The left-hand LED is timer functio buzzer alarm output.…... Listed under: AVR ATmega Projects, Clock Projects 1069. AT89C4051 to work as a Real time clock Its a digial clock which make use of AT89C4051 to work as a Real time clock. Figure 1 shows the circuit diagram digital clock. Port 1 of the controller (AT89C4051) is used as the data lines for the LCD (starting from pin 7-…... Listed under: AVR ATmega Projects, Cloc 1070. Mathematical Manipulation of Pure Sine Wave Inverter Using Atmel 89S2051 Introduction Approach used for creating the pure sine wave described in paper is done through manipulation of mathematical representation of the original sine wave. It is done by dividing half the  sine wave into m (even n segmentations, where area under a quarter of…... Listed under: AVR ATmega Projects, PWM Projects 1071. Testing Device for DiSEqC-Switches using ATtiny13-20PI This is my first AVR-project on this page. The DiSEqC-Tester allows to test DiSEqC-switches that or 1.1 protocols. (DiSEqC-Switches with 2.0 and 2.1 protocol have backwards compatibility with 1.0 & 1.1 respectively and also may be tested). The dev second sends a…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1072. Atmel AVR Infrared Downloader using ATmega8 AVR IR Downloader is one of final assignments at Electrical Engineering Brawijaya University of Malang Indonesia. The basic idea was came from our lecturer at campus, Ir. Nanang Sulistyanto. If this project was successfully made, it will be used to progra automatic machine’s uC…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1073. Flickr images on a Nokia LCD using ATmega48 LCDs are often used in microcontroller projects. Most used are these green character displays with two rows to display menus, status or debug messages. With mass production of mobile phones, color LCDs get that cheap, that they can be used as replac Some…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects, Phone Projects 1074. USB AVR in-system Programmer using ATtiny2313 Introduction. Nowadays, USB is the most popular connection between PC and peripherals such as AVR programmers, printe scanners etc. For that reason I had to modify my old serial AVR In-System-Programmer (ISP) to work with USB connection. You can say, "use a USB to Serial adaptor to…... Liste AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Microcontroller Programmer Projects 1075. USB controlled DDS signal generator with ATmega88 A simple signal generator which produces sine waves (or any waveform really) at audio frequenc DDS and is controlled a USB serial connection. Only 2 chips are used in this circuit. The AVRATmega88 which produces the signal, and an FT232R for th interface.…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects, Radio Projects 1076. AvrUsb500 — an open source Atmel AVR Programmer using ATmega8 Why Stk500 and USB? Until the beginning of this year a simple parallel port prog was the only good programmer as it could be used for any device. All device dependent information is stored in the programmer software on your co The problem is however…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Microcontroller Programmer Projects 1077. HVProg using ATmega8535 microcontroller Compatible with AvrStudio Supports all AVR Controllers Parallel and serial High-Voltage-Programming Sma easy layout with only a few parts STK500 protocol Schematics and board layout available   Introduction The project started as an enhancement of Mar Thomas  Evertool project. He has rebuilt the AVRISP…... Listed under: AVR ATmega Projects, Development Board - Kits Projects
1078. The WhereAVR using ATmega8 microcontroller Introduction The WhereAVR is a small, lightweight, low-power, and low-cost APRS tracker with a full com of analog and digital I/O, as well as the ability to decode ax.25 packets. This allows for the reception of remote commands without the need for a "real Listed under: AVR ATmega Projects, Sound - Audio Projects 1079. Video Overlay using ATmega8 microcontroller A few years ago I set about trying to design a very cheap and simple way to superimpose flight data on being transmitted over amateur television. Specifically, the data would include things like Latitude, Longitute, and Altitude, among other text including identifier…... Listed under: AVR ATmega Projects, Video - Camera - Imaging Projects 1080. Stealth USB CapsLocker using Tiny45 microcontroller This device plugs into a USB port and implements a USB HID keyboard. Instead of doing anythin waits between 30 seconds and 8 minutes and sends the scancode for the Caps Lock key. This will toggle the Caps Lock status on or off.…... Listed unde ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1081. etherrape using ATmega644 microcontroller Project Overview short description: microcontroller with ethernet usability status: beta start: April 2006 p Atmel ATmega644 Abstract With this project, we'll be creating hard- and software for enabling ethernet on an Atmel microcontroller. fd0 first built a pr of it on lochraster and then made…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1082. AVR DDS signal generator V2.0 using ATmega16 Finally second and improved AVR DDS signal generator is here. First AVR DDS V1.0 generator was only an attempt of running D algorithm without any amplitude control. This time I still wanted to keep things simple like minimum count of widely accessible components circuit, single…... Listed under: AV Projects, Radio Projects 1083. Atmel AVR-firmware based universal USB-Interface using ATTiny2313 Scanning the web on microcontroller based USB solutions, I stumbled over Obje Development's freeware USB solution based on Atmel's  AVR architecture. I decided to build up their reference design PowerSwitch with an ATTiny231 Since I never used AVR chips before, the first challenge was…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1084. A Portable Battery-Powered Roguelike Video Game using ATmega32 I. Introduction This project is a portable battery-powered video game based on th cult classic PC game "Rogue". I designed a hardware-based roguelike video game because I am a long-time Rogue addict and thought it would be cool portable plug-and-play imitation.…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1085. Evertool using ATmega16 microcontroller Evertool is an AVRISP/STK500-protocol and JTAGICE compatible Programmer/JTAG debugger. ISP Programme compatible with Atmel AVRISP, directly accessable with AVRStudio and avrdude JTAG debugger compatible with Atmel JTAGICE, directly accessable with AVRStudio and AVaRice Evertool supports all AVR devices Atmel supports with their AVRISP and JTAGICE.…... Listed under: AVR ATmega Projects, Develo Board - Kits Projects, Microcontroller Programmer Projects 1086. The Tuxgraphics AVR NTP clock using ATmega168 The Network Time Protocol (NTP) has revolutionized the world. Suddenly one could have anywhere world accurate time and date. NTP is a simple UDP based protocol and can be implemented in a Microcontroller. Using the tuxgraphics ethernet boar LCD display we…... Listed under: AVR ATmega Projects, Clock Projects, LCD Projects 1087. Printed circuit board 'Multiuse tiny1' using ATmega8 Project overview This small PCB, which I named Multiuse tiny1 was originally designed to convert controllers to USB. Since there is not a lot of space availabe inside an SNES controller, I designed the PCB to be as small as necessary. The PCB has…... under: AVR ATmega Projects, Development Board - Kits Projects 1088. Cheap and Simple Learning Board using AT89S51 Build your own a cheap simple Microcontroller learning board S-52. The board is based on ATMEL's n chip AT89S51, AT89S52, or AT89S53. This board can be used by beginners for learning Assembly and C language programming. Single sided PCB file in Introduction I…... Listed under: AVR ATmega Projects, Development Board - Kits Projects
1089. Sensor Interfacing using ATmega8 microcontroller If you've ever tried to hook up a 3.3V sensor to a 5V micro, you know what I'm talking about - conne these two can be a problem! There are several ways in which a 3.3V device can be safely connected to a 5v microcontroller.…... Listed under: AVR ATme Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Sensor - Transducer - Detector Projects 1090. The Prototino™ using ATmega168 microcontroller What is a Prototino™?   The Prototino™ is an Arduino clone with a built in prototyping area.   Designe make a permanent version of your project once you have perfected it on a breadboard but without the expense of embedding your original Arduino i Listed under: AVR ATmega Projects, Development Board - Kits Projects 1091. How-To: Super simple serial terminal using ATMEGA128 This hack shows how to make a dumb terminal out of a keyboard, LCD screen, and an 8-bit microcontroller. From time to time, a portable dumb terminal can be handy for when you have to rescue a headless server that’s acting up or if you…. under: AVR ATmega Projects, How To - DIY - Projects, LCD Projects 1092. The Game of Life using ATtiny2313 microcontroller The reason for making this project is that I was always fascinated by Conways Game of Life. It's a g demonstration of the fact that simple things with a very simple set of rules can do wonderful things: spawn more of them, modify themselves, do…... under: AVR ATmega Projects, Game - Entertainment Projects, LCD Projects 1093. HappyJTAG2 – JTAG AND SPI AVR8 interface using ATmega32 New version released ! V2.45 (Check version list for details) This construction is based on HappyJTAG Idea, to implement JTAG interface into target avr system and debug it remotly via USB, without specific JTAGICE hardware. All job is done by softraware. HappyJTAG version is…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1094. Tetrapuzz – Tetris clone for AVR using ATmega168 This is a projected that I finished development on over a year ago and I’m just now getting around to documenting it. I wanted to program Tetris from scratch and make it modular so it could be used with different displays. Right now I know…... Listed u ATmega Projects, LCD Projects 1095. Dot Matrix Arduino Clock using ATMega168 The great adventure that is building clocks continues.  Points of interest in this build is that it was the first got to play with the dot matrix display I picked up over winter break, and it's the first time I've soldered and used…... Listed under: AVR ATmega Project Projects 1096. ATtiny breadboard headers using ATtiny2313 These tiny controller boards are build to provide a quick start for projects with 8 and 20 pin AVR microco e.g. ATtiny13, ATtiny45, ATtiny85 and ATtiny2313. They don’t include any fancy stuff, they are just as simple as possible. Where is the problem? Whenev Listed under: AVR ATmega Projects, Development Board - Kits Projects 1097. Arduino-based master clock for schools using ATmega128 If your school, or kids school, or other location relies on a central master clock that is broken, you may have a use fo device. New master clocks are available of course, but school budgets are under extreme pressures, and it really is a…... Listed under: AVR ATmega Projects, Clock Projects 1098. FabISP, a fab-able in-system programmer using ATtiny44 The FabISP is an in-system programmer for AVR microcontrollers, designed for production wi FabLab. That is, it allows you to program the microcontrollers on other boards you make, using nothing but a USB cable and 6-pin IDC to 6-pin IDC cab based on…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1099. SD/SDHC Card Interfacing with ATmega8 /32 (FAT32 implementation) Hi friends, Here is my project on interfacing of SD Card (microSD). microSD cards available very cheap nowadays, a great option for having a huge memory in any embedded system project. It is compatible with SPI bus, so the interfa easy. SD card…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Memory - Storage Projects
1100. AT89LP2052 / AT89LP4052 Parallel Port Programmer Programming the AT89 LP2052/LP4052 Flash Memory, Lock Bits and User Fuses The AT 89LP2052 89LP4052  microcontroller provide two interfaces with same command format for device programming. The serial ISP Programming interface of the n 2052/4052 microcontroller needs one additional SS Signal for device programming. This SPI signal will…... Listed under: AVR ATmega Projects, Microco Programmer Projects 1101. Batwatch using ATtiny13V microcontroller Overview Batwatch is a simple monitor for a solar panel battery charger, using an Atmel ATtiny13V. It period measures the charge current and battery voltage, and shows them by blinking two LEDs. I built this circuit into the plug of a VW solar charger panel….. under: AVR ATmega Projects, Battery Projects 1102. Minimalist Arduino using ATMega328P microcontroller Overview Here at the Transistor, we love the Arduino platform, so we decided to make our own Clone. The Minimalist Arduino is designed for use in permanent or custom circuits on solderless breadboards, stripboard, or custom PCBs. It contains bare minimum parts…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1103. AVR DDS signal generator V1.0 using ATmega8 Sometimes when tuning various electronic hardware we need simple signal generator with various wav and frequency. One of the options is to by a professional with variable gain professional coating and many additional functions. But if you are an ama might want to build…... Listed under: AVR ATmega Projects, PWM Projects 1104. GSM Remote Control – GSM Module This GSM Mobile is used for our Remote Control (for example Gate Control, Temperature Control….). We use the w ‘module’ because, unlike what we did in our remote control projects, this time around the mobile phone is not mounted on a printed board, but rathe Listed under: AVR ATmega Projects, Phone Projects 1105. HUB ISP – Solving the USB-Only "Chicken or Egg" Problem using ATMEGA328P Many excellent ISP (In System Programming) designs exist for 8 bit AVR microcontrollers. Howeve require a pre-programmed microcontroller, or the "Chicken or Egg" problem: you can't program microcontrollers unless you have one already program Parallel Port or Serial Port solutions have existed, but many…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1106. Interfacing Atmel AVR with Graphics Liquid Crystal Displays using ATmega32 AVR SED1520 Library This is a C-library for avr-gcc/avr-libc to access SED1 graphics-LCDs. The modules used to develop the library only support "write to LCD", read-modify- write on the display RAM is not possible. So this Lib a "framebuffer" which holds the display-content in…... Listed under: AVR ATmega Projects, LCD Projects 1107. AVR Thermometer using AT90S2313 microcontroller Introduction I bought the LED module from BanMor' last week, just 30Baht. The moduleprovide a multiplex of 4-digit common anode LED, that's great.See the soldering pad of these signal in the 1st picture below. I thought,my friend gave me the AT chip, and with…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1108. Signal Microcontroller Simulator using AT90S8515 Introduction: The purpose of this project was to extend the Mixed Signal AVR simulator written in Fa that any single-issue microprocessor could be included in the simulation environment rather than limiting the simulations to systems based around A AT90S8515 series microcontrollers. In order…... Listed under: AVR ATmega Projects, Radio Projects 1109. Air-Mouse using ATmega32 microcontroller I. Introduction The Cornell University Airmouse Initiative is a motion sensing glove with buttons on it that p your computer to function as a mouse. Many tasks that are performed on the computer require the use of both a keyboard on the mouse, and…... Lis AVR ATmega Projects, Home Automation Projects, Sensor - Transducer - Detector Projects 1110. kaOS operating system and loader using ATmega32 Introduction We have created a real-time, multithreaded, preemptive operating system called kaO Atmel Mega32 microcontroller, which loads and executes programs from a Secure Digital or MMC card.We wrote this OS and created the SD/MMC car as a final project for Cornell's ECE…... Listed under: AVR ATmega Projects, RTOS - OS Projects 1111. RFID security system using ATmega32 microcontroller Introduction and Motivations: For our final project, we designed and built (and exhaustively test RFID-based proximity security system for use with Cornell Identification cards, which have been RFID-embedded since fall of 2003. The idea for this pr sort of spawned from our general…... Listed under: AVR ATmega Projects, RFID - NFC Projects, Security - Safety Projects
1112. The Reflow Soldering Oven with LCD Display using ATmega32 Introduction Our project consists of making a reflow soldering device using a normal toaster oven with a graphic display for control and GUI. Soldering is an important and difficult task for custom printed circuit board design especially for integrated circuits that come as chip…... Listed un ATmega Projects, Home Automation Projects, LCD Projects 1113. Self-powered solar data logger using ATmega32 Introduction: My project is a self-powered solar data logger. Put out in the sunlight, it will measure the and log this to memory to be later downloaded to a computer. The system is powered by a small solar panel and battery. Summary: The…... Listed und ATmega Projects, Battery Projects, Metering - Instrument Projects 1114. Wall of Pong using ATmega32 microcontroller Wall of Pong is a fast-moving, interactive, laser-based pong game playable on any flat surface. The syste digitally controlled laser projection platform to draw a pong ball onto any flat surface. This allows for a large playing area that can be set up…... Listed AVR ATmega Projects, Game - Entertainment Projects 1115. A Wearable Wireless Sensor System using ATmega644V Introduction In this digital age, new interfaces for musical expression provide much broader m possibilities than have ever existed before. There is a constant quest to be in harmony with one’s instrument so that music can flow freely from the im and take form effortlessly.…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Sensor - Transducer - Detector Projects 1116. Design a Customizable Virtual Keyboard using ATmega32 Introduction It is becoming increasingly difficult for users to interact with the slew of portabl they carry, especially in the area of text entry. Although miniature displays and keyboards make some portable devices, such as cell phones and PDAs, amazingly small, users’ hands do…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1117. Adaptive Cancellation of Periodic 60 Hz Noise using ATmega32 An active noise canceler to eliminate the 60 Hz noise found in electrical signals due to A line contamination. 60 Hz noise is frustrating for anyone trying to make sensitive measurements of low voltage processes (eg. Electrocardiogram measurements), record audio from electrical instruments (eg. guitar…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1118. The Self-Driving Toy Car using ATmega1284 microcontroller "A car that can track its own location and calculate the direction and distance needed to ge destination given by user inputs." Elevator Pitch For our final project, we built a self-driving car that takes in inputs for a final destination and…... Listed AVR ATmega Projects, Game – Entertainment Project Ideas 1119. RFID Checkout System Design using ATmega644 microcontroller The Elevator Pitch We successfully implemented a prototype RFID checkout system th enable consumers to instantly pay for their entire purchase upon arrival at the register, increasing customer satisfaction, reducing retailer costs, and u lowering consumer prices. Summary Shopping in the present day usually…... Listed under: AVR ATmega Projects, RFID - NFC Projects 1120. Project Development Board using ATTiny2313 microcontroller This is my first time using the AVR. I like to learn using the ATTiny 2313, because it is fas circuit is very simple. The chip has only 20 pins. I was interested because I want to build a simple…... Listed under: AVR ATmega Projects, Development Kits Projects 1121. Data Acquisition System using ATmega8 Introduction We can use a PC for connecting the homemade data acquisition hardware and produce the GUI friendly graphical presentation easily. One of the project that uses Visual Basic is the Data Acquisition & Logging System using AT89C51 made by Abba In…... Listed under: AVR ATmega Projects, How To - DIY - Projects, Temperature Measurement Projects
1122. ATMEL AVR ATMega 8535/16/32 and ATMEL AT89S5x Family Learning Kit Both Mainboard Features Pin compatible for 40-pin AVR and AT89S5x family Microcontrollers Single sided PCB, header for 4 I/O ports, ISP port and RS-232 port Built in +5V voltage regulator LM7805 with heatsink Built in +5V and (depend on input voltage) with terminal screw…... Listed under: AVR ATmega Projects, Development Board - Kits Projects, Home Automation Projects 1123. AVR Programmer using ATTINY2313 microcontroller INTRODUCTION AVR910 is a very useful programmer. It can program almost complete range of AV The original version made by Klaus is here, http://www.mikrocontroller-projekte.de/Mikrocontroller/AVR-Prog/AVR-Programmer.html. The programme capability of AVR chips. AVR910 first appeared in AVR910 application note by ATMEL. It is one…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1124. 4×4 keypad example using AVR-GCC C language This is as simple routine how to read 4x4 keypad keys using AVR-GCC language. The keypad is connect microcontroller 8 bit port. In this example it is B port. You can change ports depending on your needs – this is only an example…... Listed under: AVR A Projects, How To - DIY - Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1125. Servo motor control using Atmega8 microcontroller Servo motors are so called “closed feedback” systems. This means that motor comes with control which senses if motor mechanism is in desired location and if not it continuously corrects an error until motor reaches proper point. Servo motors are used in robotics,…... Listed under: AVR ATmega Projects, Motor Projects 1126. AVR LCD menu routine using ATmega8 microcontroller Lets have some practice and write simple AVR LCD menu routine. For this we need to write LCD library. I decided not to use one from AVRLIB. LCD controlling isn't difficult just a few lines of code unless you want to make it more…... Listed under: AV ATmega Projects, LCD Projects 1127. Simplified AVR LCD routines using ATmega8 microcontroller Controlling numeric LCD isn't so tricky as it may look like. O course you can find numbers libraries. One of more universal you can find in AVRLIB library for WinAVR AVR GCC compiler. Main disadvantage of such universal libraries that they c all…... Listed under: AVR ATmega Projects, LCD Projects 1128. Measuring motor speed and display result on LCD using ATmega8 microcontroller For measuring motos speed there can Optical interrupter used like LED and photo-transistor is coupled in to plastic housing. The gap between then allows interrupting signal with opaque material and this way switchin output from ON to…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects, Motor Projects 1129. AVR-GCC 4 bit and 8 bit LCD library using ATmega8 microcontroller Standard alphanumeric LCD display controlled by 74HC164 LCD controller can acce data bytes or 4 bit nibbles. Earlier my 4 bit and 8 bit LCD libraries were split in separate files as they were used in different projects. Now they are mer Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 1130. Output number when button is pressed using Atmega16 microcontroller This is simple demo program of reading button state, lighting LEDs, sending information via USART. 8 buttons are connected to Atmega16 port A, 8 LEDs to port B via current limiting resistors. While none of buttons arent presse running light on LEDs performed,…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1131. Simple signal drawing on graphical LCD routines using Atmega8 microcontroller During spare time I have been playing with graphical LCD. This time I display simple signals that are stored in microcontroller memory. The idea was to read signal values from look-up table and display waveform on Grap To make things more interesting…... Listed under: AVR ATmega Projects, LCD Projects 1132. Programming AVR ADC module with WinAVR using Atmega8 microcontroller Most of AVR microcontrollers have Analog to Digital Converter (ADC) integ to chip. Such solution makes embedded designers life much easier when creating projects and programming them. With no need external ADC PCB ta space, easier to create programs – it saves time…... Listed under: AVR ATmega Projects, How To - DIY - Projects, Interfacing(USB - RS232 - I2c -ISP) Proje Sensor - Transducer - Detector Projects
1133. Running TX433 and RX433 RF modules with AVR microcontrollers using Atmega8 Sometimes in embedded design you may want to go wireless. Might will want to log various readings of remotely placed sensors, or simply build a remote control for robot or car alarm system. Radio communications be two AVR microcontrollers can be easy when…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Radio Projects 1134. Interfacing rotary encoder to Atmega32 Recently I was working on a project that involved rotary encoder. I thought I'd share some thoughts on how rotary encoder can be inte and programmed. Actually it is easy to work with rotary encoders - interfacing is simple – only three wires are required…... Listed under: AVR ATmega Projects, Interfacing(USB I2c -ISP) Projects 1135. Temperature sensor with time and date display on graphical LCD using Atmega32 Some time ago I've build a prototyping board with graphical LCD. It served for various small projects and prototypes. Had a spare temperature sensor DS18B20 and decided to put simple temperature display project. G board is equipped with Atmega32 microcontroller running at 16MHz. DS18B20…... Listed under: AVR ATmega Projects, LCD Projects, Sensor - Transduc Detector Projects 1136. AVR-GCC LCD library – mixed pin support using Atmega328P Some time ago we have posted alphanumeric AVR-GCC LCD library. It works fine in 8-bit a modes. But it has some limitations that some people may find annoying. One of them is requirement that LCD pins has to be byte aligned for instance Listed under: AVR ATmega Projects, LCD Projects 1137. Led Blink Code – Hello World Led using atmega16 in C Configuring the microcontroller before running it the first time: Fuse bytes : high and low Progra once before you start using the micro-controller Disable JTAG to free up PORTC for normal use Set the correct clock clock option With the hardware se run…... Listed under: LED Projects 1138. Remote Control based Robot using C language Concept The customer’s demands were to develop and build a kit, consisting of a small mechatronic sy educational concept. In particular, he asked for a driverless robot for training purposes abroad. The idea behind this is that our customer needs a kit f sending…... Listed under: Game - Entertainment Projects, Robotics - Automation Projects 1139. On/Off Controller – Interfacing Touch LCD LC7981 using ATMega Microcontroller Concept of Touch LCD LC7981 using ATMega An on-off controller is th simplest form of a temperature control device. The output from the device is either on or off, with no middle state. An on-off controller will switch the only when the temperature crosses the…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 1140. Multichannel USB Analog Sensor using ATMega48 Microcontroller Sometimes it’s tempting to re-invent the wheel to make a device function exactly the want. I am re-visiting the field of homemade electrophysiology equipment, and although I’ve already published a home made electocardiograph (ECG) revisit that project and make it much…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Sensor - Transducer - Detector Projects 1141. Door Chime Privacy Sentry using Attiny12 An ATtiny12 controller as a timer and some switching circuitry turns the doorbell off for 10 hours at the same time each day. The stri resistors across the top of the board are series connected to make a 728 Ohm 2 watt resistor. The…... Listed under: Home Automation Projects, Security - Safety Projects
1142. DIY USB password generator using ATtiny Microcontroller Having done half a dozen V-USB tutorials I decided it’s time to whip up something cool. As U keyboards were an area untouched, I decided to make a small USB HID keyboard device that types a password stored in EEPROM every time it’s attach Listed under: How To - DIY - Projects 1143. Barker Code-Locked Loop Synchronous Demodulator using ATtiny2313 microcontroller A simple, low component count phase locked loop that locks o detects the amplitude of an incoming baseband 7 bit Barker code using a switched resistor demodulator that is driven directly by a microcontroller's o pins. • Balanced modulators using resistors and a microcontroller's…... Listed under: Other Projects 1144. Prime Calculator is Complete using ATMega8 Microcontroller My microcontroller-powered prime number generator/calculator is virtually complete! Al I’m planning on improving the software (better menus, the addition of sound, and implementation of a more efficient algorithm) and hardware (a bett enclosure would be nice, battery/DC wall power, and a few LEDs on the…... Listed under: Calculator Projects 1145. LED Dog Collar using ATTINY2313 Microcontroller LED Dog Collar So this is a pretty simple project, but I thought it was a clever idea. I have 2 dogs, a la lab mix. The lab "Sunshine" likes to runaway a lot if we let her outside at all. She always…... Listed under: LED Projects 1146. Making a USB based AVR Programmer using ATMEGA8 Microcontroller Around time when I was beginning to learn about microcontrollers I had excha laptop with a senior at college for his desktop - that's because the only way I knew how to program an ATMEGA chip was through either a serial port o Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Microcontroller Programmer Projects 1147. BUILD A SIMPLE SERIAL PROGRAMMER FOR AVR DEVICES using ATtiny2313 Microcontroller Atmel described a simple programmer based on the AT90S (NOT the AT90S1200A) controller in their application note, AVR910 (a modification to use the AT90S2313 is also given below).The circuit is so small and was able to put two of them together without using…... Listed under: Microcontroller Programmer Projects 1148. LED DOT Matrix Pong using ATMega16 Microcontroller The classic pong game. Two players. Press the buttons to move paddles up/down. Ball bounces forth. If you fail to catch it, your opponent gets one point. Score difference is showed with blue LEDs. Blue LED = lead by one point. If you…... Listed un Projects 1149. How to control Stepper Motor using AT89C51 Microcontroller As explained in earlier article, Stepper motor is operated by energizing the stator coils in an ordered sequence. W input sequence of signal is applied to the motor leads, it starts rotating in steps. AT89C51 microcontroller has a current rating of 50mA. It can…... Liste How To - DIY - Projects, Motor Projects 1150. LED Menorah using ATtiny13 microcontroller Last week on hack-a-day I saw their post on an LED Menorah that was powered by a 9v battery with the l controlled by dip switches. I thought to myself, “gee, that’s not a very creative design”. There was redemption in the minimalist designs linked…... Liste LED Projects 1151. PS/2 to C64 Mouse Adapter using ATmega8 microcontroller A pixel artist friend of mine wanted a mouse to try his skills on a real C64. I thought I could by making an adapter that would allow a regular PS/2 mouse to be used with a Commodore 64. The most popular and…... Listed under: Development Kits Projects 1152. MP3 Player using ATMega128 microcontroller History I decided to do this project for several reasons: first I like music, second I have a huge collection and third I wanted to be able to play them anytime in my living room. I began the project with one major restriction,…... Listed under: Interfacing(USB I2c -ISP) Projects, Sound - Audio Projects 1153. How to drive 595 shift registers with AVR hardware SPI using ATmega168 microcontroller Driving a shift register using an AVR chip’s built-in hardware i quite easy. Most of their offerings have an SPI module, or Serial Peripheral Interface. A shift register is exactly that, a peripheral device that communic serial line. All we need to…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1154. ATtiny12 fuse restorer using microcontroller This restores the fuses in an ATtiny12 via High Voltage Serial Programming. Plug an ATtiny12 into the 8 pin and hold down "GO!" button. The LED will come on at the end of the programming process, which only takes a couple hundred millisecond. The…... Lis under: AVR ATmega Projects
1155. LED Matrix Display using TD62783 microcontroller Last Sunday I gave a workshop in TOG as part of it’s Engineers Week 2011 activities. We spent the d assembling a 8×8 Red/Green LED Matrix Display circuit which I designed in strip board. The circuit forms an interface between a micro controller and a Listed under: LED Projects 1156. 3 channel, 8 bit EEPROM DAC with DS interface using ATtiny12 microcontroller •Low power •EEPROM memory for autonomous operation, 16 bytes ava general purpose use. •Low cost This device provides three channels of 8 bit pulse-width modulation. Output pulse duty cycle ranges from 0 to 255/256 steps. DACs may be loaded by the DS…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 1157. AvrPhone using ATmega128 microcontroller AvrPhone is a simple mobile phone with touchscreen. His brain is AVR ATmega128 microcontroller (128 kB flash, 4 kB SRAM) and u interface, the 2.4 "LCD display with touch foil and ILI9325B controller, equipped with a 16-bit bus. The communication with the old GSM module…... Lis under: Phone Projects 1158. Real Time Clock/Calendar/Alarm with Interpreter for battery backed-up and battery powered operation with DS interface using ATtiny12 Based on the ATtiny12L-4PI microcontroller -A real Time Clock/Calendar for less than US$1.50 in moderate quantity.   This is the timekeeping test circuit. It includes transistor circuit to switch in the 5V power supply when present and drop back to the 3v battery…... Listed under: Battery Projects, Clock Projects 1159. DS interface test tool using ATtiny2313 microcontroller The DS protocol was designed to provide firmware-based bidirectional host-to-slave inter proc communications for situations in which no hardware solution is available and the host and/or the slave in incapable of tending the interface in real tim only specialized hardware required is two bidirectional…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 1160. Audio Spectrum Monitor using S1D15200 microcontroller This is an evaluation use of a small graphics LCD module. Last summer, SG12232C graphic L module has been sold sold for 1500 Yens from Akizuki Denshi and I bought it. However I could not find good application for the LCD module and it wa Listed under: Sound - Audio Projects 1161. Minimum Mass Waveform Capture using AVR microcontroller Capturing repetitive waveforms at 1 million samples per second using PWM and a comp Download AVR Studio Source wfcao 030326 .asm The impetus for developing this technique came from my own need to capture repetitive waveforms least expensive and lowest part-count means possible.…... Listed under: Metering - Instrument Projects 1162. AVR mod player using ATmega325 microcontroller In 2006, I took part in an electronic demo competition on a Dutch forum (see this topic). Because co demos like they used to have on old machines like the Amiga or Commodore are harldy made anymore since hardware has come such a long way,….. under: Sound - Audio Projects 1163. Longboard Wheel Display using AVR microcontroller If you're a resident of Seattle, I highly recommend you check out the Bubble events group. One of regular events over the summer is something called "Nocturnal Push" where you can get decked out in your best glow gear and cruise the Alki Beach… under: LED Projects 1164. AttoBasic HOME using Atmega168 microcontroller This is the central location for resource for all versions of AttoBasic for Atmel AVR controllers and A computers Devices directly supported include ATMEGA328, ATMEGA168, ATMEGA88M, ATMEGA32U4, ATMEGA32, ATMEGA163, ATMEGA8515, ATTINY2 AT90S8515,  AND AT90S2313   Versions of AttoBasic run on several AVR controllers with 2K…... Listed under: Home Automation Projects 1165. A Superhet/Direct Conversion AM receiver for 181.818 kHz using Attiny2313 Downloads Download the AVRStudio assembly source  vlflo13041105A.as format) Download the AVRStudio Hex file vlflo13041105A.hex (html format) Photo of completed receiver. Its pocket sized, but not intended to be used because the antenna is a highly directional ferrite loopstick. Its only a matter…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Sound - Aud 1166. 1750 Meter Lowfer Band amplitude modulated RF source using ATtiny2313 microcontroller Download the firmware: mor040220BBeacon.asm [caption align="aligncenter" width="389"] The oscillator board is not much more than the 74HC4060 oscillator/divider. The crystal is in a socket. made by cuttin an IC socket.[/caption] This is a low power signal source I put together one evening to…... Listed under: Metering - Instrument Projects
1167. Frequency Meter with 100 MHz RF desktop channel using ATtiny2313 microcontroller This basically the frequency meter section of the frequency mete generator based on the AT90S2313 described elsewhere on this site, combined with the 100 MHz RF interface described in the page about the RS-232 MHz RF desktop channel adapter. Built and align this…... Listed under: Metering - Instrument Projects 1168. RS-232 to 100 MHz RF desktop channel adapter using ATtiny2313 microcontroller Downloads AVR Studio assembler source code 2jun2002version.asm Studio hex file 232lin.hex This is an adapter that allows a terminal to communicate via a 100 MHz data channel with peripherals on the same desk top Keystrokes from the terminal are are received through the RS-232…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 1169. Low cost RF for simple data link and remote control using ATtiny12 microcontroller Wireless data links don't have to be difficult to build or adjust They built quickly using inexpensive and readily available parts. Overview This is a simple, low cost RF data link that can send data reliably over a distance o two…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 1170. Minimum Mass Wireless LCD Display using ATtiny2313 microcontroller A 2 line X 16 character LCD display that is battery operated and works without external connection. The basic MinThe basic Minimum Mass Wireless Coupler technology is described and links to other projects on this site that use Minimum Mass Wireless Coupler are…... Listed under: Internet - Ethernet - LAN Projects, LCD Projects 1171. A Low Power PLL FM Transmitter using LMX1601 and ATtiny2313 microcontroller An LMX1601 Phase locked loop, a discreet  FET VCO, and an AVR micr controller combine to make a stable, easy to use monophonic FM transmitter that includes a an audio activated switch that turns the transmitter on o its being used. Notice: Before operating…... Listed under: Radio Projects 1172. A Simple FM Stereo Transmitter using ATTINY12 microcontroller The parts to the right of the green capacitor are the FM radio transmitter. The parts b the 8 pin DIP and the transmitter are the resistor matrix. One capacitor, C5, is mounted on the back of the board, and one other capacitor, C11, had…. under: Radio Projects 1173. DIY mobile phone – Create your own mobile phone This DIY cell phone created at MIT manages to have something for just about every major contem subculture or hipster subset I can think of. Nerds and tinkerers? Check. Wooden case for the steampunk set? Check. Huge antenna for the retro, skinn wearing set? Check. Big…... Listed under: How To - DIY - Projects, Phone Projects 1174. Are you being spied – A Simple Field Strength Indicator (field strength meter) This project is a broadband field strength sensing probe that has a 15cm It is able to detect radio energy and read the output on a common multimeter millivolts scale. It can be used to test 4MHz, 35 MHz, 55 MHz, 100 MHz, …... Listed under: Blog, Circuits 1175. What is a stun gun – How to Make Stun Gun What is Stun Gun An electroshock weapon is an incapacitant weapon used for incapacitating a person by administering electric shock aimed at disrupting superficial muscle functions. One type is a conductive energy device (CED) fires projectiles that admin shock through a thin, flexible wire. Other electroshock weapons such as stun guns, stun batons,…... Listed under: Blog, Circuits 1176. How a Microwave oven works? Bill details how a microwave oven heats food. He describes how the microwave vacuum tube, called a magnetron, gene radio frequencies that cause the water in food to rotate back and forth. [caption id="attachment_8043" align="aligncenter" width="563"] microwave in structure[/caption] He shows the standing wave inside…... Listed under: Blog, Circuits 1177. Multifunction 330 MHz Remote Control With an ATTINY2313 Simulating the PT2264 Encoder This 330 MHz remote control sends timed sequences of c pulses to accomplish complicated tasks. You can probably tell that I used a lot of solder flux on this board. Lots of flux not only helps the solder wet to copper, but it also…... Listed under: AVR ATmega Projects, Radio Projects
1178. Circuit and firmware to support Seiko-Epson G1216B1N000 dot graphics display using ATtiny2313 A serial interface and bias supply for the Seiko-Epso G1216N000 using an AT90S2313 because there just aren't enough applications examples for this display on the web. Download Assembler source cod looking for an LCD display that I could use to display waveforms on…... Listed under: AVR ATmega Projects, LCD Projects 1179. A serial interface for the Truly MTC-C162DPLY-2N using ATmega8515 The 10k potentiometer, just above the ISP connector near the lower middle of th used to adjust the display contrast according to your vertical viewing angle. DOWNLOADS ATTINY2313/AT90S2313 AVRStudio assembler source, LDCbutons040904Ca.htm ATTINY2313/AT90S2313 AVRStudio assembler source, UPDATED FOR COMPATIBILITY WITH NEWER VERSIONS OF THE…... Lis AVR ATmega Projects, LCD Projects 1180. Simplest LED Flasher Circuit As simple as it gets and still works This LED flasher occurred to me while reading about negative resistance in transistors. reported that Leona Esaki, who was at Sony at the time, had been surprised to see a negative resistance region while investigating…... Listed under: AV Projects, LED Projects 1181. A 1.5 Volt, 1970's Style LED Flashing Red Caboose Marker Light using tiny microcontroller A circuit that drives a red LED from a 1.5 volt battery and simulates an incandescent l cycle can be changed by selecting resistor values. Photo 1. This printed circuit board is 3 cm long. The first prototype was made with through hole parts.…... Listed under: AVR A Projects, LED Projects 1182. White LED Stroboscope Finally, white LED's are bright enough to use in a practical stroboscope. This circuit can operate as a bench-top stroboscope th conjunction with an oscilloscope or frequency meter and bench top power supply can accurately measure rotational speeds, or it can be operated han held…... Listed under: AVR ATmega Projects, LED Projects 1183. White LED Battery Powered Power Failure Light Overview Where I live most of the time, the AC power drops out upon occasion. This used to leave me around in the dark for a flashlight. I could have bought a battery-backed up "emergency light" for about US$35, but being basically metal boxes…... Lis AVR ATmega Projects, Battery Projects, LED Projects 1184. Atmega8 Pinout Diagram ATmega8 is an atmel's low-power 8-bit AVR RISC-based microcontroller combines 8KB of programmable flash memory, 1KB o 512K EEPROM, and a 6 or 8 channel 10-bit A/D converter. The device supports throughput of 16 MIPS at 16 MHz and operates between 2.7-5.5 volts. [ id="attachment_7971"…... Listed under: Blog, Circuits 1185. SKL14 -1A Schottky diode will fit everywhere SKL14 can be used in switch-mode power supplies or as protection diodes and thanks their really miniatu dimensions, they are also suitable at the lack of PCB space.  SMT Technologies enable a substantial increase of current density thanks to a very good h transfer from…... Listed under: Blog, Circuits, News 1186. A White LED Night Light Design BUT FIRST AN IMPORTANT NOTE: This project uses lethal voltages.  If you are not experienced in working with lethal vo read this project, but don't build it. You only have one life, and AC power can take it from you very quickly, or leave you…... Listed under: AVR ATmega P Home Automation Projects, LED Projects 1187. Series Connected Voltage Boost Circuit for a Battery Operated LED Lantern Photo. This is the test circuit -the basic driver is only two transistors, two re the circuit was evaluated using a white LED, but when it was time to button it up and archive it, I replaced the expensive white LED with a cheap green under: AVR ATmega Projects, Battery Projects, LED Projects
1188. FAST PRECISION LED DRIVER What it is The circuit allows a precision regulated drive current to be set to drive an LED, and in response to a TTL level sig LED is switched on and off with rise and fall times of less than 500 nanoseconds and less…... Listed under: AVR ATmega Projects, LED Projects 1189. Remote Controlled (R/C) Airplane LED Flasher using ATTINY12 microcontroller Downloads Download the AVRStudio assembly source for the program: AVRStudio assembly source for the include file: T12astrobe081028A.hex Find updates at www.projects.cappels.org Overview This was designed to flas LEDs to be mounted on the wing tips of a Parkzone Citabria…... Listed under: AVR ATmega Projects, LED Projects, Radio Projects 1190. Single and Two Cell White LED Drivers Without Inductors Three inductor-free circuits that allow a white LED or UV LED to be driven from one (1.5 volt) flashlight cells (3 volts total) are described. The circuits on this page are: The two cell (3 volt) circuit four transistors. The simple single cell…... Listed un ATmega Projects, Battery Projects, LED Projects 1191. 1 Watt White LED Power Supply Circuit for battery operation Download FreePC project file, gerber and png copper and silk-screen: 1wattledbuck.zip Introduction I have some 1 watt warm white LEDs left over from a project and the application for them was obvious: A better battery operated lamp fo when the power fails, which it does…... Listed under: AVR ATmega Projects, Battery Projects, LED Projects 1192. Attention-Getting Auxiliary Warning Light Flasher/Driver Overview The circuit shown in Figure 1 is capable of driving an LED array requiring up to seve with a burst of flashes before coming on until power is removed. It is intended to be used as an auxiliary warning light driver. The initial…... Listed und ATmega Projects, LED Projects, Security - Safety Projects 1193. White LED Drive Circuit using Tiny microcontroller Be Careful About Peak Current A note of caution: These LEDs are comparatively expensive, so I sugg putting a small resistor (1 to 10 Ohms) in series with the cathode of the LED and measuring the peak current as inferred from the IR drop using…... Lis AVR ATmega Projects, LED Projects 1194. Low Capacitance Scope Probe Adapter An adapter to allow low capacitance probing of high frequency circuits. Overview My boss, Dave, said "Just hold probe close to the cathode lead." Dave had worked at Tektronix for many years, and his ability to make difficult measurements was second only to his under: AVR ATmega Projects, Metering - Instrument Projects 1195. AC Current Probe for Oscilloscopes Overview I needed several current probes when designing the deflection circuits and high voltage supply for a com display monitor, and the lab in which I was consulting only had one current probe, which I shared with the other four engineers on the project.  We….. under: AVR ATmega Projects, Metering - Instrument Projects 1196. A Portable Precision Voltage Reference using microcontroller Introduction It has been said that a man with one watch knows what time it is, but a man with two watches is nev The same can be said for a person who has more than one voltmeter.  In my situation, I have several…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1197. Simple LM335 Thermometer using microcontroller Not too many parts. When a voltmeter is connected across the outside terminals of the output con display reads out in degrees C. I've been fascinated by the LM335 for some time -maybe my obsession with stability finally gave way to my fascination Listed under: AVR ATmega Projects, Metering - Instrument Projects
1198. Minimum Mass Waveform Capture and Display using AT90S2313 microcontroller A 128 x 64 graphic LCD is in the clear plastic box at the top. It is conn the waveform capture and control unit in the green pencil box below the display.   Downloads AVR Studio 3.5  ASSEMBLY SOURCE for the waveform ca controller.…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1199. Broadband RF Field Strength Probe using Atmel AT90S1200A AVR controller Download auto-zero assembly code This broadband probe has a small an (about a 15 cm length of insulated wire). Radio Frequency energy coupled to the antenna is detected and made available to drive millivolt level signals input of a DVM (Digital Volt Meter).…... Listed under: AVR ATmega Projects, Radio Projects 1200. A Field Strength Meter Using A Biased Schottky Detector using microcontroller Downloads Download the Download FreePC files in and the detector bo layout png file in zipped forma: schottkydedtector080309 Find updates at www.projects.cappels.org Starting to do a little work at 330 MHz, I decided t existing field strength meters were not adequate for for my…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1201. Precision Audio Frequency Peak Detecting Probe using microcontroller This is a handy companion for a digital voltmeter. Its allowed me to do a lot of used to use my oscilloscope for, and in addition it measures voltages to much greater precision.Using an LM324 quad op amp, this peak detector prov …... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1202. Cellphone Operated Robot using ATmega16 AVR microcontroller This Instructible is entered in the Category: 13 - 18 of the National Robotics Week Rob Contest MY URL-http://avadhutelectronics.blogspot.com/ MY Email-avadhut.deshmukh@gmail.com   Video :Cellphone Operated Robot Step 1 Compo Required   Component Required: IC1 - MT8870 DTMF decoder IC2 - ATmega16 AVR microcontroller IC3 -…... Listed under: AVR ATmega Projects, Phone Robotics - Automation Projects 1203. HF AC Millivoltmeter Adapter using microcontroller Encased in a pencil box to keep the point-to-point wiring on the back of the board from shorting to and things on the workbench, the plastic case also holds the offset and gain post as well as the input connector and the switches that…... Listed under ATmega Projects, Metering - Instrument Projects 1204. PHduino pH Meter Using Arduino About This project describes an open software open hardware pH meter using an Arduino/Freeduino board. In othe this is an electronic circuit to be connected with a glass electrode pH sensor. It was possible by the idea from my friend Mr. Denis Vidal, the…... Listed AVR ATmega Projects, Metering - Instrument Projects 1205. A Microcontroller Based Digital Lock-In Milliohmmeter using ATtiny2313 microcontroller Download: assembler source mhm031002A.asm A milliohmmeter is just the tool for c trace resistance on a printed circuit board, tracking down shorted traces, and measuring the contact resistance of a switch or connector. Its the kind o would come in real handy occasionally,…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1206. Dutchtronix AVR Oscilloscope Clock using Atmega328 microcontroller Hardware features:   Connects to your analog scope in X-Y mode using BNC cab probes (1x, 10x) Uses the Atmel AVR Atmega328p with 32KB flashmemory On board 5V power regulator for use with user provided wall adapter (8-15V center positive) Power plug (5.5mm…... Listed under: AVR ATmega Projects, Clock Projects 1207. I2C Tiny USB using ATtiny45 microcontroller Attach any I2C client chip (thermo sensors, AD converter, displays, relais driver, ...) to your PC via USB ... q and cheap! Drivers for Linux, Windows and MacOS available. The i2c-tiny-usb project is an open source/open hardware project. The goal of i2c-tiny-us Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1208. TRUE RMS-TO-DC Adapter For DVM using microcontroller Specifications Input: AC, DC or AC+ DC to > 10 KHz Ranges: 200 mv, 2V, 20V, 200V, 600V full s Accuracy: ±1%, depending on divider resistor selection Crest Factor: 1 to 3, up to 5 with degraded accuracy Input impedance: 1 Megohm shunted by 2 Listed under: AVR ATmega Projects, Metering - Instrument Projects 1209. MMC/SD/SDHC AVR Interface using ATMega8 microcontroller MMC/SD/SDHC card library This project provides a general purpose library which implem and write support for MMC, SD and SDHC memory cards. It includes low-level MMC, SD and SDHC read/write routines partition table support a simple FAT16/FAT32 read/write implementation The circuit The circuit which…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects - Storage Projects, Security - Safety Projects 1210. A Pretty Good Wattmeter For Bench Use using microcontroller Briefly, • AC True Watts using two quadrant multiplier • Optimized for 120 VAC (can be changed) • 15 watt full sca changed) • Uses DVM floating on AC Neutral as display • Requires moderately high level of analog circuit skill • Very…... Listed under: AVR ATmega Projects, Metering - Instrume
1211. RS-232 Freq. Meter/Pulse Generator Based on Atmel ATtiny2313 using microcontroller Simplicity in circuitry was the design direction. Zero mass (firmw with no physical components) would the ultimate achievement. This instrument doesn't have any front panel controls because the user interacts via a terminal program at 9600 baud. I needed a frequency meter for…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1212. Analog audio panel for PC using ATMega328 microcontroller Have you ever struggled with audio settings in control panel in middle of a VoIP call? Or, wondered if the other gu you properly? I have. My work requires great deal of remote conference calls using PC. The first thing I wonder always…... Listed under: AVR ATmega Projects, Sound - Audio Pr 1213. Preamp and 330 + MHz Prescaler for A Little More Serious Frequency Meter using microcontroller A preamp that drives the CMOS counter input and a 10 prescaler to extend the range of A Little More Serious Frequency Meter(elsehwhere on www.projects.cappels.org). (Above) Enclosed in a 16 cm x 16 plastic box, the preamp has a 60 cm cable…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1214. A Little More Serious Frequency Meter using ATtiny2313 microcontroller This is design for a frequency meter based on AVR microcontrollers. Maximum frequency is specified to be 30 MHz in the multi-chip configuration, and in single-chip configuration, there are both 5 MHz and 10 Mhz versions operat 10 and 20 MHz crystals, respectively.…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1215. HF/VHF/UHF TEST OSCILLATOR using microcontroller Its built into a plastic project box with an aluminum cover (on the bottom). The controls are as fo Large golden knob is coarse tuning, small black knob with a blue index stripe is fine tuning, the green LED is the power on indicator, the…... Listed und ATmega Projects, Metering - Instrument Projects 1216. RF Inductance Meter using microcontroller I needed a way to measure hand-wound RF inductors in my second lab, and since I would only be doing th occasionally, I didn't need anything fancy, and since once a friend finishes his AT90S1200-based design, I plan to make one myself, I figured I'd…... Liste AVR ATmega Projects, Metering - Instrument Projects 1217. LC Determination by Resonant Frequency Measurement using microcontroller A well known L/C measurement circuit is pressed into service to make a bones measurement circuit. Download the AVRStudio assembly source: lgm031227I.asm Download the AVRStudio hex file: lgm031227.hex Left-to-righ volt regulator, the LM393 oscillator (a 0.047 uf capacitor is mounted on the…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1218. Battery Checker Circuits using microcontroller The "Battery Good" checker. When the button is pressed, the green LED will glow if the battery voltage is above the preset thresh version has a higher parts count than the "Battery Low" version, but a bonus is that it can drive an LED…... Listed under: AVR ATmega Projects, Battery Projects 1219. A 1 Khz Digital Sine Wave Signal Source using ATmega8515 microcontroller • 1 Khz From a Quartz Crystal • 1 V P-P Sine Wave Calibrated Output • 1 KHz Wave Output • 900 mv Inverted Sine Wave Output (Uncalibrated) Downloads Download the WINAVR main source for the 2313 version of the firmware 2313sine.c Download the…... Listed under: AVR ATmega Projects, PWM Projects
1220. A Noise Generator per IEC 268-1, IEC 268-5, and IEC 268-7 A related article on this site: True RMS-To-DC Adaptor for DVM Introduction This project cam when I needed to perform some reliability tests on some headphones according to IEC 268-7. The test requires operating the headphones at their rate power for a number…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1221. MAX038-Based Sweep/Function Generator With Markers using AVR ATtiny2313 microcontroller Take Maxim's MAX038 function generator chip, add so and you have a pretty nice tool for the bench. Downloads: Main Circuit Schematic Power Supply Schematic You can build this with switches instead of you don't want to use a micro controller. Here…... Listed under: AVR ATmega Projects, PWM Projects 1222. An Isolated Adjustable Auto transformer using microcontroller This is a means of testing AC mains operated circuits at variable AC voltages, and it also isolation to allow safe measurements of that circuit.   A fused isolation transformer and a variable auto transformer connected together in a grounded box. What…... Listed under: AVR ATmega Projects, Home Automation Projects 1223. A 10 Bit LED Digital Panel Meter With Auto Ranging Based On The ATMEGA8 Downloads Download the AVRStudio assembly source for the program: M8DPM091109A.asm Download the AVRStudio hex file: M8DPM091109A.hex Find updates at www.projects.cappels.org Overview - A 10 bit digital pan for positive voltage only. - Input resistance: about 130k - Ranges: 0 to 10.20 volts and 0…... Listed under: AVR ATmega Projects, LED Projects, Metering - Instrument Projects 1224. Photocell Amplifier using microcontroller This is a low frequency amplifier with an adjustable transimpedance that is intended to be used to take relat measurements of a wide range of photo currents. Not having many parts, this amplifier can be put together in a short amount of time. Find updates… under: AVR ATmega Projects, Solar energy projects 1225. A SIMPLE MANUAL CURVE TRACER using microcontroller Measure current vs voltage or voltage vs current over limited range with good accuracy   This was built on a phenolic which was mounted on a plastic box. The box serves two purposes: It holds the circuit off the workbench, and it makes a…... Listed under: AVR ATmega Metering - Instrument Projects 1226. A Pretty Good LC Meter Based on the AVR using ATTINY2313 Microcontroller Calculates and displays L and C from oscillation frequency using referenc components. No relays, no range switching, a minimum of controls. And it is pretty accurate too! Note: After reading this article, check out the improve modified An Even Better LC Meter... The 2 line…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1227. An Even Better LC Meter Based on the AVR ATTINY861 An improvement over "A Pretty Good LC Meter."  Enhanced capacitance self calibration, accurat operation without precision components, and only one micro controller. Downloads Download or view the WINAVR main source file: lcm.c Download t complete package including the LCD library: Even-Better_LCM.zip (LCD Library provided with…... Listed under: AVR ATmega Projects 1228. GSM GPS module shield for Arduino Shield for Arduino designed and based on the module GSM/GPRS SIM900 or the GSM/GPRS & GPS module SIM90 make calls, voice and data connections via GPRS  allow maximum customization and provide many configurations. With a microphone and a headset w mm jack (just the standard…... Listed under: AVR ATmega Projects, GPS Based Projects
1229. Interfacing DRAM Memory using AVR microcontroller Is it possible to use DRAM with microcontroller AVR? Yes, it is possible. Jesperh has proved it. He up a DRAM to a small processor (in this case an Microcontroller Atmel 8515), and handle the RAS/CAS sequencing and refresh in software. The type of under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1230. Ponyprog Circuit for AVR & PIC16F84 using microcontroller Comments: All resistors are 1/4W.The circuit is powered by 9...15V DC or AC. When In Circu Programming (ISP) connectors are used, is possible the programmer to be powered from target’s power source. Diodes D2 and D6 protect the regulat LM7805, when target’s power is used.…... Listed under: AVR ATmega Projects 1231. Ponyprog Circuit for ATMEL'S AVR using microcontroller The ATMEL AVR programmer works with the Windows program "Ponyprog" which works unde XP, ... and can be found at http://www.lancos.com/prog.html On board the AVRs that can be programmed are those in the schematic. For other memb family or the rest…... Listed under: AVR ATmega Projects 1232. EPROM adapter for ATMEL 89 Series Flash Microcontroller Programmer Devices The EEprom programmer software supports the following devices. 28 28C256 28C17 29C256 28C64 Hardware Diode D1 and resistor R1 provide the VDD isolation when programming the 24 pin devices. The jumper J3 mu shorted for 24 pin devices, and open circuit for 28…... Listed under: AVR ATmega Projects 1233. PCB Exposure Box with Countdown timer using ATMEGA8 microcontroller Tired of spending hours and hours in wire soldering? Do your circuits look u you are looking for a way to produce professional-like PCBs? Then you had better try photoetching. And the first step to do that is to have the right eq that…... Listed under: AVR ATmega Projects, Other Projects 1234. 89Sxx Development Board using microcontroller Introduction of 89Sxx There are some 89Sxx development board, here is another one. I have designe single side development board to be used as a tool for learning MCS-51 Microcontrollers, and for easy microcontroller project development. The 89Sx development board features : 89Sxx 40-DIL based…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1235. Wireless Coupler Terminal Interface using AVR microcontroller This is a Minimum Mass Wireless Coupler that connects a terminal, or PC running term software, to other Minimum Masss Wireless devices by means of a 1200 baud data channel at 181.818 kHz. The basic Minimum Mass Wireless Couple technology is described and links to…... Listed under: AVR ATmega Projects 1236. RF Field Strength meter using AVR microcontroller The hot melt glue that covers the circuit serves multiple purposes: It helps to keep the temperature among the three transistors (to minimize thermal drift), it protects the components from physical damage, and it holds the battery holder on the boar used…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1237. Digital Telemetry using ATMega8 microcontroller The ATmega8 microcontroller-based Low-Cost Telemetry Device (LTD) is an efficient telemetry keyer. measures the voltage levels of up to four analog channels via its on-chip 10-bit ADC, converts the measurements to numbers, and then sends the data code to an external…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1238. LC Resonant Frequency Meter using AVR microcontroller A well known L/C measurement circuit is pressed into service to make a bare bones measure circuit. Download the AVRStudio assembly source: lgm031227I.asm Download the AVRStudio hex file: lgm031227.hex Left-to-right: The 5 volt regulator LM393 oscillator (a 0.047 uf capacitor is mounted on the…... Listed under: AVR ATmega Projects 1239. AVR LED RF Field Strength using microcontroller Useful as a transmitter tune-up meter or an RF sniffer, this is an RF field strength indicator that is loosely based on the Broad B Field Strength Probe, described elsewhere. It detects RF via a square law detector, basically its a crystal set with…... Listed under: AVR ATmega Projects
1240. Control Relay Card with USB port Atmel using Atmega8 microcontroller Once upon a time, though a circuit of this type of calling Searches Banim made Microchip PIC Series devreydi 6 pcs rörele control pcb computer program code can be done via usb port usb drive and 9-12 volts AC regulated power s section of…... Listed under: AVR ATmega Projects 1241. Temperature Sensor Thermometer using AT89C51 and DS1621 microcontroller DS1621 temperature sensor circuit digital thermometer to tell if using. Operation of the circuit is simple, as are as follows: temperature sensor from the numeric value being sent to the microcontroller and the micro using the I2C serial communication protocol, this value will more basıyor.Biraz If the LCD tomicrocontroller interprets…... Listed under: AVR ATmega Pr Sensor - Transducer - Detector Projects, Temperature Measurement Projects 1242. About Atmel and Combination Lock Application using AT90S2313 microcontroller Microcontroller Microcontroller 's (MCU) is a kind of CPU (CPU) can b as. MIB MCUs from slower and less capable of addressing memory, but they are designed for the implementation of real-time control problems both c and easier to use. The major difference between CPU and…... Listed under: AVR ATmega Projects, Security - Safety Projects 1243. Led Animation Circuit with PC Connectivity using AT90S2313 microcontroller Animator is a device, rather 5 × 16 matrix LED , which are used to display animation. Initially, the device serves to something completely different and it was controlled directly from the parallel port for the program is written Pascal. The idea has proved to be a…... Listed under: AVR ATmega Projects 1244. Color Sensor Circuit with AT89S52 ADC0808 This color of the surface color to red when you bring to the surface, a sensor to read the LDR, yellow, blue yellow and blue lights in different surface finishes as a different yansıtmalarını works by taking a foothold. Will be reflected from the surface to…... List AVR ATmega Projects, Sensor - Transducer - Detector Projects 1245. Serial interface with 2X16 LCD display using ATMega8515 microcontroller The 10k potentiometer, just above the ISP connector near the lower middle board,is used to adjust the display contrast according to your vertical viewing angle. DOWNLOADS ATTINY2313/AT90S2313 AVRStudio assembler sourc LDCbutons040904Ca.htm ATTINY2313/AT90S2313 AVRStudio assembler source, UPDATED FOR COMPATIBILITY WITH NEWER VERSIONS OF THE…... Lis AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1246. G1216B1N000 dot graphics display using AT90S2313 microcontroller Download Assembler source code I was looking for an LCD display that I could us workbench. The selection criteria for the display module itself was straight forward: 1. Dot graphic with sufficient resolution to display a simple wavefo Available…... Listed under: AVR ATmega Projects 1247. LCD Date Time Application using AT89S52 microcontroller This application can be installed at the same time an alarm indicating the date and time pro Atmel with 8051 -based microcontroller AT89S52 tasarlanmıştır.Uygulamamızın using the Keil compiler using the C programming language using code in different types of intervention. Proteus simulation of the application program, Isis has…... Listed under: AVR ATmega Projects 1248. Dot Matrix Display Applications using AT89C2051 microcontroller 4 Piece AT89C2051 micro-controller matrix display has a project carried out with proteus isis simulation and has asm hex code files Atmel AT89C2051 • Compatible with MCS ®-51Products • 2K Bytes of reprogrammable Flash Memo Endurance: 10,000 Write / Erase Cycles • 2.7V to 6V Operating…... Listed under: AVR ATmega Projects, Other Projects 1249. 100 MHz RF oscillator using ATtiny12 microcontroller I needed a frequency reference for tuning up the RS-232 to 100 MHz RF desktop channel adapte elsewhere on this site, when I found this Saronix crystal oscillator in my junk box.  A few minutes with AVRStudio produced an ATtiny12 to make a tone Listed under: AVR ATmega Projects 1250. Atmel Test Card using ATmega32 microcontroller PCB and the schema (sch) P-CAD 2004 Schematic drawings prepared by V18.00.2690 also c languagecode through the test ha prepared with an alternative link ATMEGA-32 Development Board Power 7V to 12V (4mm sockets) protected against reverse polarity Visualization by 8 LEDs Statements of eigh
outputs…... Listed under: AVR ATmega Projects 1251. Computer connected Flower Water Circuit using ATmega8 microcontroller Interestingly, I understand a project is determined by the required hours of irrigation data via a computer data exchange rs232 com port are made out of a project source code and is not easily implemented scheme, For more detail: Computer connected Flower Water Circuit using…... Listed under: AVR ATmega Projects 1252. Multimeter with Atmel using Atmega8-16pu microcontroller Atmega8 Multimeter "Multimeter" was the only title to einfiel to me first. Voltmeter (only DC) 0.00 - 9.99 volts and 10.0 - 30.0 volts with automatic range switching. Frequency counter 0 .. 7999 MHz (Theoretische) with automatic Switching tim Logic tester L - prohibited area…... Listed under: AVR ATmega Projects 1253. Decoding 4 buttons with two I/O's on AVR using ATtiny12 microcontroller Just the solution for AVR applications in which I/O is tight, such as the ATtiny1 should work well on other kids of controllers that have independently controlled I/O direction registers, such as PIC and 6805 controllers. This is a solu devised for those…... Listed under: AVR ATmega Projects 1254. EEPROM Driver for AVR with RAM using ATtiny15 microcontroller Download the test program with driver:  i2cm030710F.asmI had been putting off writing a driver for some 2 24LC256 EEPROMS I was thinking about using, when I came across a temperature logger application written by Sean Ellis. The Temperature logger was posted on on www.avrfreaks.net…... Listed under: AVR ATmega Projects, Other Projects 1255. ATtiny12 fuse restorer using microcontroller Plug an ATtiny12 into the 8 pin socket and hold down "GO!" button. The LED will come on at the end of th programming process, which only takes a couple hundred millisecond. The fuses are now restored to their factory default states. This picture was…... under: AVR ATmega Projects, Other Projects 1256. Analog Multiplexer using AVR microcontroller This technique uses digital  I/O pins to multiplex analog voltages into an analog input on the microcontro method is most suitable for signals that do not need to be sampled frequently and it may be extended to accommodate a large number of inputs, tho Listed under: AVR ATmega Projects 1257. PWM Waveform Capture using AVR microcontroller Described are the waveform capture method, example firmware and hardware designs. This mate formed the basis of an article that was first published in the October, 2003 issue of Circuit Cellar magazine. The only components added to the operat AT90S2313 circuit (one capacitor and two…... Listed under: AVR ATmega Projects, PWM Projects 1258. 1 KHz Synchronous Detector using AVR microcontroller Downloads: Assembler source  deco030511C.asm AVR Studio hex file is deco030511C.hex         Overview This circuit employs a synchronous demodulator to separate a 1 KHz signal from noise and measures  the amplitude of the 1 kHz signals on second at about 60 microvolts per count then…... Listed under: AVR ATmega Projects 1259. Morse Code Alarm Clock using ATtiny2313 microcontroller Morse Code Alarm Clock Modification (Almost) Trivial application of an AT90S2313 or ATtiny an alarm clock to change the alarm from "BEEP BEEP BEEP BEEP BEEP BEEP BEEP BEEP..." to "WAKE UP" in Morse code. This was designed in response request and…... Listed under: AVR ATmega Projects, Clock Projects 1260. 89C517 Segment Display using the Digital Time Data from Port0 7447 entegresinde and 7-segment displayreaches ' s.7447 -integration mikrodenetley from binary code to show in the 7 segment displayis used. So when it comes to 0000 a, b, c, d, e, f LEDs lights up g edi fireproof.7 segment displayis co in parallel to each other ' s.Using the same…... Listed under: AVR ATmega Projects 1261. 8 Channel PWM using AVR microcontroller The assembly code given here was written to see what it would take to make an AT90S1200 generate 8 cha proper PWM. In this case, by proper, I mean with the maximum high frequency content consistent with the needed duty cycle and give clock.…... Listed AVR ATmega Projects, PWM Projects 1262. AVR Programmer with ATMega8-16 About AVR Programmer   This simple AVR Programmer will allow you to painlessly transfer hex programs to most A microcontrollers without sacrificing your budget and time. It is more reliable than most other simple AVR programmers available out there and can be in…... Listed under: AVR ATmega Projects
1263. AT89C52 DS1302 DS18B20 LCD On Time-Temperature Original Atmel micro controllers to use the at series with a good example of ds1302 ds18b20 circuit 2 × 16 lcd indica set with 4 buttons on The first button press and a bout at 2 minutes (time) setting with the buttons 2 and…... Listed under: AVR ATmega Projects 1264. Capacitance Meter using AVR microcontroller Digital Capacitance Meter This is a simple capacitance meter which can measure capacitance value easy some measurement methods for capacitance, at one time the capacitance was measured with a impedance bridge or a dip meter. Recently typical ca meters can measure capacitance and…... Listed under: AVR ATmega Projects 1265. Atmel Avr Project Circuit Archive 360 MB using ATmega8 microcontroller I collected a lot of site in the internet for various atmel avr projects will not wo the idea of a day's archive is a grown up pretty. Atmel will be a solid resource for people interested in the firm. Atmel AVR Project Circuit Archive; …... L under: AVR ATmega Projects, Memory - Storage Projects 1266. PC Temperature Meter using ATtiny15 microcontroller Port-Powered Temperature Meter This is a four-channel temperature measurmet adapter that w without external power supply. It will suitable for measureing temperature and logging its data with a PC. The circuit diagram is very simple and no ad is required, everybody will able to build…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects, Temperature Measurement Pr 1267. Computer controlled marquee at90s2313 74hc595 With all the details on a circuit different from that to which the shared a marquee computer contro atmel at90s2313 source software image format you have the source schema and pcb, orcad drawings. Marquee on a circuit different from that to whi Marquee in…... Listed under: AVR ATmega Projects, Home Automation Projects 1268. Frequency counter using AVR microcontroller Universal Counter The frequency counter is the most popular instrument in the home maid instruments that the reason why it is built widely is: it can be built easily because it is digital circuit, it is generic measurement and many construction kits are…... Li under: AVR ATmega Projects 1269. 8 channel LCD Teperature meter using microcontroller Description This is the fully featured, jammed packed temperature readout unit. I can measure temperature from up at 8 DS1820 digital temperature sensors all on the same 1-wire bus. That's right only 3 wires are needed to go to all the tempera sensors, GND, VCC…... Listed under: AVR ATmega Projects, LED Projects, Temperature Measurement Projects 1270. Packet Radio using AVR microcontroller Here is some experimental hardware and software to transmit and receive AX.25 packets. It is essentially a PIC designed around a Atmel AT90S2313 with a few extra bells and whistles. I had picked up a couple of MXCOM MX-614s at the TAPR display (I…... Listed AVR ATmega Projects, Radio Projects 1271. Nixie Clock with AVR using ATmega48 microcontroller Introduction:  This is the hardware and source code for an Atmel ATmega48 based four digit Nix Clock. Description: This was my second Nixie clock project. I wanted something a little smaller / cheaper / simpler then my rather large B-7971 clock. I post…... Listed under: AVR ATmega Projects, Clock Projects 1272. Atmel AT89C2051 hardware keylogers circuit with using AT89C2051 microcontroller Atmel On the PC keyboard PS 2 AT89C2051 keylogers circuit connection cable connects to t between what is written in the wake of the program running on the pc upon AT24C512 writes eeprom eeprom reading with KeeLog has decided to release an early version of… under: AVR ATmega Projects 1273. AVR terminal for serial port using TSOP1738 microcontroller description (hardware) Above and below you can see the terminal. The LCD display is rep by the connector X1. It has a HD44780 compatible LCD controller and I'm using the 4-bit interface to send data to the LCD controller. The LED's are mu I've seen…... Listed under: AVR ATmega Projects 1274. Atmel atmega projects l35 heat time display keypad using ATMega microcontroller Atmel ATMEGA series of three projects are made with micro-contro delivering projects bahramelectronic.ir Thank you brother Bahram's administrator. 1 - ATMEGA16 LCD display temperature measurement (LM35) 2 - ATmega8 application of the keypad display with 7 segmet 3 - ATMEGA32 with a thermometer (LM35) hours. For more detail: Atmel atmega projects l3 time display keypad using ATMega…... Listed under: AVR ATmega Projects 1275. Atmel Bascom avr 8051 project, the circuit archive using AT89S8252 microcontroller Atmel series (AT89C2052, AT90S2313, AT89S8252, etc.). wide range microcontrollers with an archive of high-quality circuit atmel version you can find a lot of. Usb, alarm, lcd, nokia 3310, nokia 6100, display, LED, sms, te and so on. schema files to Protel PCB circuit has a lot of…... Listed under: AVR ATmega Projects, Other Projects 1276. Heart of LEDs using microcontroller One of the requests we received after publication of the Christmas Star was "can you do different shapes?" Well, with Mother’s Day comi soon, we thought a heart would be appropriate. Now you can have something different to give to that special Mum or…... Listed under: AVR ATmega Projects, LED Projects
1277. Atmel atmega128 clock ds1307 tda5410 hard disk using atmega128 microcontroller Previously called " Corrupted HDD Evaluate under the heading "co hard disks to evaluate the application, I mentioned a couple of hours on the web projects I had used it with emery hardisk hours now, but quite profes and all of the shared resources, shared project Circuit atmel ATMEGA…... Listed under: AVR ATmega Projects, Clock Projects 1278. Lux meters attiny26-16 light measurement circuit using attiny26 microcontroller Lux meter circuit atmel attiny26-16 microcontroller based on the valu LED displays on the display lux with LEDs placed on 2sk1061 MOSFETs. Interestingly, all of the source files in an application (pcb, diagrams, code) calib circuit is shared also provided information to  Lux meter circuit diagram: The Lux…... Listed under: AVR ATmega Projects 1279. Atmel avr usb programmer using ATMEGA8 microcontroller A lot of programmers are growing for a USB programmer for Microchip PIC controllers are avr usb programmer circuit atmelcilerde not idle in addition to the USB communication does not require a material ATmega8  ATMEGA48 can be done either the source code of software…... Listed under: AVR ATmega Projects 1280. LCD Car Accelerometer using microcontroller Introduction The circuit is drawn for measurement of acceleration from  –1000 mg until + 1000 mg. It ca placed in kantra'n the car and be supplied from the sheath of electric lighter. The circuit includes one indicative LED and a screen LCD. Description The under: AVR ATmega Projects, LCD Projects, Sensor - Transducer - Detector Projects 1281. AVR LCD Microcontrolled Oscilloscope using ATmega32 microcontroller Features Frequency measurementVoltage input Power supply Liquid Display Crystal Measurement disp Information displaying area: Auto triggering 10Hz - 7.7 kHz (firmware  2.0 and above)24V AC / 30V DC 12V DC 128x64 pixels 100x64 pixels 28x64 pixels from firmware  2.0 and above) Auto   Introduction A…... Listed under: AVR ATmega Projects 1282. VGA Monitor adaptor using AVR microcontroller Background of the project.   Several months ago I tried to connect a microcontroller system to a VGA m output data in the form of text. I was surprised to find little on this subject on the internet, to assist me in achieving this…... Listed under: AVR ATmega Video - Camera - Imaging Projects 1283. Midi Generator using ATtiny26-8PI microcontroller This circuit based on ATtiny26 but it could be anyone microcontroller of AVR family.  Produce stable tone and you can change it by press some keys like to change midi channel 0-15 , velocity 0-127, pitch 0-127. It is start from center tone…... Listed und ATmega Projects 1284. USB Pinout All Types of USB Pinout Diagrames Universal Serial Bus connectors. These USB connectors let you attach mice, printers and other accesso your computer quickly and easily. The operating system supports USB as well, so the installation of the device drivers is quick and easy, too. Compare ways of…... Listed under: Blog, Circuits 1285. USB AVR programmer using ATtiny2313 microcontroller Introduction. Nowadays, USB is the most popular connection between PC and peripherals suc programmers, printers, scanners etc. For that reason I had to modify my old serial AVR In-System-Programmer (ISP) to work with USB connection. You "use a USB to Serial adaptor to…... Listed under: AVR ATmega Projects 1286. 10 Bit analog to digital converter using ATtiny26 microcontroller Study the Analog to Digital capabilities of Atmel ATtiny26. This tiny but mighty IC is rea miracle. One special thing is the internal 10-inputs multiplexed ADC circuit which can covert analog voltages to bytes. This check circuit uses only 3 inp course you…... Listed under: AVR ATmega Projects 1287. SMS control 4 way remote control relays using ATtiny2313 microcontroller Introduction   With this circuit we can control up to 8 devices (4 devices in o example project), by sending a specific SMS message with any mobile phone. It's very useful in the case that, at the place we have the devices, we hav Listed under: AVR ATmega Projects, Phone Projects 1288. RF 2 channel remote control 418MHz using AVR microcontroller Introduction How many times you needed some remote control to handle some electric device ? Many times. T lot of remote controls like infrared, RF, SMS (like my other circuit) and more. The basic small-range remote controls are 2, Infrared and RF (Radio Frequency).…... Listed under: A ATmega Projects
1289. RCEN fuse programmer using AT90S1200A microcontroller   Introduction: As you know the AT90S1200 microcontroller includes an internal RC oscillato disabled by default. If you want to change it (enable or disable) you must to program it with parallel mode. The most programmers work on serial mod not possible to…... Listed under: AVR ATmega Projects 1290. 80×32 LED matrix display using ATmega32 microcontroller The LEDMATRIX interface News: Now with lcd4linux driver I recently purchased 10 SLM1608 (SLM1606) LED matrix display units from Ebay (you might also contact the seller directly at op16@gmx.de). These are 16x16 LED matrix units with a gr red LED per pixel allowing…... Listed under: AVR ATmega Projects, LED Projects 1291. i2c interface to USB interface using attiny45 microcontroller Attach any I2C client chip (thermo sensors, AD converter, displays, relais driver, ...) to your USB ... quick, easy and cheap! Drivers for Linux, Windows and MacOS available. The i2c-tiny-usb project is an open source/open hardware project. The i2c-tiny-usb is to…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1292. Acceleration sensing USB interface using Atmega8 microcontroller Contents The hardware The USB interface Calibration PC assisted calibration Self ca Software Drivers Joystick drivers Maemo drivers The input event subsystem Setting permissions Enigma FAQ Downloads The TiltStick is a small accele sensing device in form of a USB stick. It's using a two…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1293. Wireless Lan for AVR microcontrollers The complete WLAN solution for AVR and other CPUsThe page is about equipping an Atmel AVR microcontroller system with a Prism WLAN interface. This document is intended for people that already have experiences with the AVR microcontrollers and teaches t to add a…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1294. AVR Compiler toolchain for MAC using ATmega8 microcontroller The following instructions are from early 2007 and are pretty outdated by now. They are still here for referen they are not maintained anymore and very likely won't work with recent versions of MacOS anymore. After having developed software for the AVR under Windows…... Listed u ATmega Projects 1295. Java virtual machine for the Atmel AVR ATmega8 The NanoVM is a java virtual machine for the Atmel AVR ATmega8 CPU, the member of the AVR CPU f used e.g. in the DLR Asuro robot, manufactured by AREXX engineering. With the NanoVM, the Asuro can be programmed in the popular Java language Listed under: AVR ATmega Projects, CNC - Printing Machines Projects 1296. EPROM adapter for ATMEL 89 Series Flash Microcontroller Programmer Ver 2.0 Devices The EEprom programmer software supports the following dev 28C16 28C256 28C17 29C256 28C64 Hardware Diode D1 and resistor R1 provide the VDD isolation when programming the 24 pin devices. The jumper be shorted for 24 pin devices, and open circuit for 28…... Listed under: AVR ATmega Projects, Other Projects 1297. Digital Stop Watch with ATmega8 using microcontroller Hello Friends, In this tutorial we will make a "Digital Stop Watch" using an AVR ATmega8 Microcontroller. This will help y many concepts like Multiplexed Seven Segment Display Interfacing Using AVR Timers Using Interrupts And many others too. The code is written in C… under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1298. Relay Timer with ATmega8 AVR MCU Timers are widely used in industrial and domestic application for automating tasks. Microcontrollers can be used versatile and accurate timers with ease. Here I present a simple timer that can be used to turn on/off a load after user specified time. The Timer…... Li under: AVR ATmega Projects, Home Automation Projects 1299. Remote Controlled Fan Regulator using ATmega8 microcontroller This device can be used to remotely control the speed of an AC fan and to switch it o The remote control is a cheap NEC Format remote, usually supplied with small DVD players. Three buttons are used to command the circuit. The…... L under: AVR ATmega Projects, Home Automation Projects 1300. ATmega8 based RPM Meter Hello All, Today I will show you how you can make a simple RPM Meter using AVR ATmega8. The RPM meter we will be ma contact less type, i.e. it measures the RPM of a rotating object without actually making any contact with…... Listed under: AVR ATmega Projects, Meteri Instrument Projects 1301. ATmega8 Based Smart Code Lock Here is a project for beginners using Atmel AVR ATmega8. The project uses some techniques that are very useful for designers to learn and u Alphanumeric LCD Module Interfacing. 4x4 Keypad interfacing. PWM Control of LED (Used to dim the back-light of LCD, like in…... Listed under: AVR ATmega Projects, Interfacin
RS232 - I2c -ISP) Projects 1302. ATmega8 Based Multi channel IR Remote Hi Friends, Today I will present an easy to build Multi channel IR Remote control system. It can control heavy to AC 220V 6 Amps or smaller) with a touch of remote control. A total of 5 devices can be controlled from a…... Listed under: AVR ATmega Projects, Oth Projects 1303. AVR RGB LED and Sound Show using ATmega168 microcontroller Here is a nice and entertaining project created by http://www.ermicro.com . The auth very good programming, teaching, drawing and artistic skills. The tutorial is well planned and executed. I really liked the RGB LED and Sound show give end. I will…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1304. Visualize ADC data on PC Screen using USART AVR Project using microcontroller ADC (Analog to digital converter) is a commonly used peripheral. We use it everyday to interfac several analog sensors. Many times a nice visualization of ADC data is required during learning about new sensors. For example you just bought a analog sound sensor, and… under: AVR ATmega Projects, Sound - Audio Projects 1305. PC Controlled Robot using ATmega32 In this tutorial we will discuss a simple PC controlled robot. The Robot PC link will be a RS232 serial line. The robo have only five commands. Move forward (RS232 char 'F' or 'f') Move backward (RS232 char 'B' or 'b') Turn Left (RS232…... Listed under: AVR ATmega Pro Robotics - Automation Projects 1306. AVR ATmega8 Project LED Moving Message Display using ATmega8 microcontroller An interesting project that can be done using Microcontroller is a L message scroll er. It teaches you a quite lot of things. So I decided to make one. I made the hardware design modular and cascadeble That means the display is made up…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1307. PS2 Keyboard Interface with AVR MCU using ATmega8 microcontroller A PC keyboard is an old and trusted human machine interface. Most peoples ar with it. When a text entry is required it is the best method. If we can interface the PC keyboard with an AVR MCU we can create a whole lot…... Listed u ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1308. Line Following Robot using AVR ATmega8 One of the most basic autonomous robot you can build is a line following robot(LFR). This type of robot is ru white surface which has an arbitrary path drawn over it by using back paint. The task of the robot is to run…... Listed under: AVR ATmega Projects, Rob Automation Projects 1309. SMS Based Voting System – AVR GSM Project using ATmega32 microcontroller Hi friends ! Here I am showing a microcontroller based project called the Based Voting System". Using this system you can ask your users to vote for any of the four options. Four available options are identified by a letters 'A and…... Listed under: AVR ATmega Projects, Phone Projects 1310. Interfacing TCS3200 Colour Sensor with AVR ATmega32 Detecting colour of an object can be an interesting and useful electronic application. It can be using a colour sensor like TCS3200 and a general purpose microcontroller like AVR ATmega32. TCS3200 Colour Light to Frequency Converter Chip TCS3 is designed to detect the…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1311. AVR Music Player with Alarm Clock using AT90USB1286 microcontroller This music player project built based on AT90USB1286 microcontroller. It uses music decoder which integrates music file decoding and digital-to-analog output. Other main part including 16×2 character LCD display, ST7066/HD44 compatible, using 3.3V instead of 5V and DS1307 real time clock. By finishing this…... Listed under: AVR ATmega Projects, Clock Projects 1312. AVR Power Usage Logger using ATmega168 microcontroller This ATmega168-based project monitors household power usage and logs it to an SD card from voltage and current detectors amplified LMC6484AIN quad op-amp and then AVR microcontroller computes the power consumption using the fo P=VxI. The voltage and current are each sampled at 9615…... Listed under: AVR ATmega Projects
1313. Energy Monitoring Transmitter using Atmega328 microcontroller This energy monitoring transmitter, known as emonTx, is an Atmega328-based small wireless energy monito It also fully compatible with Arduino IDE. EmonTx is designed to take inputs from multiple CT sensors, optically from a pulse-output utility meter and f multiple one-wire temperature sensors. The…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1314. Wireless Human Health Monitor using ATmega644 microcontroller The aim of this ATmega644-based project is to build a portable device implementin technology and taking full advantage of the wide-spreading Internet to provide a convenient solution to monitor human health. The health informatio acquired on the portable side transmits to the server wirelessly…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects, Medical - He Projects 1315. AVR Digital Hum Nuller using ATmega168 microcontroller This ATmega168-based digital comb filter built to clean a realtime audio signal. It can remove ubiquitous 60Hz (50Hz in some countries) hum noise caused by power lines and household electrical wiring. Since the noise is not strictly sinusoidal it necessary to remove all…... Listed under: AVR ATmega Projects, Other Projects 1316. DC Servomotor Controller System Meter using ATtiny2313 microcontroller The ATtiny2313-based project is an experiment on the closed loop DC servo control system (SMC) by Elm Chan. It can be used for practical use with/without some modifications. The closed loop servo mechanism requires real-t operations, such as position control, velocity control and torque…... Listed under: AVR ATmega Projects, Motor Projects 1317. Low Picofarad Capacitance Meter ATtiny2313 microcontroller This little instrument, named as Pico C, can be used to measure capacitances down to fr a picofarad. It built based on ATtiny2313 microcontroller. It has range: <1 pF to 2000 pF (guaranteed); 2500 pF possible and resolution: 0.1 pF. To read …... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1318. Ear Trainer using ATMega644 microcontroller The goal of project is to helps people develop the musical skills of perfect pitch and relative pitch. Push b allow the user to navigate a graphical user interface (GUI) on a liquid crystal display (LCD). In perfect pitch training mode, a note is played…... Listed un ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1319. AVR Data Logger with MicroSD using ATmega32 microcontroller This project shows you how to store data into microSD card in files with FAT32 format microcontroller AVR ATmega32. The MCU receives sensor’s data through internal ADC. You can connect up to 8 different sensors to the system. In this Dharmani uses one…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1320. AVR Code Debugger using AVR microcontroller AVR Code Debugger is useful tool to help you debug code without require resource in the MCU you are debugging. It only use 1 and is connected to a serial port from the host PC. Using a VT100 terminal to capture the output…... Listed under: AVR ATmega Projects, RTOS - OS Projects 1321. Electric Spinning Wheel using ATmega8 microcontroller The Electric Eel Wheel is a smart electric spinning wheel which helps you spinning the fiber of y choice into yarn easily instead of traditional wheel. This Electric spinner is lighter and smaller, making it easier to take your spinning with you. You can control…... Listed under: AVR ATmega Projects, Motor Projects 1322. Rechargeable Battery Capacity Tester using ATMega168 microcontroller This ATMega168-based battery tester allows you to find out the overall capacit rechargeable battery. It can shows how long will a battery last from the time it’s fully charged to the time that the “low battery” indicator comes on you It can…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1323. Simple Automatic Battery Discharge Analyzer using ATmega48 microcontroller The project allows you to analyze characteristics of unknown/junk batte especially the capacity and variation of the voltage on discharge. It is controlled with a PC via a serial port. No external power supply is required becau powered by RS-232C signals. It uses…... Listed under: AVR ATmega Projects, Battery Projects
1324. AVR Security Keypad Lock using ATtiny2313 microcontroller The Security Keypad Lock Project is a basic access control system based on ATtiny2313. It c modified to protect just about anything. The “Code Lock” ability will allow the rightful user to deploy the platform to any property that requires simple password-protection. The “AVR”…... Listed under: AVR ATmega Projects, Security - Safety Projects 1325. Speaking Calculator using AVR ATmega88 microcontroller This Speaking Calculator project is an interesting device built just by three chips that can be useful to blind people. The system has four basic operations (addition, subtraction, multiplication and division), and the functions: clear all, change of inverse (1/x), square root…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1326. Handy Password Managing System, Lord of the Keys using AVR ATmega168 The Lord of the Keys is password managing system that able to store man usernames and passwords inside a Java Card™ smart card (one of the most secure methods to store confidential information). Whenever a dialog box in an application or web browser requesting…... Listed under: AVR ATmega Projects, Security - Safety Projects 1327. AVR LED Candle using ATtiny85 microcontroller This LED candle is built to mimic the look of a traditional candle without the dangers associated with a flame. It uses high brightness LED and is controlled by ATtiny85. It could be useful as movie props where you cannot afford to have a…... Listed under: ATmega Projects, Home Automation Projects 1328. Mini Logic Analyzer using ATmega8 microcontroller Mini Logic analyzer is ATmega8-based electronics tool that can be used to watch and analyze logic transitions 0 or 1 of a dig signal. It comes with Nokia 3310/5110 LCD to display signal and it has 4 channel inputs. A digital data signal can…... Listed under: AVR ATmega Projects, Other Projects 1329. Clever Clapper using ATtiny2313 microcontroller A “Clapper” is a device that will turn on or off an AC appliance that is plugged into it, such as a lamp o when it “hears” you clap twice in approximate succession. Pete has built a Clever Clapper with various task. If user…... Listed under: AVR ATmega Proje Projects 1330. AVR Ultrasonic Spheroid Levitation Device using ATMega16 microcontroller The goal of this project was to design and build a ‘gaming’ device capable o levitating a ping pong ball at varying heights based on the proximity of the user to the device. The project based on ATMega16 microcontroller. The pr incorporates a fairly complex…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1331. AVR Based Mobile Phone using AVR ATmega128A microcontroller AvrPhone is ATmega128A-based simple mobile phone with touch screen and SIM100 module. The display uses 2,4″ LCD with a resistive touch screen and ILI9325B driver (16 bit parallel bus). The LCD breakout board contains SD card slot XPT2046 touchscreen controller. They both are…... Listed under: AVR ATmega Projects, Phone Projects 1332. AVR Wide Range LC,F, ESR Meter using AVR ATMega88PA-PU microcontroller LCFesR meter is a precise, wide range meter that can measure inductivity capacity (C), frequency (F) and equivalent series resistance of a capacitor in-circuit (ESR) based on AVR ATMega88PA-PU microcontroller. It can be easily with homemade one or double-faced PCB and available electronic…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1333. AVR Touchpad Handwriting Recognition using ATmega644 microcontroller This ATmega644-based project implements a touchpad input system which handwriting input and converts it to a printed character. Currently, the device only recognizes the 26 letters of the alphabet, but it could be easily gene include any figure of completely arbitrary shape,…... Listed under: AVR ATmega Programmers, AVR ATmega Projects, LCD Projects 1334. AvrX, Real Time Kernel using AVR microcontroller AvrX is a Real Time Multitasking Kernel for AVR microcontrollers written in assembly. Total kernel size from ~500 to 700 words depending upon which version is being used. Since the kernel is provided as a library of routines, practical applications take u space…... Listed under: AVR ATmega Programmers, AVR ATmega Projects 1335. AVR High Voltage Programmer Using Arduino AVR microcontroller AVR microcontroller uses fuse bits to set its operational parameters like watchdog t settings and change speed of the internal oscillator. Most fuse bits can be set or reset without worry. You can flash it into one state and then flashed b using an…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1336. STK500 Compatible ISP using AVR microcontroller AVR-Doper is an STK500 compatible In System Programmer (ISP) and High Voltage Serial Programm It comes with a built-in USB to Serial adaptor to connect to modern host computers which often don’t have a serial interface. The project implements speed USB device…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects
1337. TinyRealTime, Small Real Time Kernel for AVR using atmega644 microcontroller Real-time kernel (RTK) is useful to run several task or protocol on one only one task at a time can be executed by MCU, RTK used to make each task think it owns the whole machine. RTK will handle which task has to…... L under: AVR ATmega Programmers, AVR ATmega Projects 1338. Ultrasonic Security System using Atmega644 microcontroller This portable security system is built based on Atmega644 microcontroller. It can detect based on their physical presence. The system uses URM37v3.2 ultrasonic sensor which is connected to MCU through rs232 serial communication. To r sensor for wide coverage range, the system is equipped…... Listed under: AVR ATmega Projects, Security - Safety Projects 1339. Auto Sensing Sous-Vide Cooker using AVR microcontroller This low cost AVR-based Sous-Vide Cooker is able to auto-calculate the appropriate time for certain thickness of meat using heat transfer equations. It can maintain a set temperature for extended periods of time. The project implements adva features such as a water level…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1340. AVR Thermocouple Temperature Meter using ATmega164 microcontroller The benefit using thermocouple sensor for measure temperature is it has w measurement (-200 °C to +1350 °C / -328 °F to +2462 °F range for Type K), inexpensive, interchangeable, and is supplied with standard connectors. To temperature value from output of a…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1341. AVR Based Car Diagnostic Tools using ATmega169 This project focuses on tapping into GM pre-1996 car and light truck diagnostic information. These s are commonly referred to as OBDI, or ALDL (Assembly Line Diagnostic Link). They are based, in part, on the GM-specific 8192-baud ALDL standard tha used starting in the…... Listed under: AVR ATmega Programmers, AVR ATmega Projects 1342. 5 Channel USB Analog Sensor with AVR using ATmega48 Microcontroller This project demonstrates how to build a simple module to read analog senso send the data to PC using USB connection. The project uses ATmega48 as main processor and USB FTDI serial-to-usb cable. Simply put header pins on device which you can plug…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1343. AVR Switch Timer using ATmega8 Microcontroller To get better UV expose, Andrianakis has built new Switch Timer that will turn of his UV exposure bo some time. The timer uses ATmega8 as main processor and two 7-segments LED as display. There are two buttons for set and start the timer.…... Liste AVR ATmega Projects, Calculator Projects 1344. Wireless Internet Radio Receiver using AT90CAN128 Microcontroller This stand-alone internet wireless music player, named as Wireless MP3 (WMP3), Atmel AVR AT90CAN128 microcontroller as main ‘brain’. The device can play music from internet radio stations like Shoutcast (www.shoutcast.com), co shared network drives and play mp3 files. Ubiquitous 802.11b wireless link is…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1345. Low-cost AVR programmer Before using this programmer.... Be carefull with using this programmer, because it has no insulation circuitry! Especially w high voltages e.g. 110/230 Vac on your project. One mistake and your day can be ruined, your expensive PC distroyed! Part list: 7x 220 ohm 1x…... Liste AVR ATmega Programmers, AVR ATmega Projects 1346. SP12 serial programmer software SP12 supports the following devices: AT90S1200, AT90S2313, AT90S8515, AT90S4414, AT90S2323, AT90S4434, AT90S8535, AT90S2343, ATtiny2 AT90S2333, AT90S4433, ATtiny12, ATtiny13, ATtiny15L, ATtiny26, ATtiny25, ATtiny45, ATtiny85, ATtiny2313, ATtiny861, ATmega103, ATmega603, ATmega ATmega162, ATmega163, ATmega168, ATmega8515, ATmega8535, ATmega8, ATmega16, Atmega32, ATmega48, ATmega88, ATmega128, ATmega2561, AT90PWM3. Source: Pitronics Download the…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1347. AVR assembly language What is an AVR ? First of all AVR stands for: Advanced Virtual RISC, the founders are Alf Egil Bogen Vegard Wollan RISC (also for An AVR is a small microcontroller (chip, IC) which is switching digitally (controller) by means of so called i/o's…... Listed under: AVR ATmega Projects, Clo Projects 1348. White 7-segments clock ATtiny26 Part list 1x ATtiny26 1x xtal 4.096MHz 2x 27pf ceramic 4x 7-segment white CC 2x pushbutton 1x 78L05 1x 47uF/16V e 1x 0.1uF/16V tantalium 1x 10k 1x 100n multilayer 8x 150 Ohm 4x 6k8 Ohm 4x BC327-25 PNP Features (BETA) 1. Select Hrs/Min or Min/Sec…... Listed u ATmega Projects, Clock Projects
1349. Controlling internal DAC AT90PWM3 using microcontroller Part list 1x AT90PWM3-16SQ 2x SLO2016 LED display 1x 22uF/25V elco SMD 2x 0.1uF/16V ta 2x 10 kOhm 1206 3x 100n multilayer 1206 1x coil 10uH SMD 1x rotary encoder (Sharp)   Digital voltage control unit his is how a value is stored into…... under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1350. Controlling SpeakJet with an AVR microcontroller using ATmega88 microcontroller Core Features: · Programmable, 5 channel synthesizer. · Natural pho speech synthesis. · DTMF and other sound effects. · Programmable control of pitch, rate, bend and volume. · Programmable power-up or reset annou · Multiple modes of operation. · Simple interface to microcontrollers. · Simple…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1351. Modular User Interface System using ATMega88 microcontroller The IOSTRING is a modular physical user interface system which consists of a series o basic board modules designed around the Atmel AVR AtMega88 MCU. Each module type can handle switches, pushbuttons, rotary selector switches, r shaft encoders, potentiometers, LED’s, LCD displays, and an…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1352. Switching between Red, Green and Blue (or Blue1 or/and Blue2 for an RGBB type) using AVR microcontroller Switching between Red, Green and Blue ( or/and Blue2 for an RGBB type): An RGB LED is a LED which has three (or four for an RGBB type) semi-conductor LED's in one normal housing i.e. stan mm. The Red LED is made of…... Listed under: AVR ATmega Projects, Other Projects 1353. AVR Based Operating System using ATMega32 microcontroller kaOS project is real-time, multithreaded, preemptive operating system for the Atmel Me microcontroller. It can loads and executes programs from a Secure Digital or MMC card. The system waits for a card to be inserted and a reset button pressed, at which point…... Listed under: AVR ATmega Programmers, AVR ATmega Projects 1354. 3D Color LED Graphics Display using ATmega32 microcontroller This 3-dimensional graphics display system which named as MaJaTron consists of 125 arranged in a cube of 5x5x5 dimension. Each LED is a multicolor Red, Green and Blue LED and the control circuit of the system can individually contro intensity of each…... Listed under: AVR ATmega Projects, LED Projects 1355. A GLCD connected to an AVR microcontroller using ATmega8 microcontroller A GLCD connected to an AVR microcontroller The PVG120602EGE is a 128 graphic (grey) LCD with lightblue EL backlight and two KS0108 controller chips and one KS0107 line (colums) driver (64 display lines COM1 - COM64) Th KS0108 drives segments 1 to 64…... Listed under: AVR ATmega Projects, Video - Camera - Imaging Projects 1356. Open Source AVR Temperature Controller using ATmega48 microcontroller The open source project allows you to control DC appliances based on the temperature of two thermistor inputs. It uses AVR ATmega48 as main processor. The controller has both green and white LEDs to indicate status. The output is connected to N-Channel MOSFET, AOD444,…... Listed under: AVR ATmega Projects, LCD Projects, Temperature Measurement Projects 1357. Pinning LCD display 1601 using microcontroller Pinning LCD display 1601A: Pin no. Symbol Function 1 Vss GND 2 Vdd + 5V 3 Vo Contrast Adjustment 4 Register select signal 5 RW H/L Read/write signal 6 E H->L Enable signal 7 DB0 H/L Data bus line 8 DB1 H/L Data…... Listed under: AVR ATmega Projects Projects 1358. Simple USB AVR programmer, USBasp using ATMega8 microcontroller USBasp is low cost USB in-circuit programmer for Atmel AVR micontrollers. The consists of an ATMega88 or an ATMega8 and a couple of passive components. The programmer uses a firmware-only USB driver, no special USB contr needed. Its programming speed is up to…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects
1359. Controlling 7-segments LED displays using AVR microcontroller The many posibilities....Non Multiplexed: 1. One or two displays directly to the i/o's 2. O display with a 74LS247 3. Two displays with a 74HC595 and two 74LS247 Multiplexed: 1. Two displays with a 74LS247 and 2 i/o's 2. Two displays with a and…... Listed under: AVR ATmega Projects, LED Projects 1360. Programming AVR ATxMega using USBasp and ATxmega microcontroller ATxmega programmer has different interface than 8-bit AVRs. It uses PDI inte instead of ISP. If you don’t want to buy new programmer for ATxmega you can try this little hack done by Szu. He uses USBASP (USB in-circuit program Atmel 8-bit AVR controllers)…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1361. TIL311 / INL0397-1 Hexadecimal Display usning AVR microcontroller Pin numbers: PIN 1 LED SUPPLY VOLTAGE PIN 2 LATCH DATA INPUT B PIN 3 LATCH INPUT A PIN 4 LEFT DECIMAL POINT CATHODE PIN 5 LATCH STROBE INPUT PIN 6 OMITTED PIN 7 COMMON GROUND PIN 8 BLANKING INPUT PIN 9 OM PIN…... Listed under: AVR ATmega Projects, LED Projects 1362. Head-Controlled Keyboard And Mouse For Disabled, using AVR and ATMega32 microcontroller Easy Input is a head-controlled keyboard and mouse in for paralyzed users. The system is built based on AVR ATMega32. It uses user’s head movement to control mouse movement on the monitor and user blinking to activate mouse click. Two main sensor used…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1363. Advance Fire Alarm through Mobile Phone using microcontroller An automatic fire  alarm system is designed to detect  the unwanted presence  of  fir monitoring  environmental  changes  associated  with combustion.  In  general,  a  fire alarm  system  is  classified  as  either automatically  actuated,  actuated,  or both. Automatic  fire  alarm systems  are  intended  to  notify …... Listed under: AVR ATmega Projects, Phone Projects 1364. 93C66 EEPROM chip with an AVR microcontroller How to program a 93C66 EEPROM chip with an AVR microcontroller? The 93C66 is a serially (MICROW Electrically Erasable Programmable ROM (EEPROM) chip with 4 kbit (4096 bit, can be ORGanized as 256 x 16bit or 512 x 8bit) memory space. Here a DI version…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1365. DS1669 Digital Potmeter UP/DOWN using microcontroller Part list:1x AT90S1200-12PI 1x DS1669 (Dallas) 1x 78L05 2x 1N4007 1x 4MHz X-tal 2x 27pf 1x 47uF/16V 1x 100n polycarbonate 3x 100n multilayer 1x 100 ohm 1x 10k ohm 1x 820 ohm 1x 100k trimpot 1x 10k lin. potmete DS1669 Digital Control: Listed under: AVR ATmega Projects, Metering - Instrument Projects 1366. DS1802 Digital Volume Control using microcontroller Part list: 1x AT90S1200 1x DS1802 (Dallas) 1x 78L05 1x 8MHz ceramic resonator 1x 22pF 1x 47uF 47n polycarbonate 4x 100n multilayer 1x 100 ohm 1x 10k ohm 1x 820 ohm 1x 100k trimpot 1x 10k lin. potmeter Digital Controlled Potmeter: (also kno Listed under: AVR ATmega Projects, Metering - Instrument Projects 1367. Helianthus: The Solar Tracking System using ATmega16 microcontroller Renewable energy solutions are becoming increasingly popular. Photovoltaic ( systems are but one example. Maximizing power output from a solar system is desirable to increase efficiency. In order to maximize power output fro solar panels, one needs to keep the panels aligned with the…... Listed under: AVR ATmega Projects, Other Projects 1368. 16 LED Knight Rider using 74HCT138 microcontroller Part list: 8x LED (red) 1x 180 ohm 1x 10k ohm 1x 33k ohm 1x 2u2/16V 1x 74HCT191 1x 74HCT132 74HCT138 1x 78L05 1x 47uF/16V 1x 100n 2x 1N4007 Yet another version: Here an example with 4 TTL ICs. This is I think the…... Listed under: AVR ATm Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LED Projects 1369. 8 LED Knight Rider using AVR microcontroller Part list: 8x low-current LEDs 1x 1k ohm 1x 10k ohm 1x AT90S1200 2x 1N4007 1x 100n 1x 47uF/16V 1x 78L05 Another version: In version I took PORTB of the AT90S1200 AVR microcontroller as you can see in the diagram, because this makes it…... Listed under: AVR ATmega Projects, Other Projects 1370. 6 LED Knight Rider using ATtiny22 microcontroller Part list: 6x high eff. LED 2x 330 ohm 1x ATtiny22* 2x 1N4007 1x 100n 1x 47uF/16V 1x 78L05 * The A obsolete, replace with one of the folowing AVRs: AT90S2343 / ATtiny13 / ATtiny45. History of the back and forth flashers.... In the…... Listed under: AVR Projects, Other Projects 1371. Temperature Sensor Using ATmega8 and display using LCD(16×2) STEP 1: Circuit Diagram LCD other Pin's 1,2,3,15,16 as usual not shown. Temperature Sensor (LM35) Circuit ST Programming Code Compile Using Codevision AVR View C Code STEP 3: Burn The Hex In ATmega8 View Hex Code (Make Sure grounds are common otherwise it will…... Listed u
AVR ATmega Projects, Sensor - Transducer - Detector Projects 1372. PCM Audio Based Door Bell using Atmega32 microcontroller This is a simple procedure to play PCM audio on any AVR microcontroller. AVR's high spee used to play the audio. It almost sound fine and can be used for simple projects that require sound effects. The code is compiled in winavr GCC…... Lis under: AVR ATmega Projects, Sound - Audio Projects 1373. AVR Based CRO using Atmega16 microcontroller STEP 1: Circuit Diagram Components ATmega16 MAX232 0.1uf Capacitor ----- 4pcs DB9 Connector 780 power supply STEP 2: Programme Code (Compile using Codevision AVR & Burn in Atmega16 ) View C Code STEP 3: Here We have used ADC5 of ATmeg connect…... Listed under: AVR ATmega Programmers, AVR ATmega Projects 1374. Dotmatrix using ATtiny2313 microcontroller On this page you will find a scrolling LED sign based on the ATtiny2313 AVR microcontroller, which you can yourself (when finished) Other names for this device can be: Moving message sign, Message crawler, Scrolling message, message display, etc. The idea let…... Listed under: AVR ATmega Projects, Other Projects 1375. Easy Breadboarding using ATMega microcontroller When I'm fiddling about with electronics I want to be comfortable about it. Therefore I built some t make by breadboarding life a little simpler. One example is the Network Breadboard Interface. Another one is this little project. These little pcb's can b Listed under: AVR ATmega Projects, Development Board - Kits Projects 1376. Monochrome Composite Video using Atmega8 This article describes the design of a Text on TV project. It takes serial data and displays text on a TV sc hardware part of this project is pretty simple. It uses an Atmega8 microcontroller that runs with a 16 MHz crystal. The article…... Listed under: AVR ATm Projects, Video - Camera - Imaging Projects 1377. Tea Timer using ATTiny2313 microcontroller I usually drink a lot of tea, and sometimes the tea tastes a lot better than average, which means that mos make tea I fail at least partially. The taste of the tea depends on a lot of variables: The make of the…... Listed under: AVR ATmega Projects, Home Autom Projects 1378. Kitchen Timer using ATTiny2313 microcontroller At the moment I do not have a kitchen timer. Not because I do not want one, (they're cheap enough t because it seems impossible to buy a kitchen timer with a decent user interface. That means I have to build my own,…... Listed under: AVR ATmega Pro Home Automation Projects 1379. Power usage monitor using Atmel AVR using Atmega168 microcontroller This project uses Atmega168 microcontroller to compute the power usage at and logs it to an SD card. It has a graphical LCD display too that shows the power usage as a strip chart. Besides, the voltage and current waveforms c displayed…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1380. Programmer UsbAsp using AVR microcontroller This morning (2009-12-31) I built my 4th AVR programmer. USBasp. I built this one because I wasn't co happy with my 3rd programmer and because I want to play with a software USB stack. I do know that it works (I just reprogrammed 2 old…... Listed un ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1381. Programmer using ATMEGA8 microcontroller The programmer I use is built from a kit I bought at Tuxgraphics. There are several reasons I bought this open source, works with avrdude. It connects to USB. It is a lot faster then my old programmer (Programs an ATMEGA8 in…... Listed under: AVR ATmeg Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1382. Beamer Control using attiny2313 microcontroller Beamer Control: Schematic Source code I made this project for Henk. He has a beamer for watching and a motor controlled screen. The purpose of this project is very simple. If he turns his beamer on, the screen must to down. And if the…... Listed und ATmega Projects, Home Automation Projects
1383. Door Opener using ATTiny2313 microcontroller Door Opener: Schematic Source code I made this little project for Hans, yet another brother of mine. ( brothers.) He had a garage door to control and bought a little RF transmitter and receiver to control his door. Leo made a nice cabinet…... Listed unde ATmega Projects, Home Automation Projects 1384. Dimmer using ATTiny2313 microcontroller Dimmer: Schematic Source code I made this project for Leo, a brother of mine. We had an old remote control of a video recorder lay around and he wanted some dimmers for all the lights in his house. I didn't have much experience with programming…... Listed under: AVR ATmega Projects, Home Automatio 1385. 2 Bit u Stepper using microcontroller This is the second stepper motor driver circuit I build. The first one had 4 linear current sources and got so hot it barely usable. It had some cool leds though. When I was searching for a better schematic on the internet I couldn't…... Listed under: AVR ATmega Proje Motor Projects 1386. Oscilloscope using AVR microcontroller Designing a professional digital oscilloscope is a pretty complex task wich makes them also pretty expensive. T concluded it's nothing more than a daydream to design one of those. It's far more realistic to limit the design of this instrument to something a bit…... under: AVR ATmega Projects, Metering - Instrument Projects 1387. LC Meter using AVR microcontroller LC Meter:  Schematic Source code This is the project I am currently working on (2010-01-23). The LC meter is base Elmcie or Elsie and other similar LC meters. This project is in a very early prototype stage and is at the moment only capable…... Listed under: AVR ATm Projects, Metering - Instrument Projects 1388. Power Supply using AVR microcontroller Katja & Guido at Tuxgraphics sell a very affordable little AVR controlled power supply. That power supply can controlled by sending it commands by I2C. Because I already have a pretty universal network connected to my PC it seems very logical to me to…... Lis AVR ATmega Projects, Other Projects 1389. Looking for expanding RAM for your Atmega128 An Atmega128 microcontroller has got 4K of built in static RAM, which is pretty enough for small and range projects that do not involve huge amount of data processing. But if you think you need more than that for your application, you can expand…... under: AVR ATmega Projects, Other Projects 1390. Cellphone controlled robot vehicle using ATmega16 microcontroller When we talk about wireless robot vehicles, we usually think about the RF circuits project is different. It uses a mobile phone to control the motion of a robotic vehicle, and therefore, the range of operation is as large as the coverage Listed under: AVR ATmega Projects, Phone Projects 1391. Multi-channel temperature logger using Atmega48 microcontroller This project describes how to use all the 8 ADC channels of an Atmega48 microcon read temperature sensors and the measured data to a PC for logging by using the built-in USART capabilities of the chip. For demonstration, the temp sensor used is LM335…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1392. Turn your TV into a Digital Voltmeter using Atmel’s AVR 90S1200 microcontroller This is an interesting voltmeter project that display the measured voltage on a TV screen, in gia as well as with analog bar. It also records the maximum and minimum values of measurements. The project was built by Alberto Ricci Bitti and was published…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1393. A physical display device for website visitors based on Atmega168 If you have a blog or website and want to make a physical device to display the num visitors, this project might be interesting to you. It describes about a similar device that can be directly connected to the internet via router and counts under: AVR ATmega Projects, Internet - Ethernet - LAN Projects
1394. A multifunction digital meter using Atmega128 microcontroller This is a multifunction bench test instrument built using an Atmega128 microcontrolle incorporate a lot of functions like voltmeter, ammeter, logic analyzer, frequency generator, frequency counter and also provides regulated DC power s This device is interfaced with a Windows PC to display the measurements.…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1395. AVR digital clock with white seven segment LED display using ATtiny26 microcontroller This is a digital clock project based on an ATtiny26 microcontrol displaying time on four seven segment LEDs. The seven segment LEDs glow bright white and are multiplexed through PORTB pins, whereas the segme driven by PORTA pins. The time is normally shown in…... Listed under: AVR ATmega Projects, Clock Projects 1396. Portable 2.4 GHz Spectrum Analyzer using Atmega8 microcontroller There are plenty of wireless devices available on the market that broadcast in the ISM band. Such devices include Bluetooth, WiFi, Zigbee, wireless USB, cordless phones, wireless mice and keyboards, etc. This project describes a wire spectrum analyzer to examine the surrounding radio…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1397. VGA monitor tester using ATTiny2313 microcontroller If you are a computer technician and want to avoid the need of a PC on your desk to generate te this is something you need to build. This is an embedded monitor tester that you can use to test if a VGA monitor…... Listed under: AVR ATmega Projec Projects 1398. Digital oscilloscope GLCD using Atmega32 microcontroller This project describes how to make a digital oscilloscope using an Atmega32 microcontrolle graphics LCD. The GLCD used has 64*128 pixel dots (GDM12864A with KS0108 processor) and the AVR runs at 16 MHz using an external crystal oscilla enhance the speed further,…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1399. AM radio transmission using AVR using Atmega324 microcontroller When you think about building a radio transmitter circuit, the first thing that come is it requires too many analog components. But wait a minute, this guy demonstrates an AM transmission using a microcontroller. The interesting par a plant as…... Listed under: AVR ATmega Projects, Radio Projects 1400. Open source color video game development system based on AVR This project describes an open source color game development platform based on an AVR microcontroller. code a color, high resolution, smooth video game, like Super Mario Bros or Commander Keen on this system. All video processing is done by software in background using…... under: AVR ATmega Projects, Video - Camera - Imaging Projects 1401. USB business card with a computer chip board using ATtiny85 microcontroller Have you ever seen a business card with a computer chip embedded o one does. It has an ATtiny85 microcontroller chip that stores all your personal details. You plug it into an USB port of your computer, and find the deta the…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1402. Experimental board using ATTiny2313 microcontroller This is an experimental board for ATTiny2313 microcontroller that provides a 10-pin connector circuit serial programming, and other header pins to access I/O pins. The AT2313 microcontroller runs on an external 10Mhz crystal. The board has a p button reset switch for resetting the…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1403. Automate lights in your kitchen area using ATTiny84 microcontroller This project describes an automatic light system for kitchen sink where you need light to properly clean your dishes and vegetables. It uses an ATTiny84 microcontroller with a PIR motion sensor. When motion is detected, the microc turns on the light. The light source…... Listed under: AVR ATmega Projects, Home Automation Projects 1404. AVR displays body temperature on a Nokia 3310 LCD using Atmega8 microcontroller This project describes how to measure temperature with Atmega thermistor and display it on a Nokia 3310 LCD. A thermistor is a device that changes its resistance with temperature. With a proper resistor divider net temperature can be measured by measuring the…... Listed under: AVR ATmega Projects, Phone Projects
1405. Open Source USB AVR Programmer for Students and Hobbyists using Atmega8 microcontroller If you cannot afford to buy a USB programmer for AVR worry, you can make one by yourself. This programmer uses a Atmega8 microcontroller with a few external passive components. The good thing is yo need any USB controller because it is implemented…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1406. AVR based remote controlled fan regulator This project is from Extreme Electronics that describes an AVR-based (Atmega8) remotely controlled fan reg The control commands are received through a DVD player remote control. With three buttons on the remote control, you can turn the fan On and Off conotrol the…... Listed under: AVR ATmega Projects, Video - Camera - Imaging Projects 1407. 50 MHz range frequency counter using ATtiny45 microcontroller A wide range frequency meter is an useful tool for an electronics lab. This projects de frequency meter based on AT90S231 microcontroller that can measure input frequencies up to 50 MHz. The measured frequency is displayed on 6 dig multiplexed seven segment displays. It…... Listed under: AVR ATmega Projects 1408. Easy Data Logger with Virtual USB using ATtiny45 microcontroller “V-USB is a software-only implementation of a low-speed USB device for Atmel’s AVR microcontrollers, making it possible to build USB hardware with almost any AVR® microcontroller, not requiring any additional chip.” For further detai USB and licensing, visit http://www.obdev.at/products/vusb/index.html This is a data logger…... Listed under: AVR ATmega Projects, Interfacing(USB - R -ISP) Projects 1409. Tetris and Snake with one AVR using Atmega168 microcontroller This project describes two games – Tetris and Snake, both programmed inside an Atm plug this device to a PAL TV and have fun playing the games. The circuit diagram is very simple and uses resistors to generate composite video output Listed under: AVR ATmega Projects, Game - Entertainment Projects 1410. Build an AVR Xmega Prototyping Board using AVR microcontrollers The AVR ATXmega chip is a newer offering in Atmel's AVR line.  The Xmega is billed hybrid 8/16-bit MCU, which means you can use your normal development environment to program Xmegas (as compared to AVR32 and Atmel's ARM Because the Xmega uses…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1411. Development Board With LCD using Atmega16 microcontrollers This instructable shows, how to do your own development board for Atmega16 or Atm processors.The Internet is full of home made development boards, but I think that, there is room left for another one. This board have been very usef projects and I…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1412. Blinking, Singing, Marioman using Attiny microcontrollers Use an attiny13a, two LEDs and a greeting card speaker to create a blinking Marioman that p Super Mario Brothers theme song. This can be an easy low-cost project for anyone who is looking for a fun way to break into AVR programming! The… under: AVR ATmega Projects, Sound - Audio Projects 1413. Reading Switches with using Attiny microcontrollers There have been several Instructables dealing with outputs from the ATtiny2313 and similar AVR d For example, http://www.instructables.com/id/Ghetto-Programming%3a-Getting-started-with-AVR-micro/, http://www.instructables.com/id/Drive-a-Ste Motor-with-an-AVR-Microprocessor/. Working on the latest one from The Real Elliot, which showed how to control stepper motors, I found that it wou really helpful to be…... Listed under: AVR ATmega Projects, Other Projects 1414. Halloween Robot using Attiny microcontrollers Halloween Robot controlled by an old wingman joystick. I don't reccommend this for beginners with ele only because some things like joysticks and power adapters are not all the same and must be modified. Additionally I provide programming code whic be useful for…... Listed under: AVR ATmega Projects, Robotics - Automation Projects 1415. The simple joule thief using AVR microcontrollers The Joule Thief is such an easy and simple device, but what it does is amazing. It can use a battery th usable in any other electronic device and give it life again. It can even take a battery that won't even power…... Listed under: AVR ATmega Projects, Batt Projects 1416. ISP Breadboard Header using AVR microcontrollers When I was first working with AVR microcontrollers, I relied a lot on tutorials I found on the web, b all of them raised the question of how to attach a programmer to the microcontroller when you aren't using a development board. Most of the time,… under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1417. Portal "Still Alive" on using ATMega16 microcontrollers Yet another Portal-related instructable , but Different ! This one shows you how to :   1)Build a very cheap device that pla bit version of Still Alive from Portal 2)On the same hardware , but with a different chip , play the "radio tune"…... Listed under: AVR ATmega Projects, Ra Projects
1418. Atmega8 measures ambient temperature and relative humidity using HSM-20G sensor In one of my previous posts, I discussed about Sensirion’s SHT SHT75 sensors, which are capable of measuring both temperature and relative humidity. They are digital sensors and provide fully calibrated digital ou temperature and relative humidity. I also illustrated how to interface those…... Listed under: AVR ATmega Projects, Temperature Measurement Project 1419. A complete starter guide to AVRs using attiny2313 microcontroller Have you played with Arduino's and now have a taste for microcontrollers? Have yo go beyond Arduino but got stopped by the dense datasheets? This is the instructable for you! I was working on an instructable for the epilog contest w would wirelessly…... Listed under: AVR ATmega Projects, Other Projects 1420. An universal programming adapter for the Atmel STK500 using AVR microcontroller You have an STK500 development board for the AVR controllers fr Atmel? And you want to use it with a newer AVR controller which is not supported by any of the 8 sockets on board? And you do not own an STK505 ex board? Welcome…... Listed under: AVR ATmega Projects, Development Board - Kits Projects, LED Projects 1421. Building a digital light meter with a calibrated LDR using Atmega8 microcontroller Measurement of light intensity is a prime necessity in several occasi diversity of such needs make their way to various branches of physics and engineering as well as in media. For instance, in engineering, such kinds of measurements are needed to design optimum lighting…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1422. Intelligent temperature monitoring and control system using AVR microcontroller Controlling temperature has been a prime objective in various appli including refrigerators, air conditioners, air coolers, heaters, industrial temperature conditioning and so on. Temperature controllers vary in their com and algorithms. Some of these use simple control techniques like simple on-off control while others use…... Listed under: AVR ATmega Projects, Tempe Measurement Projects 1423. AVR acoustic spectrum analyzer using Atmega8 microcontroller AVR acoustic spectrum analyzer, based on Atmega8 AVR microcontroller, operational a and few other components. Use any HD44780 compatible LCD or VFD, connect audio signal, and enjoy the effect You can build in this into your am car-audio, or other device. On this…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1424. Wireless Accelerometer Controlled rgb-LED's using atmega168 microcontroller MEMS (Micro-Electro-Mechanical Systems) Accelerometers are in widespread use as tilt-senso mobile phones and cameras. Simple accelerometers are available both as ic-chip's and cheap development pcb-boards. Wireless chips are also affordable and available in asse circuits, with matched antenna-network and decoupling-caps onboard. Hook both wireless…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1425. Mini RGB Light Cube using AVR microcontroller This is basically a knockoff of the Hypnocube, instead of being 64 LEDs, thus costing at least $150 to make, I made a smaller ver LEDs for under $30. The result is a 2x2x2 cube where each light is independently controllable. I'm not…... Listed under: AVR ATmega Programmers, AVR ATmega Projects, LED P 1426. Control Anything with one AVR pin using Attiny2313 microcontroller This instructable shows how to control a group of led's with one microprocessor o The micro I will be using is an Atmel Attiny2313. Step: 1 Parts and Tools Parts: Attiny2313 (got 5 free samples from Atmel) 20 pin socket Resistors (any work,…... Listed under: AVR ATmega Projects, Other Projects 1427. Color Sensor using Atmega16 microcontroller This is a simple color sensor using  Atmega16 MCU and can sense Red ,Green and Blue color. How it works: the sensor consist sensor and RGB LED ,so when the object putted on the sensor the light that emitting  from RGB LED will reflected from the object  to…... Listed under: AVR ATmega Projects, Se Transducer - Detector Projects 1428. Ambient Light Gift Badge using ATTiny13 microcontroller After Christmas I was in the situation that my nephew's birthday celebration came near. I ask he had a special on his wish list and he told me that he doesn't have a wish at all, for the moment. He still had not…... Listed under: AVR ATmega Proje Projects 1429. 3 Easy Holiday Gifts using ATTiny microcontroller Every year the holiday season rolls around and I get stuck on what to give for my friends and family. always say that it's better to make the gift yourself than buy it at a store so this year I did just that.  The…... Listed under: AVR ATmega Projects, LED Projects
1430. YAFLC (Yet Another Flickering LED Candle) using Tiny45 microcontroller There are numerous posts on Instructables about how to make a flickering LED This is my version. The project requires the following components: 1. Tiny45 AVR Microcontroller (Tiny13 would also do) 2. 1W Warm white (or yellow) Perspex tube 4. AA or…... Listed under: AVR ATmega Projects, Home Automation Projects 1431. Rechargeable Battery Capacity Tester using ATMega168 microcontroller Do you have a pile of AA rechargeable batteries in your drawer? Some are old new, but which sets would you bring with your camera on your next trip, and which ones are past their useful life? I like using rechargeable batteries, b Listed under: AVR ATmega Projects, Battery Projects 1432. Power your Arduino/AVR with a Hand-Cranked Battery using ATmega8 microcontroller If you've ever wanted to power your Arduino or AVR from a batt development testing (batteries have different power delivery qualities than, say, transformed AC or even a regulated wall wart in DC) testing but were going through batteries (Hey, I admit…... Listed under: AVR ATmega Projects, Battery Projects 1433. Arduino FTDI Header using ATmega8 microcontroller So, you want to program a bootloaded AVR. Or possibly, you have an Arduino Lilypad and no way program it. There are a few solutions available to you: You could buy a USB to FTDI adapter (available at Adafruit, Sparkfun, etc), you could buy…... List AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1434. Autonomus Wall Following Obstacle Avoiding Arduino Rescue Bot I'm an Electrical Engineering major and each year my college's branch of IEEE competes in a student hardwar competition. Last year's competition was inspired by the natural disasters in Haiti and Chile (the competition was held one week after the earthquake This was…... Listed under: AVR ATmega Projects, Robotics - Automation Projects 1435. How to use a 74HC595 Shift Register with a using AVR ATtiny13 microcontroller If you have been playing with microcontrollers and electronics then yo likely seen LED dot matrix displays and other projects that use shift registers like 7-segment displays and more. This instructable goes over a quick int 74HC595 8-Bit Serail to Parallel Shift…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1436. $10 ATtiny85/45 POV display!! (works really well) Hey guys! This is an Instructable for making your own ATtiny85/45 5 LED POV (Persistence Of Vision) d This is my second Instructable, also for the Elemental LED contest, so drop a comment and vote it up! The total parts cost for this POV display…... Liste AVR ATmega Projects, LED Projects, Video - Camera - Imaging Projects 1437. The $9 Quasi-duino (Almost-duino) using ATmega328 microcontroll Do you currently have an Arduino and want to make it smaller for cheap?  The Qua is for you (Italian for almost-duino).  This makes a functional "almost" Arduino, in a very small form factor using the narcoleptic library for pico-power on a pico-space breadboard.…... Listed under: AVR ATmega Projects, Other Projects 1438. Soldering an SMT MOSFET Driver with a hotplate using microcontroller Soldering SMD components isn't as hard as you might think. In fact it's easy. If this instructables you'll soon see just what great results you can obtain at home using just a hotplate. It's not just being able to make small circuit boa Listed under: AVR ATmega Projects, PWM Projects 1439. $1.50 Arduino TV Annoyer!! (Turns TVs on when you want them off) using microcontroller Hey Arduino fans! Here is an 'ible for making a device that tu on when you want them off, and off then you want them on! If you hide it in something inconspicuous, it would make a great April Fools joke or gag g Listed under: AVR ATmega Projects, Video - Camera - Imaging Projects 1440. Programming Arduino Bootloader without Programmer using ATmega168 microcontroller OH NO!!! You've screwed up and now the Arduino bootload 'duino is gone!  What are you going to do? Go spend money for a programmer??? Well don't! I've got a solution that only requires your 'duino and som So its not the…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1441. Jar of Fireflies using AVR ATTiny45 microcontroller This project uses green surface-mount LED's along with an AVR ATTiny45 microcontroller to simulat behavior of fireflies in a jar. (note: the firefly behavior in this video has been greatly sped up in order to be easier to represent in a short film. The…... L under: AVR ATmega Projects, Game - Entertainment Projects 1442. Music Playing Alarm Clock using ATmega644 microcontroller This Instructable will be about designing a music player from using various building blocks. You will understand th communication between the microcontroller, memory, computer, LCD display, RTC, IR remote, and the music file decoder. I will try my best to to teach you in a…... Listed unde
ATmega Projects, Sound - Audio Projects 1443. Door Activated LED Lighting using Hall Effect Sensors using Attiny85 microcontroller I've been meaning to make something cool for my dorm room th semester and decided that some custom closet lights would look great. In this Instructable, I'll show you how to make some nice-looking LED lights tha on automatically using a hall…... Listed under: AVR ATmega Projects, Home Automation Projects 1444. Getting Started with Atmel AVR and BASCOM using attiny26 microcontroller I have seen plenty of Instructables showing how to work with microproces they all assume that you have worked with them before and know what you are doing. I have not seen an Instructable that takes you from nothing an on each step.…... Listed under: AVR ATmega Projects, Other Projects 1445. How to use the Dragon Rider 500 with your AVR Dragon using ATtiny2313 microcontroller This instructable is a crash course in how to use some of the of the Dragon Rider 500 from Ecros Technologies. Please be aware that there is a very detailed User's Guide available on the Ecros website. The Drago a interface board…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1446. Make a breadboard adapter for your AVR microcontroller using attiny2313 If you like to play around with micro controllers you know this hustle: You w test a part of a program and first you need to completely wire up the uC on the bread board. Not with these handy parts any more! These are…... Liste AVR ATmega Projects, Metering - Instrument Projects 1447. How to program a AVR (arduino) with another arduino using attiny2313 microcontroller * you've got your arduino with atmega168 and you bought an atmega328 at you local electronics store. It doesn't have an arduino bootloader * you want to make a project that doesn't use arduino - just a regular (like the USBTinyISP) - you…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1448. Creating a charlieplexed LED grid to run on ATTiny85 This instructable was inspired by my first AVR microcontroller project that I've been working on fo time now. I wanted to start learning more about the AVR microcontroller and see how much I could do with the minimum amount of hardware... no ex …... Listed under: AVR ATmega Projects, LED Projects 1449. How to control a 16×2 LCD using an AVR ATtiny2313 If you are just getting into microcontrollers there's alot to know as you have likely found out. Ther good online tutorials for the Atmel AVR's and chances are you have see a few of those by now. I recently got into microcontrollers and…... Listed under ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 1450. How to program a AVR (arduino) with another arduino using atmega168 microcontroller This instructables is usefull if: * you've got your arduino with atmega168 and you boug atmega328 at you local electronics store. It doesn't have an arduino bootloader * you want to make a project that doesn't use arduino - just a regular AVR chip…... Listed unde ATmega Projects, How To - DIY - Projects 1451. Singing Pumpkins/ Arduino using microcontroller Lets start off by saying that I am a noob to micro controllers like Arduino. After looking through instr for a while I saw the things that arduino could do. That is when I realized that I had to get one and learn the whole…... Listed under: AVR ATmega Proje - Audio Projects 1452. Turn a TV-B-Gone into a super camera remote! Intro: My Nikon DSLR has an infrared remote function (remote sold separately) that is really handy, but limited in range. A while ago, I bought a TV-B-Gone Kit from it's inventor Mitch Altman, and it can turn TV's off from a great distance. I…... Listed under ATmega Projects, Video - Camera - Imaging Projects 1453. Vintage Toothbrush Timer using ATMega328p My last visit to the dentist convinced me that I should really brush my teeth at least two minutes. I decid build a special toothbrush timer: it would detect when a brush is taken out, measure two minutes and notify when the time is…... Listed under: AVR AT Projects, Medical - Health based Projects 1454. Custom Tron Disc Mod using ATMega328 In this Instructable, I cover modding the store-bought Deluxe Identity Disc to an upgraded version with 64 le controlled by an AVR MCU. The upgraded version is costume-ready and would be an excellent addition to your Tron costume - it'll also look great on y Listed under: AVR ATmega Projects, Other Projects
1455. Build Your Own BARBOT using AVR microcontroller Ever wanted a robotic liquor server?I purchased a Lynxmotion robotic arm last year and an Arduin play around with. I had it serial controlled with a joystick and it was a great way to start in robotics. More recently I wanted to take…... Listed under: AV Projects, Robotics - Automation Projects 1456. Ard-e: The robot with an Arduino as a brain using microcontroller Hopefully after reading this instructable you will be able to take your first step into r Ard-e cost about $90 to $130 depending on how much spare electronics you have lying around. The main costs are: Arduino Diecimella- $35 https://www.makershed.com/ProductDetails.asp?ProductCode=MKSP1 Bulldozer kit- $31 http://www.tamiyausa.com/product/item.php?product-id=70 Servo-…... Listed under: AVR ATmega Projects, Robotics - Automation Projects 1457. Turn signal biking jacket using microcontroller This tutorial will show you how to build a jacket with turn signals that will let people know where you're when you're on your bike. We'll use conductive thread and sewable electronics so your jacket will be soft and wearable and washable when you're…... under: AVR ATmega Projects, Game - Entertainment Projects 1458. The 74HC164 Shift Register and your Arduino using GD74HC164 microcontroller Shift registers are a very important part of digital logic, they act as glue in between the paralle serial worlds. They reduce wire counts, pin use and even help take load off of your cpu by being able to store their data. They come…... Listed under: AVR ATmega Projects, How Projects 1459. Using a Dot Matrix LED with an Arduino and Shift Register The Siemens DLO7135 Dot matrix LED is one amazing piece of optoelectronics. It's billed as Matrix Intelligent Display (r) with Memory/Decoder/Driver. Along with that memory, it's got a 96-character ASCII display set with upper and lower case characters, a built-in character generator…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1460. Arduino EMF (Electromagnetic Field) Detector A while back I saw an EMF (Electromagnetic Field) Detector at makezine.com that used a led bargraph. I modify it to use a 7-Segment LED Display! Here's my project. Sorry I don't have any pictures of it in use. Hopefully I can post…... Listed under: AVR ATm Projects, Sensor - Transducer - Detector Projects 1461. Arduino magnetic stripe decoder using microcontroller This instructable shows how to use some freely available code, an arduino, and a standard ma stripe reader to scan and display the data stored on magnetic stripe cards such as credit cards, student IDs, etc. I was inspired to post this after readin Listed under: AVR ATmega Projects, Memory - Storage Projects 1462. Arduino XMAS hitcounter using AVR microcontroller Christmas is coming closer, so here is my contribution to put you in the right mood. It is a blog hit that rings a bell. Literally. It puts a smile on your face, every time someone hits your blog. It consists of an Arduino board,…... Listed under: AVR ATmeg Game - Entertainment Projects 1463. The Lightning Simulator/Breathalyzer/Graphic Equalizer – Using Arduino Powered The LED strips are mounted on an outdoor trellace which functions lightning simulator, outdoor breathalyzer, graphic equalizer synced to music, and a few other effects with sound. Materials:   8 12v RGB Waterproof Fl Strips 10ft long (usledsupply.com) - $800 8 RGB 4A/Ch Amps…... Listed under: AVR ATmega Projects, Home Automation Projects, LED Projects 1464. Make a Web Connected Robot (for about $500) (using an Arduino and Netbook) This Instructable will show you how to build your own Web Connected (using an Arduino micro-controller and Asus eee pc). Why would you want a Web Connected Robot? To play with of course. Drive your robot from acro room or across the country,…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects, Robotics - Automation Projects 1465. Interfacing ATmega32 with an LCD and a DAC Hi techies!! This is one more of my circuits, interfacing ATmega32 with an LCD and a DAC. it also includes general purpose push-buttons and In System Programming connector. The controller is operating with 14.7456 MHz frequency crystal, convenient for generating standard baud rates (for…... Listed under: AVR ATmega Projects, How To - DIY - Projects, LCD Projects
1466. Arduino and Touchpad Tic Tac Toe using microcontroller Or, an exercise in input and output multiplexing, and working with bits.  And a submission for Arduino contest. This is an implementation of a tic tac toe game using a 3x3 array of bicoloured LEDs for a display, a simple resistive touchpad, and an under: AVR ATmega Projects, Game - Entertainment Projects 1467. The 4x4x4 LED cube (Arduino) In this instructable I will show you how to make a 4x4x4 LED cube that will be controlled by an Arduino Demulionove. n you might say" that Arduino has only 14 I/O pins well also the 6 analog pins can be used as pins…... Listed under: AVR ATmega Projects, LED Projects 1468. Arduino Laser Tag – Duino Tag Duino tagger- General introduction Duino tag is a laser tag system based around the arduino. Finally a laser tag system be tweaked modded and hacked until you have the perfect laser tag system for office ordnance, woodland wars and suburban skirmishes. Laser tag… under: AVR ATmega Projects, Other Projects 1469. Ardu-pong! the Arduino based pong console A while back the instructables robot made a post on Facebook about some guys who played pong on an (http://wayneandlayne.com/projects/video-game-shield/games/#pong) but after looking around, i saw that everyone who did this was only worried ab making it work. and often resulted as a very hard…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1470. How to make a multi-layered acrylic and LED sculpture with variable lighting levels Here you can find out how to make you very own n as made for the exhibition www.laplandscape.co.uk curated by art/design group Lapland. More images can be seen at flickr This exhibition runs from Wednesday 26 N - Friday 12 December 2008 inclusive, and had…... Listed under: AVR ATmega Projects, How To - DIY - Projects, LED Projects 1471. Garduino Upgrade, Now with more Twitter! A couple months ago I came across two great instructables.  The first was the Garduino, an arduino contro garden to help you grow plants at home.  The second was the Tweet-a-Watt, a project that teaches you how to monitor your home power usage using Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1472. Garduino: Gardening + Arduino Garduino is a gardening Arduino. So far, Garduino: -Waters my plants whenever their soil moisture level drops below a predefined value. -Turns on grow lights, but only when it's dark out and only long enough to make the plants get 15 hours of total light…... Listed unde ATmega Projects, Development Board - Kits Projects 1473. Control a Schlage electronic deadbolt with an arduino! This instructable will walk you through the process of dismantling and hacking a Schlage electro deadbolt in order to control it with an arduino. Step 1 Purchase the lock and unpack it I got mine on sale for $99 at Lowe's. Remove it from the…... List AVR ATmega Projects, Other Projects 1474. The Arduino Weather Station / Thermostat using ATmega328 microcontroller I've always been interested in monitoring my local weather, and noticed weather.com and accuweather.com think my local weather is, and what I see out the window. I also wanted better control over my heating and A/C sy computer and…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects, Temperature Measurement Projects 1475. Arduino All-in-One Getting Started Guide An all-in-one tutorial to getting started with the Arduino open-source electronics prototyping platform. This g meant for the beginner but should be also be useful to you if you already tinker with electronics but want to get started with the Arduino. I'll cover: -… under: AVR ATmega Projects, How To - DIY - Projects 1476. Arduino Powered Binary Clock using ATmega168 microcontroller This instructable will help you to build an Arduino Binary Clock.  The orignial idea for instructable was designed by Daniel Andrade.  My instructable uses surface mount components, but can easily be adapted to through-hole componen wish.  You can follow my other Instructable…... Listed under: AVR ATmega Projects, Clock Projects 1477. Interface a rotary phone dial to an Arduino An old rotary phone can be used for a number of purposes in your Arduino projects - use it as a novel input device, or use the Ardu interface a rotary phone to your computer. This is a very basic guide describing how to…... Listed under: AVR ATmega Projects, Phone Projects
1478. Digital Window Sticker (Arduino Controlled) using ATMega328 microcontroller A bumper-sticker sized L.E.D. matrix that displays images in sequence fr card, to produce an animated sign or "window sticker." Arduino controlled! Also includes Windows, Mac, and Linux code for converting .xbm image file Digital Window Sticker files. Perfect for a shop…... Listed under: AVR ATmega Projects, Other Projects 1479. Arduino Watch Build Instructions The Arduino Watch provides augmented sensing of temperature and range, 16-bit color drawing program, Breakout and also tells the time in your choice of digital, binary, or analog.  Additional sensors, devices, and programs are easy to add as any standard Arduino. source code…... Listed under: AVR ATmega Projects, Clock Projects 1480. Mushroom Environment Control – Arduino Powered This is my first Arduino project aimed at helping me with my other hobby which is growing oyster shiitake mushrooms indoors. In a nutshell, the controller takes in two temperature readings, 1 Humidity reading and 1 Co2 reading and triggers a set Listed under: AVR ATmega Projects, Medical - Health based Projects 1481. How to connect Arduino and RFID On this instructable I will try to show how to interface a RFID sensor with the Arduino. I am using the RFID sensor fr seeedstudio the serial version of it. There are a few parts you will gonna need. I also bought some RFID keys.…... Listed under: AVR ATmega Projects, H DIY - Projects, RFID - NFC Projects 1482. How To Smell Pollutants This Instructable explains how to use a gas sensor with your Arduino. This lets your Arduino smell (and hence you program responses to) overall gas l variety of nasties, including ethanol, methane, formaldehyde, and a bunch of other volatile organic compounds. My cost…... Listed under: AVR ATmega Sensor - Transducer - Detector Projects 1483. Temperature Control For Kitchen Appliances In this Instructable, I will step through controlling the temperature of most kitchen appliances. As an exam use an old Westbend Poppery popcorn maker (aka. coffee roaster), but these same techniques will be applicable to most hot plates, coffee makers, an irons.…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1484. Wireless Altoids Display This Instructable will show you how to modify an Altoids tin for a wireless 2x16 character display. Using an Altoids tin was insp the need to have a small yet protective enclosure for a pair of Xbee modules recently bought from Sparkfun. I purchased the…... Listed under: AVR ATm Projects, Internet - Ethernet - LAN Projects 1485. Secret Knock Detecting Door Lock Protect your secret hideout from intruders with a lock that will only open when it hears the secret knock. This starte bit of a joke project, but turned out to be surprisingly accurate at judging knocks. If the precision is turned all…... Listed under: AVR ATmega Projects, S Safety Projects 1486. Gmail and RSS Notifiers using the Arduino I’ve been really interested in doing J4mie’s Physical Gmail Notifier ever since it came out in February. I only r dropped into the project and got to learn a lot about python, plists, and arduino auto-reset functionality. I’m going to share what I’ve learned because… under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1487. Magnetic Levitation using the Arduino It’s been only a couple weeks since I discovered Arduino, an open source microcontroller platform. I was looking cheap interface between my laptop and electronic circuits. Arduino with its price $35 and easy to use development environment was the best choice. after…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1488. Wi-Fi Enabled Coil Gun with iPhone App We’ve covered loads of airsoft, nerf, and gun projects, and here’s another superb pr0ject to add to our collecti coil gun placed on a turret which is triggered via Wi-Fi.   Additionally, it uses remote targeting and shooting through an iPhone, iPod Touch or…... Listed AVR ATmega Projects, Internet - Ethernet - LAN Projects, Phone Projects
1489. Superb DIY Retro Lighting Design What is it? It is a decorative lamp; a very, very impractical decorative lamp employing a few vintage display devices and a couple of LEDs too. A mine was one of a group of artists who produced Ascension (the giant origami-crane tent) at…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1490. A credit card sized Ethernet Arduino compatable controller board using ATmega168 microcontroller I love the Arduino as a simple and accessible cont platform for many varied projects.  A few months ago, a purchased an Ethernet shield for my Arduino controller to work on some projects with a mate it was a massive hit -…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1491. Light for life: Glowing button cycling jacket Not everyone wants to look like an athlete while cycling to work or school. This cycling-jacket, made of hem wool, is equipped with lots of shining bright LEDs. It looks just as good during the day as it does during the night. Embedding the…... Listed under: AVR Projects, Game - Entertainment Projects 1492. The Word Clock – Arduino version using ATMega168 microcontroller Major updates - A much better enclosure for this clock has been designed - check http://www.instructables.com/id/The-Wordclock-Grew-Up/ Last month I wanted to build a special gift for my beautiful wife, Megan.  She has a teaching background in English, so what better present to make for…... Listed under: AVR ATmega Projects, Clock Projects, LED Projects 1493. Arduino R/C Lawnmower (painted) using Atmega168 microcontroller What this is: This instructable will show you how to make your Arduino into an R/ interface that you can use for just about anything requiring remote control. I will also show you how I built an R/C lawnmower using my Arduino, a che transmitter and…... Listed under: AVR ATmega Projects, Robotics - Automation Projects 1494. How to have fun with Arduino (and become a Geek in the process) Do you wish to earn your geek card - pronto? Lets get started! This guide will start y path to the dark side using the open source Arduino development and prototyping platform. It will introduce you to microcontrollers, get you started w Listed under: AVR ATmega Projects, How To - DIY - Projects 1495. Control Electronics using an Arduino and Infrared LEDs Learn how to use infrared LEDs to send signals to your TV and other electronic devices via an A First, the Arduino will interpret IR pulses sent out by the TV remote, save them to memory, then “replay” them upon the user’s command. You can…... under: AVR ATmega Projects, LED Projects, Other Projects 1496. Arduino animatronics- make your awesome costumes more awesome! using ATmega328 microcontroller Here's how to add lights, sound and action t favorite Halloween project using the open source Arduino microcontroller. Arduino is easy to learn to use and it opens up a whole new world for costu builders and creature creators. If you want to learn…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1497. Using the iRobot Create's Command Module with Linux using avr microcontroller Since iRobot hasn't provided linux users with a way to use the comm myself. Don't be intimidated, its not hard at all, really. All you need to do is run a couple of scripts. Lets get started, shall…... Listed under: AVR ATmega Microcontroller Programmer Projects, Robotics - Automation Projects 1498. Use Visual Studio 2010 to Compile AVR Hex Files using AVR microcontroller I'm not a huge fan of Microsoft, but man, they do make one slick programm In searching around for a solution to use the IDE to program AVR's I came across some scattered instructions.  As I love the intellisense feature of Visu (VS)…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1499. Laser Tripwire takes a Photo, Uploads it to Twitter This instructable will show you how to construct a laser tripwire that can twitter and grab an image webcam, as well as execute any command you can put in a bash script. This instructable is actually quite simple and is even suitable as a beginner…... under: AVR ATmega Projects, Video - Camera - Imaging Projects
1500. The Household Informer using atmega168 microcontroller Who wants to go outside to see if the mail has arrived? In the cold winter or rain I’d rather n to put on a jacket and shoes, only to find that there was no mail. This project will notify you of the mail…... Listed under: AVR ATmega Projects, Home Automation Projects 1501. The $9 Quasi-duino (Almost-duino) Do you currently have an Arduino and want to make it smaller for cheap?  The Quasi-duino is for you (Italian for al duino).  This makes a functional "almost" Arduino, in a very small form factor using the narcoleptic library for pico-power operations on a pico-space breadboard.…... Listed under: Circuits 1502. Turn Your Arduino Into an ISP Learn how to turn your Arduino into an AVR In System Programmer. This will allow you to burn bootloaders onto new ch program AVRs without a bootloader. Step 1: Materials To begin you will need: * Arduino (I will be using the Uno) *…... Listed under: AVR ATmega Projec Camera - Imaging Projects 1503. GuGaplexed Valentine LED Heart using ATTiny13V Microcontroller GuGaplexing is a new LED display multiplexing technique. Compared to Charlieplex GuGaplexing allows you to control twice as many LEDs, with just a few additional components. GuGaplexed Valentine LED Heart project has 40 LEDs a an 'Arrow Piercing a Heart" arrangement using only 5…... Listed under: AVR ATmega Projects, Game - Entertainment Projects, LED Projects 1504. Smoke & Fume Absorber Demo video Smoke & Fume Absorber A Long History The ancient Egyptians produced lead and other important metals like g silver as early as 5000 BC. In the Roman era, lead was used for coinage, jewelry and other everyday items including the production of…... Listed under ATmega Projects, Other Projects 1505. Use Google Voice Search through Arduino & Bluetooth With Google announcing the launch of Voice Search for desktop, we couldn’t help thinking that even more fun to be had with talking to a computer. So, we went ahead and built an open source dev board to inspire people to build their…... Listed AVR ATmega Projects, Internet - Ethernet - LAN Projects 1506. Arduino powered hangman giftbox/lockbox using ATmega328 microcontroller A medium sized box that requires the user to succeed in a game of han order to gain access to the contents of the box.  Great gift Idea!!! my Arduino sketch will be included in this instructible sorry for the poor quality pictu Listed under: AVR ATmega Projects, Game - Entertainment Projects 1507. Beginner's Guide – AVR Programming You will get this done in 30 min. Step 1: Parts 1. 1 X  any type of circuit board 2. 1 X Atmel AVR Atmega16 microco 3. 8 X 330 ohms Resistors 4. 8 X LEDs 5. 1 X AVR Programmer (just use for download…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1508. Assembling the ZIFduino USB 1.2 using ATMEGA168 microcontroller The ZIFduino, for all intents and purposes, is an Arduino with a ZIF socket. It's gea toward those that want to do prototyping on the platform, but then move the ATMega chip to a stand-alone environment. The pin layouts are exactly t so it…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1509. Assembling the Dragon Rider 500 for use with the AVR Dragon using ATmega88 microcontroller Not long ago the Atmel company came out with a grea use with the AVR line of microcontrollers called the AVR Dragon. This small USB device provides professionals and hobbyists alike the ability to use: In Programming (ISP), JTAG, Debug Wire, and…... Listed under: AVR ATmega Projects, RTOS - OS Projects 1510. Fun Hackable Speaker Timer using ATMega328 microcontroller This is a fun speaker timer I made for some upcoming conferences.  It uses a 4-digit charlieplexed LED (pseudo 7-segment) display and is driven by a AVR ATMega328 or an Arduino.  It allows a default time to be set, can be paused, and put…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1511. Slaveflash with Attiny24 ver. 2.0 You might have noticed the Slaveflash I built with an Attiny 24, the instructable can be found here: Slaveflash-trigger-f with-Attiny24   After building the first prototype I collected all my old flashes I got over the years and had four more slaveflash-triggers to built. I alread figured…... Listed under: AVR ATmega Projects, Memory - Storage Projects
1512. Build a Complete AVR System and Play Mastermind using ATmega328p microcontroller The game Mastermind has been around a long time, and I rem getting a board version with colored pegs when I was a kid. I love this game, as it is solvable simply by pure logic. One player (or a computer/microcon chooses a sequence of…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1513. Getting started with LCD's and Microprocessors using ATmega8 In this Instructable, find out how to control LCD's with a ATmega8 and Bascom. Demo You will need: - Breadboa - ATmega8 - Programmer - Bascom AVR (There is also a demo version for Free) - 10k resistor - 100k resistor - 10k…... Listed under: AVR ATmega Projects, LCD Projects 1514. Programming adapter from 10 pin to 6 pin for AVRs This is the last one of my 'Things that make life easier' series, I published in the last few days. It's v simple, but most of the time the simple things are the most helpful. I always used the big 10 pin jack for programming…... Listed under: AVR ATmega P Microcontroller Programmer Projects 1515. Direction Aware Messaging LED Spin Top using Tiny44 microcontroller We recently built a LED spinning top with message display. Its an improved vers similar top published by Elektor in their December 2008 issue. The Elektor top can be spun only in one direction. The synchronization required to prin on the LEDs…... Listed under: AVR ATmega Projects, LED Projects 1516. Annoying Beeper using Microcontroller ATtiny13 Play a prank on your friends (enemies?) by hiding a high-pitched beeper which sounds off at random intervals. This instructable uses minimal parts. All that is required is: battery microcontroller speaker Why don't I just use a 555 timer chip? You certain I…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1517. Open Source Temperature Controller- Appliance Heat Exchanger video Open Source Temperature Controller- Appliance Heat Exchanger Here's a heat exchanger demo using the open source temperature controller. Full heat exchanger available here Intelligent controller, schematics, and code availab The open source temperature controller allows you the flexibility to control DC appliances based…... Listed under: AVR ATmega Projects, PWM Projects 1518. Instalacion del controlador USBasp (USBasp drivers setup) – Dark Side Electronics English version available at the bottom Se enseñara paso a paso co instalar los controladores (drivers) necesarios para el correcto funcionamiento del programador USBasp para microcontroladores AVR. Primero, mencionaremos algunas consideraciones para evitar fallos por usos indebidos del programador. También se mencionará  el protocolo y…... Listed und ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1519. How to Read Binary/Hex Thumbwheel Switch with an AVR Microcontroller This instructable will show you how to read the number on a binary pushwh thumbwheel switch using LED's or an AVR microcontroller (I'm using an ATmega328p but this can be adapted for any AVR or probably another microco of your choice). Multiple thumbwheel switches…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1520. DIY Digital Thermometer Using ATMega8 This instructable will show you how to make a thermometer that displays the temperature of the air. It's not accurate thermometer in the world, but for this price and the fact that it was homemade... This instructable will show you how to make…... Listed und ATmega Projects, Temperature Measurement Projects 1521. Power Your Arduino From Your Car The Arduino -- and AVRs in general -- have a wide range of power supply options ranging from around 1.8V to 5.5V choice of voltage is usually determined by the desired clock speed or power consumption requirements. The Arduino and its many variants have…... L under: AVR ATmega Projects, Car Projects
1522. Build the Penguin game system using ATMega32/644 microcontroller Gotta love microcontrollers.They do lots of stuff ... you can find them in compute traffic lights , toys , and almost all electronic devices nowadays. Well , this is a project that pushes an 8-bit ATMega32 microcontroller to the limits. As y guessed…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1523. Electronic Tic-Tac-Toe with RGB LEDs video Electronic Tic-Tac-Toe with RGB LEDs RGB LED game to play Tic-Tac-Toe for two players. Uses 2 AVR Microco Mega16 and Mega8. RGB LEDs allow each user to choose his/her color to represent Cross/Nut.   For more details, click: Electronic Tic-Tac-Toe with RGB Listed under: AVR ATmega Projects, Game - Entertainment Projects 1524. Drive a Stepper Motor with an AVR Microprocessor using ATTiny2313 microcontroller Got some scavenged stepper motors from printers/disk drives/e around? Some probing with an ohmeter, followed by some simple driver code on your microprocessor and you'll be stepping in style. Step 1 Get to Kn Steppers Basically, you're going to need to figure out where…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Motor P 1525. Getting started with LCD's and Microprocessors In this Instructable, find out how to control LCD's with a ATmega8 and Bascom. You will need: - Breadb Wires - ATmega8 - Programmer - Bascom AVR (There is also a demo version for Free) - 10k resistor - 100k resistor - 10k variable…... Listed under: AVR A Projects, How To - DIY - Projects, LCD Projects 1526. Slaveflash-trigger for digital cameras with Attiny24 When flashing with digital compact cameras, the camera usually uses several small flashes before m the actual picture. This is o.k. if the built-in flash is the only flash you have, but if you want to use an external second flash you have a problem:…... List AVR ATmega Projects, Other Projects 1527. Apple-style LED pulsing using a $1.30 MCU using ATTiny85 microcontroller The Atmel ATTiny85 chip is an 8-pin MCU that is totally awesome.  If you've programming with the bigger boys (the ATMega series), these are a nice adventure - you're rather limited in the number of output pins, but a creative gives us a…... Listed under: AVR ATmega Projects, LED Projects 1528. Debugging AVR code in Linux with simavr I recently started programming AVR chips, namely the ATTiny85.  They can be programmed using C, compile readily available in Ubuntu, and you can do a LOT with them - just search for avr on this site!  Anyway, I was having some trouble with my…... Listed un ATmega Projects, RTOS - OS Projects 1529. Watch futurama on an 8×8 pixel screen using atmega168 microcontroller here's how to convert otherwise reasonable quality video into pixelated garb play it on a 2 color 8x8 led matrix, with no sound and only moderate sync. ingredients: - (1) 8x8 2 color led matrix - (1) atmel avr atmega168 - (2) 74hc5 shift…... Listed under: AVR ATmega Projects, LCD Projects 1530. AVR/Arduino RFID Reader with UART Code in C RFID is the craze, found everywhere - from inventory systems to badge ID systems. If you've ever been department store and walked through those metal-detector-looking things at the entrace/exit points, then you've seen RFID. There are several places good information on…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, RFID - NFC Projects 1531. How To Make A Grounding Wrist Band In my life i deal with lots of sensitive electronics every day and frying these electronics is a big concern when to them. Most people think its hard to fry electronics with static electricity. Its not, one touch could send your $100 graphics card down…... Listed under: ATmega Projects, How To - DIY - Projects 1532. Telnet to your Arduino/AVR! The other day I was wanting to check on one of my AVR's but I was upstairs and god knows it was too much of a hassle to downstairs to where the microcontroller was. But, there were two idle computers sitting upstairs next to…... Listed under: AVR ATmega Projects, Intern Ethernet - LAN Projects 1533. A protective case for the Atmel AVR Dragon using AVR This instructable will show you how to easily modify a readily available plastic case to hold and p your AVR Dragon PCB. Atmel promotes their AVR Dragon as a low cost development product tool for use with their AVR microcrontollers. While the pro does come…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1534. Ghetto Development Environment Using Microcontrollers A while back, I posted up a quick and dirty "el cheapo" method of getting started programm Atmel AVR series chips: Ghetto Programmer (version 1.0) Since then, I've vamped, re-vamped, and otherwise improved my setup. Thought it'd be nice document it. The goal…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects
1535. USB RFID Reading Keyboard using USnooBie video USB RFID Reading Keyboard Demo   This is a step by step tutorial on how to build a RFID tag readin keyboard using the USnooBie. This tutorial is provided with the project files. The code files are heavily commented with references to relevant…... Liste AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, RFID - NFC Projects 1536. New Jar of Fireflies When I ran across the Jar of Fireflies Instructable sometime this past summer, I knew I had to build it.  Full credit to Keso for an exc of instructions!  I wouldn't have gotten to the point of developing the firefly behavior without such a solid base for…... Listed under: AVR ATmega Proje - Entertainment Projects 1537. FanBus Digital Fan and LED Interface for PC using ATMega168 microcontroller Last year I modified a blue LED fan with RGB LED's to enhance the look server case.  Last summer I built a gaming computer and ever since I wanted to light it up with multiple controlled lights and fans.  I finally figured out under: AVR ATmega Projects, LED Projects 1538. Augmenting a Microcontroller using AVR Microcontrollers (MCUs) are fantastic little ICs that give an extra element of versatility to your electronics, robotics or other project. Bu really not much use on their own. To function, all MCUs need some sort of support components, and a board to live on…... Listed under: AVR ATmega Other Projects 1539. Development system for PIC and AVR microcontrollers After testing many systems development for PIC and AVR microcontrollers, none satisfy me. So this system with breadboard that has satisfied me. Step 1: More space free In this development system, I put two protoboards turned 180 degrees fro other. The space…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1540. VUSBTiny AVR SPI Programmer Using ATtiny85 after making a usbtiny isp programmer and using it for 6 months, i was looking at making another one carrying around. i like the simplicy of the usbtiny isp design but would like to make it even smaller and take less parts. one thing…... Listed under: AVR Projects, Other Projects 1541. Direction Aware Messaging LED Spin Top video Direction Aware Messaging LED Spin Top We recently built a LED spinning top with message display. Its improved version of a similar top published by Elektor in their December 2008 issue. The Elektor top can be spun only in one direction. The synchroni Listed under: AVR ATmega Projects, LED Projects, Other Projects 1542. Tiny AVR Microcontroller Runs on a Fruit Battery Some of the fruit and vegetables we eat can be used to make electricity. The electrolytes in many frui vegetables, together with electrodes made of various metals can be used to make primary cells. One of the most easily available vegetable, the ubiqu lemon…... Listed under: AVR ATmega Projects, Battery Projects 1543. Fire-free LED Matchstick Using a Tiny13 microcontroller video Fire-free LED Matchstick I just completed a new project: a fire-free and fire-safe LED mat light this matchstick you strike it against a normal matchbox filled with neodymium magnets. The LED matchstick has an inductive sensor that detects magnetic field as you…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1544. How to use an LED Array Module using AVR With a single LED you can indicate the state of something: on or off. That might be a little boring. With an LEDs you can display characters or even some simple blocky graphics. That might add a little pizzaz to a small microcontroller…... Listed under: AVR AT Projects, LED Projects 1545. Programmable LED using Atmel ATtiny13v Microcontroller Inspired by various LED Throwies, blinking LEDs and similar instructables I wanted to do my version of an LED contro microcontroller. The idea is to make the LED blinking sequence reprogrammable. This reprogramming can be done with light and shadow, e.g. you could…... Listed under: AVR Projects, LED Projects
1546. Hacking your Digg Button with a Removable Interface Cable using AVR The Digg Button from adafruit industries www.adafruit.com is a very simple DIY electronics kit suitable for beginners. It consists of a microprocessor, a 3-digit display, a button and some available i/o pins. As it comes from adafruit, counter that displays the number of…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1547. Getting started with VMUSIC2 The VMUSIC2 is a complete MP3 player module from FTDI, Inc. which makes it easy to integrate MP3 functionality in to y microcontroller project. It has two interfaces: SPI or UART (serial) Some example applications: 1. Make your robot talk and play sound effects…... Listed AVR ATmega Projects, How To - DIY - Projects 1548. Jar of Fireflies using AVR ATTiny45 Microcontroller This project uses green surface-mount LED's along with an AVR ATTiny45 microcontroller to simulate behavior of fireflies in a jar. (note: the firefly behavior in this video has been greatly sped up in order to be easier to represent in a short film. The…... L under: AVR ATmega Projects, Game - Entertainment Projects 1549. I2C Bus for ATtiny and ATmega168 I love the Atmel AVR microcontrollers! Since building the Ghetto Development System described in this Instructable no end of fun experimenting with the AVR ATtiny2313 and the ATmega168 in particular. I even went so far as to write an Instructable on using switche Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1550. 16-key Keypad Decoding with an AVR MCU This instructable will show you how to interface a 16-key keypad to your AVR microcontroller and read the k a key is pressed. I'll introduce the keypad first, then the 74HC922 16-key decoder IC as a pin-saving mechanism, then finally how to take the…... Listed AVR ATmega Projects, How To - DIY - Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1551. Connecting Nokia 3310 LCD to USB using AVR What do you do with an old phone, a microcontroller and lots of time? You hook the old phone's LCD sc the computer USB of course! In this project we're going to communicate with a Nokia 3310 LCD display over USB! How are we…... Listed under: AVR AT Projects, LCD Projects, Phone Projects 1552. Repair dead AVR's – Attiny fusebit doctor (HVSP) Did you make a mistake while programming fusebits, or purposely disabled reset pin (RSTDISBL) or IS programming (SPIEN)? No need to buy or make inconvenient HV programmer only for unlock couple of Tiny AVR’s. This Attiny fusebit HV doctor will cu dead tiny microcontrollers,…... Listed under: AVR ATmega Projects, Other Projects 1553. ATtiny programming with Arduino After this Instructable you should be able to program an A Ttiny85/45 with an arduino. It may sound complex but it isn't. After doing some research I could not find to much info on how this could be done. I however did find http://www.instructables.com/id/Program with-Arduino/. This Instructable…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1554. ISP 6 pin to 8 Pin Socket Using ATTiny45 The reason i mainly built this project was to program the ATTiny45, which has a 8 pin connection, while my US (from Ladyada) only has a 10 pin and 6 pin connection. After snooping around the internet for about 3-4 weeks i found nothing what…... Listed under: ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1555. Micro controller programming: Making a set of traffic lights using Microcontroller ATTiny2313 So you wana learn how to programme a micro controlle tutorial has been designed as a next step, following the fantastic tutorial 'Ghetto Programming: Getting started with AVR microprocessor on the cheap Real Elliot link you should read this before progressing onto…... Listed under: AVR ATmega Projects, LED Projects 1556. Instalacion del controlador USBasp (USBasp drivers setup) – Dark Side Electronics using AVR microcontroller English version available at the bottom Se enseñara paso a paso como instalar los controladores (drivers) necesarios para el correcto funcionamiento del programador USBasp para microcontr AVR. Primero, mencionaremos algunas consideraciones para evitar fallos por usos indebidos del programador. También se mencionará  el protocolo y under: AVR ATmega Projects, How To - DIY - Projects, Microcontroller Programmer Projects
1557. How to Read Binary/Hex Thumbwheel Switch with an AVR Microcontroller using ATmega328p microcontroller This instructable will show you how to re number on a binary pushwheel or thumbwheel switch using LED's or an AVR microcontroller (I'm using an ATmega328p but this can be adapted for an probably another microcontroller of your choice). Multiple thumbwheel switches…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1558. AVR LCD Namebadge Using ATtiny2313 So, you're going to a conference/meetup/nerdfest and you want to do something that sets you apart from nor people.  An LCD namebadge powered by an ATtiny2313 is a great way to do that.  This is a general purpose LCD display unit powered by a 9V…... Listed AVR ATmega Projects, LCD Projects 1559. Power Your Arduino From Your Car using AVR microcontroller The Arduino -- and AVRs in general -- have a wide range of power supply options ranging around 1.8V to 5.5V. The choice of voltage is usually determined by the desired clock speed or power consumption requirements. The Arduino and its variants have…... Listed under: AVR ATmega Projects, Battery Projects, Car Projects 1560. Making a set of traffic lights Using Arduino This tutorial will step you through the process of creating a set of controllable and configurable traffic lights also teaching you the basics of Arduino. Some knowledge is needed and I highly recommend reading and following through on most if not all of the…. under: AVR ATmega Projects, LED Projects 1561. LoveBox – The box of love using ATtiny2313 Microcontroller As most guys I don't tell my wife that "I love you" as often as I should, but this little gadget will at least improve that as bit. So by combining a nice box and some hardcore electronics nerdiness I've made a nice christmas…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1562. Stripboard Arduino using ATMega168 microcontroller In this, my first Instructable I'm going to show you how to make a stripped down Arduino for a f the price, using Stripboard/Veroboard. Material List: 1x Atmel ATMega168 = �2.65 1x Stipboard = 72p 1x 7805 Voltage regulator = 26p 2x LEDs =…... L under: AVR ATmega Projects, How To - DIY - Projects 1563. Build a Complete AVR System and Play Mastermind Using Microcontrollers The game Mastermind has been around a long time, and I remember getti board version with colored pegs when I was a kid. I love this game, as it is solvable simply by pure logic. One player (or a computer/microcontroller) ch sequence of…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1564. Using Arduino to communicate with embedded project using AVR ATMEGA microcontroller Building a stand-alone AVR ATMEGA project sometimes lea with no easy to read output from your project. But you can use an Arduino to act as a communications bridge between your embedded project and yo Serial Monitor program! I'm building an embedded multi-channel…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1565. Low speed AVR oscilloscope V2.00 (Is updated on 19 Mar 2011) >> The firmware was updated on 19 Mar 2011 << A few months ago a friend of mine -c mechanical at profession- told me that he had problem with some car sensors. He couldn't check, with a simple multimeter, if a sensor was working p …... Listed under: AVR ATmega Projects, LCD Projects, Metering - Instrument Projects 1566. AVR mini board with additional boards using attiny2313 microcontroller Somewhat similar to PIC 12f675 mini protoboard, but extended and with addi boards. Using attiny2313. Step 1 Scheme Let us first start with a scheme. The scheme is pretty obvious since it only connects attiny2313 with the pins only additional elements are resistors…... Listed under: AVR ATmega Projects, Development Board - Kits Projects
1567. How to add more Outputs to your Microcontroller using 74HC595 microcontroller This Instructable will show you step-by-step how to add 8 extra digit outputs, using only 3 of your microcontroller's digital outputs. Step 1 Which Microcontroller Should You Use? In order to do this Instructable with your microcontroller, you will need to make sure that it has the…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1568. Guia para programar uC AVR – Dark Side Electronics using AVR microcontroller La forma más sencilla y rápida de programar un micro-controlador (uC) de la familia AVR, usand programador USBasp, es utilizado el programa eXtreme Burner - AVR de Extreme Electronics. En esta guía te detallaremos como programar tu propio esto necesitarás lo siguiente:…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1569. Getting started with ubuntu and the AVR dragon using atmega8 microcontroller Here's what i did to get started using the AVR Dragon to program ATM microcontrollers using ubuntu (This is aimed at beginners, I myself am also being a beginner, so any improvements from more experienced users are appreciated). After finally switching my laptop and…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects, RTOS - OS Projects 1570. Led dimmer 2 channels using Attiny13 microcontroller This is Attiny13   2 channels dimmer with 5 program modes and speed control: 1. Dim between channels 2. Dim 2 channels together 3. Blink mode 1 4. Blink mode 2 5.Blink mode 3 Step 1 Hardware Dimmer is based ot Attiny13V: - 1k flash…... List AVR ATmega Projects, LED Projects 1571. Adding ICSP header to your Arduino/AVR board using ISP10PIN microcontroller So you may have been playing with Arduino's, or rather, Hackduino's. I made your own Hackduino or similar project, you may be wondering how to add the ICSP header. Basically, using the ICSP header will allow you to use external programmer to 'upload'…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1572. Synchronizing Fireflies using Microcontroller ATtiny13 Have you ever asked yourself how do hundreds and thousands of fireflies are able to synchroniz themselves? How does it work, that they are able to blink all together without having a kind of boss firefly? This instructable gives a solution and show this…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1573. The Arduino LED Cube using LED microcontroller Are you bored? Do you want to make something amazing to impress your friends with? Let's try mak LED cube..... A work of art, that lights up..... Step 1 What in the world is and LED? LED is an acronym for Light Emitting Diode,…... Listed under: AVR ATm Projects, LED Projects 1574. LED matrix using shift registers This instructable is meant to be a more complete explanation than others available online. Notably, this will provide m hardware explanation than is available in the LED Marquee instructable by led555. Goals This instructable presents the concepts involved with shift re and high side drivers.…... Listed under: AVR ATmega Projects, LED Projects 1575. Charlieplexing 7 segment displays using Atmel Tiny26 microcontroller Charlieplexing of discrete leds has been the topic of a few other instructables. T Charlieplexing LEDs- The theory and the How to drive a lot of LEDs from a few microcontroller pins comes to mind. They are both excellent and should by anyone…... Listed under: AVR ATmega Projects, LED Projects 1576. AVR32 Development Board at Home This is my first instructable.So plz comment and help me out with any mistakes i might commit . I have created a pcb for avr 32 ,its a deve board .I saw that there none online with pcb that could be done at home so…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1577. Faraday For Fun: An Electronic Batteryless Dice using Microcontroller ATTiny13 There has been a lot of interest in muscle powered electronic devices, d large part to the success of Perpetual Torch Perpetual Torch, also known as battery-less LED torch. The battery-less torch consists of a voltage generat power the LEDs, an electronic circuit…... Listed under: AVR ATmega Projects, Game - Entertainment Projects
1578. DIY Electronic Birthday Blowout Candles Step 1 The Circuit Step 2 Building the Circuit board Step 3 Soldering the Circuit board Step 4 Programming the Micro Step 5 Using the To power the circuit, you need 4 batteries of 1.2V, AA or AAA size or 3 batteries of 1.5V…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1579. Buggy – A Crafty Programmable LED Creature using Microcontroller Atmel Attiny44v Buggy is a programmable LED craft project using a homemade, si sided, PCB board, and a programmable AVR Attiny44v microcontroller. Buggy has two bi-colored LED eyes and can sense visible and IR light and emit s using a piezo speaker. Not counting the board, there is…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1580. LED Hanukkah Menorah using Microcontroller ATtiny13 I wanted to make an LED menorah for a friend. In planning this I decided I wanted to keep the count very low and use components I had on hand. I think I have achieved my goals and couldn't be happier at the outcome of…... Listed under: AVR A Projects, Game - Entertainment Projects 1581. How to choose a MicroController It used to be that the number of different microcontroller chips available to the hobbyist was pretty limited. You got whatever you could manage to buy from the mail-order chip dealer, and that narrowed down the choice to a small number of chips.…... Listed under: ATmega Projects, How To - DIY - Projects 1582. Swiss AVR Knife using Microcontroller ATtiny84 The Swiss AVR Knife bundles a number of AVR programming projects together in a single convenient A Gum Tin. Because of the flexibility afforded by microcontroller programming, it also provides a starting point for any number of projects based on LED sound output. The…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1583. How To Communicate With An Alien Artifact or . . . Close Encounters of the Curiously Minty Kind. This Instructable will show you how to build an Altoids version of the 'Close En mothership, and how to interact with it. This may be vital training for that day when the Bright White Beam comes to suck…... Listed under: AVR ATmega Projects, LED Projects 1584. LED Microcontrolled Stained Glass Firefly Pendant using Microcontroller ATTiny45 chip This Instructable will walk you through the steps needed to ma stained glass pendant with anLED that blinks in a pattern using a microcontroller. The blink pattern is an actual firefly song of a type of Japanese firefly scaled down version…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1585. AVRSH: A Command Interpreter Shell for Arduino/AVR. Ever wanted to be "logged in" to your AVR microcontroller? Ever thought it would be cool to "ca register to see its contents? Have you always wanted a way to power up and power down individual peripheral sub-systems of your AVR or Arduino in under: AVR ATmega Projects, RTOS - OS Projects 1586. Build your own (cheap!) multi-function wireless camera controller using Microcontroller AVR ATMega8 Introduction Ever fancied building your own cam controller? IMPORTANT NOTE: Capacitors for the MAX619 are 470n or 0.47u.  The schematic is correct, but the component list was wrong - updated. T entry into the Digital Days competition so if you find it useful, please rate/vote/comment…... Listed under: AVR ATmega Projects, Internet - Ethernet - L Projects, Video - Camera - Imaging Projects 1587. A sunrise and sunset lamp with LEDs You know it, in the winter time it is hard to get up, because it is dark outside and your body just won’t wake up in middle of the night. So you can buy an alarm-clock that wakes you up with light. These devices…... Listed under: AVR ATmega Projects, LED Projects 1588. Ghetto Programming: Getting started with AVR microprocessors on the cheap. Microprocessors are so cheap these days. If only there were a way to p them up just as cheaply... *wavy dream-sequence lines* In this instructable, find out how to build up a complete AVR microprocessor toolchain: comp programmer software, programmer hardware, and some simple demos…... Listed under: AVR ATmega Projects, How To - DIY - Projects
1589. Servo Controlled Labyrinth using Microcontroller ATmega32 Do you know this classic wooden labyrinth game with two knobs for X and Y rotation? So, decided to modify one by connecting two standard servos to the knobs and let a microcontroller (ATmega32) play the game. Credits: - To CarlS www.instructables.com/id/Servo-Controlled-Marble-Maze/ for inspiration.…... Listed under: AVR ATmega Projects, Motor Projects 1590. LED Scolling Dot Matrix Font & Graphics Generator 5×8 5×7 8×8 using the AVR ATtiny2313 and AVRStudio If you are into geeking it out with projects of the electronical kind, the have likely wanted to create a dot matrix display or a POV. To do this you will need to have a font file or table to read the characters from.…... Listed un ATmega Projects, LCD Projects, LED Projects 1591. Color Changing Digital PC Fan Controller using Microcontroller ATMega168 We've all seen LED fans that you can put in your computer to make it look usually come in blue, sometimes red or green and consist of a basic PC fan with 4 bright LED's mounted in the 4 corners.  They source their…... Listed AVR ATmega Projects, Game - Entertainment Projects, LED Projects 1592. Atmel Xmega USB/Serial Arbitrary Waveform Generator This instructable walks you through programming and using the Boston Android Xmega evalu board to work as a simple arbitrary waveform generator taking advantage of the integrated 12bit DAC and high speed DMA controller. I have provided precompiled firmware as well as source code which…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1593. LED Cube 4x4x4 using Microcontroller Atmega16 Amazing 3 dimensional LED display. 64 LEDs makes up this 4 by 4 by 4 cube, controlled by an Atmel A microcontroller. Each LED can be addressed individually in software, enabling it to display amazing 3d animations! 8x8x8 LED cube now available, by p demand:…... Listed under: AVR ATmega Projects, LED Projects 1594. Infrared Proximity Sensing Coffee Table Module & Color Changing Glowing Faucet using Microcontroller ATMEGA48 This is merely an instructable to ex this device operates. I hope everything is not too obfuscated. This prototype consists of three 8x8” modules. Each module operates independently of e other. Each module consists of 4 “pixels”. Each pixel is 4 inches square and…... Listed under: AVR ATmega Projects, Home Automation Projects 1595. The Multi-format Clock – Gift contest I tend to have good ideas when I don't need them but when I need them I always face the black wall of no inspira had to come up with an idea for a present for Jeff-O. After a long week without inspiration, I came…... Listed under: AVR ATmega Projects, Clock Project 1596. Make a 8×10 L.E.D Matrix using the Arduino and 4017 decade counter In this instructable I will show you how to build a quite fancy 8 by 10 L.E.D matr scrolling text and animations) using the Arduino and 4017 decade counter. This type of matrix is easy to make and program and it is a good way…... Li under: AVR ATmega Projects, LED Projects 1597. LED Binary Calculator using Microcontroller ATtiny2313 You can't calculate binary values "as is" on most handheld calculators and using the windows one is just a pain, so i dec make my very own (binary only) calculator. This calculator supports all the basic functions like : NOT,OR,AND,XOR, addition,subtraction,multiplication,division and modulo. So j we…... Listed under: AVR ATmega Projects, Calculator Projects, LED Projects 1598. Debugging AVR code in Linux with simavr using Microcontroller ATTiny85 I recently started programming AVR chips, namely the ATTiny85.  They can be programmed using C, compilers are readily available in Ubuntu, and you can do a LOT with them - just search for avr on this site!  Anyway, I was havin trouble with my…... Listed under: AVR ATmega Projects, RTOS - OS Projects 1599. Power your Arduino/AVR with a Hand-Cranked Battery If you've ever wanted to power your Arduino or AVR from a battery for development testing (ba have different power delivery qualities than, say, transformed AC or even a regulated wall wart in DC) testing but were tired of going through batteries admit…... Listed under: AVR ATmega Projects, Battery Projects
1600. USB controlled home automation hack using Microcontroller ATmega8 Hack a wireless home automation system to be USB controlled using two AVR microcontrollers! Check out the video! The system is really more responsive, but the browser on my phone is slow. Skills ans tools There are two ways hacking an RF remote to…... Listed under: AVR ATmega Projects, Home Automation Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1601. Music Playing Alarm Clock using Microcontroller AT90USB1286 This Instructable will be about designing a music player from using various building blo will understand the communication between the microcontroller, memory, computer, LCD display, RTC, IR remote, and the music file decoder. I will try to to teach you in a…... Listed under: AVR ATmega Projects, Clock Projects, Game - Entertainment Projects, Sound - Audio Projects 1602. Rechargeable Battery Capacity Tester using Microcontroller ATMega168 Do you have a pile of AA rechargeable batteries in your drawer? Some are old new, but which sets would you bring with your camera on your next trip, and which ones are past their useful life? I like using rechargeable batteries, b Listed under: AVR ATmega Projects, Metering - Instrument Projects 1603. Mechanized Android Figure using Microcontroller ATtiny44A These Android figures are cute, but they don't actually do anything. Let's change that. Hav at the video: These are the steps to make an Android that reacts to sound, moves it's head, sends out Morse Code messages and displays some cool l Listed under: Android Projects, AVR ATmega Projects, Internet - Ethernet - LAN Projects 1604. Numitron clock & thermometer using Microcontroller atmega48 I really like nixie and numitron clocks, but I never worked with them before. So I decid it a go. I choose numitrons because of 2 reasons: first of all nixies need a higher voltage than numitrons to work. Nixies need around 170V…... Listed u ATmega Projects, Temperature Measurement Projects 1605. Yet Another Daft Punk Coffee Table (5×5 LED Matrix) Yes, I know this has been done before, but I wanted to build my own, using as few parts as possible.  I built this as a table mount model, but it can be scaled up to make a coffee table.  I built…... Listed under: AVR ATmega Projects, Home Automation Projects 1606. Build your own Wifi radio using Microcontroller ATmega16 The internet hosts lots and lots of online radiostreams, most of them with a certain theme, from old time classics to Tibetian riverdancing. I must admit that I love to listen to them while I'm building stuff, as I can choose the music I…... Listed u ATmega Projects, Internet - Ethernet - LAN Projects, Radio Projects 1607. How to get started with Eclipse and AVR Programming AVRs is fun, but sometimes the manufacturers development environments make code mainten chore. If your looking for a free, cross platform, high quality piece of software for programming AVRs Eclipseis a good choice.Moving to an Integrated Development Environment (IDE), such as Eclipse is…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1608. Lampduino – an 8×8 RGB Floor Lamp Lampduino is a computer-controlled free-standing floor lamp, comprised of an 8x8 RGB LED matrix. The lamp st high and 18" wide.  Light emanates from both sides.  It has various display modes, as well as an included editor for creating animations.  The lamp is controlled…... Listed under: AVR ATmega Projects, LED Projects 1609. Rainbow glowing ping pong Using ATTing 13 While I was finalizing e-snowflake project, I imagined that single RGB 5050 LED would create nice rainbow placed inside a ball like ping-pong. You can find plenty of such projects on the net, this one was heading to embed everything within ping-pong, batter Listed under: AVR ATmega Projects, Game - Entertainment Projects 1610. Charlieplexing 7 segment displays using Microcontroller This instructable describes how to charlieplex a bunch of 7-segment led displays. Charlieplexi discrete leds has been the topic of a few other instructables. The Charlieplexing LEDs- The theory and the How to drive a lot of LEDs from a few microc pins comes…... Listed under: AVR ATmega Projects, LED Projects
1611. How To Use a Nokia Color LCD using an AVR Nokia manufactures a wide variety of cell phones and many of their cheaper phones contain simple LCD's may be used in microcontroller projects.  There is one particular LCD model that is used in a wide variety of their phones and is often referred to…... L under: AVR ATmega Projects, LCD Projects 1612. How to Read Many Switches with One MCU Pin Have you ever been chugging away at a project(s) and the project keeps growing and growing, while you add more things to it ( that a Feaping Creaturism)? On a recent project, I was building a frequency meter and added a five function signal…... Listed under: AVR ATmega Projects, Other Projects 1613. Cellphone Operated Robot Using Microcontrollers Component Required: IC1 - MT8870 DTMF decoder IC2 - ATmega16 AVR microcontroller IC3 - L293D driver IC4 - 74LS04 NOT gate D1 - 1N4007 rectifier diode R1, R2 - 100-kilo-ohm R3 - 330-kilo-ohm R4-R8 - 10-kilo-ohm C1 - 0.47μF ceramic disk C2, C3, C Listed under: AVR ATmega Projects, Phone Projects, Robotics - Automation Projects 1614. An Absolute Beginner's Guide to 8-Bit AVR Programming-AVR Dragon If you'd like to test the waters of microcontroller programming, the new AVR Dra Atmel Corporation is a nifty, low-cost entry-level development tool. Unfortunately, right out of the box, the AVR Dragon is not the definitive answer for beginner looking for an all-in-one…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1615. ATTiny2313 Multi-mode LED Matrix Clock This is a mutli-mode clock project based on attiny2313. it employs a 8x8 led matrix as display. with the limite resolution, this 12 hour clock shows time in 6 different modes. The circuit employs row and column multiplexing to drive the leds, one row at…... Listed AVR ATmega Projects, Clock Projects, LED Projects 1616. Temperature Indicator Using attiny2313 micrcontroller Description Features: Measures temperatures from -55°C to +125°C Three LED's to indicate in w range the temparature is. User definable thermostat with high and low settings Output via a relay to control a heater element or a blower fan (or som else) Power supply ......................4.5…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1617. Stepper motor Driver Using AT2313 microcontroller Description With this circuit you can drive a unipolar stepper motor. It operates in full step mode. get a stepper motor from an old 5.25 disk drive. The AVR attiny2313 micro controller controls the pulses for the stepper motor. The pulses are amplifi Listed under: AVR ATmega Projects, Motor Projects 1618. Relais Board Using AT2313 Description This is a peripheral board with 4 relais, rated at 5A/250V each. The board has a ML10 output connector for con with the AT2313 Project board. It has also 4 LED's for indication which relais is switched on. Hardware The circuit is simple, it…... Listed under: AVR ATm Projects, How To - DIY - Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1619. DS1820 Temperature Controller using atmega8515 microcontroller This project displays the temperature on an LCD display with an resolution of 0.06 DS1820 is used for sensing the temperature. It can measure temperature range from -55deg to +125deg. But i take care of only the possitive tempera There are 3 switches to change…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1620. Real Time Clock PCF8583 Using AVR microcontroller Description The PCF8583 is a clock/calendar circuit based on a 2048-bit static CMOS RAM organize words by 8 bits. Addresses and data are transferred serially via the two-line bidirectional I2C-bus. The built-in word address register is incremented automatically after each written or read…... Listed under: AVR ATmega Projects, Clock Projects 1621. 8×8 Dotmatrix Scrolling LED display using atmega8515 microcontroller Here's an another project, which makes an Scrolling LED display. Here 64 leds w connected to an Matrix display. The Anodes are drived through an Driver IC UDN2981 and the cathodes are drived through ULN2803. The Atmega851 in this project to control…... Listed under: AVR ATmega Projects, LED Projects 1622. Bluetooth Based Smart Home using atmega8 microcontroller This project is used to automate the home appliances through Bluetooth enabled PC. You can use the USB Bluet the PC side and an Serail Bluetooth converter is used at the microcontroller side. The sparkfun bluetooth module is used here, but you can use…... Listed under: AVR ATmega P
Home Automation Projects 1623. Multipattern Running light using ATtiny2313 microcontroller Here's an another project with LED. It can show different patterns. There are 11 channels Circuit Diagram For more Detail: Multipattern Running light using ATtiny2313 microcontroller... Listed under: AVR ATmega Projects, LED Projects 1624. Real Time Clock ATMega16 Description The ATMega16 chip in the M16 has a real-time counter that operates asynchronously when a 32,768hz watch c connected to it, providing a real-time clock. Bascom has built-in support for the RTC, making it very easy to use time functions. The watch crystal…... Li under: AVR ATmega Projects, Clock Projects 1625. PC Thermometer Using ATTiny2313 Description With this project you can show the temperature on you PC. This thermometer plugs in on any free ser gives temperature readings accurate to 0.5°C with no calibration.The project consists of the ATTiny2313 RS232 Project board and the DS1621 Thermom board and…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1626. PC Steppermotor Driver Using AT2313 µ-controller Description With this circuit you can control two unipolair stepper motors in full step mode via the serial port of your PC. A terminal program such as Hyperterminal can be used to control the stepper motors. The stepper motors can be driven one at under: AVR ATmega Projects, Motor Projects 1627. LCD Thermometer TCN77 Using AVR Microcontroller Description The TC77 is a digital temperature sensor with a Serial Peripheral Interface. Temperat converted from the internal thermal sensing element and made available at anytime as a 13-bit two’s compliment digital word. Communication with t accomplished via a SPI and…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1628. LCD Thermometer TCN75 Using ATTiny2313 Description This small thermometer board uses the Microchip TCN75 device. It is a cheaper clone of the LM75, it costs about 2,50 TCN75 comes in a SO8 packaging. The TCN75 is a serially programmable temperature sensor. It has an output that is programmable…... Listed under: ATmega Projects, Temperature Measurement Projects 1629. LCD Thermometer LM35 Using AT Mega8 Description The LM35 of National Semiconductors that is used in this project is a precision centigrade tempe sensor, which has an analog output voltage. It has a range of -55ºC to +150ºC and a accuracy of ±0.5ºC . The output voltage is 10mV/ºC . The…... Listed AVR ATmega Projects, Temperature Measurement Projects 1630. AVR GPS Locator using avr microcontroller In this project i have interfaced an GPS with AVR microcontroller, the ATtiny2313 gets the location from the display it over the LCD display. This project also have the feature of marking a place with its name. For entering the Name of the…... Listed under: AVR Projects, GPS Based Projects 1631. MMC card based WAV player using atmega32 This projects gives you a simple wav player with help of the MMC card connected to ATmega32. You can AVR microcontroller. The MMC card works on 3.3v so a 3.3v regulator is used and the 5v to 3.3v level conversion is done by…... Listed under: AVR ATme Projects, Sound - Audio Projects 1632. LCD Message Display Using AT Mega8 microcontroller Description This LCD message display can show text with large characters on an 20*4 LCD mod display can show five characters at a time. Each characters is build from twelve characters of the display module. The text on the display can be read f Listed under: AVR ATmega Projects, LCD Projects 1633. LCD Interface Board Using ATTiny2313 Description This board can directly connected to the STK 500 board or the ATTiny2313 ISP program board with flatcable on the 10 pin header of the STK500 and the 10 pin header of the LCD/Switch board. The display has 16*2 character positions…... Listed unde ATmega Projects, LCD Projects
1634. 8 MHz frequency meter using AVR microcontroller This project can measure the clock pulses fed to the Timer input of the AVR microcontroller. The Ba code counts the clock pulses for 1 second and display it over the LCD display. The frequency is displayed in Hertz and this project can measure a…... Li under: AVR ATmega Projects, Metering - Instrument Projects 1635. LCD Display On Glass Interface Using AT2313 Description Liquid Crystal Display on Glass is the newest in LCD technology. The display's are very compa measures 55x27 mm and the height is only 2mm without LED backlight and 5.8mm with LED backlight. The display's can have different LED backgrou instead of…... Listed under: AVR ATmega Projects, LCD Projects 1636. Temperature controlled fan using PWM microcontroller This project gives you a simple temperature controlled fan. If the difference between real temperature and the user tem is high then the fan will run at full speed and if the difference is low then the fan will rotate at slow speed. The speed…... Listed under: AVR ATmega Pro PWM Projects, Temperature Measurement Projects 1637. SMT160 based Temperature indicator There are lot of temperature sensors both with analog & digital outputs. This project gives you an another temp indicator which has been done with a digital sensor SMT160. Although it is a digital sensor it does not gives out the temperature directly. The output… under: AVR ATmega Projects, Temperature Measurement Projects 1638. Digital Melody player using atmega16 microcontroller Here' s an melody player with Atmega16. The command "Sound Speaker" is used to generate so is the inbuilt command in Bascom AVR. For more Detail: Digital Melody player using atmega16 microcontroller... Listed under: AVR ATmega Projects, So Audio Projects 1639. Stepper motor Control with Atmega16 With this project you can control a unipolar stepper motor. You can control both the speed and the direction of motor. The speed and direction and can changed with help of the keypad. The data's are displayed over the LCD display. A 4x4 keypad…... Listed unde ATmega Projects, Motor Projects 1640. Graphical LCD with KS108 controller Description The Graphical LCD 128x64 controlled is with the ATMega16, the graphic LCD GLCD HG1286418C-VA w S6B0107/S6B0108 controller is used. See below for the pinout of the display. The display has 8 data bits and 5 control bits. The databits are hooked to PORTB…... Listed under: AVR ATmega Projects, LCD Projects 1641. Simple calculator using avr microcontroller Atmega16 Here's a simple calculator with the Atmega16 microcontroller. It have an LCD display and a 4x4 You can also download the proteus simulation file on the downloads Bascom Code   $regfile = "m16def.dat" $crystal = 1000000 Config Kbd = Portd , D 30…... Listed under: AVR ATmega Projects, Calculator Projects 1642. Transform a cheap RC Transmitter with Custom Firmware using ATMEGA64 Microcontroller The Turnigy 9x is a cheap Chinese radio transmitter widely by hobby king and other retailers under a variety of names. This is a computerized radio transmitter and is already a great deal for the price ($53 curr pretty capable if you can figure out how to…... Listed under: AVR ATmega Projects, Radio Projects 1643. ATTiny2313 Board RS232 Description This board is a small controller board on which you can build your projects. It is suited for educational use, expe prototyping. The board uses the AT2313 microcontroller with a 10Mhz crystal. The board contains the ISP 10-pin connector for in circuit serial…... Liste AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1644. Make an automatic plant light using ATTiny26 Microcontroller This light helps your plants grow. I got the idea from the Garduino, but nothing is taken from it. The schematic an program are mine. This plant light gives your plants 4 additional hours of light per day. When it gets dark, it turns…... Listed under: AVR ATmega Projects, Game - Entertainmen 1645. LED wind indicator Using atmega8 Microcontroller I have something with the weather. I always like to know how warm or cold it is, how much rain has how hard the wind blows and from what direction,... and so there are lots of sensors around our house to keep me up…... Listed under: AVR ATmega P LED Projects
1646. Ghetto Pixels – Building an open source BlinkM Using ATTiny45 Microcontroller Unless you've been living under a digital rock for the last few years, or simply aren't interested in flashing lights, you'll already know about the awesomeness that is the BlinkM from ThingM. It's a very small PCB featuring a power LED that responds very easily…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1647. USB PCB Business Card Using ATtiny85 Microcontroller This is a business card that will type out some text when you plug it into a USB port. It uses a A microcontroller with V-USB based code to emulate a keyboard. The typing is triggered by the CAPS LOCK status LEDs being toggled 3…... Listed under: ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Other Projects 1648. Using ATMega328 Microcontroller Custom Tron Disc Mod In this Instructable, I cover modding the store-bought Deluxe Identity Disc to an upgraded ve with 64 leds, controlled by an AVR MCU. The upgraded version is costume-ready and would be an excellent addition to your Tron costume - it'll also lo on your…... Listed under: AVR ATmega Projects, LED Projects 1649. DIY TiX Clock using ATMEGA16 AVR microcontroller Here's my instructable for a DIY TiX clock.  It is powered by an AVR microcontroller.  The display is m using a piece of reflector grid you find covering office lights, some smoked perspex, a diffuser and a bunch of LED's.  The Idea came from…... Listed un ATmega Projects, Clock Projects 1650. Starry Ceiling for Kids Bedroom Using AT90S8538 microcontroller When my little girl was born I wanted to make her a special night light for in her roo her a ceiling light with twinkling stars. It is made up of a piece of custom wood with 100 LEDs mounted in it. An…... Listed under: AVR ATmega Projects, Entertainment Projects, Home Automation Projects 1651. Using max7219 microcontroller Build an electronic score keeper/storage box The instruction manual for each of the MANY munchkin series of card ga always includes a phrase like "you will need a 10 sided die for each player or some other device to keep score." 10 sided dice are not hard to find in m Listed under: AVR ATmega Projects, Other Projects 1652. Using AtTiny2313 microcontroller Build an electronic polyhedral die Dice are fun. Polyhedral dice used in D & D are even more fun, particularly in big handfuls of different sizes handful isn't always practical. Ever since I saw the dragon bone electronic die wand advertised in the back pages of Dragon magazine…... Listed under ATmega Projects, Other Projects 1653. Turn a TV-B-Gone into a super camera remote Intro: My Nikon DSLR has an infrared remote function (remote sold separately) that is really handy, but limited in range. A while ago, I bought a TV-B-Gone Kit from it's inventor Mitch Altman, and it can turn TV's off from a great distance. I…... Listed under ATmega Projects, Video - Camera - Imaging Projects 1654. How to drive a lot of LEDs from a few microcontroller pins. Using the fact that many microcontroller pins have three states (+V, GND, or "high impeden can drive N*(N-1) LEDs from N pins. So the little 8 pin microcontroller like a PIC12Fxxx or an ATtiny11 can drive 20 LEDs on its five available output pin Listed under: AVR ATmega Projects, LED Projects 1655. Hack a Toaster Oven for Reflow Soldering using ATmega32 microcontroller As I get more serious into my electronics hobby, I need to work with more S components. Some component packages are very difficult or impossible to solder with a traditional soldering iron. To solve this problem, I decided to toaster oven to become…... Listed under: AVR ATmega Projects, CNC - Printing Machines Projects 1656. Using the 8Pin ATTINY programming shield with an external clock Instructables author extraordinaire Randofo created a great programming shield to Arduino to program 8 pin ATTINY processors. He was even generous enough to give 50 copies of it out to people who authored instructables using AV processors. It works great on brand new ATTINYs and…... Listed under: AVR ATmega Projects, Other Projects
1657. Picopter using Microcontroller ATmega128RFA1 Update May 4 2012: I am still working very hard on version 3 of Picopter. The new version's hardware done. There are new 3D printed motor holders. I've done some measurements with regards to mass and radio spectrum. I've posted stuff to http://ww zhao.com/picopter_forum/index.php including…... Listed under: AVR ATmega Projects, Robotics - Automation Projects 1658. Box with a Music Lock using ATMega328P Microcontroller There are a lot of locks out there. There are locks open with a key, with a combination of digits, with various bodily pa with a correct geolocation. I decided to make a lock that I have not seen yet. Since I am learning…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1659. Measure negative temperature with Lm35 LM35 can measure temperatures from -55deg to 150deg and we need negative supply voltage for measurin negative temperature. This circuit eliminates the negative voltage power supply and this project can measure the negative temperature Download the file to simulate the project on your…... Listed under: AVR ATmega Projects, Metering - Instrument Projects, Temperature Measurement Projects 1660. DC Motor Speed Control using PWM This project gives a speed control of DC motor through PWM method. The Dc motor is derived by the L298 driver can also control the direction of the motor. There are three buttons to control the motor. Also a bar graph Led display…... Listed under: AVR ATmega P Motor Projects 1661. ISD4004 based voice recorder So far we  have seen various devices that are talking, such us cars, dolls etc.This project is also like one of them. you can various projects such us IVS, robots etc. There are various voice recording IC's. They have different recording time…... Listed under: AVR ATmega Projec - Audio Projects 1662. Thermometer with Clock using ATmega16 This project will display the temperature and time over the LCD display. LM35 is used to sense the temperat the analog out of the LM35 is converted to digital by using the inbuilt ADC on the ATmega16 chip. An software clock is generated and…... Listed under: ATmega Projects, Temperature Measurement Projects 1663. Scientific Calculator using AVR Microcontroller This project gives you a nice and simple scientific calculator using AVR microcontroller. It has 2 keypads in the circuit diagram and the results are shown on the 16x2 LCD display. You can do sin,cos, tan functions using this project. The code is…... Listed un ATmega Projects, Calculator Projects 1664. Traffic light controller using avr microcontroller Here's a traffic light controller using avr microcontroller. It can be adopted for a four way road. The cod written in Codevision C. You can download the C code and the proteus file from the download. For more Detail: Traffic light controller using avr…... List AVR ATmega Projects, LED Projects 1665. ATTiny Board For AVR ATTiny microcontrollers Description With this small board you can program most of the AVR ATTiny microcontrollers or you can projects to use it in a stand alone application. It can be powered with a 9V battery because it has 5V voltage regulator on it. The…... Listed under: AVR A Projects, How To - DIY - Projects 1666. DS1307 based Clock using lcd This project gives you a real time clock with the RTC chip DS1307. This RTC chip has inbuilt oscillator for clock and it has registers for full calender. In this project we dont take care about the days and we just use the…... Listed under: AVR ATmega Projects, Clock Projects
1667. Digital dimmer using Microcontroller atmega8 This project is used to control the brightness of the lamp or can be used to control the speed of the fan system consists of 3 block they are Zero crossing detector Microcontroller (Atmega8) Load Driver (BT136)As the name implies the zero crossing detect Listed under: AVR ATmega Projects, Home Automation Projects 1668. Digital Voltmeter using Microcontroller Atmega8 This project gives you a digital voltmeter which can measure voltage from 0v to 25V DC. The values ar displayed over the 7segment display. Atmega8 is used and the internal ADC is used to measure the DC voltage. The resistor network is used to reduce under: AVR ATmega Projects, Metering - Instrument Projects 1669. Make-Yourself ATmega32 Starter's Kit with LCD, I2C, SPI, RTC, ADC interfaces Here is my home-made kit of ATmega32 microcontroller interfacing. The A controller is rich with features like onboard 32kB in-System programmable flash, 1 KB EEPROM, 2KB SRAM, 10bit ADC (8 channel), SPI bus inteface, TW (compatible with I2C bus) interface, an USART, analog comparator, etc.…... Listed under: AVR ATmega Projects, Development Board - Kits Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1670. Capacitance and Inductance meter using Atmega8 This project can measure capacitance and inductance using the Atmega8 microcontroller and the c written in Bascom AVR. The limitations of this project is Inductance Range: 0.1?H to 2H Capacitance Range: 1pF to 2.5?F Electrolytic Capacitor Measure Range: 0.1?F to 30000?F Circuit Diagram: For…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1671. SD/SDHC Card Interfacing with ATmega8 /32 (FAT32 implementation) Here is my project on interfacing of SD Card (microSD). microSD cards are availab cheap nowadays, a great option for having a huge memory in any embedded system project. It is compatible with SPI bus, so the interfacing is easy. S adapters are…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Memory - Storage Projects 1672. LPH7319 controlled via I2C I recently obtained a very old mobile phone from a friend. The battery was dead, so I dismantled it and to my surprise foun display with soldered contacts. In other mobile phones the display was connected via a conducting polymerpad, which was extremly difficult…... Listed AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1673. microSD FAT32 testing using Visual C++ This post presents a way for testing and learning the FAT32 system on microSD/ SDHC cards without building t hardware with microcontroller, thanks to Henry Yiu. This project uses the FAT32 library available in my previous post, but does away with the microcon part. So,…... Listed under: AVR ATmega Projects, Memory - Storage Projects 1674. Ultrasonic range finder using ATMega8515 This project is used to measure the distance using ultrasonic sensors. The ultrasonic signal passes through the atmosphere to a bar which we want to measure the distance. Part of this signal is reflected and travels back to the receiver. The time delay between sending…... Listed under: AVR ATmega Projects, Projects, Sound - Audio Projects 1675. 4×4 LED Display The 4×4 LED Display was my first project with a two-layer circuitboard layout. The alignment was not 100% optimal, but sufficent. I wa make the board as small as possible, so the parts had to be stacked at some places. The square LED’s were…... Listed under: AVR ATmega Projects, How - Projects, LED Projects 1676. microSD ATmega32 Data-Logger Aim of this project is to present a way to store a large quantity of data into microSD card in files with FAT32 format. H ATmega32 is used for data collection and microSD interface. The data is received from in-build 8-channel ADC of ATmega32. One…... Listed under: AVR Projects, Memory - Storage Projects 1677. UV Exposure Unit & Etching Manufacturing circuitboards containing SMD-parts with toner-transfer is nearly impossible. The thin traces almost never g transferred completely to the copper. One solution to this problem is to use photoresist boards and expose them with UV light. The layout is printed o transparency, which is…... Listed under: AVR ATmega Projects, Other Projects
1678. 8×8 Bicolor LED Matrix using MAX6964 For a long time I had a layout for this circuit, but could never build it, because the layout was to small to be ma tonertransfer. So it was the first layout I made with my new exposure unit. It’s quite small, so it…... Listed under: AVR ATmega Projects, LED Projects 1679. Thermometer using DS1621 and Nokia 3310 LCD interfaced with ATmega8 I am presenting one application with the Nokia 3310 LCD: Designing a ther using DS1621 temperature sensor IC. DS1621 is 8-pin sensor from Maxim, with temp range of -55 to +125 degree C, which can be interfaced with microcontroller over two-wire serial i2c bus. It…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Temperature Measur Projects 1680. EPROM Display using ULN2308A microcontroller Due to university and work it has been a while since the last post. But I just completed a little project that’s worth posting. Sev 27C256 EPROMS were lying around unused. So I thought about a purpose for them. As I also had some…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -IS 1681. CNC Update 2 Using atmega32 microcontroller Another update on the CNC. The interfaceboards are etched, soldered and tested. IO / Control Boards directionsignals are generated by an ATmega32 which is controlled over RS232. This is only for testing purpose. In the final version a PC will control the movement.…... Listed under: AVR ATmega Projects, CNC - Printing Machines Projects 1682. Delta Robot using atmega32 micrcontroller And now for something completely different: A little robotics project for the weekend. The described robot build entirely from model making supplies and materials from the hardware store. Also only very few tools are needed. A metal saw, a drill press, a vic Listed under: AVR ATmega Projects, Robotics - Automation Projects 1683. Simple PWM DC motor control using MOSFET H-Bridge with AVR ATmega8 Here is a very simple project of controlling a small DC-motor (taken from an personal cassette player) with ATmega8. The ATmega8 is having three PWM channels, out of which two are used here. PWM waveforms are fed to MO (RFD3055) H-bridge. Here, direction is…... Listed under: AVR ATmega Projects, PWM Projects 1684. circuit schematic symbols circuit schematic symbols: Download High Quality circuit schematic symbols images of common electrical and electronics  components, for creating any schematic diagram. Basically Electrical components can be divided in two categories Passive components and Active Components. This post will have following schematic symbols. Click on Image…... Listed under: Blog, Circuits 1685. 4 bit interfacing of a 16X2 LCD display to PIC16F877A, Atmega16/32 & MSP430 16x2 LCDs are most commonly used display units in microcontroller ba projects. I got much information about LCD, LCD commands, LCD initialization etc from the below link and I hope, it will be very much helpful for begin more Detail: 4 bit interfacing of…... Listed under: AVR ATmega Projects, LCD Projects 1686. My own AVR ISP programmer using PIC16f877a and python! Introduction: (don't skip to read the note below) I recently purchased few AVR microcontro don't know much about AVR since I am using it for first time. Any way, I have some experience on working with PIC and MSP430. To program AVR usin Listed under: AVR ATmega Projects, Microcontroller Programmer Projects
1687. 4×4 Matrix Key-board Interfacing with ATmega32 Here is a project for beginners to interface a 16-key (4x4) keypad with ATmega32 using 8-pins i.e. one port of the microcontro useful particularly where we need more keys but don't want to spend more uC pins for interfacing. The 4x4 keypad is…... Listed under: AVR ATmega Projects, Interfacing(USB - I2c -ISP) Projects 1688. NOKIA 3310 LCD interfacing with ATmega8 Using graphic LCD in a project gives it really a good look and flexibility of displaying different characters and But, the graphic LCDs are quite costly. The NOKIA 3310 LCD provides a really low-cost solution to add a small graphic display into your project…... Liste AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 1689. DIY AVR Programmers For those who are trying to make AVR kit at home, an AVR programmer which can be simple to make will be really useful, as it'll buying the programmer!! Here I'm giving a few webpage links on how to make a programmers yourself. -…... Listed under: AVR ATmega Projects, How T Projects 1690. TV remote controller 160KHz High Quality Stereo MMC WAV player using ATMEGA32 Introduction: This is my first AVR based hobby project and the mo successful one compared to my all previous stuff. I am 100% satisfied with this work. Few months ago, I tried to make a wav player using a PIC16F877A worked anyway, but the…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1691. Multitasking in AVR (A demo to run 7 tasks on an atmega32) Introduction:      Switching multiple tasks on a same CPU is the one of the major function operating system. What I did now is a time sharing multitasking (time multiplexing) on an AVR. Here an atmega32 is configured to use Round-Robin Multitasking. Round-Robin allows…... Listed under: AVR ATmega Projects, RTOS - OS Projects 1692. An attempt to show grayscale images on an LED dot matrix display with software PWM using PIC16F877A Introduction: This is just a time pass hobby p am trying to display some pictures (JPEG/PNG/BMP etc) on my 8x8 led dotmatrix display.  You can see photos of my 8x8 led dotmatrix display showing grayscale pictures. The main thing which you may notice…... Listed under: AVR ATmega Projects, PWM Projects, Video - Camera - Imaging Projects 1693. AVR based monochrome signal generation for a PAL TV using atmega16 micrcontroller Introduction: I have learned some thing about TV in one of my semester but I forgot most of them. Now I refreshed a few basics and tried to implement a monochrome PAL TV signal generator using an AVR micrco was using PIC earlier…... Listed under: AVR ATmega Projects, Video - Camera - Imaging Projects 1694. Drawing geometric figures on a PAL TV using ATmega32 (128×64 resolution) Introduction: I am interested to draw lines, square, rectangle, circle etc on screen. At first I was confused where to start. While thinking about it, a pencil and an eraser came to my mind. If we have a good pencil, eraser and a… under: AVR ATmega Projects, Video - Camera - Imaging Projects 1695. Running PYTHON (pymite-09) on an Arduino MEGA 2560 using atmega16 micrcontroller Now it is the first time I am using an arduino board. Arduino m is really a great product. The chip got a flash of 256KB, RAM of 8KB and EEPROM of 4KB. Also, the data sheet of Atmega2560 says that we can extend… under: AVR ATmega Projects, How To - DIY - Projects 1696. Generating AUDIO ECHO using Atmega32 microcontroller Introduction: But now I can do this very easily by a simple digital signal processing using a microcontroller. It's concept is very simple, ie we need to apply a proper delayed feedback in digital samples with in a circular buffer. I did this using a Listed under: AVR ATmega Projects, Sound - Audio Projects 1697. Implementing Discrete Fourier Transform in Atmega32 to make an audio spectrum analyzer "All waveforms, no matter what you scribble or observe in universe, are actually just the sum of simple sinusoids of different frequencies." Hi, I am just refreshing the basics of fourier transform. I am not an ex I did a small audio spectrum…... Listed under: AVR ATmega Projects, Sound - Audio Projects
1698. Arduino Mega 2560 What is Arduino Mega 2560: The arduino mega 2560 is a microcontroller board in line with the ATmega2560 (ATmega2560 datashe having 54 digital input/output hooks (of which 14 can be used PWM results), 16 analogue inputs, 4 UARTs (Universal asynchronous receiver/transmitte interface with…... Listed under: AVR ATmega Projects, Blog, Circuits, How To - DIY - Projects 1699. Homage UPS Schematic Circuit Diagram Homage UPS: Homage UPS is one of the top selling brand. Homage UPS/Inverter is based on chopper techno having modified sine wave. It has overload output protection, with batter and output volts measurements displayed on LCD interface. Further specific mentioned in undergiven table Homage…... Listed under: Blog, Circuits 1700. PCM UPS Schematic Diagrams PCM Powercom was founded in 1987, a leading provider of power protection products with ISO 9001 certificate. There 2,600 employees around the world.  Powercom designs, manufactures, markets and services UPS systems. PCM UPS Schematic Diagram for Model UL 700/1000/1500VA POWER Features : LED/LCD…... Listed under: Blog, Circuits 1701. PowerMan UPS Schematic PowerMan UPS/Inverters Uninterruptible power supplies and voltage regulators Business founded in 1993. Prior to 2000. c engaged in distribution of products of famous brands. In the year 2000. the idea of creating his own brand POWERMAN, and from that period, the com exclusively OEM…... Listed under: Blog, Circuits 1702. APC UPS Schematic Diagrams APC by Schneider Electric, formerly referred to as American Energy Conversion Corporation, is really a manufacturer of uninterruptible energy su electronics peripheral devices and data center items. In 2007, Schneider Electric acquired APC and combined it with MGE UPS Systems to create Schne Electric's Critical…... Listed under: Blog, Circuits 1703. UPS Schematic Circuit Diagram UPS is an abbreviation of Uninterpretable Power Supply. It is an electronic product used to provide backup power for s devices in case their normal power failure or blackout. Given UPS Schematic Circuit Diagram with its component list is a complete guide to build stand Listed under: Blog, Circuits, Featured You and 21K others like this.Like

Advanced view of atmega microcontroller projects list at mega32 avr

  • 1.
    Share this: List ofProjects using Atmega Microcontroller with advance view: 1. INFRA RED REMOTE CONTROLLED ROBOCAR USING AVR (ATMEGA32) MCU The present PROJECT describes a design and implementation of an infrare remote controlled RoboCar which can be used for various automated unmanned control applications. I have designed remote controlled RoboCar(left right/front-back motion). The entire system is based on microcontroller (Atmega32) that makes the control system…... Listed under: LED Projects 2. Using a Quadrature Encoder With an ATtiny 2313 and an OLED Display In this instructable you'll learn how to use a rotary encoder (see http://en.wikipedia.org/wiki/Rotary_encoder ) with a microcontroller and how to display the numeric value as a bar and a numeric value on an OLED d See the video below for the project in action. The…... Listed under: LED Projects 3. 2cm Height 7 Segments 6 Digits AVR Clock With 4 Digits Thermometer This project is explaining how to create yourself a 6 digits 7 segments clock with microcontroller Step 1: Prepare the Parts for This Project We need to prepare a parts for this project, 6x 7 Segments Common Anode 6x PNP transisto driver, I…... Listed under: Clock Projects 4. Temperature Control System Using Labview (Atmega32) This work describes a framework of ON/OFF, proportional and linear temperature control syst design and implementation of this process is done using LABVIEW, virtual workbench software. The project involves includes data acquisition, data pro and the display of data. At the initial stage Data…... Listed under: Temperature Measurement Projects 5. Firmware Upgrade for USBASP Clone – Fixing Error Setting USBASP ISP Clock USBASP is one of the most popular programmer for AVR Microcontroller by Thomas Fischl. It is one of the oldest programmer for AVR. And very common being used with AVRdude software. There are many GUI based on AV such as: embedXcodeAVR8 Burn-O-MatAVRDUDESSBitBurneravrdude-guikhazamaeXtreme Burnerand many more In this…... Listed under: Clock Proje 6. Low Speed AVR Oscilloscope V2.00 (Is Updated on 19 Mar 2011) >> The firmware was updated on 19 Mar 2011 << A few months ago a friend of mine -car mechanical at profes me that he had problem with some car sensors. He couldn't check, with a simple multimeter, if a sensor was working properly.…... Listed under: LCD Projects 7. Learn About Microcontrollers This Instructable was designed to answer the question: how do I get started in microcontrollers? Now, in clear, simple En can learn what a microcontroller is, and how to use one. You will learn how to make everything that you need to get started.…... Listed under: Microco Programmer Projects 8. Homemade Battery Monitor Using AVR I want to share my experiment with voltage divider, ADC and AVRHomemade battery monitor using AVRIt's pre the sensor are only two resistors and zener diode with capasitor, I don't buy them, I've found it in my box.We can use it for monitoring our…... Listed u Battery Projects 9. Measuring Tempurature Using Sensor(LM35) and Atmega32 A digital thermometer is a good project in microcontrollers because it provides an opportunity to learn using sens measure the real world signals that are analog in nature. I am trying to describes a similar project based on a Atmega32 microcontroller and an LM35…... Listed under: Temper
  • 2.
    Measurement Projects 10. TemperatureSensor(LM35 ) Interfacing With ATmega32 and LCD Display| Automatics Fan Control Step 1: In this project, You will learn How to interfac Temperature Sensor(LM35 ) with AVR ATmega32 Microcontroller and LCD display. Before This Project you have to need Learn about following articles h add lcd library in avr studio| avr microcontroller tutorial introduction…... Listed under: Temperature Measurement Projects 11. Debugging AVR Code in Linux With Simavr I recently started programming AVR chips, namely the ATTiny85.  They can be programmed using C, compile readily available in Ubuntu, and you can do a LOT with them - just search for avr on this site!  Anyway, I was having some trouble with my…... Listed un Projects 12. Interfacing PS2 Controller With AVR -Bit Bang Hey friends in this instructable I will show you how to interface sony PS2 controller with AVR microcontro will be your handy code which you can  be used in future to control robots .You can get analogue value from joystick  which can be used…... Listed und Projects 13. Swiss AVR Knife The Swiss AVR Knife bundles a number of AVR programming projects together in a single convenient Altoids Gum Tin. Because of the flexibility afforded by microcontroller programming, it also provides a starting point for any number of projects based on LEDs and sound output. The…... Listed under: Microcontroller Programmer 14. How to Use the Dragon Rider 500 With Your AVR Dragon This instructable is a crash course in how to use some of the features of the Dragon Rider 500 Ecros Technologies. Please be aware that there is a very detailed User's Guide available on the Ecros website. The Dragon Rider is a interface board….. under: LCD Projects 15. AVR Microcontroller. Pulse Width Modulation. Сontroller of DC Motor and LED Light Intensity. Pulse Width Modulation (PWM) is a very common technique in telecommuni power control. it is commonly used to control the power fed to an electrical device, whether it is a motor, an LED, speakers, etc. It is basically a modulationtechnique, in wh width…... Listed under: Motor Projects 16. Introduction to ADC in AVR Microcontroller | for Beginners In thid tutorial you will know everything ADC in avr microcontroller Step 1: What Is an ADC? or Analog to Digital Converter, allows one to convert an analog voltage to a digital value that can be used by a microcontroller. There are many…... List Microcontroller Programmer Projects 17. Getting Started With Atmel AVR and BASCOM I have seen plenty of Instructables showing how to work with microprocessors, but they all assume that worked with them before and know what you are doing. I have not seen an Instructable that takes you from nothing and builds on each step.…... Liste Battery Projects 18. Cheap STK500 AVR Programmer for Atmel Studio Atmel Studio is a powerful tool for making AVR programs, but writing a program is the first step. To u program, you must make a circuit and transfer your code into the microcontroller. You can program your AVR from Atmel Studio by the use…... Listed Microcontroller Programmer Projects 19. AVR Microcontroller Fuse Bits Configuration. Creating and Uploading in the Flash Memory of Microcontroller the LED Blinking Program. https://youtu.be/6rkRAnkuqM0 In this case we will create simple program in C code and burn it into the memory of the microcontroller. We will write o program and compile the hex file, using the Atmel Studio as the integrated development platform. We will configure fuse bits and…... Listed under: LE 20. AVR Microcontroller. Toggle LED’s Using a Push Button Switch. Push Button Debouncing. https://youtu.be/YIZiwaXxtco In this section, we will learn How program C code for ATMega328PU to toggle the status of the three LED’s according to the input from a button switch. Also, we have explored a solutio problem of is ‘Switch Bounce‘. As…... Listed under: LED Projects
  • 3.
    21. Density BasedTraffic Signal System using Microcontroller Nowadays, controlling the traffic becomes major issue because of rapid increase in automob also because of large time delays between traffic lights. So, in order to rectify this problem, we will go for density based traffic lights system. This articl you how to…... Listed under: Microcontroller Programmer Projects 22. Microcontroller Projects: Home Automation System In this era of digital revolution, we are surrounded by smart devices that are capable of making de their own without much human intervention. Our home can also be made smart by implementing a real-time home automation system that monitors parameters like power consumption…... Listed under: Home Automation Projects 23. Line Follower Robot using Microcontroller Have you ever made your own robot? Here is a very simple and easy robot. In this project, I will explain how and build a Line Follower Robot using microcontroller. The Line Follower Robot is a basic robot that follows a specific path…... Listed under: Robotics - Automation Projects 24. Temperature Controlled DC Fan using Microcontroller A Temperature Controlled DC Fan is a system which automatically turns on a DC Fan when the a temperature increases above a certain limit. Generally, electronic devices produce more heat. So this heat should be reduced in order to protect the d There are many…... Listed under: Temperature Measurement Projects 25. Microcontroller Projects: Sonar Water-Level Meter Three-fourths of the earth is water, out of which 97 per cent is saline (in oceans, seas and groundwa remaining 2.5 per cent to 2.75 per cent is fresh water, out of which 1.75 per cent to two per cent is frozen in glaciers,…... Listed under: Battery Projects 26. RFID based Attendance System Most educational institutions’ administrators are concerned about student irregular attendance. Truancies can affect s overall academic performance. The conventional method of taking attendance by calling names or signing on paper is very time consuming and insec inefficient. Radio Frequency Identification (RFID) is an interesting solution in…... Listed under: Radio Projects 27. Ultrasonic Radar Model Using Microcontroller ATmega128 The circuit described here demonstrates the working of a radar system. It uses ultrasonic w detect an object and measure its distance and angular position, and displays the same on a 20x4 LCD screen. -- Ashutosh M. Bhatt is an M. Tech in embedded…... Listed under: Motor Projects 28. AT90S1200 D.D.S. FUNCTION GENERATOR The presented project is a function generator for sinusoidal and square signals production. The output freq covers the range from 10 Hz to 100 KHz with a step of 2 Hz. The waveform synthesis... Electronics Projects, AT90S1200 D.D.S. Function Generator "avr microcontroller projects, " The presented project is…... Listed under: Sensor - Transducer - Detector Projects 29. GAS DETECTOR CIRCUIT ATTINY45 Gas sensors are employed in a wide range of applications in the fields of safety, health, instrumentation etc… Comm examples are domestic/commercial alarms for explosive or toxic gases or in automotive application, as gas... Electronics Projects, Gas Detector Circuit ATtiny45 "avr project, microcontroller projects, " Gas sensors are employed…... Listed under: Sensor - Transducer - Detector Projects 30. UNINTERRUPTIBLE POWER SUPPLY UPS AT90S8515 PWM with AT90S8515 a good practice to understand the logic can give 200w Power should be dev more The driver circuit method used in section H-Bridge driver integrated HIP4080 I have in the... Electronics Projects, Uninterruptible Power Supply U AT90S8515 "avr project, microcontroller projects, " PWM with AT90S8515…... Listed under: Battery Projects 31. MICROCONTROLLER GSM ALARM AND CONTROL CIRCUITS Now quite a popular topic with Cell Phone Control with Microchip pic series for those who do these types of projects that could give clues will limp a few projects, including projects... Electronics Projects,Microcontroller GSM Alarm and Contro Circuits "avr project, microcontroller projects, " Now quite…... Listed under: Clock Projects
  • 4.
    32. MICROCONTROLLER CONTROLLEDDIGITAL POWER SUPPLY CIRCUITS ARCHIVE NXP80C31, PIC16F876, PIC12F629, PIC18F452, PIC16F876, PIC16F870, P HC908QT4 made with integrated power sources in various voltage and power MCU of microcontrollers in power electronics used always been interest Unfortunately this type MCU, PIC,... Electronics Projects, Microcontroller Controlled Digital Power Supply Circuits Archive "avr project, microcontroller p NXP80C31, PIC16F876,…... Listed under: Circuits 33. MICROCONTROLLER CONTROLLED BATTERY CHARGING CIRCUITS PIC Series Microcontroller ATMEL etc. Battery battery charger integrated circuits ma the PIC16F819, PIC16F84, PIC16F876, ATMEGA32, AT90S4433-PCR, AT90S1200-P, based on the ATmega8’s 7units applications Microcontroller controlled charging circuits all files: microcontroller-controlled-battery-charging-circuits.rar alternative... Electronics Projects, Microcontroller controlled battery c circuits "avr project, battery charger circuit, microchip projects,…... Listed under: Battery Projects 34. MICROCONTROLLER CONTROLLED ROBOT PROJECTS Multi-robot projects have been realized with the microcontroller. In addition to professional prac ‘projects have simple robot Most of the projects in the PIC16F series microcontrollers used ATMEL series over with no project varieties... Electronics Projects, Microcontroller Controlled Robot Projects "avr project, microcontroller projects, " Multi-robot projects have been…... Listed under: Robotics - Automation Projects 35. OLD CD ROM TRACK PLAYER WITH MICROCONTROLLER Old Cd Rom in handy if you want to make a Track Player PIC16F877 and AT89C51, AT89S52 con are made with good projects. Add to My Cdrom the features of the project with PIC16F877:... Electronics Projects, Old Cd Rom Track Player with Microcontroller "avr project, microchip projects, microcontroller…... Listed under: Other Projects 36. AVR TEMPERATURE MEASUREMENT SYSTEM Atmel AVR, Atmel microcontroller series with a super “Temperature Control Measurement System” 16 sensor inputs 4 alarm input computer’s connection. Temperature measurement, alarm, an exemplary application in the PC communication This measuring... Electronics Projects, A Temperature Measurement System "avr project, microcontroller projects, " Atmel AVR, Atmel microcontroller…... Listed under: Temperature Measurem Projects 37. MONITOR AUDIO RADIO SPECTRUM ATMEGA8 Atmega8-16 ac circuits with LEDs monitor the spectrum vu-meters of the advanced state of our LCD an spectrum analyzer circuit looks very nice variety of testing everything in the middle video There are...Electronics Projects, Monitor Audio Radio Spectru Atmega8 "atmega8 projects, avr project, microcontroller projects, " Atmega8-16…... Listed under: Radio Projects, Sound - Audio Projects 38. WHEELS BIKE LIGHT CIRCUIT ATTINY2313 a flashy accessory for your bike 74LS595N 25LC080P a good practice based on the software with all the deta pcb diagram hex code schema (schema) and PCBs (br) Latest eaglecad prepared by...Electronics Projects, Wheels bike light circuit "avr project, microco projects, " ATTINY2313 a flashy accessory…... Listed under: LED Projects 39. ATMEGA162 LCD OSCILLOSCOPE CIRCUIT A very nice project cost is a bit high in our country, even hard to find parts Atmel AVR microcontroller series with this type of project is ideal for those who want to... Electronics Projects, ATMEGA162 LCD Oscilloscope Circuit "avr project, microcontroller project nice project…... Listed under: LCD Projects 40. ATMEGA8 AT90S4433 WIRELESS RF TEMPERATURE TRANSMITTER And a beautiful project with ATmega8 AT90S4433 your computer from a remote loca the location’s wireless RF system temperature data come Mailbox temperature measured in the test program with garden-temperature condition is displayed... Electronics Projects, ATmega8 AT90S4433 Wireless RF Temperature Transmitter "atmega8 projects, avr project, microcontroller projects, "… under: Medical - Health based Projects, Temperature Measurement Projects 41. LM3886 TDA7318 DIGITAL AMPLIFIER AT90S8535 AT90S8535, TDA7318 and LM3886 have been realized with digital amp system LED Indicator-signal in selection can be made, unfortunately explanations could not solve in a language but ATMEL microcontroller dealing with people a... Electronics Projects, LM3886 TDA7318 Digital Amplifier AT90S8535 "audio amplifier circuits, avr project, ic amplifier,…... Listed under: Sound - Audio Projects 42. ATMEGA168 MOOD POLY CONTROLLED INTERACTIVE LED LIGHT “Polycontrolled Interactive LED Mood Light” is based on Atmel ATMEGA168/88 quite a RGB LED application design professional as well as various modes, speed, the program’s options. I hope I know the main parts... Electronics Projects, ATMEGA168 Mood Poly Controlled Interactive LED Light "avr project, microcontroller projects, " “Polycontrolled…... Listed under: LED Projects 43. SPEED INDICATOR CIRCUITS TACHOMETER ATMEL ATMEGA8 Atmel ATmega series of projects have been realized with the speedometer and LCD display are the different in used circuits. Display circuit used Used atmega8l-8P. Hex file and prepared by Proteus. Dns file there.... Electronics Projects, Speed Indicator Circuits Tachometer Atmel
  • 5.
    atmega8 "atmega8 projects, avrproject, microcontroller projects, "…... Listed under: Metering - Instrument Projects 44. AT89S52 THERMISTOR CIRCUIT THERMOMETER LCD DISPLAY NTC Thermistor Thermometer based on AT89S52 circuit and HIH 3160 humidity sensor h and temperature information is given. Display LCD display circuit and there are two versions of the C source code and schema... Electronics Projects, A Thermistor Circuit Thermometer LCD Display "avr project, microcontroller projects, " NTC Thermistor…... Listed under: Circuits 45. MODEL AIRCRAFT PROJECTS Different models of the project Model Aircraft Model airplane models, drawings, model details, sample circuits, fan motor as well as stock control circuit microchip PIC16F microcontrollers made with a variety of serial... Electronics Projects, Model Aircraft Projects "avr projec microcontroller projects, " Different models of the project…... Listed under: Other Projects 46. COMPUTER CONTROLLED 8-CHANNEL DIMMER CIRCUIT AT90S2313P 200 watt dimmer circuit is controlled from RS232 port with MOC3021 opto isolat driver control program running on xp pretty simple hex to asm code pcb diagram AT90S2313P There have also dosyalarıda... Electronics Projects, Com Controlled 8-Channel Dimmer Circuit 200W AT90S2313P"avr project, microcontroller projects, " AT90S2313P…... Listed under: Circuits 47. WAV PLAYER CIRCUIT WITH ATMEL ATTINY2313 ATtiny2313 microcontroller circuit with MAX232 PC connection can be established based on the pc pro wav file loading the output of the power amplifier TDA2003 integrated amp Atmel Wav Player Circuit Test The... Electronics Projects, Wav Player Circuit Atmel ATtiny2313 "avr project, microcontroller projects, " ATtiny2313 microcontroller…... Listed under: Radio Projects, Sound - Audio Projects 48. USB TO LPT CONVERTER CIRCUIT WITH ATMEL ATMEGA8 Converter from USB to LPT parallel port (25 pin SubD receptacle) with hardware virtualization input/output instruction level Supports all parallel port modes named SPP, EPP and ECP, 16 Byte FIFO depth USB Low... Electronics Projects, USB to LPT Converter Circuit with Atmel ATMEGA8 "atmega8 projects, avr project,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 49. ATMEGA128 ATMEGA32 PC CONTROLLED LED MATRIX ANIMATION LED SIGNS Serve to control the 128×64 graphic LCD with a preview of the contents array and menu graphics. The heart of the controller is Atmega 128 CPU for communication with the PC corresponds... Electronics Projects, ATMEGA1 ATMEGA32 PC Controlled LED Matrix Animation LED Signs "avr project, microcontroller…... Listed under: LED Projects 50. AT89S52 8051 RF DC MOTOR SPEED CONTROL Wireless within a certain area with a control circuit for controlling the speed of DC Motor. Work, should reach my goal I began to identify materials. These materials AT89S52 microcontroller, our... Electronics Projects, AT89S52 8051 RF DC Motor Speed Control "8051 example, avr project, keil…... Listed under: Motor Projects 51. 89C51 8051 VOLTMETER THERMOMETER DS1621 ADC0808 ADC 0808 standard data acquisition systems many components on a single chip host is a m ADC 0808 8-bit flip makes the process and addresses from input latch 8-channel data selection (multiplexer) and...Electronics Projects, 89C51 8051 vo thermometer DS1621 ADC0808 "8051 example, avr project, keil example,…... Listed under: Metering - Instrument Projects 52. CALCULATION OF BODY LENGTH WITH 8051 AND DS89C430 In this project, which is designed using DALLAS DS89C430 microcontroller (in simulation AT89C51RC2) circuit and a marching band, calculated on the length of the body, the LCD display was performed. Circuit consists of three... Electronics Projects, Calculation of Body Length with 8051 and DS89C430 "8051 example, avr project,…... Listed under: Calculator Projects 53. AT89C51 8051 GRAPHIC LCD ANIMATION GLCD Animation circuit voltage is applied to the currently displayed map of Turkey comes first. Subsequently Turkish flag and a picture of Mustafa Kemal Atatürk, the next step is to come. Art world... Electronics Projects, AT89C51 8051 Graphic LCD Animation "8 example, avr project, keil example, microcontroller…... Listed under: LCD Projects 54. AT89C51 L293D DC MOTOR WITH DOOR CONTROL CIRCUIT The main purpose of the circuit is to control the gate of the house. This DC motor and pro two limit switches is provided by mechanical parts. The two buttons open and close... Electronics Projects, AT89C51 L293D DC Motor with Door Contro Circuit "8051 example, avr project,…... Listed under: Motor Projects 55. AT89C51 SQUARE WAVE SIGNAL GENERATOR Signal generator test is often the recipients of the amplifiers used in the test and repair of this equipmen the signal source. Wave detector, radio frequency used in places such as bridges.... Electronics Projects, AT89C51 Square Wave Signal Generator "8051 avr project, keil example, microcontroller…... Listed under: Radio Projects, Sound - Audio Projects
  • 6.
    56. DISEQC TESTERCIRCUIT WITH ATMEL ATTINY13 This device is designed to help define the way DiSEqC-switches to the working protocols 1.0 and 1.1 an number of entrances to 4 – x. It feeds the unit from the source of... Electronics Projects, DiSEqC Tester Circuit with Atmel ATtiny13 "avr project, microco projects, " This device…... Listed under: Circuits 57. MONITOR TEST CIRCUIT WITH ATMEGA88 color image of a classic test circuit will monitor the audio output of this circuit in addition to the music in the from the old ateri amp could work in the test... Electronics Projects, Monitor Test Circuit with atmega88 "avr project, microcontroller projects, " color im of…... Listed under: LCD Projects 58. ATMEL ATMEGA8 IR DETECTOR CIRCUIT 8-channel approach to IR detector sensor circuit is realized with ATmega8 microcontroller. I2C bus (TWI, SMBu measuring through the obstacle detection, designed for mobile robot. Approach reflects the beam of infrared light detector... Electronics Projects, Atm ATMEGA8 IR detector circuit "atmega8 projects, avr project, microcontroller projects, " 8-channel…... Listed under: Circuits 59. AT89C51 MICROCONTROLLER ANALOG CLOCK FOR GRAPHIC LCD Analog Clock GLCD We use 128×64 pixel graphical LCD having “HY-12864K” is. This a file extension of the LCD connections are provided in PDF. 128 × 64 graphic LCD s have the same... Electronics Projects,AT89C51 Microcontroller Analo Graphic LCD "8051 example, avr project, keil…... Listed under: Clock Projects 60. AT89C51 ANIMATED BMP GRAPHIC LCD DISPLAY AT89C51 microcontroller controlled Animated BMP project usnig Graphic LCD Display 128×64 project source code and proteus isis simulation schematic files Graphic LCD Animated BMP Schematic project files: at89c51-animated-bmp-graphic-lcd-displa author: Cihangir Kılıç... Electronics Projects, AT89C51 Animated BMP Graphic LCD Display "8051 example, avr project, keil example, microcontroller pro Listed under: LCD Projects 61. 8051 PS2 KEYBOARD WITH LCD WRITING TEXT PS / 2 protocol used text via a keyboard microcontroller applications that perform printing text on the L keyboard microcontroller to print text on the LCD. Through keyboard microcontroller...Electronics Projects, 8051 PS2 Keyboard with LCD Writing Text " example, avr project, keil…... Listed under: LCD Projects 62. ATMEGA32 10A 2-CHANNEL METER WITH LCD DISPLAY   PID Temperature Controller Max232 PC via RS232 serial port connection can be made Accordi information I found PID Temperature Controller is accurate temperature control system i AT90S2313 control system with high mains voltage... Electron Projects, AT90S2313 Computer Supported PID Temperature Controller "avr project, microcontroller projects, " PID…... Listed under: Temperature Meas Projects 63. ATMEGA32 10A 2-CHANNEL METER WITH LCD DISPLAY 10 Ampere circuit Ampere meter based on ATmega32 128×64 large LCD display it measures 10 channel AC DC used sed1330 Automatically Detect This project is a 2 channels amp meter. Those...Electronics Projects, ATmega32 10A 2-channel mete LCD display "avr project, microcontroller projects, " 10…... Listed under: Metering - Instrument Projects 64. ATMEGA128 MMC CARD SUPPORTED 3-COLORS LED SIGN MESSAGE BOARD ATmega128 microcontroller based on the ATmega128 a quality marquee p instead of text information stored on the MMC card codes shared resources At the beginning this project was to buy a led sign to...Electronics Projects, ATmega128 MMC Card Supported 3-Colors LED Sign Message Board "avr project, microcontroller…... Listed under: LED Projects 65. ATMEGA8 MOTORCYCLE ALARM CIRCUIT Separate power supply. Signalling on mobile phone call.This function has only a few hundred euros more exp equipment. motorcycle into the phone by calling The digital alarm input is a normally closed contact. The... Electronics Projects, ATmega8 Motorcycle a circuit "atmega8 projects, avr project, microcontroller projects, " Separate power…... Listed under: Sensor - Transducer - Detector Projects 66. 8051 ROBOT ARM STEPPER MOTOR CONTROL In this 8051 Robot ARM application I use for robot arm 3 stepper motor design, study and is to be infor about the expulsion. Stepping motors to provide work, applied to the ends of... Electronics Projects, 8051 Robot ARM Stepper Motor Control "avr proje microcontroller projects, " In this…... Listed under: Robotics - Automation Projects 67. 8051 ELEVATOR PROJECT STEPPER MOTOR CONTROL This application step (step) motor control, input and output ports through 8051 will examine the providing lift. We use our stepper motor circuit. As we know, certain steps of the stepper motor,... Electronics Projects, 8051 Elevator Project Stepper M Control "avr project, microcontroller projects, " This application…... Listed under: Motor Projects 68. MICROCONTROLLER CONTROLLED METAL DETECTOR PROJECTS Result of displays in the form of two scales, which are estimated to judge the materia addition, the screen is small scale level of response and the current supply voltage. PIC18F252 The program... Electronics Projects, Microcontroller Con Metal Detector Projects "avr project, microcontroller projects, " Result of displays…... Listed under: Sensor - Transducer - Detector Projects
  • 7.
    69. AT89C51 L293DMOTOR CONTROL PROJECT AT89C51 L293D Motor Control Circuit Operation, Our project name and the name suggests, the treadmill motor control is required. When designing this project, I saw fit to use DC motors. Because the...Electronics Projects, AT89C51 L293D Motor Control Pr project, microcontroller projects, " AT89C51 L293D Motor…... Listed under: Motor Projects 70. ATMEGA168 JAVA GUI INTERFACE NIMH CHARGE CIRCUIT Source files are Java and C Diff communication with the computer via the RS232 port is made 2 × 16 LCD display also got on the circuit with... Electronics Projects, ATmega168 Java GUI Interface NIMH Charge Circuit "avr project, battery charger ci Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 71. AT89C51 5X7 LED MATRIX APPLICATION Circuit Operation: This practice of over 5 × 7 matrix LED A… Z characters are intended to be created. Provision characters in source code LEDs (table) was created and when necessary with the... Electronics Projects, AT89C51 5X7 LED Matrix Application "8051 exa project, keil example, microcontroller…... Listed under: LED Projects 72. AT89C51 LCD DISPLAY FREQUENCYMETER PROJECT Frequency in all matters relating to the definition based on frequency is required. In the same way numeric (digital) Frequency frequency to do the same as the description of the circuit should be... Electronics Projects, AT89C51 LCD display Frequency Project "8051 example, avr project, keil example, microcontroller…... Listed under: LCD Projects 73. AT89C51 KEYPAD CONTROLLED SCROLLING LED DOT MATRIX TEXT AT89C51 Scrolling LED Circuit Operation: Keypad’t the values entered the program continually monitored, “*” key is pressed unless the display of the first letter that section required all letters appear, but the... Electronics Projects, AT8 Keypad Controlled Scrolling LED Dot Matrix Text "8051 example, avr project,…... Listed under: LED Projects 74. AT89S52 LCD DISPLAY STEPPER MOTOR CONTROL EXAMPLE AT89S52 Stepper Motor Control Stepper motor, the motor angular position is changing in This engine is moving into specific steps, according to the windings is controlled by sending signals. Any stimulus that would... Electronics Projects, AT8 Display Stepper Motor Control Example "8051 example, avr project, keil…... Listed under: LCD Projects 75. 8051 CALCULATOR CIRCUIT 8051 Calculator Circuit Operation As seen at half one has to use the keypad and an LCD with 8051. The keypad consists of columns. When the button is pressed certain keys combined... Electronics Projects, 8051 Calculator Circuit "8051 example, avr project, keil example, microcontroller projects, " 8051…... Listed under: Calculator Projects 76. 8051 ADC0808 LCD DISPLAY VOLTMETER ADC0808 analog / digital converter of the 8 analog inputs (IN0-IN7) and 8-bit digital output (OUT0-OUT7) are Entries will be transferred to the digital output of the converter which converted to 3-bit ADD,...Electronics Projects, 8051 ADC0808 Lcd Display Voltme example, avr project, keil example, microcontroller…... Listed under: LCD Projects 77. LED DISPLAY SPEED METER CIRCUIT WITH AT89C51 Speed Meter Circuit consists of four parts. These Supply solid floor Sensor sensor, microcontroller microcontroller solid hexadecimal numbers we obtained from the 7-segment display technology with time code converter solid. Program Keil µVision3... Electronics Projects, LED Display Speed Meter Circuit with AT89C51 "8051 example, avr project, keil…... Listed under: LED Projects 78. 8051 STOPWATCH CIRCUIT WITH LCD DISPLAY Stopwatch Circuit 8051 on behalf of the programming of integrated compiler program that is used too m left with only the easiest to use and most advantageous for... Electronics Projects, 8051 Stopwatch Circuit with Lcd Display "8051 example, avr project, example,…... Listed under: LCD Projects 79. USB CONTROLLED WEB SITE HIT COUNTER ATMEL ATTINY25 WITH DELPHI Web site counts the number of inputs to the circuit .. Circuit attiny25 an inte and MAX7219 section based on the indicators used for the 7-segment display 8 hunting and Delphi source code are... Electronics Projects, USB Contro Site Hit Counter Atmel Attiny25 with Delphi "avr project,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 80. EMBEDDED RTL8019AS WEB SERVER PROJECT ATMEGA103 I quickly was able to appeal to the network card via a 8-bit data bus. The connectivity of the card and thus the RTL8019AS chip via two 8-bit ports of the processor and... Electronics Projects, Embedded RTL8019AS Web Server Project ATMega10 project, microcontroller projects, " I quickly…... Listed under: Internet - Ethernet - LAN Projects
  • 8.
    81. USB PORTRELAY CONTROL WITH ATMEL ATMEGA8 6 relay control units can be made via the usb port usb drive computer program code and schema fi pcb circuit to regulate the supply 9-12 volt ac section there on the SPI... Electronics Projects, USB Port Relay Control with Atmel Atmega8 "atmega8 pro project, microcontroller…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 82. AT89C51 DS1621 THERMOMETER CIRCUIT AT89C51 Operation of the thermometer circuit DS1621 temperature sensor circuit using a digital thermome tell if I made . As a simple circuit operation is as follows; The numerical value obtained from the temperature... Electronics Projects, AT89C51 DS1621 Thermometer Circuit "8051 example, avr project, keil example, microcontroller…... Listed under: Temperature Measurement Projects 83. PC CONTROLLED AT90S2313 LED ANIMATION CIRCUIT Why I write about it? This system uses two ready rolls 5 x 8 LED matrix, 89C2051, is a programm serial port and it can be very easy to adapt to the needs of... Electronics Projects, PC Controlled AT90S2313 Led Animation Circuit "avr project, microco projects, " Why I…... Listed under: LED Projects 84. AT89C2051 WITH DOT MATRIX DISPLAY APPLICATIONS 4 Piece AT89C2051 microcontroller project has been realized with matrix display isis proteus sim and asm files available in hex code Atmel AT89C2051 • Compatible with MCS®-51Products • 2K Bytes of Reprogrammable Flash Memory... Electronics Projects, AT89C2051 with Dot Matrix Display Applications "avr project, microcontroller projects, " 4 Piece…... Listed under: LED Projects 85. ANALOG LED CLOCK CIRCUIT AT89C2051P 301 LED Analog Clock Project Schema Files of PCB and C51 Compiler Source Code has been prepared by th The clock circuit is made of 301 LEDs with a diameter of 3mm... Electronics Projects, Analog LED Clock Circuit AT89C2051P "avr project, led projects, microcontroller projects, " 301…... Listed under: LED Projects 86. PC CONTROLLED FLOWER WATERING CIRCUIT WITH ATMEGA8 As far as I understand an interesting project information via computer is determined irr required time data exchange via RS232 com port has made the source code and diagrams...Electronics Projects, PC Controlled Flower Watering Circuit ATmega8 "atmega8 projects, avr project, microcontroller…... Listed under: Sensor - Transducer - Detector Projects 87. ATMEL ATMEGA8 MULTIMETER CIRCUIT (LED DISPLAY) Hello, “Multimeter” was the only title that first came to my mind to. Voltmeter (positive DC volta 0.00 to 9.99 V and 10.0 – 30.0 V with automatic range switching. Frequency counter 0... Electronics Projects,Atmel Atmega8 Multimeter Circuit (led display) "atmega8 projects, avr project, microcontroller projects, "…... Listed under: LED Projects 88. 8051 PROGRAMMABLE POWER SUPPLY Circuit Operation: Circuit diagram appears in the 0-5 the entered value from the keypad circuit, which is conne port P1 applied to the integrated DAC 0808 DAC output is obtained from the analog...Electronics Projects, 8051 Programmable Power Supply "8051 ex project, keil example, microcontroller projects, "…... Listed under: Circuits 89. DS1302 RTC 8051 DIGITAL CLOCK CIRCUIT (LCD DISPLAY) 8051 keil example application circuit LCD Display Digital Clock using DS1302 RTC 8051 Digital Schematic 8051 Digital Clock Circuit keil source code and proteus isis simulation schematic files: ds1302-rtc-8051-digital-clock-circuit-lcd-display.rar au @Aytan ASLAN... Electronics Projects, DS1302 RTC 8051 Digital Clock Circuit (LCD Display) "8051 example, avr project, keil…... Listed under: Clock Proje 90. 89C51 DIGITAL CLOCK CIRCUIT From the incoming data encoded in Port0 integrated 7-segment display with 7447 microcontroller integrated ulaşır.744 code from the 7-segment display is used to show. So when it comes to 0000 a, b, c,...Electronics Projects, 89C51 Digital Clock Circuit "8051 example, av keil example, microcontroller projects, "…... Listed under: Clock Projects 91. AT89S52 DS1620 THERMOMETER CIRCUIT (LCD DISPLAY) This project gave ds1620’n given as a result of the digitally using AT89S52 microcontroller is a display of temperature information of the LCD screen. Moreover, the circuit ambient temperature when it reaches a...Electronics Projects, AT89S52 DS Thermometer Circuit (LCD Display) "8051 example, avr project, keil example,…... Listed under: Circuits 92. LCD DATE TIME TEMPERATURE AT89C52 DS18B20 DS1302 Atmel microcontrollers with a good example for the use of DS18B20 DS1302 circuit 2 × 16 L with 4 buttons in circuit adjustments can be made The first button is a long hold... Electronics Projects, LCD Date Time Temperature AT89C52 DS18B20 DS1302 "8051 example, avr project, keil…... Listed under: LCD Projects
  • 9.
    93. 8051 MICROCONTROLLERUP DOWN COUNTER CIRCUIT (KEIL) With 8051 DOWN COUNTER The basic principle of this circuit based on the number ent the keypad is left counting down or up. # On the keypad to make counting down and counting... Electronics Projects,8051 Microcontroller Up Down Co Circuit (keil) "8051 example, avr project, keil…... Listed under: Circuits 94. PS2 KEYBOARD KEYLOGGER CIRCUIT ATMEL AT89C2051 KeeLog has decided to release an early version of it's hardware keylogger family to the public software source code, keylogger hardware electrical schematics, and documentation. This PS/2 key logger is a 100% operational and tested device, ass and used by hundreds of…... Listed under: Other Projects 95. RTL8019 ISA WEB SERVER CIRCUIT ATMEGA32 RELAY CONTROL CAMERA CONNECTION Very detailed and complicated project all of the resources to be for different applications feyza can give example might now mikrocontroller.co my site ATmega32 web server project shared resources of the project the... Electronics Projects, RTL8019 ISA Web Server Circuit ATmega32 Relay Control Camera Connection "avr project,…... Listed under: Circuits 96. ADC0831 8051 LM35 TEMPERATURE CONTROL WITH LCD SCREEN Adc 0831 with 8051 lm 35 temperature sensor, and a detailed project examples for inverters. author :Özer Deniz Objective: LM 35 temperature sensor dealt with 0831 ADC analog-to-digital conversion of knowledge,... Electronics Projects, ADC0831 8051 LM35 Temperature Control with LCD Screen "avr project, microcontroller projects, "…... Listed under: LCD Projects, Temperatu Measurement Projects 97. 8051 SRF04 ULTRASONIC DISTANCE METER CIRCUIT 8051 srf04 ultrasonic distance measurement application also contains information about the diffe controllers and this information can be useful for applications 8051 microcontroller distance measurement using ultrasonic transceiver done. Studies microcontrollers 8051 with... Electronics Projects, 8051 SRF04 Ultrasonic Distance Meter Circuit "avr project, microcontroller projects, " 8051 srf04…... L under: Metering - Instrument Projects 98. NIMH NICD BATTERY FAST PWM CHARGER CIRCUIT ATMEL AVR Battery charging circuit atmel attiny26lp based on switched PWM works as a fast charg the switching circuit 100UH coil and irf5305 irl3803 MOSFETs used charging current of 300 mA, 600 mA …...Electronics Projects, NiMH NiCd Battery Fas Charger Circuit Atmel AVR "avr project, battery…... Listed under: Battery Projects 99. USB JOYSTICK CONVERTER FOR ATARI, AMIGA, COMMODORE 64 Old atari, commodore-64, amiga joystick you can use on your computer usb converte circuit based on Atmel ATmega8-pin adapter does not require power from the USB port in addition to working with 5Volt...Electronics Projects, USB Joy Converter for Atari, Amiga, Commodore 64 "avr project, microcontroller projects, "…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 100. 27 MHZ WIRELESS KEYBOARD SPY CIRCUIT ATMEL ATMEGA64 In an article “Symantec warns: each word or phrase that you enter on the wireless keybo be tracked!” Was called I knew it was true, but such a project would never have thought... Electronics Projects, 27 MHz Wireless Keyboard SPY Circuit A ATmega64 "avr project, microcontroller projects, "…... Listed under: Circuits 101. DIGITAL AUDIO CONTROL CIRCUIT NOKIA 3310 LCD ATMEL ATMEGA8 TDA7439 My old chassis while stirring an old stereo on the chassis tda7439 foun integrate these with making an application decided and ultimately such a nice application appeared application If we are talking...Electronics Projects,  Audio Control Circuit Nokia 3310 LCD Atmel ATmega8 TDA7439"atmega8 projects,…... Listed under: Sound - Audio Projects 102. TV OSCILLOSCOPE CIRCUIT WITH ATMEGA8515 ATTINY12 Attiny12 ATMEGA8515 a very interesting project based on digital solid-source software and schema files, PCB’s drawin people working with Atmel series microcontrollers can give different ideas can be useful in different projects analogue... Electronics Projects, TV Oscilloscope Circuit with ATme ATtiny12"avr project, microcontroller projects, " Attiny12 ATMEGA8515 a…... Listed under: LCD Projects 103. ATMEL ATMEGA PROJECTS THERMOMETER LM35, DISPLAY, KEYPAD Atmel ATMEGA series made with micro-controller’s three projects which can delive bahramelectronic. site manager of @ Bahrain thanks to my brother. 1 – ATMega16 LCD display temperature measurement (LM35) 2 – 7 segment... Ele Projects, Atmel ATmega Projects Thermometer LM35, Display, Keypad "avr project, microcontroller projects, " Atmel…... Listed under: LCD Projects 104. DIGITAL TONE CONTROL CIRCUIT ATMEL ATTINY2313 LM1036 Recently a similar application I’ve done, but ds1844 integrated can not be found had be problem AVR reviewing ATtiny2313 `fame four PWM channels, saw direct this practice came to my mind bass treble...Electronics Projects, Digital Tone Circuit Atmel ATTINY2313 LM1036 "avr project, microcontroller projects, " Recently…... Listed under: Sound - Audio Projects
  • 10.
    105. 8051 BASCOMAVR PROJECTS ATMEL CIRCUITS ARCHIVE With Atmel series (AT89C2052, AT90S2313, AT89S8252, etc..) Was very spacious with quality ar series microcontroller atmel version of the circuit can find a lot. Usb, alarm, LCD, nokia 3310, nokia 6100, display, LED,... Electronics Projects, 8051 Basc Projects Atmel Circuits Archive "avr project, microcontroller projects, " With…... Listed under: LCD Projects 106. USB UART CONVERTER PIC16F88 CIRCUIT ATTINY2313 Recently circuit on the web I’ve seen perform this southern been applying If we are talking appl atmel’s famous ATtiny2313 achieves with USB UART converter further circuit 8bit I / O 128-byte EEPROM 32-byte...Electronics Projects, USB UART Conv PIC16F88 Circuit Attiny2313 "avr project, microchip projects, microcontroller projects,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 107. ATMEL AT90S2313 COMPUTER-CONTROLLED SCROLLING LED TEXT All details were shared with the marquee circuit computer control program atmel a source software image format PCB, schematics and drawings have OrCAD source. The marquee on the circuit The marquee circuit 350 leds... Electron Projects, Atmel AT90S2313 Computer-Controlled Scrolling LED Text "avr project, microcontroller projects, " All details…... Listed under: LED Projects 108. HDD CLOCK CIRCUIT ATMEL ATMEGA128 DS1307 TDA5410 MOTOR DRIVER Before “Broken HDD Evaluate under the heading” corrupted hard disks to a few apps I’ve used on the web with the sandpaper I I told you about that time had projects now hardisk... Electronics Projects, HDD Clock Circuit Atme ATmega128 DS1307 TDA5410 Motor Driver "avr project, led…... Listed under: Clock Projects 109. 100WATT PV PANEL CONVERTER ATMEGA8 100W DC TO AC ICL7667 ETD34 The use of solar energy will be the topic for a long time an active electronic used a lot in this business at one of these inverter dc to ac converters. Ac... Electronics Projects, 100Watt PV Panel Converter Atmega8 100W DC to AC ETD34 "atmega8…... Listed under: Solar energy projects 110. POWER LED DRIVER CIRCUIT LED CURRENT SOURCES ATMEGA8 PWM Power LED driver circuit based on Atmel ATmega8 is working with 12 volt 3 1 watt Luxeon power LEDs wi buck converter is operated ATmega-8 a good example source code to solve logic... Electronics Projects, Power LED Driver Circuit LED Current Sources A PWM "atmega8 projects, avr…... Listed under: LED Projects 111. PCB PRINTING WITH EPSON CX4200 INKJET PRINTER MODIFIED Prepared by: Volkan Sahin – First of all you need to know when the project was challen if there is the possibility worthwhile CX4200 Epson inkjet to print text by modifying the... Electronics Projects, PCB Printing with Epson CX4200 inkje Modified "avr project, microcontroller projects, "…... Listed under: Other Projects 112. MICRO ROBOTIC FLY SCREEN CLEANER AT90LS8535 ROBOT BUG A very interesting robot project ratchet içintasarl been cleaning the flapper cleaner ro of the system microcontroller atmel at90ls8535 source software given c. Uygulayamasa sections of the circuit on the robot project source... Electronics Projects, Micro Robotic Fly screen cleaner AT90LS8535 Robot BUG "avr project, microcontroller projects, "…... Listed under: Robotics - Automation Proj 113. CNC DRILLING MACHINE CONTROL DIRVE BOARD ATMEL AT89C2051 L297 L298 Printed circuit board drilling machine on the Atmel AT89C2051 microc L297 L298 motor drivers.. software does not open hex code provided free computer control program, but other parts of the circuit (motor drives, serial... Electronics Projects, CNC Drilling Machine Control Dirve Board Atmel AT89C2051 L297 L298 "avr project,…... Listed under: CNC - Printing Machi Projects 114. 2.4 GHZ SPECTRUM ANALYZER CIRCUIT NOKIA 3410 LCD ATMEGA8 Mobile phones with Nokia 3410 LCD screens often used microcontrollers Atmel AT and cywm6935 nokia 3410 LCD modules made with a 2.4 GHz spectrum analyzer circuit Handheld 2.4 GHz Spectrum Analyzer Circuit After visiting... E Projects, 2.4 GHz Spectrum Analyzer Circuit Nokia 3410 LCD ATmega8 "atmega8 projects, avr…... Listed under: Circuits 115. ATMEL ATMEGA8 VIA USB CONTROL CIRCUIT Hi, I have done recently attiny2313’l usb application (ATTINY2313 PIC16F88 USB UART converter circuit) th needs at this time on I did with ATmega8. RS232 portion of the circuit 15 disuse I /... Electronics Projects, Atmel Atmega8 via USB Control Circuit "atmeg projects, avr project, microcontroller projects, "…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects
  • 11.
    116. LIGHT FOLLOWINGROBOT WITH ATMEL ATTINY25 Light following robot circuit board on attiny25v not very complicated circuit Lithium-polymer batter provided with the circuit feeding the tiny H-bridge output (2N3904) drive motors are controlled with two LDR light is perceived. As... Electronics Project Following Robot with Atmel ATtiny25 "avr project, microcontroller projects, " Light following…... Listed under: Robotics - Automation Projects 117. TRANSISTOR TESTER CIRCUIT ATMEGA8 LCD DISPLAY Transistor very useful for testing the circuit, but I do not know more pic programming with atmel seeing this type of advanced applications get confused Transistor test circuit, BJT, MOSFET, triac,...Electronics Projects, Transistor Tester Circuit ATM Display "atmega8 projects, avr project, microcontroller projects, "…... Listed under: Circuits 118. ATMEGA8 PROGRAMMABLE CONTROLLER BOARD ELECTRONIC PLC CIRCUIT Tiny Basic Controller (TBC) is a simple device that can operate as a PLC (p automation, control, etc. For example, this one can dial-up by modem to the remote computer and control the system, can control some processes, temperature regulation, battery charging,…... Listed under: Development Board - Kits Projects 119. FOR ALL THE TELEVISION REMOTE CONTROL (JUST OFF) 90% of all leisure joke circuit television (including plasma, LCD) is said to work 30 … 50 meters space closes the television. Circuit made ATTINY85V-10 micro-controller circuit with two 1.5v AA battery...Electronics Projects, For all the television rem control (just off) "avr project, microcontroller projects, "…... Listed under: Other Projects 120. AT89C52 APPLICATIONS EXAMPLES PROTEUS ISIS CIRCUITS (10 PROJECTS) AT89C52 examples of applications can be helpful for beginners of all sample prepared with simple 3 .5 source lines of code. Bass. Hex, bin, etc.. isis proteus have codes and simulation files. 0-255 binary...Electronics Projects, AT8 Applications Examples Proteus isis Circuits (10 projects) "avr project, microcontroller projects, "…... Listed under: Circuits 121. ATMEL AT89C2051 CLOCK CIRCUIT WITH LED DISPLAY Pretty stylish digital clock circuit of the display to show information on the hours, but around kıl with 120 LEDs in display attracts attention also has an alarm feature. Microprocessor AT89C2051 LED clock...Electronics Projects, Atmel AT89C2051 Clo with LED Display "avr project, led projects, microcontroller…... Listed under: Clock Projects 122. STEREO 64LEDS VU METER CIRCUIT ATMEGA8 Lately, when I went deeper into programming, I was fascinated by precise A / D converters in microcontrollers. And so I decided to make a 2x32 LED VU meter with the ATmega8 microcontroller, which can be bought for example in GME for only so…... Listed under: LED Projects 123. 3-20V 01-10A POWER SUPPLY CIRCUIT ATMEGA8 LCD AMMETER, VOLTMETER What cannot do more than one radio amateur? What can not be more than one radio amateu right - without a GOOD power supply, or even better, a GOOD TWO-CHANNEL power supply. That's right - without a GOOD power supply, or even better, a…... Listed under 124. OPERATED WASHING MACHINE CONTROL CIRCUIT WITH ATMEGA32 ATmega32 microcontroller based on the project is already quite interesting and a professional I see this type of advanced projects ATMEL series Some sections of the circuit MOC3043 opto diac, MOC3023 isolated with LCD... Electron Projects, Operated Washing Machine Control Circuit with ATmega32 "avr project, microcontroller projects, " ATmega32 microcontroller…... Listed unde 125. THERMOMETER CIRCUIT DS1820 ATMEGA32 SIEMENS S65 LCD Thermometer circuit board ATmega32 used on the LCD display DS1820 sensor used in Siemens S65 mobile phone graphic LCD LS020 ATmega32 project’s source code S65 LS020 bitmap bmp files for graphic LCDs and... Electronics Projects, Thermometer Circuit DS1820 ATmega32 Siemens S65 LCD "avr project, microcontroller projects, " Thermometer…... Listed under: Circuits 126. TANK ROBOT ATMEGA48 BLUETOOTH JAVA PROJECT Introduction After two more complex robots ( Eurobot2008 and Robot2 ), I decided to build a small and simple car. The ch on a plastic tune, which was controlled by two AA pencil monoculars - similar toys can be found in toy shops, on soils or in bazaars. Others are…... Listed under: Robotics - Auto Projects 127. ATMEL ATMEGA8 NOKIA6100 LCD PCF-8833 APPLICATION Nokia 3310 screen already had several applications with bi-color LCD at this time I decided t experiment with it. Heavily on the market, the Nokia 6100 LCDs and their controllers for microchip using Atmel...Electronics Projects, Atmel Atmega8 N LCD PCF-8833 Application "atmega8 projects, avr project, microcontroller projects, "…... Listed under: LCD Projects
  • 12.
    128. TFT LCDOV7660 ATMEL ATMEGA32 APPLICATION EXAMPLE ILI9325 DRIVER Emerging technologies on the market with LCD prices quite fell microcontr applications proliferate mobile phone, mp4 and graphic LCDs became available, especially Atmel series with enhanced graphics LCDs can be used ATm 320... Electronics Projects, TFT LCD OV7660 Atmel ATmega32 Application Example ili9325 Driver "avr project, microcontroller…... Listed under: LCD Proj 129. TFT LCD DIGITAL PHOTO FRAME ATMEGA128 SD CARD TSC2046 Digital Photo Frame TFT ATmega128 TFT source C code of practice are used to SPFD54 LCD 3.2 inch 320 × 240 size images displayed in the SD card. Source: ourdev.cn/ Digital Photo Frame... Electronics Projects, TFT LCD Digital Photo Fram ATmega128 SD Card TSC2046 "avr project, microcontroller…... Listed under: LCD Projects 130. ATMEGA16 TOUCHSCREEN PROJECT TFT APP AVR GCC ILI9325 Touch TFT application based on ATMega16 processor used in the 16 MHz frequency driv ILI9325 OTM3225, source C code (AVR GCC)’s. Source: ourdev.cn 2.4-inch TFT LCD, point-screen work notes Alternative link: atmega16-touchscreen-pro app-avr-gcc-ili9325.rar... Electronics Projects,Atmega16 Touchscreen Project TFT App AVR GCC ILI9325 "avr project, microcontroller projects, " Touch….. under: LCD Projects 131. ATMEGA128 AVR GRAPHIC LCD APPLICATION SIEMENS S65 LS020 Siemens s65 using the Atmel ATmega128 caption to display graphics on the LCD all t resources an application prepared S65 LCD driver library, sample text and detailed graphics shared C code. S65 application is... Electronics Projects, AT AVR Graphic LCD Application Siemens S65 LS020 "avr project, microcontroller projects, "…... Listed under: LCD Projects 132. AT89C2051 DIGITAL SCALES CIRCUIT ATMEL This is a kitchen scale with a maximum weight of 2.5kg and an accuracy of 10g. Exceeding the range is ind an acoustic signal and an LED. Weight is displayed on a four-digit LCD display. The weight also includes a weight-zero reset button. The power is solved Listed under: Circuits 133. PROGRAMMED DOOR ALARM CIRCUIT ATTINY24 ATTINY13 CONTROLLED This simple mini-burglar alarm on the ATtiny 13 microcontroller is designed t apartments, offices, summer cottages ... When the reed switch opens, the alarm beeps or, with a little refinement, you can send an SMS from a mobile phone. The alarm control is carried out…... Listed under: Circuits 134. ADC EXAMPLE ATMEGA8 DIGITAL VOLT METER AMMETER AVR PROJECT ADC - analog-to-digital converter (ADC-Analog-to-Digital Converter). Converts a analog signal to digital. Bitrate ADC determines the accuracy of the signal conversion. Conversion time - respectively, the speed of the ADC. The ADC is embedded in many microcontrollers of the AVR family and simplifies the use of the microcontroller in any regulation schemes…... Listed under: Meter Instrument Projects 135. ATMEL APPLICATION NOTES AND SOURCE C ASM CODE Atmel’s products and practices related to application notes prepared for the asm code source language prepared by the majority of the samples. 138’s application List: 1-Register and Bit-Name Definitions for the AVR... Electronics Projects, Atmel application notes and source c asm code "avr project, microcontroller projects, "…... Listed under: Development Board - Kits Projects 136. RF TRANSCEIVER EXAMPLE WATER GUN PROJECT CIRCUIT TX434 ATMEGA8 RX434 The RF transceiver with ATmega8 prepared samples prepared with C software has all the source code for the application circuit used joke handmade by remote control a water gun at school students...Electronics Proj Transceiver Example Water Gun Project Circuit TX434 ATMega8 RX434"atmega8 projects,…... Listed under: Game - Entertainment Projects 137. ATMEL ATTINY15 MICROCONTROLLER EXAMPLE DC TO DC CONVERTER CIRCUIT Atmel ATtiny15 Microcontroller DC to DC converter circuit 3.6 Li-Ion ba voltage of 5 volts raises a more detailed circuit attiny15 not a good example for software power control with microcontroller assembly language prepared... Electronics Projects, Atmel ATtiny15 Microcontroller Example DC to DC Converter Circuit "avr project, dc…... Listed under: Circuits 138. REMOTE-CONTROLLED DIGITAL TIMER CIRCUIT WITH ATMEL ATTINY2313 Based on Atmel ATtiny2313 microcontroller circuit with the remote control fo reverse control can be done over time led display are viewing. ATtiny2313 by the time specified number 9 which is connected to...Electronics Projects,  Controlled Digital Timer Circuit with Atmel ATtiny2313 "avr project, microcontroller projects, " Based…... Listed under: Clock Projects 139. ATMEGA8 BIPOLAR STEPPER MOTOR DRIVER CIRCUIT L293B Bipolar stepper motor control circuit 6v … 35v inter able to run power 1 amp on the circui program, sensor, PWM, UART has links ATMega8 output used in motor drive l293b circuit of... Electronics Projects,ATMega8 Bipolar Stepper Motor Driv L293B "atmega8 projects, avr project, microcontroller…... Listed under: Motor Projects
  • 13.
    140. 220V SOLDERINGIRON TEMPERATURE CONTROL WITH AT89C2051 LED DISPLAY Sold in the market potency heat settings with TRIAC 220v temperatur controlled soldering iron more advanced version control AT89C2051 microcontroller is provided by heat setting 2 button is made with indicators, one display... Electronics Projects, 220V Soldering Iron Temperature Control with AT89C2051 LED Display "avr project, microcontroller…... Listed under: Tem Measurement Projects 141. ACTIVE ELECTRONIC LOAD CIRCUIT ATMEGA88 100W DUMMY LOAD In each electronic device in one form or another there is a power supply unit (PSU course, because no one will work for free. Before connecting to the circuit, it would be nice to see how the PSU works at different loads. Personally, I a Listed under: Circuits 142. STAR LED EFFECTS CIRCUIT ATTINY13 PROJECT Stars in the shape of hard work to prepare printed circuit board design for SMD LEDs to be mounted lik deal of attention and effort, but finally emerged quite nice circuit noncontiguous... Electronics Projects, Star LED Effects Circuit ATTINY13 Project "avr p projects, microcontroller projects, "…... Listed under: LED Projects 143. ELECTRONIC PIANO CIRCUIT ATTINY2313 SIMPLE AUDIO PROJECT Atmel ATtiny2313 two 1.5V AA batteries powered electronic piano circuit connected (3V) can be operated. PB3 – PB4 16 on pins 15 and 32 ohm speaker connected to these pins as exit.... Electronics Projects, Electronic Piano Circuit Attin Simple Audio Project "avr project, microcontroller projects, " Atmel…... Listed under: Game - Entertainment Projects 144. How to build alarm security system using motion sensor with PCB Prototyping Introduction Security is important for everyone from our homes to plac work. You need to feel safe when you are sleeping at night. You might have important documents that you need to keep private. Sometimes you have in your house that must be…... Listed under: Security - Safety Projects, Sensor - Transducer - Detector Projects 145. CNC PROJECT ATMEGA16 X-Y-Z MOTOR CONTROL CIRCUIT ATMega16 microcontroller based on a detailed cnc project with computer com RS232 on po communicating project’s source C code, schematics eagle CAM (graphic printout is used to direct the CNC circuitry and sent to)... Electronics Projects, C Project ATMega16 X-Y-Z Motor Control Circuit "avr project, microcontroller projects, " ATMega16 microcontroller…... Listed under: CNC - Printing Machi Projects 146. DSPIC33FJ128GP NOKIA 6100 LCD DRIVER CIRCUIT ATMEGA168   @ Erhan brother Atmega8 prepared with the application had shared (Atmel Atmega8 6100 LCD (pcf8833) application) I In addition to the helpful one more example’ll share the codes and microchip dspıc33fj128gp both the... Electronics Projects, dsPIC33FJ128GP Nokia 6100 LCD driver circuit ATmega168 "avr project, dspic projects,…... Listed under: LCD Projects 147. AT90S8535 SG2524 PWM SOLAR PANEL PV INVERTER CIRCUIT Solar Energy PV inverter systems used in energy production a detailed study about all th about the project (in English) is. PV conversion control is provided by Atmel microcontrollers at90s8535 (source software has... Electronics Projects, AT9 SG2524 PWM Solar Panel PV inverter Circuit "avr project, microcontroller projects,…... Listed under: Solar energy projects 148. NOKIA LCD MODELS PROTEUS ISIS EXAMPLES CIRCUITS LIBRARY Nokia lcd screens, pic, atmel microcontrollers used in this project, with a lot of other j popular as talking about the proteus simulation model for the program, set up a virtual environment, try... Electronics Projects,Nokia LCD Models Prot Examples Circuits Library "avr project, microcontroller projects, "…... Listed under: LCD Projects 149. FREQUENCY METER CIRCUIT LCR METER ATMEGA328 I have been thinking about building an LC meter for a while since I do not have a multimeter that capable of measuring inductance and while the multimeters I have can measure capacitance, they are not able to give accurate readings for small capacitance…... Listed under: Metering - Instrument Projects 150. SMART REMOTE ATMEGA88 CIRCUIT COPY THE TWO BUTTONS This fun project lets you take control away from the person holding the remote control by intercepting the invis signals as they travel through the air so you can play them back to the TV or video machine. You can also "train" your Remote Hijacker…... Listed unde Development Board - Kits Projects 151. 24V 48W DIGITAL SOLDERING STATIONS ATMEGA8 After a year of using my assembled Microfibers according to the Jendy documents23 , I decided to b another (third) microfuel. I wanted to reduce the dimensions, use the 24V AC heating power, to adjust the temperature better and to add additional fu Features of micro-drives : temperature range 80 °…... Listed under: Other Projects
  • 14.
    152. FAST FOURIERTRANSFORMATION FFT CIRCUIT ATMEGA8 SCT2024 LED DRIVER ATmega8 (TQFP32 package) based on FFT Circuit applied the entry sign led display (SCT2024 serial-interfaced LED driver 256 LEDs), you can see in the FFT circuit source C, hex codes have... Electronics Projects, Fast Fourier transformation FFT Circuit ATmega8 SCT2024 LED driver "atmega8 projects, avr…... Listed under: LED Projects 153. LED ANIMATION CIRCUIT ATMEGA168 Last year in one of my classes we were required to make an 'artefact' or something that reflects the interests of Most people make posters and the past two quarters that's what my class did too. Posters however are static, usually boring, and…... Listed under: LE 154. ILI9325 TOUCH-SCREEN PROJECT TFT ATMEGA644 ELT240320ATP Atmel is a great project with a series of applications can be made super graphics use project Atmega644 the ELT240320ATP GLCD (320 × 240) driver ILI9325 Simple as iPhone menu has pacman...Electronics Projects, ILI9325 Touch-Screen TFT Atmega644 ELT240320ATP "avr project, microcontroller projects, " Atmel is…... Listed under: Game - Entertainment Projects 155. LABORATORY ADJUSTABLE 0-24V DIGITAL POWER SUPPLY CIRCUIT ATMEGA8 Power supply circuit two separate sections consisted primarily power sol based on the current settings for the tl082 opamp used current voltage display section Atmel ATmega8 microcontroller used optionally this section ma not... Electronics Projects, Laboratory Adjustable 0-24v Digital Power Supply Circuit ATMega8 "atmega8 projects, avr project,…... Listed under: Developm Board - Kits Projects 156. CURRENT MEASUREMENT DATA LOGGER CIRCUIT ATMEL AVR, PIC Very high current of the current transformer and with microcontroller sensitive way to be recorded will be useful for source code with 2 sample application circuits one of the Atmel AVR ATMEGA48 88/168-P...Electronics Projects, Curren Measurement Data Logger Circuit Atmel AVR, PIC "avr project, microcontroller projects, "…... Listed under: Metering - Instrument Projects 157. AUTOMATIC RABBIT FEEDING SYSTEM ATMEGA8 TIMER In fact, feeding, feeding various timing circuits used for business. Generally puzzling, time-consuming mechanical p getting no special circuitry to rabbits in this project but the authors have used to feed rabbits :)... Electronics Projects, Automatic Rabbit Feeding System ATmega8 Timer "at projects, avr project, microcontroller projects, "…... Listed under: Sensor - Transducer - Detector Projects 158. LED HEART CIRCIUT ATMEGA88 Atmel atmega88 PCB LEDs circuit drawing heart looks great, especially boxing PCAD pcb drawings and diagrams and d code files have a heart-shaped 22 pcs SMD LED flashes with... Electronics Projects, Led Heart Circiut ATmega88 "avr project, led projects, microcontroll projects, " Atmel atmega88 PCB LEDs…... Listed under: LED Projects 159. LED PROPELLER CIRCUIT AT90S2313 ATINY2313 Printed circuit board layout pcb design effects with LEDs been a good practice to work in the dark whe with an ultra bright LEDs looks very nice. Atmel AT90S2313 64 LEDs instead of... Electronics Projects, Led Propeller Circuit AT90S2313 ATINY2313 "avr p projects, microcontroller projects, " Printed…... Listed under: LED Projects 160. ATMEGA16 LEDS SNOW EFFECT CIRCUIT LED SNOW CRYSTAL It really is a great led light application LEDs so fluently is moving a profit crystalline with m been excellent ATMega16 microprocessor 32 Edet output used to all the LEDs griplar connected software...Electronics Projects, ATMega16 LEDs Snow Circuit LED snow crystal "avr project, led projects,…... Listed under: LED Projects 161. 15A MOTOR SPEED CONTROL CIRCUIT ATTINY45 PWM Used in motor speed control circuit microcontroller atmel attiny45p exit number 5 Kubla conne pin opto pc817 pc817 output while the engine is controlled as isolated MOSFETs have bs170 and irlz34 Attiny45 Pb4... Electronics Projects, 15A Motor Control Circuit Attiny45 PWM "avr project, microcontroller projects, pwm…... Listed under: Motor Projects 162. LED EFFECT CIRCUIT ATTINY2313 MULTI FUNCTION Led effect circuits, including myself, a lot of people might be interested, especially this sort LEDs an circuits have great interest in blue, white, LED prices now old and not so expensive LED... Electronics Projects, Led Effect Circuit Attiny2313 Multi Funct project, led projects, simple circuit…... Listed under: LED Projects 163. RGB LED EXAMPLE CIRCUIT ATMEGA88 ATMEGA8 ATMEGA48 White LEDs, blue LEDs, ultra bright LEDs RGB LEDs saying quite a lot in the sample applic popular microcontrollers are used in this circuit, atmega8 ATMEGA48 Atmega88 ATmega output MOSFETs are driven by... Electronics Projects, RGB Led Circuit Atmega88 Atmega8 Atmega48 "atmega8 projects, avr project, led…... Listed under: LCD Projects 164. HDD BRUSHLESS MOTOR DRIVER CIRCUIT ATMEGA8 Brushless motor drive circuit used in computers hard drive with Atmega8 checked the engine ATm output MOSFET (IR4427, IRFZ44) strengthened engine with A, B, C, D, attached to either end. Software is written... Electronics Projects, HDD Brushless driver Circuit Atmega8 "atmega8 projects, avr project, microcontroller projects, "…... Listed under: Motor Projects
  • 15.
    165. ATMEGA32 LEDCUBE CIRCUIT 74HCT238 On the Internet, atmel, microchip series microcontrollers with a lot Led cube has a project in this application them, but diagrams, photos, supplemented with a detailed description there thanks to this project...Electronics Projects, Atmega32 LED Cube Circuit 74HCT238 "avr project, led projects, microcontroller projects, " On…... Listed under: LED Projects 166. USB POWERED INDUCTANCE METER CIRCUIT ATMEGA8 Coil measurement “Inductance Meter” circuit based on Atmega8 microcontroller LCD HD44780 driver and the system’s supply is taken from the USB port on the computer or adapter operated with the circuit. Circuit of... Electronics Projects, USB Powered Inductance Met Atmega8 "atmega8 projects, avr project, microcontroller projects, "…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Metering - Instrument 167. ATEMGA168 TLC5940 PWM RGB LED CYLINDER 95 pieces made using RGB LEDs Led cylinder project quite professional printed circuit board, software circuit that is used quite ATEMGA168 microcontroller with integrated LEDs TLC5940 LED driver plowed. Installation was very difficult... Electronics Projects, ATEMGA168 TLC5940 PWM RGB Led Cylinder "avr project, led projects, microcontroller projects,…... Listed under: LED Projects 168. MULTIFUNCTION DIGITAL AMPLIFIER PROJECT TDA7294 ATMEGA32 TDA7313 A lot of work in the ATmega32 occur when project featuring a beautiful ro amp volume control on the floor in the TDA7313 TDA7294 is used in the upgrade process. Digital FM radio... Electronics Projects,Multifunction Digital A Project TDA7294 ATmega32 TDA7313 "avr project, microcontroller projects, tda7294…... Listed under: Sound - Audio Projects 169. FT232R USB I-O CIRCUIT ATMEGA88 USB I / O circuit ATMEGA88 based on the usb connection FT232 is done via detailed ir project ( German explanatio source code, circuit diagrams and PCB drawing of the picture... Electronics Projects,FT232R USB I-O Circuit ATMEGA88 "avr project, microcontroller pro USB I /…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 170. 0-30V REGULATED DIGITAL SWITCHING POWER SUPPLY ATMEGA8 LM2576ADJ Very high quality design of the digital power supply circuit. Voltage curre 16 lcd display of the beauty and power of the switching mode operation switching DCDC Madden LM2576 ADJ (adj... Electronics Projects, 0-30V Regula Switching Power Supply ATmega8 LM2576ADJ "atmega8 projects, avr project,…... Listed under: Development Board - Kits Projects 171. TOY CAR MODIFICATION MADE SIMPLE ROBOT PROJECT ATTINY2313 Simple robot project ATtiny2313 microcontroller used robot body for a cheap rem controlled toy car is made up of the robot’s four sides LED sensors placed somewhere when it hit the back çekliy direction...Electronics Projects, Toy Ca Modification Made Simple Robot Project ATtiny2313 "avr project, microcontroller projects, "…... Listed under: Car Projects, Robotics - Automation Proje 172. REMOTE CONTROLLED PROPELLER CLOCK CIRCUIT AT90S2313 Before air time, “Propeller Clock” projects I shared in this project control and mode sele be achieved in both analog clock and digital clock view modes control for the Sony control protocol used... Electronics Projects, Remote Controlled Pro Clock Circuit AT90S2313 "avr project, microcontroller projects, " Before air…... Listed under: Clock Projects 173. LIPO LI-ION BATTERY CHARGER CIRCUIT BALANCING ATTINY26 Attiny26 microcontroller based on the charging circuit has a lot of features in a single p 12.6V LiPo batteries and Li-ion batteries and battery charging voltage edebiliry balanslıy regulate temperature, timing, voltage and... Electronics Projec ion Battery Charger Circuit Balancing ATtiny26 "avr project, battery charger circuit,…... Listed under: Battery Projects 174. ZENER DIODE TEST CIRCUIT VOLTAGE INDICATOR ATMEGA8 Interestingly circuited actually zener diode test measuring instruments should have a prop you are secure, a voltage see better, but so far no measuring instruments equipped with this feature I... Electronics Projects, Zener Diode Test Circuit V Indicator ATmega8 "atmega8 projects, avr project, microcontroller…... Listed under: Metering - Instrument Projects 175. REMOTE CONTROLLED ROBOT CIRCUIT RC5 AT90S2313 The robot’s control AT90S2313 microcontroller provided with the processor 4MHz is operated control rc5 protocol that uses a control used robot çalışmala for 4 pcs 2200mAh NiMH batteries used for the experiment alkaline... Electronics Projects Controlled Robot Circuit RC5 AT90S2313 "avr project, microcontroller projects, " The robot’s…... Listed under: Robotics - Automation Projects
  • 16.
    176. LINE FOLLOWINGROBOT PROJECT ULTRASONIC SENSOR CIRCUIT ATMEGA16 CNY70 SFR05 Quite a different line following robot project was already in competition designed for the author as he could a nice job exposes the robot’s appearance sumo robots similar to healthy controls ATMega16 microcontroller... Electronics Projects, Line Following Robot Project Ultrasonic Sensor Circuit Atmega16 CNY70 SFR05 "avr project,…... Listed under: Ro Automation Projects 177. NI-MH BATTERY CHARGER CIRCUIT ATMEL ATTINY26   Ni-MH Battery Charger circuit 4 AA batteries can be charged in the circuit is more complex, but in attiny26 microcontroller circuits BD140 transistors and a few passive components consist of batteries connected to... Electronics Projects, Ni-MH Batte Charger Circuit Atmel ATtiny26 "avr project, battery charger circuit,…... Listed under: Battery Projects 178. ROBOTIC DOG PROJECT, 16 CHANNEL SERVO CONTROL PROGRAM Prepared with great effort as a hobby project “robot dog” very detailed, especially t mechanical portion control, etc. rc5 remote control computer. has features such as control solid Atmel ATmega32 and ATMEGA8515 based on... Electr Projects, Robotic Dog Project, 16 Channel Servo Control Program"avr project, microcontroller projects, "…... Listed under: Robotics - Automation Projec 179. 64 LED PROPELLER EFFECT CIRCUIT ATMEGA8 Led effect circuit 64 leds LEDs on the printed circuit board disposed in the impeller has a very different e plurality of circuit components used SMD type. Effects displacement, velocity pcb solder buttons...Electronics Projects, 64 Led Propeller Effect Circuit ATmega8 "atmega8 projects, avr project, led projects,…... Listed under: LED Projects 180. BLUETOOTH JOYSTICK CONTROLLED DISCOVERY ROBOT PROJECT Very detailed advanced robot project for many of us not be implemented, but the co schematics, methods different robot project can be used in reconnaissance robot via mobile phone blutut can be manipulated by...Electronics Projects, Bluetooth Joystick Controlled Discovery Robot Project "avr project, microcontroller projects, " Very detailed…... Listed under: Robotics - Autom Projects 181. MCP4725 DAC AVR ATmega library The MCP4725 DAC is a pretty common and cheap single channel 12 bit buffered voltage DAC, it also has an onboar EEPROM. To drive this chip we can use I2C interface. The ATmega8 used for my implementation has an embedded I2C interface, so we just can use tha interface. The…... Listed under: Development Board - Kits Projects 182. Switch debounce library Contact bounce (ref. https://en.wikipedia.org/wiki/Switch#Contact_bounce) is a common problem with mechanical switches a contacts are usually made of springy metals. When the contacts strike together, their momentum and elasticity act together to cause them to bounce or more times before making steady…... Listed under: Development Board - Kits Projects 183. ATmega32 ADC for Light and Temperature Sensors This tutorial shows how to implement the Analogue to Digital Converter (ADC) function on ATMega code. It consists of code examples, and the meaning of some nomenclature such as sampling rate, and resolution. However before we get to the code start from the…... Listed under: Sensor - Transducer - Detector Projects, Temperature Measurement Projects 184. RTTTL Player for the ATmega32 Ring Tone Text Transfer Language (RTTTL) is a simple text-based code for recording monophonic musical tones. The script is usually loaded in mobile phone, which is able to convert the code to equivalent musical notes. Many early phones had an integrated RTTTL player, which played…... Listed under: Game - Entert Projects 185. Connecting Piezo Speaker to ATmega32 An ATMega32 sound generator code is extremely simple to implement. Almost any GPIO pin can drive a piezo and the output quality is fine for producing some beeps. The code shown here is the simplest one I remember using basic physics, and since it…... List Sound - Audio Projects 186. PHONE CONTROLLED MOBILE ROBOT CIRCUIT MT8870 ATMEGA16 Wireless, remotely controlled applications quite popular in this project through the phone robot control is done the robot on the Nokia 1100 mobile phone used phone signals from the MT8870 receiver DTMF decoder... Electronics Projects, Phone Controlled Mobile Robot Circuit MT8870 ATMega16 "avr project, microcontroller projects, "  …... Listed under: Robotics - Automation P 187. 4 CHANNEL PWM CONTROL CIRCUIT VISUAL BASIC RS232 AT89C2051 PWM control project software source code in Visual Basic and are prepared (linu windows) via RS232 serial port (19200 Baud) AT89C2051 microcontroller based on the 4-channel PWM control circuit can be made. PWM output... Elec Projects, 4 Channel PWM Control Circuit Visual Basic RS232 AT89C2051"avr project, microcontroller…... Listed under: Development Board - Kits Project
  • 17.
    188. NOKIA5110 LCDLOGIC ANALYZER CIRCUIT ATMEGA8 Built on the atmega 8 microcontroller Logic Analyzer circuit for nokia 5110 display lcd display kullanılanılıyor crafted with AVRstudio Software four. source software insurance settings schema, pcb, etc. files. Frequency capture 400 kHz, Max... Ele Projects, Nokia5110 LCD Logic Analyzer circuit ATmega8 "atmega8 projects, avr project, microcontroller projects, "…... Listed under: LCD Projects 189. ADJUSTABLE POWER SUPPLY CIRCUIT 0 30V LCD Power supply circuit consists of a few sections 04 to 0 30v power supply based on solid TL081 op amp 2N3055 power transistor quite popular and a classic by many people applied. LCD... Electronics Projects,Adjustable Power Supply Circuit 0 30V LCD "at projects, avr project, microcontroller…... Listed under: LCD Projects 190. SYNTHESIZER CIRCUIT AT89S53 AT89S52 Musicians use a variety of sound-producing device “Synthesizer” When you are setting a very good quality wo making. AT89S52 and AT89S53 Synthesizer used in the project on the LFO, ENV FILTER, OSC, MIX...Electronics Projects, Synthesizer Circuit AT89S53 AT8 project, microcontroller projects, "   Musicians use a…... Listed under: Sound - Audio Projects 191. WAVE READER CIRCUIT AT89S52 FLASH MEMORY PIC24, 32, MSP430 is progressing rapidly but AT89S52 time, I still made sure that what is in use by 80 project, kingston 8gb flash memory is read in the wav files (wav... Electronics Projects, Wave Reader Circuit AT89S52 Flash Memory "avr project, microc projects, "   PIC24,…... Listed under: Sensor - Transducer - Detector Projects 192. WITH PELTIER MINI REFRIGERATOR CIRCUIT ATMEGA8 DS18S20 Peltier Thermoelectric Cooler Is how it works with 12-Volt Feed information and 50W P Fridge built on the lcd display after the ATmega8 microcontroller from a more advanced peltier control circuit. The value...Electronics Projects, With Pe Refrigerator Circuit ATmega8 DS18S20 "atmega8 projects, avr project, microcontroller…... Listed under: Home Automation Projects 193. S65 SIEMENS LCD EXAMPLES CIRCUIT ATMEGA16 ATMEGA32 Before “Siemens S65 LS020 glcd ATmega128 AVR” shared examples of implementation th lot of similar projects with ATmega16 ATmega32, microcontrollers. A few of them; Image via representation of FAT16 MMC card color, font... Electronic Projects, S65 Siemens LCD examples Circuit ATmega16 ATmega32 "avr project, microcontroller projects, "  …... Listed under: LCD Projects 194. PT100 SENSOR THERMOSTAT CIRCUIT ATMEGA8 Thermostat circuit for 2 pt100 temperature measurement used atmega8 mikrüdenetleyici sensor pt1 sensors gives the circuit output is being used according to the information received. The thermostat is located on the circuit board led... Electronics Projects, PT100 Sensor Thermostat Circuit ATmega8 "atmega8 projects, avr project, microcontroller projects, " Thermostat…... Listed under: Sensor - Tr - Detector Projects 195. EXCELLENT LED BALL CIRCUIT ATMEGA88 Great design has been providing birthday gifts as does not prepare mention Led to control atmega88 microc is used ports çoklayıp LEDs milk to 74HC595 used LEDs effect has been very welcoming approximately 256... Electronics Projects, Excellent Led Ball Cir ATmega88 "avr project, led projects, microcontroller projects, " Great…... Listed under: LED Projects 196. USB PASSWORD GENERATOR CIRCUIT ATTINY85 Attiny85 not found on the USB module to work, but as software optimized circuit when connected to computer mouse USB HID is known as pull-up resistors on the circuit has very few ingredients... Electronics Projects, USB Password Generator Circuit ATtiny85 "avr project, microcontroller projects, "   Attiny85 not found…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 197. MECHANICAL CLOCK CIRCUIT ATMEGA8 In fact, what lies At the forefront of the digital but mechanics should have been a wonderful project:) is an inte time in the atmega8 microcontroller time and when the mind comes to the... Electronics Projects, Mechanical Clock Circuit ATmega8 "atmega8 project project, microcontroller projects, " In fact,…... Listed under: Clock Projects 198. DIGITAL RADIO CIRCUIT TEA5767 AT89S8253 TEA5767 is a digital radio, especially mp3 and fm radio module @ETE before “TEA5767 Pic16f628 Digital PLL-controlled FM radio re system” article is controlled with the Pic16f628 microcontroller used in this project, the radio... Electronics Projects, Digital radio circuit TEA5767 AT89S project, microcontroller projects, " TEA5767 is a…... Listed under: Radio Projects 199. ULTRA SONIC CLEANER ROBOT CIRCUIT L298 AT89C2051 AT89C2051 microcontroller used in robot motor drive for cleaner L298 dual H-bridge driver I 40 kHz ultra sonic senrörler (multicomp sq-40-t-10b) to detect and to change direction with the bodies, continues to...Electronics Projects, Ultra Sonic C Robot Circuit L298 AT89C2051 "avr project, microcontroller projects, " AT89C2051…... Listed under: Robotics - Automation Projects
  • 18.
    200. USB BUSINESSCARD WITH ATTINY85 Attiny85 Atmel microcontroller with USB Business Card project established quite interesting circuit with very few attiny85 16.5 MHz internal RC oscillator frequency used. USB connector on the USB socket on the PCB designed... Electronics Projects, USB Business C attiny85 "avr project, microcontroller projects, "   Attiny85 Atmel…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 201. ATMEGA88 IR2184 DC SERVO MOTOR DRIVER CIRCUIT DC Servo motor driver circuit based on the microcontroller atmel atmega88 outputs half bridge Ir2184 is being used with this integrated works at a frequency of 16MHz DC servo Irf540 MOSFETs atmega88... Electronics Projects, Atmega88 IR2184 D Motor Driver Circuit "avr project, dc dc converter…... Listed under: Motor Projects 202. LINE FOLLOWING ROBOT SUMO ROBOT, CONTROL CIRCUITS Sumo, Line following and robot control card project open source design and very high qu resources provided PIC microcontroller code and eagle diagram pcb drawings are especially line following robot prepared for... Electronics Projects, Li following Robot Sumo Robot, control circuits "avr project, microcontroller projects, " Sumo,…... Listed under: Robotics - Automation Projects 203. ATMEL LED MULTI-FUNCTION DISPLAY ATMEGA32U4 WATCHES Atmel microcontroller Board with Led indicator wristwatch ATmega32U4 project there connection and SD card connection, the advanced charging system, piezo sensor, etc. are included in the design of printed circuit boards... Electronics Projects, Atmel LED Multi-Function Display ATmega32u4 Watches"avr project, microcontroller projects, "   Atmel…... Listed under: LED Projects 204. SIM900 MODULE PCB AVR APPLICATIONS Simcom Sim900 GSM module produced by the company prepared for the PCB module and ATMEGA32 micro based on Nokia 3310 lcd display GSM module for remote control application SIM900D (place of origin: CN; proteus... Electronics Projects, SIM900 Mod AVR Applications "avr project, microcontroller projects, "   Simcom Sim900…... Listed under: Phone Projects 205. GUITAR TUNING PROJECT WITH ARDUINO UNO Arduino Uno kit on the Board at the entrance of the TL082 opamp used Guitar Tuning circuit audio aud and frequency to detect the “Arduino-Frequency-Detection” software used. According to the LEDs light at... Electronics Projects, Guitar Tuning Project w Arduino Uno "arduino projects, avr project, microcontroller projects, "…... Listed under: Sound - Audio Projects 206. ARDUINO UNO WITH INTERESTING CLOCK PROJECT I’ve shared this with different time interesting projects carried out with the Arduino Uno this time, the most interesting thing isn’t debatable kullanışlımı project but the idea as a different kind of... Electronics Projects, Arduino Uno With Interesting Clo Project "arduino projects, avr project, microcontroller projects, "…... Listed under: Clock Projects 207. ATMEGA32 PCB DRILL MACHINE This document describes the construction of a PCB drill machine driven by a master-controller board and three stepp driver boards. These four single sided PC boards each contain an Atmega16/32 microcontroller. Communication between... Electronics Projects, ATME drill machine "avr project, microcontroller projects, " This document describes the…... Listed under: CNC - Printing Machines Projects 208. PORTABLE RF JAMMER CIRCUIT ATMEGA48 So far I have ever seen , tidy and with all the resources shared jammer circuit project design, it’s very smart pretty small pocket on the internet a lot jammer circuit ,... Electronics Projects, Portable RF Jammer Circuit ATmega48 "avr project, microcontroller proj far…... Listed under: Sensor - Transducer - Detector Projects 209. WINAMP REMOTE CIRCUIT BLUETOOTH AT90USB1287 NOKIA LCD LMX9838 A very detailed report of a project is already included in the schema, the a the thesis, the eagle pcb source code etc. everything. The circuit used the main parts AT90USB1287 LMX9838 (Bluetooth... Electronics Projects, Winam Circuit Bluetooth AT90USB1287 Nokia LCD LMX9838 "avr project, microcontroller projects, "…... Listed under: Other Projects 210. BATTERY ALARM CIRCUIT FOR MODEL HELICOPTERS ATTINY13 ATTINY13 Atmel microcontroller installed on the circuit model helicopter is checking the of the battery the battery (or battery) voltage circuit when the level set LEDs, buzzer, giving the alam. ATTINY13 PB2, PB1,... Electronics Projects, Batter Circuit for Model Helicopters ATtiny13 "avr project, microcontroller projects, simple…... Listed under: Battery Projects, Circuits, Clock Projects 211. ATMEL ATTINY45 BLUETOOTH SCOREBOARD CIRCUIT The scoreboard circuit is based on Atmel microcontroller ATtiny45 circuit cell phone can be contr bluetooth, the bluetooth module used in the indicator circuit BTM400-6B is an LCD TV has VGA output of...Electronics Projects, Atmel ATtiny45 Bluetoo Scoreboard Circuit "avr project, microcontroller projects, " The scoreboard circuit is based…... Listed under: Circuits 212. ATMEGA8 USB EMAIL NOTIFIER CIRCUIT Market “USB Mail Notifier” ready devices are sold, but in practice, ileginç project also ATmega8 microcontroller and the email account t connects the program’s source code (C + + RAD studiox) or not different... Electronics Projects, ATmega8 USB Email Notifier Circuit "atmega8 projects, avr project, microcontroll
  • 19.
    projects, "  …... Listedunder: Interfacing(USB - RS232 - I2c -ISP) Projects 213. MULTI-FUNCTION DIGITAL WRISTWATCH CIRCUIT ATMEL ATMEGA168PA Digital clock project PCB design is very good and prepared and used according coffers of small metal wristwatch. Except for a few digital Wristwatch circuit material including all the elements of SMD...Electronics Projects, Multi-fun Digital Wristwatch Circuit Atmel ATmega168PA "avr project, microcontroller projects, " Digital clock…... Listed under: Clock Projects 214. DIGITAL CLASS D AMPLIFIER PROJECT TAS5613 TDA9859 ATMEGA128 TDA9859 The main part of the preamplifier is an integrated circuit TDA9859, this integrated circuit is contr the I2C microprocessor Atmega128. Individual settings of the preamplifier through the keyboard are displayed on the... Electronics Projects, Digital Cla Amplifier Project TAS5613 TDA9859 ATmega128 "audio amplifier circuits, avr…... Listed under: Sound - Audio Projects, Uncategorized 215. DIGITAL CLASS D AMPLIFIER CIRCUIT TAS5706A PCM1850A ATMEGA128 TAS5706A Class D Amplifier was itself the signal processor. From this parts dep the other elements. Has an impact on the type of power supply, the control method of the type converter. That... Electronics Projects, Digital Class D A Circuit TAS5706A PCM1850A ATmega128 "audio amplifier circuits, avr…... Listed under: PWM Projects 216. 0-30V 0-3A ADJUSTABLE SWITCHING LABORATORY POWER SUPPLY DC-DC Laboratory Power Supply 0-30V 0-3A LT1074 is a switching regulator type ste (lowering) with a maximum current of 5 A. Can work with the value of the input voltage up to 60 V... Electronics Projects,0-30V 0-3A Adjustable Switchin Laboratory Power Supply "avr project, dc dc converter…... Listed under: Other Projects 217. 240W ELECTRONIC BALLAST CIRCUIT IR2104 ATMEGA48 CONTROLLED IR2104 240W Fluorescent tube Ballast Circuit. Work was designed an electronic starting six fluorescent lamps with a total output of 240W with integrated dimming-controlled analog input and button. Priority is set to... Electronics Projects, 240W Electronic Ballast Circuit IR2104 ATmega48 Controlled"avr project, microcontroller projects, power…... Listed under: Circuits 218. 1A 10A ADJUSTABLE BATTERY CHARGING CIRCUIT 100AH Atmel ATTINY24 microcontroller based automatic battery charger circuit can charge 12V batt different power on (1A…10A current setting range of the charging current with limitation 10Ah, 20Ah, 30Ah, 40Ah, 50Ah, 60Ah, 70Ah, 80Ah,... Electronic Projects, 1A 10A Adjustable Battery Charging Circuit 100Ah "avr project, battery charger circuit,…... Listed under: Battery Projects 219. 230V FAN REGULATOR CIRCUIT MOSFET MC33152 ATTINY25 Brushless asynchronous motors, with compact rotor windings, called short cages, are use different fans. Their advantages are durability and simple construction. The presented layout uses a certain characteristic of such a fan... Electronics Projects, 230V Fan Regulator Circuit Mosfet MC33152 ATtiny25 "avr project, microcontroller projects, power…... Listed under: Circuits 220. THERMOMETER HYGROMETER CIRCUIT USB DHT22 ATMEGA8 The presented layout is a snap on a computer for measuring DHT22 temperature and h measures the temperature from -40 to 80 ° C with a resolution of 0.1 ° C and accuracy... Electronics Projects,Thermometer Hygrometer Circuit USB DH ATmega8 "atmega8 projects, avr project, microcontroller projects, "…... Listed under: Metering - Instrument Projects 221. PROGRAMMABLE TIMER CIRCUIT ATTINY25 ATtiny25 Programmable Timer To describe the operation of the device, we will use an example – control of electromagnetic bolt mounted in the wicket. In the simplest version we require that the push... Electronics Projects, Programmable Timer Circuit ATtiny project, microcontroller projects, " ATtiny25 Programmable Timer To describe…... Listed under: Clock Projects 222. TINY USB PROGRAMMER AVR MICROCONTROLLERS AVRDUDE USB programmer There are few components – the ATtiny45 microcontroller, two Zener resistors. Of course, there are still connectors – USB plug and IDC-6 plug. Resistor R1 informs host... Electronics Projects, Tiny USB programmer AVR microcontrollers AVRDUDE "avr project, microcontroller projects, programmer circuit, "…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 223. ATMEGA48 TIMER TRIGGERED BY CURRENT FLOW ASM-010 ATMEGA48 Many devices may be in standby mode during downtime. They do not perform they are apparently disabled, but the control circuits are powered. To extract useful information from the point of...Electronics Projects, ATMEGA48 Tim triggered by current flow ASM-010 "avr project, microcontroller projects, power…... Listed under: Clock Projects
  • 20.
    224. Ultrasonic RadarModel Using Microcontroller ATmega128 The circuit described here demonstrates the working of a radar system. It uses ultrasonic w detect an object and measure its distance and angular position, and displays the same on a 20x4 LCD screen. -- Ashutosh M. Bhatt is an M. Tech in embedded…... Listed under: Sensor - Transducer - Detector Projects 225. Digital Soil Moisture Meter A digital soil moisture meter is used for indicating the water content of a given soil sample. As crop production requires wa different stages and in different amounts, it is important to measure soil moisture from time to time to know its status. The…... Listed under: Metering Instrument Projects 226. NIXIE TUBE THERMOMETER CIRCUIT Nixie lamp Thermometer DS18B20 Circuit with ATtiny2313 The first Nixie lamps appeared in the mid-twentieth ce many years they have been used in a variety of apparatuses but have been supplanted by newer... Electronics Projects, Nixie Tube Thermometer Circu project, microcontroller projects, " Nixie lamp Thermometer DS18B20 Circuit…... Listed under: Metering - Instrument Projects 227. ATMEGA8 FT232R USB ESR METER CIRCUIT USB ESR Meter Circuit The main part of the meter is a ATmega8 microcontroller that controls the entire dev main the task is to process measured data and perform calculations so that the... Electronics Projects, ATmega8 FT232R USB ESR Meter Circuit "atmeg projects, avr project, microcontroller projects, "…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 228. ATMEL ARDUINO COLORED CONNECTION CHART Projects or schematics, drawings that will work when preparing pcb Atmel AVR Microprocessors Info directly on Atmel microcontrollers. Colored linking expansions are more comprehensible for those dealing with Atmel Series... Electronics Projects, Atm Arduino Colored Connection Chart "arduino projects, " Projects or schematics, drawings that…... Listed under: Circuits 229. AUTOMATIC FEEDING MACHINE WITH CD-ROM MECHANIC For the author, the automatic feeding machine for the wedge is the easiest mechanical par application. they insert a plastic container all of which is placed on the CD present on the... Electronics Projects, Automatic Feeding Machine With CD-R Mechanic "avr project, microcontroller projects, " For the…... Listed under: Phone Projects 230. Avr Atmega8 Microcontroller – An Introduction In my previous article, I’ve discussed about ATmega32. Now, let me introduce another member of AVR microcontroller fami ATmega8. This member has many features similar to that of ATmega32. But it has reduced number of features and capabilities, yet it has enough features to…... Listed und ATmega Projects 231. Handling the Digital Input Output in AVR Micro Controllers I have already discussed about a few chapters necessary to get into AVR programming. Now the first article that deals with programming.  Let us start with the basics. Digital input output (I/O) is the basic feature supported by  AVR micro contro facilitate…... Listed under: LED Projects 232. Standard Library & String Formatting for AVR Here in this article, I am planning to brief you through the Standard library of AVR-GCC. By the term “Stan Library” we mean the “Standard header” files like “stdio.h”, we commonly see in C programming language. Have you ever used String Formatting in AN Listed under: AVR ATmega Projects 233. Frequency counter circuit Simple Frequency Counter You may have already seen various projects over many websites named Frequency counter, Digit Frequency Counter etc. I’m posting just another of them. Showing the use of timer/counter of AVR micro controller (Atmega8) in one of it’s form. This c be…... Listed under: LCD Projects 234. How to Work With 32K crystal and AVR Microcontroller This article teaches you how to add 32K external crystal source to  AVR micro controller (Atmega8 ) with circuit diagram program. Introduction Timing-is one of the basic function, performed by the micro controllers. Every microcontroller has at least one timer/counter module in its…... Listed und
  • 21.
    ATmega Projects 235. Howto work with the ADC unit of an AVR Micro-controller Introduction The first step to digital signal processing is to convert a signal into digital data, the Analog to Digital Converter devices comes into action. Some of the AVR micro controllers include ADC unit in their features. This is a very useful un Listed under: Security - Safety Projects 236. Interfacing LCD Module with AVR in 4-Bit Mode This article is another step forward in learning more about AVR microcontrollers. We have demonstrated interfacing of LCD mo ATmega328 microcontroller, which will help you to learn its basic concepts. ATmega328 is an eight bit AVR (Advanced Virtual RISC) based microcontroller. It is a…... Listed unde Projects 237. Bluetooth Home Automation using AVR and Android App DIY-Bluetooth based Home Automation Project In this project, let’s see how to design a Blue based home automation project.This article explains the steps involved in the designing of a Bluetooth home automation kit, starting from the configu a Bluetooth module. The article also explains…... Listed under: Android Projects 238. Keypad Door Lock using AVR Microcontroller – Atmega16 Password Based Keypad Door Lock  In this article, a digitally secured lock based on password verification is expla system uses a seven segment display array to show the password, a matrix keypad to enter the numbers/password and operates a relay (to activate the solenoid…... Listed Security - Safety Projects 239. MultiPurpose Atmel Development Boards Project Atmel series microcontrollers series to prepare for the software quality testing to ensure ease in you circuit has 3 different test circuit. ATmega8, ATMega16, atmega162, ATtiny2313 and ATTINY13 made to the circuit RS232... Electronics Projects, MultiPu Atmel Development Boards Project "avr development board, "…... Listed under: Development Board - Kits Projects 240. ATmega16 Analog-Looking Digital Clock Project Atmega16 microcontroller in our circuit monitor 7 inch in size. Screen “3 inch” or “4 inch” may be, it doe matter. We have the biggest screen by controlling the foot links we could find.... Electronics Projects, ATmega16 Analog-Looking Digital Clock Project "a microcontroller projects,…... Listed under: Clock Projects 241. Make Your Own WiCard WiFi Module on a Breadboard Like Arduino you can make your own WiCard on a breadboard. All you need are resistors, capac breadboard, wires, ATmega8, and ESP8266. Story Like “Arduino," you can make your own WiCard on a breadboard. If you want to make WiCard on a b before making…... Listed under: AVR ATmega Projects 242. Interfacing HC-05 Bluetooth module with AVR Microcontroller In this tutorial let us learn How to interface HC-05 Bluetooth Module with AVR ATmega8 microcontroller. We will establish communication between Android mobile and Atmega8 through Bluetooth module which takes place through UART communication protocol. In this project we will control a LED using Bluetooth…... Listed under: Phone Projects 243. Interfacing RF module with Atmega8: Communication between two AVR Microcontrollers Making our projects Wireless always makes it to look cool an extends the range in which it can be controlled. Starting from using a normal IR LED for short distance wireless control till an ESP8266 for worldwide H control, there are lots of ways…... Listed under: LED Projects 244. Interfacing GSM Module with AVR Microcontroller: Send and Receive Messages GSM modules are interesting to use especially when our project requir could make all actions that our normal mobile phone could do, like making/receiving a call, sending/receiving a SMS, connecting to internet using GPR can also connect a normal microphone…... Listed under: Phone Projects 245. UV Sensor ML8511 AVR Atmega library Ultraviolet (UV) is an electromagnetic radiation with a wavelength from 10 nm to 400 nm. The ML8511 is an ultraviolet sensor that outp analog signal correlated to the amount of UV light detected. By datasheet the sensor detects wavelength from 280nm to 560nm. Here…... Listed under: Sensor - Transducer - D
  • 22.
    Projects 246. Using AVRStudio – My first C++ code This is an extremely simple "Hello World" C++ code for the ATMega32 that you can follow using AVR Studio. You d need any hardware such as the chip or even the ISP programmer cable because AVR Studio simulates the inputs and outputs, and you…... Listed unde Projects 247. Power factor measurement using Atmel AVR Micro-Controllers To learn about the power factor measurement, you should have a basic knowledge of p factor. There are three types of loads. Resistive  Inductive Capacitive When we apply AC voltage to resistive loads it will not change the current wave fo inductive loads will…... Listed under: LCD Projects 248. Auto No Break Power Supply Control The major aim of this no break power supply project is to supply continuous energy supply to a load, by picking t from any spring out of the four like – generator, mains, inverter and solar robotically in the lack of any of the…... Listed under: LCD Projects 249. RFID Based Toll Collection System We know in offices, shopping malls and in many other places where only the person with authorization card is allow enter the room. These systems use RFID communication system. RFID is used in shopping malls to stop theft as the products are tagged with RFID chi Listed under: LED Projects 250. DC motor interfacing with AVR ATmega16/ATmega32 DC motor converts electrical energy in the form of Direct Current into mechanical energy. In case the mechanical energy produced is in the form of rotational movement of the motor shaft. The direction of rotation of the shaft of the motor can be… under: Motor Projects 251. ATmega8 Line Follower Robot (LFR) Project – Part 2/2 Now that the mechanical assembly part is over,and we have completed the construction of left a (L&R) infrared sensor cards. Since the MCU (ATmega8) cannot drive the dc motors directly, a dedicated motor driver circuit is used. The motor driver c is based…... Listed under: Robotics - Automation Projects 252. A digital DC powersupply Introduction In 2002 I wrote a linuxfocus.org article about a Microcontroller based DC powersupply (LF November2002 articl article received a lot of interest as I noticed from emails which I received on this subject. The design of this powersupply was however something for advanced…... Listed under: LED Projects 253. An NRF24L01+ and FTDI Ready Atmega 328P-PU (3.3V, 500 MA) Microcontroller With Dual Power Capability, Undervoltage, Hysteresis, and Thyristor-Crowbar Overvoltage Prote board is designed to safely drive a 3.3V microcontroller and connected accoutrements. It supports primary and backup power sources and provides n over and under voltage safeguards. The microcontroller here is a bare-bone, no-frills Atmega 328P-PU with no leds, driven by a 16 MHz…... Listed und Projects 254. AVR-based Sensor Keyboard A modern microcontroller has almost everything that's needed to implement a touch sensor matrix. There are several se technologies: IC manufacturers typically advise using certain tech, sometimes they offer ready to use hardware- or software-based solutions. I was cur try to implement a sensor…... Listed under: AVR ATmega Tutorial, Sensor - Transducer - Detector Projects 255. Arduino LFO Waveform Generator V2 Introduction This project uses an Arduino microprocessor and a MAX522 8 bit serial DAC to produce arbitrary lo frequency oscillator (LFO) waveforms. These waveforms are useful for driving a tremolo/vibrato circuit in a guitar amplifier such as the Lil Tiger or the Hammonator 2RVT. This…... Listed under: Motor Projects 256. Programming ATMEGA32 (or Any Other AVR) Using Arduino IDE The Arduino is a very cool development board where you could create hundreds of pr it doesn't mean that for every project you create, you would need an Arduino board dedicated to that project alone. A hundred projects and a hundre Arduinos? That's a…... Listed under: Android Projects, AVR ATmega Tutorial 257. AVR ATmega32 Mini Development Board – Interfacing LCD AVR ATmega32 Mini Development Board is interfaced with a LCD module (2×16) operating at 5V. The voltage at t pin of the LCD can be varied by potentiometer to adjust contrast. LCD can work either in 4 or 8 bit mode. Here, the circuit is…... Listed under: LCD Projects 258. Interfacing Ultrasonic Rangefinder with AVR MCUs – AVR Tutorial Obstacle detecting sensors are one of the most basic type of sensors that electronic hobbyists use. There several methods to make cheap obstacle sensors. These simple sensors are made using a IR Rx/Tx pair or Normal LED and LDR pair(this design is most basic…... Listed und Android Projects, Development Board - Kits Projects
  • 23.
    259. How tocontrol DC motor speed using PWM on Atmega32 Using PWM (Pulse Width Modulation) to control a device is a common practice in embedded for example, you can use it to control the light intensity of a LED or control the speed of a DC motor. In this article, we will explain how to…... Listed un Motor Projects, PWM Projects 260. Servo Motor Control by Using AVR ATmega32 Microcontroller Servo motors are a type of electromechanical actuators that do not rotate continuously or stepper motors, rather they used to position and hold some object. They are used where continuous rotation is not required so they are not used t wheels (unless…... Listed under: Microcontroller Programmer Projects, Motor Projects 261. Atmel ATmega Video generator with SDRAM This projects uses 8MByte SDRAM from a 168 pin DIMM SDRAM and generates videosignal for a VGA monitor with a resolution of pixels with 256 colors at 60Hz using mega8515. The project uses burst mode of SDRAM, which can feed up to 512 bytes…... Listed under: AVR ATmega Tutorial, Microcontroller Programmer Projects 262. How to make Automatic Charger for a 7Ah Battery 7Ah Sealed Lead Acid Battery  7Ah Sealed lead acid battery is a very popular battery which people u most places like fans, LEDs etc. The reason behind popularity of 7Ah battery is due to its medium size and medium Ah rating. By medium means,…... L under: Battery Projects 263. hd44780 Character LCD Displays – Part 2 Introduction This tutorial continues from Character LCD Displays – Part 1. In this part we will connect the LCD module to an Atme microcontroller, then write some code to drive it. The Circuit Our first task is to build the circuit. We will be using…... Listed under: LCD Projects 264. First steps with micro controllers (ATMega8) Purpose of this article: 1) to learn how to connect the Micro controller in a simple circuit and how to powe see how to create a simple programmer (a device to connect the micro controller to a PC for uploading software) 3)…... Listed under: AVR ATmega Tuto Development Board - Kits Projects, LED Projects 265. Minimal Arduino with ATmega8 Like me, you may have a few old Arduino boards or ATmega8 chips (in the boards) laying around from when you were playing with Arduino. Those chips can still be really useful as the heart of a tiny “Minimal Arduino” setup. A normal Arduino…... Listed under: Android P Circuits, Other Projects 266. Atmega8 based Voltmeter Ampmeter v2 Low power consumption Better Amperes display resolution while using low value drop resistor. Much smalle only 5cm x 5cm. Still no SMD components. Easy calibration, only one voltage adjust and one ampere adjust preset, no voltage out detection. Voltage s my 12Volt…... Listed under: AVR ATmega Tutorial, Microcontroller Programmer Projects 267. Micro-controller Programming on a Bread Board In playing around with DIY electronics, Pugs has developed enough confidence to share his knowledg juniors. So, in one such occasion, he decided to give a try to program a micro-controller, as part of the electronics hobby club. There have been many hobbyist…... Listed under: Battery Projects 268. Nokia5110 graphical display interfacing with AVR ATmega16/ATmega32 Introduction Nokia5110 is a graphical display that can display text, images and patterns. It has a resolution of 48x84 and comes with a backlight. It uses SPI communication to communicate with a microcontroller. Data and comma be sent through microcontroller to the display…... Listed under: Phone Projects 269. Configuring and using XBEE wireless modules Xbees are some of the most powerful wireless modules you can find and they’re also very easy to config use. The only thing is they cost about Rs.1000 to Rs.2500 depending on the range and other parameters. If you’re like me and only bought…... Listed u ATmega Tutorial, LCD Projects, Microcontroller Programmer Projects 270. The simplest digital voltmeter with AVR This is probably the simplest possible digital voltmeter with Atmel AVR microcontroller. The circuit is controlled by a microprocessor IO AVR ATmega8 (ATmega8, ATmega8L), a program to download and configuration bits setting is below. (ATmega8 may seem too "big", but was chosen be Listed under: AVR ATmega Tutorial, Clock Projects, Electronics News Updates, LED Projects
  • 24.
    271. Input DevicesMeasure something: add a sensor to a microcontroller board that you have designed and read it. This week I decided to make ATMEGA board. ATMEGA 328 Some of the Features of ATMEGA 328 are 1.8-5.5V operating range Up to 20MHz 32kB Flash program memory…... Listed under: AV Tutorial, Microcontroller Programmer Projects, Sensor - Transducer - Detector Projects 272. PIR motion sensor interface with AVR-microcontroller ATMEGA32 Passive Infra red sensor also known as PIR sensors is capable of detecting motion or movement within a certain range. These type of sensors have wide range of applications in our daily life and it is essential to learn the interfacing met article is…... Listed under: AVR ATmega Tutorial, Sensor - Transducer - Detector Projects 273. Analogue to Digital Conversion on an ATmega168 Many AVR microcontrollers are capable of doing Analogue to Digital Conversion. The ATmega168 ha (8 ports on the SMD packages) that can be used for analogue input. This tutorial shows you how. The circuit The Breadboard layout is based on the At breadboard…... Listed under: Android Projects, AVR ATmega Tutorial, Microcontroller Programmer Projects 274. How to make an Arduino Pro Mini bare bones with Real-time Clock Recapitulation One thing I didn’t find clearly over the internet is how to make an Ar Mini bare bones, that is, from the scratch, and how to make one on the breadboard. This is really useful if you want to make a custom pcb/smd…... Lis Clock Projects, LED Projects 275. How to drive 595 shift registers with AVR hardware SPI Driving a shift register using an AVR chip’s built-in hardware is really quite easy. Most of their of have an SPI module, or Serial Peripheral Interface. A shift register is exactly that, a peripheral device that communicates via a serial line. All we need to under: AVR ATmega Tutorial, Clock Projects 276. Make your own AVR JTAG debugger Tired of putting LEDs every time you want to check some value in the microcontroller? Well, its time to build yours debugger. A debugger is a device which helps you run through your code in the microcontroller step by step and also gives you…... Listed under: LED P Robotics - Automation Projects 277. Introduction to Arduino UNO (uses AVR ATmega328) Overview Arduino is an Open Source embedded development platform which is easy-to-use. It comprises of Hardware bo Software tools. Examples of some of the most popular Arduino Hardware boards are , Arduino Uno This board is designed around the ATmega328 AVR microcontroller. It is….. under: Android Projects, Microcontroller Programmer Projects 278. An AVR microcontroller based Ethernet device Ethernet has traditionally been a quite complex interface. All Ethernet chips until today had 100 pins or where difficult to find in small quantities and difficult to use from a small microcontroller with little memory. Microchip has changed the world with th ENC28J60…... Listed under: Other Projects 279. Fastest Finger First Quiz Project using ATmega16 Most of you must have watched quiz games in TV shows or at your schools where few contestants ar to press a switch if they know the answer to the question. An electronic system is required to find out exactly which one of then…... Listed under: LED 280. Making a LED Message Display with Keyboard Interface LED signage has become the choice in modern days to convey message to visitors of a venue. corporate office, shops, restaurants or any kind of social functions like marriages. Some big and complicated display needs dedicated control PCs and to build contents…... Listed under: LED Projects 281. LED Dot Matrix Room Temperature Display using P10 and ATmega8 Room temperature display on big screen is a common requirement from industria Used in server rooms, PLC rooms, storage rooms and many other places in an industrial units. Traditionally seven segment displays of big size (say fou height) were used. But now a…... Listed under: LED Projects
  • 25.
    282. P10 LEDDisplay Panel Interface with AVR ATmega8 Making LED displays and signage is a complete industry in itself serving all sorts of clients like bank stations, factories, airport and more. In earlier days display units were made using individual LEDs carefully placed and soldered to make matrix of dis this…... Listed under: LED Projects 283. Control Electrical Appliances from Android Smart Phone using Bluetooth : Project Construction Connecting Bluetooth Module with Development Boar Bluetooth module has seven interface pins of which two are NC (not connected) pins. The table below shows how you can interface with it our low cos development board. Bluetooth Module Dev Board GND GND RST PD2…... Listed under: Phone Projects 284. Control Electrical Appliances from Android Smart Phone using Bluetooth : Project Construction Connecting Bluetooth Module with Development Boar Bluetooth module has seven interface pins of which two are NC (not connected) pins. The table below shows how you can interface with it our low cos development board. Bluetooth Module Dev Board GND GND RST PD2…... Listed under: Phone Projects 285. Home Appliance Control over Mobile Network You can call up on your colleague's mobile number and ask him/her to turn on or off the lights or other of your office. You may be any where in the world at that time, as mobile network allows to to talk to anyone…... Listed under: Phone Projects 286. ATMega328 Board The ATMega328 board is a microcontroller board based on the ATmega328, The board contains everything needed to support the m 5VDC to power it. Simply connect the power connector to a computer with a USB cable or power it with a AC-to-DC adapter or…... Listed under: Batter 287. ATTiny 2313 BOARD his board is a development board on which you can build your projects. It is suited for educational use, experiments or prototypin board uses the ATTiny2313 microcontroller with a 20Mhz clock. The board contains the ISP 10-pin connector for in circuit serial programming. It…... Lis under: LCD Projects 288. LED Mood light In this projects 8 different colors are displayed with the use of a RGB LED. The microcontroller that is used is the ATMega8. An RGB LED which has three LED's integrated in one packaging. These LED's have the colors red, green, and…... Listed under: LED Projects 289. servo motor controller In ths project you can learn how to build a servo controleer motor with the ATMEGA328 board. The position of the servo motor controlled by the software (sweep back and forth) or by a potentiometer. The position of the servo motor is set by…... Listed under: Motor Projects 290. LED Driver MAX7219 – clock Below is the schematic that shows how the IC is wired to the ATMEGA328 microcontroller and the 4 digit 7-segment displa comon cathode.   Besides the MAX7219 you need only three other external components: two capacitors and one resistor. The capacitors are here to… under: LED Projects 291. Using Push Button Switch with Atmega32 and Atmel Studio This tutorial is meant for beginners in the field of Atmel AVR programming. I hope that you read my first tutorial Blinking LED using Atmega32 and Atmel Studio. In most of the embedded electronic projects you may want to use a push button Listed under: LED Projects 292. Build Your Own Microcontroller Based PID Control Line Follower Robot (LFR) – Second Part One of the interesting parts in building the Line Follower Robot is; you could sta very simple version by using just two transistors with the LED and LDR for sensor (Build Your Own Transistor Based Mobile Line Follower Robot – First Part)…... Listed unde Robotics - Automation Projects 293. Basic User’s Experiment Notes The “Basic User’s Experiment Note” is based on the popular 8-bit Atmel AVR ATmega328P microcontroller using AVRJazz 28PIN development This e-book covering most of the Atmel AVR ATmega328P microcontroller important features. With almost 140 pages, this e-book is organized similar to many of the…... Lis under: Sensor - Transducer - Detector Projects
  • 26.
    294. Basic ServoMotor Controlling with Microchip PIC Microcontroller The servo motor is widely used in model hobbyist such as airplane R/C model for moving the rudder, ailerons elevators and acceleration control or in the car R/C model for steering and acceleration control. In this tutorial we will learn how to control the servo… under: Motor Projects 295. OH HAI! on Windows 10 IoT Core Story Oh, Hai Hai ('hi') is an integration point for several stand alone smart home technologies.  Hai runs on the Rasp and can be adapted to optimize electricity consumption (lighting/HVAC) and water usage (irrigation/rain collection) in a number of ways. Hai was origi envisioned…... Listed under: Home Automation Projects 296. ThiDom Home automation Story This project uses Arduino, Raspberry and Attiny, it allows you to control nd monitor your home (AC outlet, shutters, h light, opening detector, temperature ...). The raspberry is the web server allowing control all arduino These can be controlled from any web browser a Listed under: Home Automation Projects 297. Cellular Data Logger Story I have been collecting data from Raleigh's trails and parks for the last couple years.  My primary platform has been a custom board I developed for low-cost (hey, these things may get damaged or stolen) and long battery life.  I wanted a connected…... Listed under: Sensor - Tr Detector Projects 298. Physical computing with ATtiny Story I have a nice "carranca" (or wall mask) from Chile that stands in my corridor. It's a very beautiful decorative mask liked from the very first moment I saw it at the shop. Few weeks ago I wondered if I could bring…... Listed under: Sensor - Transducer - Detector Projec 299. POV Cylinder with Arduino Due Story Introduction This is my first Arduino project. My work was inspired by several maker projects that created Persist Vision Displays [2,3,4]. Persistence of vision (POV) refers to the optical illusion whereby multiple discrete images blend into a single image in the huma and believed to…... Listed under: LED Projects 300. OLED on the Cheap! Things used in this project Hardware components: OLED 128x64 SPI-capable Available on Aliexpress or eBay for $4 to $20 × 1 For Arduino platforms, use the unmodified Adafruit libs × 1 Story I like cheap electronics for playing. Cheap is good for budget conscious…... Listed under: Projects 301. Tinker's Word Clock – REVISITED! NOW 110% more AWESOME I have been tinkering with Word Clocks for years. There is only one thing I like more than word clocks… it’s designing them so that they are easy to put together. This tutorial will go through my latest version (5!!!!!). By the end of…... Listed un Projects, Home Automation Projects 302. nRF24L01+ with ATtiny85 3 Pins Story This would be the continuation of my previous project Programming ATtiny85 with Arduino Uno. Now with cheaper ATtiny85 in place I wa for cheaper ways to transmit the sensor data. Which brought me to nRF24L01+ a cheap, low power RF transceiver. This seemed…... Listed under: Other Projects 303. Programming ATtiny85 with Arduino Uno Story I am working on a project which requires reading multiple sensor data on different locations. These re few PWM pins so using multiple Arduino Uno would be expensive and unnecessary. So I decided to use ATtiny85 microcontroller in place of Arduino U development…... Listed under: PWM Projects 304. Franzino is a low cost Arduino standalone board Hardware components: Atmel ATmega328P × 1 16 MHz Crystal × 1 Capacitor 22 pF × 2 Capacitor 100 (generic) × 2 Linear Regulator (7805) × 1 Capacitor 10 µF × 2 1N4007 – High Voltage, High Current Rated Diode × 1…... Listed under: Development Boar Projects
  • 27.
    305. Arduino WithoutExternal Clock Crystal on ATmega328 Story An Arduino consists of many components like: a linear regulator, USB to Serial microcont debug LED, power LED, reset button, RX & TX LED, crystal oscillator, etc. But a minimal circuit can have just the brain of the Arduino UNO, that is, an ATmega328p…... Listed under: Clock Projects 306. Reducing Arduino Power Consumption Story When it comes to portable electronics, one of the most important features is how to maximize the batter ATmega328P, used on popular boards like the SparkFun RedBoard, Arduino Uno, and Pro Mini are actually quite power hungry. The RedBoard and Ard …... Listed under: Other Projects 307. Gimmick on Barebones Arduino 16MHz Story Did you see this 8MHz no-crystal Arduino? Arduino on Internal Oscillator Crystal as Clock Source by Nam Chauhan is a great project if you can live with 8MHz using the internal RC oscillator of the Atmega328P chip. I really like Naman's project; I did…... Liste Other Projects 308. Tri-Mode Digital Clock with ATtiny85 and RTC Story Hello everybody, This is my first project using ATtiny85 microcontroller and also including a Real Tim (RTC) working with it. The use of ATtiny85 is a very interesting way to shrink your Arduino projects in a final tiny version. The Three-Modes Digital Clock Listed under: Clock Projects 309. Bootload Your ATtiny85 Story What is a Bootloader? Microcontrollers require a programmer to install firmware on them. A programmer is a device, that when combined with s loads firmware to the microcontroller. There are many programmers available. I won't go into to detail about them, but I will…... Listed under: LED Projects 310. SSD1306xLED Tinusaur ATtiny85 Library for SSD1306 Story SSD1306xLED is a C library for working with the SSD1306 display driver to control dot matr OLED/PLED 128×64 displays. It is intended to be used with the Tinusaur board but should also work with any other board based on ATtiny85 or simila microcontroller. The…... Listed under: LED Projects 311. 3D-Printed RGB Wallet Stand out from the crowd with this unabashedly ostentatious excuse for a wallet. It's got plenty of space, RGB lights, and you ca put your name on it for added vanity. Interested? Keep reading!In the files section of this build you can find two…... Listed under: Other Projects 312. Open Source IoT Platform The Project Intended as open source for those who want to build their own dosimeter with their own tools, this is an IOT de can take several sensors and have the data centralized online. The readings are accessible via a RESTful API, or by…... Listed under: Home Automation 313. Light-Up Poker Chip Spice up your poker games with these cool blinking chips. They can be programmed on the fly to have a certain number of the LE illuminated to indicate value, or you can have the lights blink in a cool pattern. They make great playing chips…... Listed under: Game - Entertainment 314. Scrumtato: Make Daily Stand-Ups Agile Again Story The following was originally published in my blog. At Delphi in Gothenburg, where I am currently e we create all kinds of cool products for the automotive industry. To organize our development process, we use SCRUM and abide by the Agile principle morning,…... Listed under: Other Projects 315. Goldilocks Analogue – Prototyping 3 Following my initial design article, and the follow up design article, I’ve put quite a lot of thought into how I can make this Goldilocks A device best achieve my stated goals. Pictured is the new 3rd Goldilocks Analogue Prototype. I'm now working on the 4th Goldilocks Analogue…... Listed under: LCD Projects 316. Playing Simon On A Hacked Farm Toy About My kids have a plastic farm toy. It neighs, it baas, and frankly, it grates. But since I tricked it out with a microcontroller brain, at least it can play Simon. One of the marvels of parenthood is the sheer volume of noisy plastic junk…... Listed under: Phone Pr
  • 28.
    317. Taiko TrainerHigh level Design Overview/Rationale This idea was inspired by team member Gabriel Soares who is part of Cornell’s Taiko Drum Club (Yamatai). Through his p and performing with others, he recognized the opportunity to design a drum trainer that can help students better learn to…... Listed under: LED Projects 318. Coil Winding machine counter with Atmega8 and Reed relay Connectors Everything has been mounted on a test board, including the headers for: ISP programmer (USBAsp), the 5110 Nokia LCD, the power supply (5V in, fed to the 3.3V regulator), the Reed relay connector, the reset button connector a another 2 pins connector, used to…... Listed under: Motor Projects 319. Bluetooth remote controllable (Lego) cars How it started It started with the idea to make a technical proof of concept combining the Physical Web and WebBluetooth. The Physical Web is an effort by Google to allow interacting with "things" without fiddling around with installing apps or setting anythin The…... Listed under: Car Projects 320. Markov Music Box markov summary Traditional music boxes play one or two tunes very well, but are not very interactive. Put differently, they have a h quality of synthesis, but a fixed-pattern note sequencer and fixed tonal quality. I wanted to build a device which would play an…... Listed under: PWM Sound - Audio Projects 321. DIY Canon IR Remote Hardware components: Atmel ATtiny13a CHF 1.25 × 1 Osram SFH409 IR Diode CHF 0.75 × 1 Battery holder CR1220 CHF 0.65 × 1 Battery CR1220 3V × 1 Push Button CHF 0.25 × 1 Resistor 15Ω CHF 0.07 × 1 Micro Slide Switch…... Listed under: How To - DIY - Projects 322. wozItDo: Tiny IQ puzzel, BIG challenge Hardware components: Atmel ATTiny85 × 1 LED (generic) × 3 Resistor 221 ohm Or similar, I used 220 ohm × 3 S Pushbutton switch 12mm or similar × 1 Coin Cell Battery Holder × 1 Coin Cell Battery CR2032 any 3v cell that fits is…... Listed under: LED Projects 323. The Tinusaur Project About The Tinusaur What is it Briefly, the Tinusaur is a minimal micro-controller hardware configuration based on Atmel AVR ATt of products and more specifically those with DIP-8 case such as ATtiny25/ATtiny45/ATtiny85, ATtiny13 as well as their variations. The goal of the Tinusa project…... Listed under: Other Projects 324. Yet Another Z180 (YAZ180) Project I’m thinking about a new project, something a little unusual but still with a rich history of information upon which to base the build. On Tind the RC2014 project which is a build of a Z80 platform but based on some modern components.…... Listed under: LED Projects 325. Goldilocks Analogue Synthesizer For the past year, I’ve been prototyping an Arduino clone, the Goldilocks Analogue, which incorporates advanced ana output capabilities into the design of the original Goldilocks with ATmega1284p AVR MCU and uSD card cage. Recently the design scope crept up to inc SPI memory…... Listed under: Other Projects 326. Arduboy Solar Charge Controller, Inverter, PowerBank, Lamp About this Project I have a few solar panels, 12 Volt batteries, transformers and few more laying around for a while crying out aloud to make some good use of them. Thus the birth of this device - complete small PV solution on a…... Listed u Solar energy projects 327. Sigfox Talking Plant Hardware components: Arduino UNO & Genuino UNO × 1 Atmel ATA8520D (EVK arduino) × 1 Software apps and online services: S Twitter Story What is Sigfox Talking Plant? It is a simple project based on Sigfox network to make a plant talk on Twitter. The…... Listed under: Other Projects
  • 29.
    328. Make yourown remote temperature/humidity sensor Hardware components: Atmel atmega 328p-pu × 1 ControlEverything.com SI7020-A20 I²C Humi Temperature Sensor ±4%RH ±.4°C × 1 433 MHz transmitter / Receiver kit × 1 AMS1117-ADJ voltage regulator × 1 Capacitor 100 µF × 1 Capacitor 100 nF Resistor 1k ohm ×…... Listed under: Sensor - Transducer - Detector Projects 329. XBee Walkie Talkie Hardware components: Goldilocks Analogue Still as prototype currently, but functionality can be recreated with MCP4822 DAC, Mic Amplifier, and Headphone Amplifier, together with Arduino Uno. × 1 MAX9744 × 1 MAX9814 × 1 MCP4921 DAC × 1 Arduino UNO & Genuino UNO × 1 Arduino…... Listed under: Other Projects 330. Bionic Organs/Devices/Limbs Wireless Charging Hardware components: IDT Qi 5W Transmitter Prototype Kit × 1 IDT Qi 5W Receiver Prototype Kit × 1 A Atmega328p × 1 HC-SR04 Ultrasonic Sensor × 1 Hand tools and fabrication machines: Arduino cc Schemeit PCBWeb Story Bionic devices/organs has a lifetime where its…... Listed under: Other Projects 331. Personal Home Assistant Hardware components: Arduino UNO & Genuino UNO × 1 Atmel ATMega328 × 1 Linear Regulator (7805) × 1 Jumper wires (generic) × 20 Resistor 10k Resistor 1k ohm × 5 Capacitor 22 pF × 6 16 MHz Crystal × 3 SparkFun Pushbutton…... Listed under: Home Automation Projects 332. Darby's not dead. Hardware components: Particle Spark Core × 1 atmega168 × 1 pn532 breakout board/ adafruit × 1 Story In the future there is a bar the dead punk rockers hang out. They are each given a MiFare classic card programmed with their name and…... Listed under: Other Projects 333. Digital Thermometer using AVR, LM35 and 16×2 LCD Thermometers are the device we use to measure the temperature in any desired scale and we al quite familiar with the analog thermometers. There are some disadvantages in analog thermometers and this can be overcome by using this digital thermometer using avr. The…... Listed under: LCD Projects 334. AVR Serial Communication (UART) Programming tutorial This tutorial focuses to teach you how to program AVR Serial Communication (UART). UART p important role in almost every embedded applications which we see in our day to life and hence it was considered to be very important concept in ev Microcontroller. The…... Listed under: Other Projects 335. Tutorial on printing image in Graphical LCD (GLCD) using Atmega32 Graphical LCD’s known as GLCD are display devices which are capable of displayin graphical images, customized characters, etc. This paves way for any system to present information to the end user by means of interactive graphics s printing image. Bored of using the old…... Listed under: LCD Projects 336. Creating Pac man custom patterns and animation in LCD display LCD modules are widely used to display calculated data’s, user references and much addition all character based LCD which uses HD44780 controller consists of a special RAM known as CGRAM which allows user to create custom patte tutorial will teach you to…... Listed under: LCD Projects
  • 30.
    337. LCD Interfacewith Atmega32 AVR microcontoller for beginners LCD’s are quite familiar module when comes interfacing with microcontrollers. We can find these display modu plenty of instances where a specific info is need to be displayed for the viewers. This article explains LCD interface with Atmega32 a AVR family Microcontroller and display…... under: LCD Projects 338. Digital Clock using AVR Atmega16 Microcontroller Digital clocks revolutionize the way we live our daily life as it helps people to stick with their schedul article will teach you to build your own Digital clock using DS1307 RTC Chip with Atmega16 microcontroller. As we all know that DS1307 is a…... Listed Other Projects 339. Volt-Amp meter using AVR microcontroller Voltage and current are two most important parameters of electricity. This project teaches you to build a si amp meter using avr microcontroller. This project may not enable you to build a high end measurement tool but will be a good diy project which gives Listed under: Metering - Instrument Projects 340. Door/Window alarm circuit Door or Window alarm circuit have been used widely in many homes to detect intrusion. A simple search in internet might lot of alarms for you to buy. But making your own alarm will be something special and that’s the purpose of this…... Listed under: Other Projects 341. Automatic plant watering system using AVR(Atmega16) Microcontroller Plant watering system evolved through various stages where primitive irrigatio possess many drawbacks as it fails to conserve water and human energy. So introducing Automation in it can help us to overcome these drawbacks a way to conserve water. This can be done…... Listed under: Other Projects 342. ATmega32 Switch Toggle Program ATMega32 switch code is extremely simple to implement, and this article looks into how to write the code to make a light up when a switch is pressed. The atmega32-switch-code.c program tests the switch input to the ATMega32 Development System. There are many Listed under: LED Projects 343. ATmega32 blinking LED Lights Using the ATMega32 microcontroller to flash or blink some LEDs is extremely simple and this tutorial shows how to mak blinker circuit including the example program code to blink eight LEDs. In this tutorial, you will learn how to make a program to blink…... Listed under: Projects 344. Intelligent temperature monitoring and control system using AVR microcontroller Controlling temperature has been a prime objective in various appli including refrigerators, air conditioners, air coolers, heaters, industrial temperature conditioning and so on. Temperature controllers vary in their com and algorithms. Some of these use simple control techniques like simple on-off control while others use…... Listed under: Temperature Measurement 345. GSM Based Home Automation GSM based home automation, project allows you to control electrical appliances using your mobile phone SMS. It consists of ATmega8 microco SIM300 GSM modem, Relays. There are many Home Automation Systems available in our market. Most of these are simple home appliances controlli systems like DTMF controlled…... Listed under: Home Automation Projects 346. GSM Based Fire Alarm System GSM, Microcontroller Based Fire detection and SMS Alert system, it uses LM35 Temperature Sensor and MQ2 for Smoke and 16x2 LCD is used to display temperature and Smoke Level, Over limit set points are set inside the program you can modify it as per…... Listed und Security - Safety Projects 347. Password based door locking system Password based door locking system, uses Matrix keypad to enter the password, This project is extended to ope Remote RC-604, In this project all required data is given Circuit diagram, C code, PCB design and All related data, This project is based on…... Listed un Security - Safety Projects
  • 31.
    348. AVR Microcontrollerbased Temperature Monitoring and Control System AVR Microcontroller based Temperature Controller, it uses LM35 Temperature for measurement of temperature and 16x2 LCD is used to display temperature set point, Heater Status and current temperature, It controls temperat turning on and off of the heater using relay. This project is…... Listed under: Sensor - Transducer - Detector Projects, Temperature Measurement Proje 349. Bluetooth based home automation Bluetooth based home automation, project allows you to control electrical appliances using your android mobile p consists of ATmega8 microcontroller, HC-06 Bluetooth module, Relays. There are many Home Automation Systems available in our market. Most of th simple home appliances controlling systems like DTMF controlled…... Listed under: Home Automation Projects 350. Fingerprint based security system This AVR microcontroller based project demonstrates Finger print based access control / security system, in this pro have provided all required data, PCB, Code, Circuit Diagram, Proteus Simulation. This project operates a relay based on valid finger detection. It is prov 6-Keys for…... Listed under: Security - Safety Projects 351. Token number display system using microcontroller Bank token number display project is build using ATmega8 Microcontroller and ULN2003 for drivi LED display, PCB layout, Circuit diagram are self explanatory. It is capable to display three digits, its simple project using microcontroller. Token issue s are ideal for banks, airports, public…... Listed under: LED Projects 352. 16×2 LCD interface with microcontroller Interfacing with Hitatchi 44780 The purpose of this page is to give a brief tutorial on how to interface with Hita 44780 based LCDs. I have tried to provide the all the data necessary for successfully adding LCDs to your application. The most common connector….. under: LCD Projects 353. DS1307 RTC Interfacing with AVR microcontroller In this tutorial we will learn How to interface RTC DS1307 with AVR microcontroller. We are using Atm the demo. GENERAL DESCRIPTION The DS1307 serial real-time clock (RTC) is a low-power, full binary-coded decimal (BCD) clock/calendar plus 56 bytes SRAM. Address and data are…... Listed under: Clock Projects 354. Analog to Digital Converter AVR C Programming One of the important features in today’s modern microcontroller is the capability of converting the analog signal to the digital This feature allows us to process the analog world easily such as temperature, humidity, light intensity, distance, etc; which usually captured by electro sensor…... Listed under: Microcontroller Programmer Projects 355. AVRJazz Mega168/328 Learning and Development Board The AVRJazz Mega168 board from ermicro is designed to be used both as the AVR microcontr learning and development board. The AVR Jazz Mega168 board is stand alone microcontroller module equipped with the latest Atmel high performan power technology AVR ATMega168 or ATMega328 microcontroller…... Listed under: Development Board - Kits Projects 356. Introduction to AVR Microcontroller Pulse Width Modulation (PWM) PWM is used in many industrial mostly for controlling the motor speed. The PWM because it’s the most efficient method comparing to the analog one. That’s why most of the modern microcontrollers today have this features build in does this PWM works…... Listed under: PWM Projects 357. Atmel AVR ISP Microcontroller Programmer Project One of the frustrating part in learning AVR microcontroller for the beginners is the AVR microcontr programmer. The question is how to program my AVR mircrocontroller; actually if you googling on the internet and search for AVR ISP Programmer th plenty information; start from…... Listed under: Microcontroller Programmer Projects 358. AVR Twinkle Twinkle Using PWM Project Would be interesting if we could make our microcontroller to sing for us not just beeping or blinking; this proj about using the powerful AVR ATmega168 16-bit PWM feature to produce accurate musical notes such as playing the child’s favorite Twinkle-Twinkle L Star…... Listed under: PWM Projects 359. AVR LCD Thermometer Using ADC and PWM Project Sometimes we need our microcontroller to interact with more human readable information. It wi better for us if we could make it display the words not just blinking the LED. Today most modern gadget such as mobile phone and PDA, use LCD (Liqu Crystal…... Listed under: PWM Projects 360. Controlling DC motor with AVR ATtiny13 PWM and ADC Project It’s interesting to explore what we can do with this tiny 8 pins; 8-bit microcontroller. The is the smallest and cheapest Atmel AVR 8-bit microcontroller families but yet, it’s loaded with sophisticated peripherals such as two 8-bit PWM channe channels 10-bit ADC.…... Listed under: PWM Projects
  • 32.
    361. Build YourOwn Microcontroller Based PID Control Line Follower Robot (LFR) – Second Part One of the interesting parts in building the Line Follower Robot is; you could sta very simple version by using just two transistors with the LED and LDR for sensor (Build Your Own Transistor Based Mobile Line Follower Robot – First Part)…... Listed unde Robotics - Automation Projects 362. Transforming your AVR Microcontroller to the I2C or TWI Slave I/O Expander Project The I2C bus (read as I squared C) is one of the most important em system serial bus interface first introduced by Philips in 1980; using just two lines called SCL (serial clock) and SDA (serial data) respectively make the I perfect…... Listed under: Other Projects 363. Developing Embedded Application with BASIC Language on the Microchip PIC18F Microcontroller using the Amicus18 Development system The BASIC (Beginners’ All-purpose Symbolic Instruction Code) language has been known as one of the popular high level language choice in embedded system to fact the born and development of the personal computer (PC) we use today has been influenced by the used of…... Listed under: Development Board Projects 364. Build your own stopwatch using Maxim MAX7219 Serially Interfaced, 8-Digit LED Display Drivers One of the basic usage of the TIMER peripheral on ev microcontroller is to provide the accurate timing mechanism. Using the TIMER peripheral as the basic timing, we could easily develop a stopwatch and to the 8-Digit seven segment numeric LED display. Thanks…... Listed under: Clock Projects 365. Building the I2C Smart DC Motor Controller with Atmel AVR Microcontroller – Part 1 The idea of building my own I2C (read as I square C) smart DC motor controller is came when I was learning and playing together with my son on his LEGO® MINDSTORM® NXT 2.0 about a year ago. The NXT sophisticated controller also…... Listed under: Moto 366. Telepresence Robot using Microchip PIC16F1829 and Atmel AVR ATmega168 I2C Smart DC Motor Controller Microcontroller – Part 2 The I2C (read as I square C) smart DC m controller is designed using the Atmel 8-bit AVR Atmega168 microcontroller and configured to act as the I2C slave device where it could be controlled by other microcontro microprocessor through the I2C SDA (serial data)…... Listed under: Robotics - Automation Projects 367. The LED Chasing Effect Project using Atmel AVR Microcontroller One of the interesting projects for most of the embedded beginners enthusiasts or ho to build the LED chasing effect. In this project we are going to use both the Arduino IDE and Atmel AVR Studio to program the AVR ATMega168 microco therefore you…... Listed under: LED Projects 368. How to use I2C-bus on the Atmel AVR Microcontroller I2C (read as I Squared C) bus first introduced by Philips in 1980, because of its simplicity and flex I2C bus has become one of the most important microcontroller bus system used for interfacing various IC-devices with the microcontroller. The I2C bu only…... Listed under: Other Projects 369. Interfacing GSM Module with Atmega32 AVR microcontroller GSM (Global System for Mobile Communication) technology lets user to communicate wi across mobile networks hence it offers a vast area of coverage. Interfacing GSM technology with microcontroller will enable us to extend the commun cover large area. This tutorial will teach you…... Listed under: Other Projects 370. Integrating Wiznet W5100, WIZ811MJ network module with Atmel AVR Microcontroller The rapid penetration of the internet networks into many of tod modern homes and personal gadgets (e.g. smart phone and smart pads) opening a tremendous useful and interesting embedded system application be integrated into our house or known as the intelligent house. For…... Listed under: Internet - Ethernet - LAN Projects 371. Using Serial Peripheral Interface (SPI) Master and Slave with Atmel AVR Microcontroller Sometimes we need to extend or add more I/O ports to our microcontroller based project. Because usually we only have a limited I/O port left than the logical choice is to use the serial data transfer method; wh usually only requires from one up to…... Listed under: Other Projects 372. Working with the Comparator Circuit Sometimes in the embedded system world we need to process the analog world and sending the signal to the m signal exceed some predetermine limit we’ve set. Some example of this situation is to send the interrupt signal to the microcontroller operation…... Lis under: Development Board - Kits Projects 373. Using Transistor as a Switch Most of microcontrollers work within 5 volt environment and the I/O port can only handle current up to 20mA; therefore to attach the microcontroller’s I/O port to different voltage level circuit or to drive devices with more than 20mA; we need to…... Listed under: Other Pr 374. Working with AVR microcontroller Communication Port Project Back in the old days the COM port or known as RS-232 (EIA-232 standard) is one of the communications protocol and hardware use in many computer system installation start from small UNIX machine to the mainframe. The RS-232 proto used by terminal such…... Listed under: Other Projects
  • 33.
    375. Microwave Controllerusing ATmega8 – AVR Project The user interface has the following parts. Output Device: A 16×2 alphanumeric LCD Module is used as the main output can display numbers, alphabets and few symbols. It can show two line and each line can have 16 characters. The backlight enables the…... Listed under: LCD Projects 376. Stepper motor control with an ATmega8 microcontroller This note provides basic implementation details and procedural information to design and as stepper motor system. The controller discussed here is the ATmel mega8, an 8-bit microcontroller (MCU). The note consists of a general description an highlights of implementing a basic stepper motor…... Listed under: Motor Projects 377. Interfacing Servo Motor with Atmega32 Microcontroller Servo Motor is a DC Motor equipped with error sensing negative feedback to control the exact position of the shaft. Unlike DC Motors it will not rotate continuously. It is used to make angular rotations such as 0-90°, 0-180° etc. Stepper Motors ca Listed under: Motor Projects 378. Interfacing DC Motor with Atmega32 Microcontroller In some of your electronic projects you may want to control a DC Motor with Atmega32 Microcon We can’t connect a DC Motor directly to a microcontroller due to following reasons. A microcontroller can’t supply the current required for the working Motor. ATmega32 Microcontroller can source or…... Listed under: Motor Projects 379. Interfacing LCD with Atmega32 Microcontroller using Atmel Studio As we all know LCD (Liquid Crystal Display) is an electronic display which is commo used nowadays in applications such as calculators, laptops, tablets, mobile phones etc. 16×2 character LCD module is a very basic module which is co used by electronic hobbyists and is used in…... Listed under: LCD Projects 380. Blinking LED using Atmega32 Microcontroller and Atmel Studio Similar to printing ‘Hello World’ in C or C++, the very first step towards programming a microcontroller is Blinkin with a delay. Atmega32 is a very popular high performance 8 bit AVR Microcontroller. For this example project we need to use two registers…... Listed under: LED Projects 381. Interfacing rotary encoder to Atmega32 Recently I was working on a project that involved rotary encoder. I thought I'd share some thoughts on how ro encoder can be interfaced and programmed. Actually it is easy to work with rotary encoders - interfacing is simple – only three wires are required…... L under: LCD Projects 382. Graphical LCD Text Display The Graphical LCD Text Display is complete!   I've used the same Atmel ATMega8 controller that I used in the Composite Vid Display.   The interface is the same as well; an 8 bit parallel port with a strobe input and a busy output.  …... Listed under: LCD Projects 383. An advanced energy saver project with DTMF capabilities to use electricity efficiently by reducing the unwanted uses. INTRODUCTION:   A lot of electri wasted due to ignorance or fault of the user. Sometimes a person in the room turns on all the electric equipments which is of no use to them. As an e supposedly a person enters in the hall or conference…... Listed under: Other Projects 384. Analog to Digital Converter of ATmega32 with LED Display Microcontrollers are capable of detecting binary signals: is the button pressed or not? These digital signals. When a microcontroller is powered from five volt, it understands zero volts (0V) as a binary 0 and five volts (5V) as a binary 1. But the re Listed under: LED Projects 385. 4X4 Keypad Interfacing with ATmega32 and LED Display Keypads are parts of HMI or Human Machine Interface and play really important role in a sma embedded system where human interaction or human input is needed. Matrix keypads are well known for their simple architecture and ease of interf this project, we will…... Listed under: LED Projects
  • 34.
    386. 4X4 Keypadbased Password with ATmega16 and LED Display Security is a prime concern in our day-today life. Everyone wants to be as much secured possible. Keypad based password is one of the many method and the most common and easy one to provide security to any system. In this project, w Listed under: LED Projects 387. 4X4 Keypad based Password with ATmega32 and LCD Display Security is a prime concern in our day-today life. Everyone wants to be as much secured possible. Keypad based password is one of the many method and the most common and easy one to provide security to any system. In this project, w Listed under: LCD Projects 388. 3-axis Accelerometer Sensor-ADXL335 Interfacing with ATmega32 ADXL335 accelerometer sensor is a MEMS (Microelectromechanical systems) sensor which can measure stat acceleration of gravity in tilt-sensing applications, as well as dynamic acceleration resulting from motion, shock, or vibration. The accelerometer senso in mobile devices, gaming systems, disk drive protection, image stabilization,…... Listed under: Sensor - Transducer - Detector Projects 389. Accelerometer based Hand Gesture Controlled Wheel Chair with ATmega32 for Physically Handicapped In this project, we will learn How to design an Accelerometer based Hand Gesture Controlled Wheel Chair with AVR ATmega32 Microcontroller for Physically Handicapped. Here, we will use our han gestures as input signals to drive the wheel chair in different direction and we will…... Listed under: LCD Projects 390. DS1307 RTC based Digital Clock Designing in 12 Hour Format with ATmega32 and 7-Segment Display A digital clock is a type of clock that displays the t digitally (i.e. in numerals or other symbols), as opposed to an analog clock, where the time is indicated by the positions of rotating hands. The clock/ca provides seconds, minutes, hours information. The clock…... Listed under: Clock Projects 391. AVR uartConfig – an atmega and arduino eeprom config library Update to version 2014-06-13 AVR uartConfig is a small footprint library you can use to your micro eeprom through uart communication. AVR uartConfig is a set of tools running on Windows, Linux and Mac, made up or: a avrgcc firmware commandline utility…... Listed under: AVR ATmega Projects 392. Accelerometer and Relay based Hand Gesture Controlled Wireless Home Automation System with ATmega32 using 433MHz RF In this project, we will to design an Accelerometer and Relay based Hand Gesture Controlled Wireless Home Automation System with AVR ATmega32 microcontroller using 4 RF. Here, we will use different hand gestures as input signal to control the appliances i.e 2 bulbs…... Listed under: LCD Projects 393. Password Protected BT136 Triac based Keypad Controlled Wireless Home Automation System with ATmega32 using 433MHz RF-I In this project, we wi How to design a Password Protected BT136 Triac based Keypad Controlled Wireless Home Appliances System with AVR ATmega32 microcontroller usin 433MHz RF Part-I. Here, we will use the 4X4 keypad as the input device to enter the password and…... Listed under: Home Automation Projects 394. LM35 Temperature Sensor Interfacing with ATmega32 and LED Display LM35 series is a low cost and precision Integrated Circuit Temperature Sensor w output voltage is proportional to Centigrade temperature scale. Thus LM35 has an advantage over other temperature sensors calibrated in Kelvin as t don’t require subtraction of large constant voltage to obtain…... Listed under: LED Projects 395. Atmega 32u4 Based Wireless USB Keyboard How a generic keyboard is made has been already explained in the Atmega 32u4 Based Generic USB Keyb Project. In this project a wireless keyboard will be designed. For making a wireless keyboard, there will be two circuits involved in the project - a transm Listed under: Other Projects 396. Atmega 32u4 Based LED Status In the Atmega 32u4 Based USB Controlled LED Series Project, it was demonstrated how to use control transfer to rece peripheral. In this project, it will be demonstrated to transfer data from microcontroller to the host computer. For this, the…... Listed under: LED Proje 397. Atmega 32u4 Based Wireless USB Mouse How a generic mouse is made was explained in the Atmega 32u4 Based Generic USB Mouse Project. In this p wireless mouse will be designed. For making a wireless mouse, there will be two circuits involved in the project - a transmitter circuit which…... Listed u Other Projects
  • 35.
    398. Atmega 32u4Based USB Speaker A speaker is a device that produces sounds from the electrical signal having audio encoded. The speakers usually ha mm jack for audio output from the computer. Nowadays USB interface is also gaining popularity for interfacing audio devices with the computer. A lo under: Other Projects 399. Atmega 32u4 Based USB Musical Keyboard The music keyboard is one of the most common musical instruments. The electronic musical keyboards ha around for a long time. The electronic music keyboards synthesize musical sounds electronically according to MIDI (Musical Instrument Digital Interfac standards. Fortunately, the USB protocol does have provision…... Listed under: Other Projects 400. Atmega 32u4 Based USB EEPROM Reader External memories are frequently used to store and carry computer data. The USB flash drives are quite com nowadays. This project is an attempt to demonstrate making of USB storage devices. The project converts an external EEPROM which basically has I2C to an USB…... Listed under: Other Projects 401. Atmega 32u4 Based USB Controlled LED Series Throughout this USB series, different types of USB devices have been designed and developed. These were enumerating with the host computer and then were using Class Specific transfers for further USB communication. Like the Keyboard, Mouse and devices were using interrupt transfers for…... Listed under: LED Projects 402. Atmega 32u4 Based USB Controlled Servo Motor In this project, a device will be designed which will allow controlling a servo motor from the desktop on USB interface. For controlling a servo motor, PWM output needs to be generated from the microcontroller. The length of the ON time of the PWM… under: Other Projects 403. Atmega 32u4 Based USB Digital Voltmeter In this project, a digital voltmeter will be designed which will show the voltage reading on a desktop applica device will read analog voltage with respect to the ground, digitize the reading and send the reading to personal computer on USB interface. The devic Listed under: Other Projects 404. Attiny85 As a Step/Dir Stepper Motor Controller Somewhere in Greece, someone did something never done before... Seen those things before? Thing: Thing: 3 Oh, you have! You bought one of them you say? Oh... Don't worry, I did too. They did the job, yeah. But we paid for them…... Listed under: Mo Projects 405. Custom PCB for Lights, Temperature, Video OSD and VTX PSU upgrades to HKing Rattler RC Car I’ve had the HobbyKing Rattler for some time now and I’ve been making small modifications here and there which have accumulated over time and has gotten to the point where it would be nice to have everything on a custom PCB. Here’s how everythin Listed under: Temperature Measurement Projects 406. Open Programmer – USB programmer for PIC, EPROM, ATMEL, SPI Open Programmer – An open source USB programmer for PIC micros, I2C-SPI-MicroWire-OneWire-UNIO EEPROMs, some ATMEL micros, generic I2C/SPI devices and (soon) other devices. Completely free and Open Source (including firmware) Programs PIC10-12-16-18-24, dsPI EEPROMs type 24xxxx (I2C), 25xxx (SPI), 93xx6 (MicroWire), DS24xx (OneWire), 11xxx (UNIO),…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 407. Updating electricity meter to communicate via WLAN A while ago Farnell sent email to me and offered one (inexpensive) product  as a sample in excha mentioning it at this blog. I browsed for a while for an interesting part and settled with Microchip MRF24WB0MA/RM WiFi module (Order code 182314 module…... Listed under: Home Automation Projects 408. Using Maxim DS1307 Real Time Clock with Atmel AVR Microcontroller Using Atmega32 Building our own digital clock is one of the dreamed project by the hobbyist or anyone that want to learn or involve seriously in the embedded system world; the ability to integrate time, day and date to the embed system is one of…... Listed under: Clock Projects 409. Single Chip Computer: Easy to Produce AVR BASIC Co This instructable will document and explain my latest project, a standalone computer system ba a single chip (IC); the ATmega 1284P. The 1284P is responsible for all aspects of the system, including running the BASIC interpreter, generation RCA vi signals and reading keyboard input.…... Listed under: Android Projects 410. Doppler Radar for Collision Avoidance Introduction My project uses Doppler radar sensors in order to provide the user with movement, speed, and di information of their environment. An array of Doppler radar sensors are placed on the user�s head and vibration motors are placed on the user�s c neck, back,…... Listed under: Sensor - Transducer - Detector Projects
  • 36.
    411. Drums Anywhere:solution to making a great drum beat Using 3D-printed boxes Introduction "The sound and experience of drums... Any time, anywh any object." -Project Soundbyte It's Friday night and you're hanging with your friends at home. There are no parties tonight and you have seen everyth Netflix already - you're bored out of your…... Listed under: Sound - Audio Projects 412. Ultrasonic range-finder with haptic feedback Introduction "An ultrasonic range-finding hat with variable haptic feedback for obstacle detection." -Proje Bite For our ECE 4760 final project, we designed and implemented an ultrasonic range-finding hat that uses haptic feedback to alert its wearer about o in his or her path. The…... Listed under: Sensor - Transducer - Detector Projects 413. Autocross/Track day Data Logger for BMW E36 M3 Customer's Voice “Hello, I am interested in a race car logger than will be able to display and log cru information during autocross and track events. I am interested in tracking vehicle speed, RPM, engine coolant temperature and lateral g-forces. Ideally can be…... Listed under: Car Projects 414. Touchpad Figure Recognition Our project implements a touchpad input system which takes user input and converts it to a printed character. Currently letters of the alphabet, but our training system could be easily generalized to include any figure of completely arbitrary shape,…... Listed under: LCD P 415. Capacitive Touch with Atmel’s AT42QT1070 Touch Sensor IC Rather than using an out-of-the-box capacitive touch solution for my projects, I thought I’d attempt making my breakout board. The idea is to use a sensor capable of triggering normal digital input pins using touch. This post covers the selected touch sensor IC,…... Listed under: Sens Transducer - Detector Projects 416. AVR ATtiny USB Tutorial Part 2 This is the second part of my USB tutorial for ATtiny2313 and V-USB library. In the first part we learned how to get 3.3V to power our circuits. In this part, we will expand our setup with following parts: Larger breadboard and additional…... Listed under: Interfacing(USB - -ISP) Projects 417. AVR Atmega audio input RMA using FFT Radix-4 audiogetradix4 is a simple library you can use to interface with a ac audio input. It reads data from an and returns the RMS value of the input using DFT Radix-4 algorithm. The discrete Fourier transform (DFT) converts a finite list of equally-spaced…... Lis under: Sound - Audio Projects 418. Irradiance/Illuminance Meter using TLR235R sensor with AVR Atmega The TSL235 is a light-to-frequency converter. This library reads TSL235 output fr and convert it to irradiance, and then to illuminance. Irradiance is the power of electromagnetic radiation per unit area (radiative flux) incident on a su expressed in watt per square metre, the…... Listed under: Metering - Instrument Projects 419. An AVR Atmega LCD Menu builder library lcdmenu1 is a simple and small lcd menu builder for AVR Atmega. It works with only 4 buttons (up, down, rig additional buttons can be added. It can also store values to eeprom User can use button up and down to list menu categories, right…... Listed under: L Projects 420. An optical dust meter that uses the GP2Y1010AU0F sensor library made with AVR Atmega This project is a dust detector that use the GP2Y1010AU0F s Attached you can also find the GP2Y1010AU0F sensor library for AVR Atmega.GP2Y1010AU0F is a dust sensor by optical sensing system. An infrared e diode (IRED) and an phototransistor are diagonally arranged into this device.…... Listed under: Sensor - Transducer - Detector Projects 421. AVR Atmega dehumidifier controller board, update This project is an update to the previous dehumidifier based you can here: http://davidegironi.blogspot.it/2013/04/avr-atme dehumidifier-controller.html This update adds some usefull functions. The main issue that i've fixed is the microcontroller crash, that happens sometimes. I've noticed that so the controller stop running, crash or doesn't works as…... Listed under: Sensor - Transducer - Detector Projects 422. A simple brushless sensorless motor driver for AVR Atmega Brushless electric motor (BLDC motors) are synchronous motors that are powered by a DC source via an integrated inverter/switching power supply, which produces an AC electric signal to drive the motor. For an introduction to BLDC motors look at my sensored motor driver…... Listed under: Motor Projects
  • 37.
    423. An AVRAtmega based PID magnetic levitator This is a magnetic levitator implemented using Atmega8 microcontroller. Magnetic levitation is a method an object is suspended with no support other than magnetic fields. To make a magnet levitate, an hall sensor is attached to a coil. The coil acts as an… under: Sensor - Transducer - Detector Projects 424. A led matrix Mask built on AVR ATmega8 AVR Mask1 is a led mask built around 74hc595 shift register and 8x8 led matrix. The "Dylan Dog" comics deco conjunction with his stands, make it good looking.t has 4 8x8 led matrix, 2 for the mouth, and 2 for eyes. When the user…... Listed under: LED Projects 425. A simple Sound Pressure Level Meter (SPL) dB audio meter using AVR ATmega A sound level meter or sound meter is an instrument which measures s pressure level. Sound pressure level (SPL) or sound level is a logarithmic measure of the effective sound pressure of a sound relative to a reference va measured in decibels (dB)…... Listed under: Sound - Audio Projects 426. SD card logger library with log rotation that fits on ATmega8 This library implements an SD card Data Logger that runs on ATmega. It has a small footp can be loaded on an ATmega8, leaving space for user code. It supports SD and microSD cards formatted with FAT16. It also features log rotation.The "P FAT…... Listed under: Memory - Storage Projects 427. A Pickup Winding machine built on an ATmega8 The core of this project is an ATmega8. It features: wind counter slow startup automatic stop configura motor speed configurable winds 2 directions If you are looking for a CNC version: you can find it here: http://davidegironi.blogspot.it/2016/06/a-cnc-p winding-machine-built-on.html This winder has an LCD display that will show…... Listed under: Motor Projects 428. USB AVR programmer I’ve already had a programmer for Atmel’s AVR microcontrollers, but I couldn’t use it in my lab, because my laptop doesn’t have a LPT port. So I decided t new programmer with USB connection. I’ve found an open source programmer AVR doper, and…... Listed under: LCD Projects 429. RSS Reader using AVR mega8 I spent part of an afternoon developing a hardware RSS reader (most of my time was spent on the python side of things pretty simple and uses an AVR microcontroller connected to a computer via a serial cable Hardware I am using the Dragon…... Listed under: LCD Proje 430. Veronica – VRAM I considered subtitling this article, “adventures in breadboard noise”, since that’s what I spent most of my time dealing with. In any case, let’s recap where Veronica’s video generator was generating a stable VGA signal. In addition, a test pattern was being displayed…... Listed under: LCD Projects 431. RFID based security system using AVR ATmega32 microcontroller RFID technology brought a great revolution in our life as it simplifies the machine communication. RFID’s are used almost everywhere today Schools, hospitals, industries and much more. This article teaches you to build a simple RFI security system using AVR microcontroller which is reliable…... Listed under: Security - Safety Projects 432. AVR HVSP Fuse Resetter description in working w/ 8 or 14 pin avr devices, i would sometimes want to use the RESET pin as io as the io pin count is low doing so will disable further programming via SPI. i do not need a full blown HV…... Listed under: AVR ATmega Projects
  • 38.
    433. AVR ThermostatThis thermostat is built around an ATMega164 and a TC1047A temperature sensor. It controls your furnace and air conditioner. It is n programmable, although it has a clock and is capable if some additional code were written (any volunteers?). The unique feature is that instead of a b of buttons…... Listed under: Temperature Measurement Projects 434. Week 11: Networking with ESP8266 For this week I set out to make a board that will show realtime MBTA bus arrival times using the ESP8266 wifi mod LCD. Seemed doable. People of the internet have been excited about the ESP8266 lately. Here is a snapshot of google…... Listed under: LCD Projects 435. Building a Wifi Radio – Part 7, Building an LCD Display This is the seventh part of an ongoing series about building a low cost, open source streaming internet radio.  If you already, check out the previous parts (see the links at the end of this article) for some background about the project. In part…... Listed under: LCD Projects 436. CT Sensor on AVR ATmega A CT (Current Transformers) sensor is a device used to measure alternating current. A CT sensor, like other current transformers is made by a prima winding, a magnetic core and a secondary winding. The primary winding is often a single wire passing through the main…... Listed under: Sensor - Tra Detector Projects 437. Reading temperature on AVR Atmega using a thermistor with NTCtemp library 02 A thermistor is a type of resistor whose resistance varies significantl temperature, more so than in standard resistors. NTCtemp is a simple AVR library to read temperature from a thermistor connected to an atmega mic library implements three models convert adc value read from analog…... Listed under: Temperature Measurement Projects 438. CMR Robot Arm Our project was mainly designed for the Cornell Mars Rover project team (CMR), which will be using the robotic arm for competition t complete many different tasks in the deserts of Southern Utah. For our ECE 4760 final project, we created the control systems for…... Listed under: Ro Automation Projects 439. AVR 16bit Stereo Wave Player Introduction This project aims to implement a cost-effective wave player based on AVR (ATmega / ATiny Series) with CD-A Quality, which can play 8-bit/16-bit Mono/Stereo standard RIFF (Resource Interchange File Format) wave files.  This project can be applied into many applications such as bus /…... Listed under: Sound - Audio Projects 440. Drive a stepper motor with acceleration and deceleration using an Allegro driver on ATmega8 The stepper motor is an electromagnetic device that con digital pulses into mechanical shaft rotation.Most common types of stepper motor can be bipolar or unipolar, depending on the winding. To make a s motor move, motor windings must be loaded in the correct order. A…... Listed under: Motor Projects 441. InLinea01: A PID controlled line following robot build on an ATmega 8 InLinea01 is a simple PID controlled line following robot. This is not speed orient follower, this is just a prototype I built to experiment with this type or machines, though it can be the first step to build a faster one. The goal of a…... L under: Robotics - Automation Projects 442. A DIY A4 Laser Engraver made from a scanner and a printer on ATmega328 This "Get Ready For Win98" Laser Engraving Machine it's built using an old and an old printer. A laser engraving machine is a tool that uses lasers to engrave an object. I've an old broken scanner and an old printer lying aroun by this instructables…... Listed under: CNC - Printing Machines Projects 443. CT Sensor on AVR ATmega A CT (Current Transformers) sensor is a device used to measure alternating current. A CT sensor, like other current transformers is made by a prima winding, a magnetic core and a secondary winding. The primary winding is often a single wire passing through the main…... Listed under: Sensor - Transducer - Detector Projec
  • 39.
    444. A webconfigurable Xively logger, build on AVR ATmega328 Xively (formerly Cosm and before that Pachube) is a platform devoted to simplifying the interconnection of devices and data with applications on the Internet of Things. It is an on-line database service allowing developers to connect senso data (e.g. energy and environment data from objects,…... Listed under: Sensor - Transducer - Detector Projects 445. Cheap CO2 meter using the MQ135 sensor with AVR ATmega MQ135 is an Air Quality Sensor suitable for detecting of NH3, Alcohol, Benzene and othe The description below, is what i derive from the poor datasheet of this sensor, it may be uncorrect, so if you have suggestions please leave me a feedb The…... Listed under: Sensor - Transducer - Detector Projects 446. A simple brushless sensored motor driver for AVR Atmega Brushless electric motor (BLDC motors) are synchronous motors that are powered by a DC source via an integrated inverter/switching power supply, which produces an AC electric signal to drive the motor. Additional electronics control the in output amplitude and waveform (and therefore percent of…... Listed under: Motor Projects 447. PWM Motor Driver with MOSFET H-Bridge and AVR ATmega8 Here is a very simple project of controlling a small DC-motor (taken from an old personal player) with ATmega8. The ATmega8 is having three PWM channels, out of which two are used here. PWM waveforms are fed to MOSFET (RFD3055) H- Here, direction is…... Listed under: Motor Projects, PWM Projects 448. Atmel AVR ATMega16 Interfacing WIth 16×2 char LCD An alphanumeric low cost LCD Display is very essential for may small and big projects to Display type of information. Hitachi HD44780  Chipset based 16x2 char LCD is Really very cheap and easily available in the local market. Project Description:-   project we are going to…... Listed under: LCD Projects 449. An AVR-Based Microstepping Bipolar Chopper Stepper Motor Driver (STMD) Features Open Source - The schematic, parts list, and software are all free downloadable! Hobbyist-friendly - No surface mount parts means allows this drive to be easily repaired! DMOS driver chips rated at 55V and 3 Amps. availability - Electronic parts are all…... Listed under: Motor Projects 450. LCD Interfacing with AVR Interfacing LCD Display in 8bit Mode I’ve already discussed about the LCD display in a note here in this website. You can read on character LCD Display here. Now let us come to the interfacing side of LCD. Let us see the 8bit…... Listed under: LCD Projects 451. How to Establish A PC-Micro controller USART communication Introduction USART is one of the primitive inter-device communication protocols. It is not used in modern comp still, a few mother boards come with the module necessary for an USART communication. Here, in the case of PCs, the port is known as COM port…... Listed under: AVR ATmeg 452. How to Interface an External EEPROM with AVR Atmega32 In this article, we will explain how to communicate to an external EEPROM from the AVR Atm MCU using the I2C communication protocol. So let’s begin our tutorial on how to interface an EEPROM (AT24C16A) with AVR Atmega32. You will usuall external EEPROM…... Listed under: Sensor - Transducer - Detector Projects 453. Worry-Free Automatic Timed Plant Feeder Description Do you often forget to irrigate your plants? Do you have to ask your neighbors to take care of th your whole families are out for a vacation? Don’t worry any more! Here is a solution. This embedded system, worry-free automatic timed plant…... List LCD Projects 454. Week 11: Networking with ESP8266 For this week I set out to make a board that will show realtime MBTA bus arrival times using the ESP8266 wifi mod LCD. Seemed doable. People of the internet have been excited about the ESP8266 lately. Here is a snapshot of google…... Listed under: LCD Projects, S Transducer - Detector Projects
  • 40.
    455. Color VideoGame on AVR Introduction Our project is to make a color video game that runs primarily on the ATmega 1284P. To do this, we adhered to standard for color video. The sync signals used for NTSC are generated on the ATmega 1284P itself, and all game…... Listed under: Game - Entertainme Projects 456. Working with Atmel AVR Microcontroller Basic Pulse Width Modulation (PWM) Peripheral Pulse Width Modulation (PWM) is a technique widely used in modern switching ci control the amount of power given to the electrical device.  This method simply switches ON and OFF the power supplied to the electrical device rapidly. The average amou energy received…... Listed under: PWM Projects 457. How to interface RFID with AVR ATmega32 microcontroller RFID is most arguably a evolutionary wireless technology which boosted working of embed devices up to great mark. And there is plenty of systems and devices working based on this technology. This article is focused to teach you how to inte with AVR microcontroller.…... Listed under: AVR ATmega Projects 458. Remote Temperature Monitoring using GSM – AVR Project Temperature monitoring have wide application in daily life. In modern day keeping an eye on temperature of pla as server rooms, hospital rooms, warehouses and green houses can help solve many problems. But with the use of normal temperature sensors, someone needs to go….. under: Temperature Measurement Projects 459. ATMega16 AVR Microcontroller Seven Segment Digital Clock The ATMega16 Seven Segment Digital Clock In this ATMega16 AVR project we will be designing and implementing a clock with the aid of a Atmel AVR ATMega16 microcontroller and Seven Segment Displays. As such before going through this digital clock AVR project it is…... Listed under: Cloc 460. Servo motor control using AVR Servo motors are so called “closed feedback” systems. This means that motor comes with control circuit, which senses mechanism is in desired location and if not it continuously corrects an error until motor reaches proper point. Servo motors are widely used in robotic Listed under: Motor Projects 461. Running TX433 and RX433 RF modules with AVR microcontrollers Sometimes in embedded design you may want to go wireless. Might be you will wan various readings of remotely placed sensors, or simply build a remote control for robot or car alarm system. Radio communications between two AVR microcontrollers can be easy when…... Listed under: Robotics - Automation Projects 462. Obstacle Avoiding Robot using AVR ATmega32 – Part II Hello and Welcome back to the second part of Obstacle Avoiding Robot Tutorial. In the last part we studied the drive and the mechanical construction of our robot. In this part we will make the sensor part. The sensors will help our robot detect…... Listed under: Robotics - Automation Proj 463. Weeks 11-12: AVR USB Devices and Programming One of the relatively unexplored topics in this week’s lecture was USB, the ubiquitous protocol that a computers to communicate with peripheral devices (containing microcontrollers). Creating a USB device allows any computer to talk to it without the specialized software and hardware we’ve been using…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 464. Lab: DC Motor Control Using an H-Bridge Introduction Contents [show] In this tutorial, you’ll learn how to control a DC motor’s direction using an H-br reverse a DC motor, you need to be able to reverse the direction of the current in the motor. The easiest way to do this is…... Listed under: Motor Proj 465. Final Project: built a sous-vide immersion cooker For my final project I built a sous-vide immersion cooker: Sous-vide is a method for cooking food in a temperature-controlled water environment for longer than normal cooking times, at an accurately regulated temperature. Sous-vide cookers are often high-end restaurants. In the past few…... Listed under: Temperature Measurement Projects 466. Arduino Robotic Arm In this tutorial, we design an Arduino Uno Robotic Arm. Entire arm will be designed from some scrap material and servos. Entire of construction has been explained in detail below. The arm has been built with cardboards and the individual parts have been locked to…... Listed un Robotics - Automation Projects 467. LED Blinking with ATmega32 Microcontroller Blinking LED is the first step you would like to take to get started with electronics. In this tutorial we are g connect an LED with ATmega32, which is an AVR series microcontroller. We are going to blink the LED at half a second rate.…... Listed under: LED Projects
  • 41.
    468. Interfacing LCDwith ATmega32 Microcontroller To establish a good communication between human world and machine world, display units play an important role. And so the important part of embedded systems. Display units - big or small, work on the same basic principle. Besides complex display units like graphic display Listed under: LED Projects 469. Power LED Dimmer using ATmega32 Microcontroller In this project we are going to use one of the features of ATmega32A to adjust the brightness of 1 The method that is used to adjust the speed of  LED is PWM (Pulse Width Modulation). The method of PWM is explained here. Consider…... Listed und Projects, PWM Projects 470. Automatic Staircase Light We all know that one of the places where power wastage happens most in homes and offices is at staircases. We usually tur at stairs and leave it in a hurry. In this project we are going to design a stair case lamp which…... Listed under: Home Automation Projects 471. Microcontroller Based Electronic Voting Machine Whenever we go to vote for elections we come to see electronic voting machines. In this project we a to design and develop a simple voting machine by using ATmega32A microcontroller. Although we can use the controller to get more than 32 people v machine, to…... Listed under: AVR ATmega Projects 472. RFID Based Toll Plaza System We know in offices, shopping malls and in many other places where only the person with authorization card is allowed to the room. These systems use RFID communication system. RFID is used in shopping malls to stop theft as the products are tagged with RFID chip…... L under: AVR ATmega Projects 473. 0-99 Counter using AVR Microcontroller In this tutorial we are going to design a 0-99 counter by interfacing two seven segment displays to ATMEGA32A Microcontroller. Here we count events based on number of times button is pressed. Before moving ahead, let's understand what is a seven segment d seven segment display…... Listed under: LED Projects 474. Temperature Measurement using LM35 and AVR Microcontroller In this project we are going to design a circuit for measuring temperature. This circuit developed using “LM35”, a linear voltage sensor. Temperature is usually measured in “Centigrade” or “Faraheite”. “LM35” sensor provides output based of centigrade. LM35 is three pin transistor…... Listed under: Temperature Measurement Projects 475. RFID Based Voting Machine We know in offices, shopping malls and in many other places where only the person with authorization card is allowed to room. These systems use RFID communication system. RFID is used in shopping malls to stop theft as the products are tagged with RFID chip…... Liste AVR ATmega Projects 476. 0-25V Digital Voltmeter using AVR Microcontroller In this project we are going to design a 25V range digital voltmeter by using ATMEGA32A microcontr ATMEGA, we are going to use 10bit ADC (Analog to Digital Converter) to build a digital voltmeter. Now the ADC in ATMEGA can not take a input…... Liste Metering - Instrument Projects 477. Distance Measurement using HC-SR04 and AVR Microcontroller In this tutorial we are going to discuss and design a circuit for measuring distance. This circuit is developed by i ultrasonic sensor“HC-SR04” with AVR microcontroller. This sensor uses a technique called “ECHO” which is something you get when sound reflects back after striking with…... L under: Calculator Projects 478. Touch Keypad Interfacing with ATmega32 Microcontroller In this tutorial we are going to interface a 4x2 (8 key) touch keypad with ATMEGA32A microco We all know keypad is one of the most important input devices used in electronics engineering. This module does not have actual keys, but have spec designed capacitive metal pads,…... Listed under: LED Projects 479. 4×4 Keypad Interfacing with ATmega32 Microcontroller In this tutorial we are going to interface a 4x4 (16 key) keypad with ATMEGA32A microcontrolle know that keypad is one of the most important input devices used in electronics projects. Keypad is one of the easiest ways to give commands or instr an electronic…... Listed under: AVR ATmega Projects 480. Flex Sensor Interfacing with AVR Microcontroller In this tutorial we are going to interface FLEX sensor with ATMEGA8 microcontroller. In ATMEGA8, we use 10bit ADC (Analog to Digital Conversion) feature to do this job. Now the ADC in ATMEGA cannot take a input more than +5V. [caption id="attachment_34862" align="aligncenter"…... Listed under: Sensor - Transducer - Detector Projects
  • 42.
    481. Joystick Interfacingwith AVR Microcontroller In this tutorial we are going to interface a joystick module with atmega8 microcontroller. A JOY STICK is an module used for communication. It basically makes easy the user machine communication. A joystick is shown in below figure. [caption id="attachme align="aligncenter" width="600"] Joystick Interfacing with AVR Microcontroller[/caption]…... Listed under: AVR ATmega Projects 482. Anti-Theft Alert System using ATmega8 Microcontroller In this project we are going to make a vibration alert system with ATMEGA8 microcontroller. Th be used as a theft alert system, for that we are going to interface tilt sensor with ATMEGA8. A tilt sensor is shown in below figure. [caption id="attachment_34853" align="aligncenter"…... Listed under: Sensor - Transducer - Detector Projects 483. 100mA Ammeter using AVR Microcontroller In this project we are going to make a low range ammeter using ATMEGA8 microcontroller. In ATMEGA8, w going use 10bit ADC (Analog to Digital Conversion) feature to do this. Although we have few other ways to get the current parameter from a circuit, we under: AVR ATmega Projects 484. Light Intensity Measurement using LDR and AVR Microcontroller In this project we are going to interface LDR with ATMEGA8 microcontroller, and with can measure LIGHT INTENSITY in the area. In ATMEGA8, we are going to use 10bit ADC (Analog to Digital Conversion) feature to measure the light inte LDR is a transducer…... Listed under: AVR ATmega Projects 485. Fire Alarm System using AVR Microcontroller In this project, we are going to make a Fire Alert System using ATMEGA8 microcontroller and fire sensor.  sensor can be of any type, however we are using IR (Infrared) based Fire Sensor. Although IR based Fire Sensors have some disadvantages mostly of in it…... Listed under: Security - Safety Projects 486. Alarm Clock using ATmega32 Microcontroller In this project we are going to design a simple Alarm clock using ATMEGA32 timers. ATmega32A microcontroller has a 16 bit timer will be using that timer to count the seconds and develop a digital clock. [caption id="attachment_34830" align="aligncenter" width="650"] AVR Microcontroller Based Digital Al Listed under: Clock Projects 487. Introduction to Octocoupler and Interfacing with ATmega8 In this tutorial we are going to interface an Optocoupler with ATMEGA8 microcontroller. Octocouplers are fascinating devices used to isolate the electronic and electrical circuits. This simple device isolates the sensitive electronics from robu electronics like motors, yet keeping the load in control over the source. [caption…... Listed under: AVR ATmega Projects 488. How to establish UART communication between ATmega8 and Arduino Uno? Here we are going to establish a communication between an ATmega8 microcontroller and Arduino Uno. The communication established here is UART (Universal Asynchronous Receiver Transmitter) type. It’s serial commu By this serial communication data can be shared between two controllers, which is a required in various embedded system…... Listed under: Android 489. 8×8 LED Matrix Interfacing with AVR Microcontroller In this session we are going to design an 8x8 LED display with 8x8 LED matrix and ATmega8 micro which can show alphabets or names. [caption id="attachment_34818" align="alignnone" width="650"] LED Matrix Interfacing with AVR Microcontroller A 8x8 LED matrix contains 64 LED (Light Emitting Diodes) which…... Listed under: LED Projects 490. Make Your Own Homemade Arduino Board with ATmega328 Chip Arduino is an open-source development platform for engineers and hobbyists to de electronics projects in an easy way. It consists of both a physical programmable development board (based on AVR series of microcontrollers) and a p software or IDE which runs on your computer and used to write and upload…... Listed under: Arduino Programmer Projects 491. Scrolling Text Display on 8×8 LED Matrix using AVR Microcontroller In this tutorial we are going to design an 8x8 LED Matrix Scrolling Display using ATM which will show scrolling alphabets. 8x8 LED Matrix contains 64 LEDs (Light Emitting Diodes) which are arranged in the form of a matrix, hence the na matrix. We are…... Listed under: LED Projects 492. Atmega 32u4 Based USB Data Logger (Part 23/25) In this project, a device will be designed that will read analog data from any analog sensor and will s digitized form of that data to a personal computer on USB interface. On PC, a desktop application will store the data in an excel…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 493. Controlling a BLDC Motor with an ESC REQUIREMENTS: 1. Microcontroller (AtMega 16) 2. A Brushless DC motor (BLDC) 3. An Electronic Speed Controll Power source to drive the motor (LiPo battery) DESCRIPTION: Brushless motors have much more satisfying results as compared to brushed motors. T difference between them is…... Listed under: Motor Projects
  • 43.
    494. AT89C2051 DevelopmentStick 89C2051 Development Stick kit offers an easy way of interfacing 89C2051 compatible MCU’s. Slim design with plug in type approach Voltage reg board for stable and regulated supply to the MCU RESET switch for resetting the MCU 0592 MHz Crystal 4K external EEPROM Power-On…... Listed under: Development Board - Projects 495. EGYDuino – Arduino compatible board EGYDuino is a DIY Arduino clone made on a single sided PCB board. It’s simple and cheap to build using home PCB fabrication meth it’s 100% compatible with Arduino. Description ATmega8 takes care of the USB to serial communication and should be burned with…... Listed under: Android Projects 496. ATmega64 Development Board This project is a development board for Atmel ATmega64 microcontroller and can be used to easily develop custom AV firmware or as an introduction board to microprocessors and programming. A development board is better to be used instead of a breadboard setup facilitates…... Listed under: Development Board - Kits Projects 497. DigiPot – Rotary Encoder Digital Potentiometer Description The “potentiometer” is actually a rotary encoder (TW-700198) connected to a microcontroller that reads the sig and convert it to a value that is displayed on 7-segment displays. The value also is sent via i2c/spi/serial/usb to the host. Also 3 LED and…... Listed under: AVR ATmega Proje 498. Atmega168 TV-B-Gone Yes, I know what you are thinking: "oh no, please not another TVBGone..." Anyway, this instructable is for the newbies as me w still experimenting with Arduino, and prefer to program an Atmega168 in Arduino than an AtTyny85 with other methods. This circuit is…... Listed unde Automation Projects 499. Arduino atmega644/1284 clone This project is about to DIY an Arduino board wth an ATMEGA644P or 1284P to have more INPUTS/OUTPUTS than on atmega328P. You can buy an arduino mega but it's more expensive. The microcontrollers will be bootloaded with Sanguino and the project seems to b Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 500. Small Footprint ATMega328P Board For my Word Clock project, for which I built a custom 8 x 8 LED Matrix with controller, I needed a much smaller foo DIY-Duino (board for an ATMega328P microprocessor), one that would have all of the main functionality of my previous DIY-Duino boards (such…... Lis under: Development Board - Kits Projects 501. Flames effect with a 8×8 LED Matrix and ATMega328 A while ago I found some blog posts explaining how to use a LED matrix as a pendant (http://hackaday.com/2013/01/10/8x8-led-matrix-pendant-sealed-in-a-block-of-epoxy/ and https://sites.google.com/site/tinymatrix/ ). The 8x8 matrix p looked cool, but it was missing detailed information on which parts to use and how to solder everything together.…... Listed under: LED Projects 502. Remote controlled switch using Atmega 328p Ever dreamt of controlling an appliance like a CFL or a fan at your finger tips and thinking for a cheap so Well, then you are looking at the right instructable!! This instructable will provide you with a cheap and best possible solution to control…... Listed und Automation Projects 503. Easy Technique for Bootloading Atmega328pu and Atmega328p-pu# Xolcano it is very difficult to bootload Atmega chips when you don't have proper knowledge about device ! each chips are associated with its own Signature.at the beginning I found very difficult in uploading bootloader file to Atmega 328pu and Atmega 328p-pu , although their…... under: Interfacing(USB - RS232 - I2c -ISP) Projects 504. Digital Wall clock Using Atmega-8 and RTC Clock is one of the most essential house hold things. There are various types of clocks like good old Pendulu Analog clocks and the now trending modern Digital clocks. Digital clocks has many advantages over the analog clocks like the Accuracy in time, easy…. under: Clock Projects
  • 44.
    505. Running anHD44780 Display off the ATmega on a Gertboard There was a thread on the Raspberry Pi forums about running a 16x2 HD44780 based di the ATmega chip on the Gertboard.  I normally use a shift register to run my display, so I wasn't much help to them.  I decided to try and…... Listed und Projects 506. How to fix dead atmega and attiny avr chips Atmega fusebit doctor, as name says it, device for repairing dead Atmega and Attiny family AVRs by writin fusebits. Most common mistakes or problems are a wrong clock source (CKSEL fusebits), disabled SPI programming (SPIEN fuse) or disabled reset pin fuse). This simple…... Listed under: How To - DIY - Projects 507. Getting Started With the ATMega328P In the Internet of Things movement, people across the globe are connecting their stuff – TVs, pets, even housep the internet and transmitting all sorts of data. If you’re going to be a part of that movement, or want to dabble in creative…... Listed under: Interfacing RS232 - I2c -ISP) Projects 508. ATmega DIP40 Minimal Board After I wrote several articles about using ATmega microcontrollers (DIP40) in Arduino environment I had some feedback asked how to be effectively put into operation this project. As I came into the Arduino world from classical microcontrollers development world, I have Listed under: Development Board - Kits Projects 509. Program an ATmega168/328 with codebender If you want to use an inexpensive ATmega168 or ATmega328p for your project, but you want the simplic arduino code and codebender, this tutorial will guide you through! A brand new ATmega microcontroller does not come preconfigured to use with Ard code. So…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 510. Alarm clock Using Atmega-328 and RTC Hi everyone! This is my first instructable! After reading hundreds of instructables, I decided to make one myself. Clock is one of the mo essential house hold things. There are various types of clocks like good old Pendulum clocks, Analog clocks and the now trending…... Listed under: Clock Projects 511. Atmega Alarmclock & Thermohumidity meter First, let me introduce you my project. I made an Alarm clock with extended functionality & thermomete humiditymeter. Everything started when my friend (who used to bring me some old electronic rubbish and I used to check if there's not something us brought me…... Listed under: Clock Projects, Metering - Instrument Projects 512. Interfacing Analog Joystick with AVR ATmega32 If you have played games on console you must be knowing what a joystick is. In games a joystick is gen used to control the motion of character or a vehicle (like plane or car). Joystick give a very realistic two dimensional control! Joystick are…... Listed unde Interfacing(USB - RS232 - I2c -ISP) Projects 513. Working with TWI (I2C) sensors / Devices Introduction The I2C is a multimaster, multislave serial single-ended computer bus and was invented by Phili 1982. The atmel microcontrollers use a compatible  to I2C serial bus that is named TWI (Two Wire Interface). The  TWI supports serial communication and 400 kHz. The…... Listed under: Sensor - Transducer - Detector Projects 514. Boolean Algebra Calculator Power Supply: It can be defined as a device that supplies electrical energy to one or more electric loads. The term is most c applied to devices that convert one form of electrical energy to another, though it may also refer to devices that convert…... Listed under: Calculator P 515. Automatic Railway Gate Controller with High Speed Alerting System The main aim of this project is to operate and control the unmanned railway gate proper manner in order to avoid the accidents in the unmanned railway crossing. In a country like ours where there are many unmanned railway cros accidents are increasing…... Listed under: Security - Safety Projects 516. Interfacing 16X2 LCD to AVR Microcontroller   Well this is not different from the way interfacing the LCD to 8051 or PIC microcontroller. The crystal oscillator will provide the clo microcontroller. The capacitors connected to the crystal will act as filters and help the crystal to resonate and oscillates…... Listed under: LCD Projects
  • 45.
    517. Water LevelIndicator The Water Level Indicator employs a simple mechanism to detect and indicate the water level in an overhead tank or any other w container. The sensing is done by using a set of nine probes which are placed at nine different levels on the tank…... Listed under: Sensor - Transducer Detector Projects 518. DTMF Controlled Home Automation System Circuit Generally, appliances used in our home are controlled with the help of switches. These days, you c automation of these appliances using many technologies. This article presents the controlling of home appliances using DTMF technology. DTMF is ac Dual Tone Multi Frequency. So, just…... Listed under: Blog, Home Automation Projects 519. 2 Digit Up/Down Counter Circuit Generally, one can see the digital displays which display the score when buttons are pressed on score boards. The ma of this score board is 2 digits up/down counter circuit. The 2 digits are displayed on two 7 segment displays. This article describes 2…... Listed under: C Projects 520. Digital Temperature Sensor Circuit Temperature sensors are widely used in electronic equipments to display the temperature. You can see the digital c displaying the room temperature value. It is due to the temperature sensor embedded in it. Generally, temperature value is analog. It is converted to d value and…... Listed under: Temperature Measurement Projects 521. RFID Based Attendance System – Circuit, Working, Source Code Attendance in colleges is generally paper based which may sometimes cause errors. Taking attendance ma consumes more time. So the proposed attendance system uses RFID technology to take attendance. In this system, each student is issued an RFID tag. Controlling unit is i institute.…... Listed under: Sensor - Transducer - Detector Projects 522. Auto Intensity Control of Street Lights treet lights are controlled manually in olden days. These days automation of street lights has emerged. But one observe that there is no need of high intensity in peak hours i.e. when there is no traffic and even in early mornings. By reducing the…... Listed under: Transducer - Detector Projects 523. Street Lights that Glow on Detecting Vehicle Movement Street lights are switched on depending on the intensity of the Sun light on LDR. If the intensity Sunlight on light dependent resistor is low, its resistance value is high. This value increases and becomes high when it is completely in dark. This resist Listed under: Sensor - Transducer - Detector Projects 524. Sun Tracking Solar Panel As the non renewable energy resources are decreasing, use of renewable resources for producing electricity is increasing. So are becoming more popular day by day. We have already read a post about how to install solar panel for home. Solar panel absorbs the energy…... Lis under: Sensor - Transducer - Detector Projects 525. Line Follower Robot using Microcontroller When robot is placed on the fixed path, it follows the path by detecting the line. The robot direction of moti depends on the two sensors outputs. When the two sensors are on the line of path, robot moves forward. If the left sensor moves…... Listed under: Ro Automation Projects 526. Density Based Traffic Signal System using Microcontroller Nowadays, controlling the traffic becomes major issue because of rapid increase in automobiles and also because of time delays between traffic lights. So, in order to rectify this problem, we will go for density based traffic lights system. This article explains you how to…... Listed under: Car Pro
  • 46.
    527. PWM BasedDC Motor Speed Control using Microcontroller In many applications, it is important to control the speed of DC motor where precision and protection are essence. Here we will use a technique called PWM (pulse width modulation) to control the speed of DC motor. We can achieve speed co DC motor…... Listed under: PWM Projects 528. Biometric Attendance System Circuit Biometrics is the emerging technology used for identification. Biometric refers to automatic identification of a pe based on biological characters such as finger print, iris, facial recognition, etc. In this article finger print based attendance system is proposed. Attenda educational institutions, industries will require…... Listed under: Sensor - Transducer - Detector Projects 529. Temperature Controlled DC Fan using Microcontroller Generally, electronic devices produce more heat. So this heat should be reduced in order to pro device. There are many ways to reduce this heat. One way is to switch on the fan spontaneously. This article describes a circuit that automatically, swit fan…... Listed under: Temperature Measurement Projects 530. GSM Module SIM300 Interface with AVR Amega32 A GSM/GPRS Module like SIM300 can be used for any embedded application that requires a long ra communication, like a robot in Chennai controlled by a person sitting in New Delhi! Or simply a water pump in a rice field turned on in the morning….. under: Interfacing(USB - RS232 - I2c -ISP) Projects 531. Ultrasonic Rangefinder HC-SR04 Interfacing with ATmega8 In this article I will describe how to interface a Ultrasonic Range Finder Module with a AVR A microcontroller. I will provide a HEX file which you can burn into your ATmega8 directly to quickly test this whole setup. Ultrasonic range finder modul find…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 532. Microwave Controller using ATmega8 – AVR Project Pause Function You can press STOP/Clear button during countdown phase to pause the timer and to switch of the asso relay of selected function (microwave or grill). This will enable you to open the door of oven and have a look at the food being…... Listed under: Home Automation Projects 533. Simple Single Motor Control using AVR ATmega16 Microcontrollers are good when it comes to brain, but to do anything in real world they need muscles too ! Their muscles are electromechanical actuators like motors. Their are several types of motor available to do various type of motion. The simplest of them are…... Listed u Motor Projects 534. Microwave Controller using ATmega8 – AVR Project The user interface has the following parts. Output Device: A 16×2 alphanumeric LCD Module is used as the main output can display numbers, alphabets and few symbols. It can show two line and each line can have 16 characters. The backlight enables the…... Listed under: Home Automation 535. AVR Dual RGB Matrix Driver Multiplexing LEDs can be tricky, but we're working with RGB LEDs, so think of each RGB as three individual LEDs. For an 8 that is 192 total LEDs on a single matrix. Even though there are only 32 connection pins, it is…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projec 536. AVR Chronograph from concept to PCB A chronograph is a device used to measure the speed of a passing object.  In it's simplest form, this involves tw of some kind that 'see' the object, some device that can measure time, and some output to deliver the data to the user.…... Listed under: Developmen Kits Projects 537. Clock/temperature LED display This project is based on the timer/counter 0 example. It shows time, date and temparature on 7 segment displays. Inst LCD display the time is shown on a four digit 7 segment display with common cathode. The date and temparature is shown on…... Listed under: Clock LED Projects, Temperature Measurement Projects 538. Running LED bicolor This is a good project for beginners. It is easy to build.This running LED light uses seven bicolor led's red and yellow, they light up pattern that can be made within the program code.The program code is written in assembler. ATMELs AVR STUDIO…... Listed under: LED Projects
  • 47.
    539. LED thermometerhis project shows the temperature on a three digit 7-segment display, it measures the temperature from -9.5 to 99 degrees Celcius steps, or from 0 to 210 degrees Fahrenheit in 1.0 degrees steps. Because of the LED display the temperature is also…... Listed under: LED Projects, Tem Measurement Projects 540. LCD interface This example is based on a LCD module with the Hitachi HD44780 LCD-controller.You can get these displays in various kinds, from 1 to 4 lines and from 8 to 40 c per line. A display with 16 characters per line and 2 lines is used in…... Listed under: LCD Projects 541. RGB LED color mixer Page 1 of 4 An RGB LED is a LED which has three LED's integrated in one packaging. These LED's have the colors Red, Green, and RGB LED used here is a hyperflux LED with common cathode, which can draw 20mA current. Such a…... Listed under: LED Projects 542. Stepper motor driver With this circuit you can drive a unipolar stepper motor. It operates in full step mode. The AVR attiny2313 micro controller contro pulses for the stepper motor. The pulses are amplified by the ULN2003 driver. The driver accepts 5V inputs, the output for the…... Listed under: LED P 543. LED VU meter Schematic and build Below is the schematic of the LED VU meter. The circuit is builds with the ATMega328 board an two LED boards con it. You can also build it on a breadboard. For more detail:  LED VU meter... Listed under: LED Projects 544. Temperature indicator This project uses a Dallas DS1621 temperature sensor which indicates the temparature of the device. The temperature sensor thermal alarm output, which becomes high when the temperature of the device exceeds a user defined value. When the temperature drops below a u defined…... Listed under: Temperature Measurement Projects 545. Running LED's using ATTiny2313 This running LED or LED chaser is a good project for beginners in the microcontroller technology. It is easy to build, a assembler program code can be easily adapted. This running LED light has 15 red 3mm LED's. The 15 outputs of ports B and…... Listed under: LED Pro 546. Running LED's This small project let you make running leds. For this project you need a attiny2313 microcontroller and 8 leds and 8 resistors. The leds programmed so that they show differrent patterns. Hardware The leds are connected to PORTB of the microcontroller via the…... Listed under: LED Pr 547. PC stepper motor driver With this circuit you can control two unipolair stepper motors in full step mode via the RS232 serial port of your PC. A terminal program such as Hype can be used to control the stepper motors. The stepper motors can be driven one at a…... Listed under: Motor Projects 548. Photocell or LDR A photocell or photo resistor is a Light Dependent Resistors (LDR). LDR's are sensors that detect light. They are small, inexpensive, low easy to use and don't wear out. Overview A photocell or photo resistor is a Light Dependent Resistors (LDR). LDR's are sensors that…... Listed under: S Transducer - Detector Projects
  • 48.
    549. Electronic crickethis electronic cricket is a fun project. A real crickets chirp at night and faster in warmer temperatures. A cricket chirp is composed of three sinus waves of a single frequence of about 5kHz. occurring in rapid succession. Introduction This electronic cricket is…... Listed under: Game - Entertainment Projects 550. Relais Driver Board This is a peripheral board with 4 relais, rated at 5A/250V each. The board has a ML10 output connector for connection with the AT Project board. It has also 4 LED's for indication which relais is switched on. Hardware The circuit is simple, it consists…... Listed under: Development Bo Projects 551. Dot matrix display This is a Dot Matrix Scrolling Sign. A Dot Matrix Display has an 5x7 led matrix with 5 columns and 7 rows. The display is controlled b ATMega328 microcontroller board. The rows are controlled by PORTB of the microcontroller, while PORTD puts the data…... Listed under: LED Projects 552. Clock/temperature LED display This project is based on the timer/counter 0 example. It shows time, date and temparature on 7 segment displays. Inst LCD display the time is shown on a four digit 7 segment display with common cathode. The date and temparature is shown on…... Listed under: Clock 553. LCD/switch interface Page 1 of 2 This board can directly connected to the STK 500 board or the ATTiny2313 ISP program board with a 10 pole flatcable pin header of the STK500 and the 10 pin header of the LCD/Switch board. The display has…... Listed under: LCD Projects 554. Digital Book Cricket with ATtiny 85 The project described here is a digital implementation of “book cricket game” which students normally use to play i childhood time. The heart of the project is 8 bit MCU from AVR family called ATtiny85. ATtiny85 are small and cheap microcontrollers which are conven Listed under: Game - Entertainment Projects 555. Attendance System using AVR and RFID This project aims to automate the process of taking attendance on pen and paper and prevent any fraudulent entry. It uses RFID tags t attendance. Each student is assigned a unique tag, which he/she is required to swipe over the reader to give his/her…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Project 556. Interfacing Serial Bluetooth Modem with Computer using ATmega16 This article would give you a general idea about how to setup and interface any B modem with your computer. There are many types of Bluetooth modems available in market, which vary in quality, cost, range, etc. Some of the well k Serial Bluetooth modems…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 557. Smart Home Automation using AVR in this technological world, automatic systems are being preferred over manual system. In this series Home Autom plays an important role for humans. In this unit we talk about basic needs to understand the project well and also for its future advancements. We are Listed under: Home Automation Projects 558. Interfacing 4-wire Resistive Touchscreen with ATMega16 Microcontroller Touch screens are two dimensional input devices. Nowadays most of the elec gadgets use them. Laptops, smart phones, tablets and even some home appliances like washing machines & microwave ovens also use a touch scree nowadays. Why Touch screens? Touch screens are preferred over keypads…... Listed under: LCD Projects 559. How to Interface a GSM (SIM 300) Modem with ATmega32 to Send and Receive SMS What is a GSM Modem? GSM stands for Global System for Mobile Communications.It is a standard set developed by the EuropeanTelecommunications Standards Institute (ETSI) to describe protocols for second gener digital cellular networks used by mobilephones. A Modem is a device which modulates and…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects
  • 49.
    560. AVR I/OPorts AVR microcontrollers are the advanced microcontrollers. From 1996 onwards these are come into existence. In AVR family there are so m controllers are available. Mainly the AVR family is sub grouped as ATmega, ATtiny, Xmega, UC3, SAM3 and SAM4. In these form 8 to 32…... Listed under Interfacing(USB - RS232 - I2c -ISP) Projects 561. Fastest Finger First Circuit using ATMega16 Fastest Finger first circuit is basically used in quiz type games where the reaction speed of a participant is s The circuit enables us to identify who responded first to the question by triggering a visual and audio indication. Components Required 1 x ATMega16 development…... Listed under: Game - Entertainment Projects 562. DIY: Retro Style Analog Volt Meter using Servo Motor Digital equipments have rapidly replaced Analog equipments in the long run. Well that is becaus former has lot of advantages over the latter. But do you miss those retro style analog measuring instruments? Those pointy indicators and graduated Well I do and so…... Listed under: Metering - Instrument Projects 563. embRACE: The Embedded Race embRACE, a game developed on the embedded platform, entirely coded in assembly language. The game has been programmed on an ATMega16 micro-controller, interfaced with a 16x2 LCD display module. The game possesses an interactive user interface and exc features like: -Main Menu -Pause Menu -Real…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 564. Latitude & Longitude Display System Using GPS & AVR Microcontroller This project is a reference to budding engineers or a helping hand to those who work and interface a GPS Receiver with microcontrollerand making their own channel to communicate with satellite, seeking for some useful informat satellite to make a effective and…... Listed under: GPS Based Projects 565. Controlling RGB LED colour using Atmega16 This tutorial will give you a brief introduction to the concept of colors and how different colors can be pro using RGB LED. The color would be controlled using an ATMega16 microcontroller. RGB LEDs are basically the combination of the 3 LEDs (Red, Green a Listed under: LED Projects 566. Speed and Direction Control of Stepper Motor using AVR Microcontroller Stepper motor can be termed as digital motor because it operates on pulses AC or DC motor that rotates continuously, stepper motor rotates in steps. It rotates in number of steps as per applied number of pulses. Stepper mot in many applications…... Listed under: Motor Projects 567. Accelerometer Based Hand Gesture Controlled Robot In many application of controlling robotic gadget it  becomes quite hard and complicated when comes the part of controlling it with remote or many different switches. Mostly in military application, industrial robotics, construction vehicles in civil medical application for surgery. In this field…... Listed under: Robotics - Automation Projects 568. Digital Clock using Seven Segment Display and ATMega16 In this ATMega16 AVR project we will be designing and implementing a digital clock with the a atmel AVR ATMega16 microcontroller and seven segment display. Before going through this digital clock AVR project it is recommended to complete tutorial on Interfacing a Seven Segment Display with…... Listed under: Clock Projects 569. LED Light Bulb Controller using AVR Microcontroller Previously before 10-15 years the majority of electrical lights were either light bulbs (with yellow li tube-light sticks (with white light). The major disadvantage of these lighting devices was they consume more electrical energy (in terms of Watt) and gi luminance (brightness). Light…... Listed under: LED Projects 570. Speed and Direction Control of DC Motor using AVR Microcontroller Controlling direction and speed of DC motor is very essential in many applications Robotic application – to change direction and speed of moving robot ·         Industrial application – to change direction and speed of rotating machiner Domestic application – to vary speed…... Listed under: Motor Projects 571. Interfacing 16X2 LCD to AVR Microcontroller Well this is not different from the way interfacing the LCD to 8051 or PIC microcontroller. The crystal oscillator will provide the cloc microcontroller. The capacitors connected to the crystal will act as filters and help the crystal to resonate and oscillates to…... Listed under: Home Automation Projects
  • 50.
    572. 4 WireTouch Screen Based Digital Magic Slate Ever played with magic slates in your childhood? Well this project will show you how to make a digital m using a PC, a touch screen and few other components.   Components Required      1.      4-wire resistive touch screen with connector      2.      ATMega16 Listed under: LCD Projects 573. Intelligent LED light controller using AVR Now a days LED light bulbs are becoming more and more popular because they have several advantages. Som advantages are listed below ·         Their energy (electrical) consumption is much more less ·         Their luminance is more ·         Their intensity can be v ·        …... Listed under: LED Projects 574. DC Motor Control with Joystick & AVR Microcontroller In many of the applications it is required to alter the direction of DC motor instantly. Like in wash machine, mixer, drilling machine winding – rewinding machine etc. Changing the direction of DC motor using joystick is most suitable and handy meth Joystick Control for…... Listed under: Motor Projects 575. GSM Based Intruder Alerting System Did you know that most of the thefts at home happen when it is empty? But not everyone is rich enough to hire a for their house and at the same time they themselves cannot be at home 24x7. Now what if there is…... Listed under: Phone Projects 576. GSM Based AC Appliance Control This project would show you how to control an AC appliance remotely from anywhere using your mobile phone. This project is useful in various applications. Say for example a farmer can switch ON or OFF the motor pump present near his field remotely.…... Listed un Phone Projects 577. Cell Phone Controlled Pick and Place Robot Conventionally, wireless controlled robots uses circuits, which have a drawback of limited working range, l frequency range and limited control. Use of mobile phones for robotic control can overcome these limitations. It provides the advantages of robust co working range as large as the coverage…... Listed under: Robotics - Automation Projects 578. Light Tracker Demonstration Electricity is the most required and important element of human life. We cannot imagine our day to day life without elect Electricity is generated using conventional (coal, diesel) and non conventional (water, wind, sunlight) energy sources. The recent and latest trend is to g electricity…... Listed under: Metering - Instrument Projects 579. Variable Power Supply with LCD Are you an electronic hobbyist? Then an adjustable power supply is a must for your various needs. This project explai make a LM317 based adjustable power supply unit with a digital display. Components Required 1.     LM317 IC 2.     Resistor – 240 Ohms 3.    …... Listed LCD Projects 580. Interfacing Triple-Axis Accelerometer with AtMega16 Requirements AtMega 16 IC/development board 3-Axis accelerometer LCD screen 16X2 (for displ and Z data) Description This project makes use of three out of the eight ADCs present in AtMega16 IC to display the corresponding digital data of X, Y a outputs…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 581. Atmega32 avr based Drone Quadricopter atmega32 avr based Drone Quadricopter: Introduction Our project is a novel hand held controller in which w accelerometer to wirelessly control the motion of a Parrot AR Drone Quadricopter. Rationale: The main idea of our project was building a cool glove co for…... Listed under: Drones 582. Audio Tone Generator using AVR Microcontroller The circuit presented here demonstrates how to generate Audible Frequency from an AVR Microcont output of Microcontroller is always digital so to generate audible sound at the outset first it needs to be converted into Analog. A DAC (Digital to Analo Converter) is used…... Listed under: Sound - Audio Projects 583. Stepper Motor Angle Control using AVR Microcontroller There are many applications in which it is required to set the position of an object at a desire angle. Some of the examp 1.      Satellite Dish Antenna positioning  The Satellite Dish Antenna should be in straight alignment with Satellite in Space to receive…... Listed under: Motor Projects
  • 51.
    584. Bluetooth ControlledPortable LED Display The aim of the project is to make a portable LED display from SMD LEDs and to display the custom program patterns at our command. The core application of the project is to act as a portable display for event organisers or exhibitionists or consultants to…... under: LED Projects 585. Coin Operated Timer Control Power Supply Box to Control AC Appliances Saving electricity is a major concern for domestic and industrial units. We alw hard to save electricity in many ways to reduce our electricity bills, but due to some known and unforeseen circumstances our efforts do not normally transform in saving electricity. Adding to…... Listed under: LCD Projects 586. Sleeping Security – Smart Keypad Lock using AtMega16 This project is just a smart version of any keypad lock. What’s smart about it is that it can detec it is needed by the user or not and accordingly switches itself to take a sleep. Making a microcontroller to sleep reduces power consumption…... Listed Security - Safety Projects 587. DIY – Waveform Generator using AVR Microcontroller To interface 8-bit DAC with AVR microcontroller ATMega32 and generate different waveforms like Wave, Sine Wave, Triangular Wave, Staircase Wave and Saw-tooth Wave. Instruments ·         AVR Development Board ·         ADC – DAC card ·         Digita Oscilloscope (DSO) ·         Power Supply Apparatus ·         Connecting…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 588. Fully Customized Device On/Off Timer Timers are used in many different applications for example in Industrial Applications, to switch ON or switch OFF any device or a machin a specific period of time. In the same way the timers are used in Domestic Appliances like in Air Conditioners,…... Listed under: Clock Projects 589. Mobile – Gesture Controlled Car REQUIREMENT: AtMega 16 microcontroller L293D motor driver IC Bluetooth module (HC05) Chassis Motors & Wheels phone (Android + Bluetooth compatibility) Battery (for car section) DESCRIPTION: Have you ever wondered of operating a toy car with you own mobile Yes I have made such…... Listed under: Car Projects 590. Un-interruptible Bench-top DC Power Supply With Display This tutorial explains how to make your own power supply unit for all your electronics ande system experiments. It also has a backup battery which will be used in case of power cuts and a display. Components Required 1.     SLA 12V battery 2 Banana Jack…... Listed under: LCD Projects 591. Fingerprint Detection using Microcontroller REQUIREMENTS: AtMega 16 Microcontroller (development board) Fingerprint scanner module (R305) 16X2 Alphanumeric LCD (for user display) DESCRIPTION: In today’s secure world biometric safety is on the top. Unlike other techniques which make use of p and numbers, that are needed to be remembered, biometric techniques…... Listed under: LCD Projects 592. Controlling a BLDC Motor with an ESC REQUIREMENTS: Microcontroller (AtMega 16) A Brushless DC motor (BLDC) An Electronic Speed Controller (ESC) source to drive the motor (LiPo battery)   DESCRIPTION: Brushless motors have much more satisfying results as compared to brushed motors. The ba difference between them is that in a…... Listed under: Motor Projects 593. How to display text on 16×2 LCD using AVR microcontroller (ATmega16) This article is in continuation to the article Single character LCD display using A aforesaid article shows how to display a single letter on LCD. Moving forward towards learning to work with LCD, this article explains how to display a LCD. Displaying…... Listed under: LCD Projects 594. Display custom characters on LCD using AVR Microcontroller (ATmega16) This is the most interesting article to play with LCD. After going through the a can create any character/symbol which cannot be created using the ASCII values for example smiley. You can even create small games. Conventionally is use to display text…... Listed under: LCD Projects 595. How to use inbuilt ADC of AVR microcontroller (ATmega16) Microcontroller understands only digital language. However, the inputs available from the environment to the micro are mostly analog in nature, i.e., they vary continuously with time. In order to understand the inputs by the digital processor, a device called Analog to Digital Converter (ADC) i
  • 52.
    Listed under: Interfacing(USB- RS232 - I2c -ISP) Projects 596. Serial communication (Data receive) using AVR Microcontroller (ATmega16) USART Communication between two entities is important for the informat take place. In general the information transport system can be parallel in which the complete byte of data is sent at a time, with each bit having a sepa dedicated line or it can…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 597. How to interface AVR microcontroller with PC using USART (RS232 protocol) This article covers data transmission using 8 bit USART. The readers shoul basic understanding of serial communication and how to receive the serial data output. More  details on these topics  are available on Serial commun using AVR Microcontroller USART. The registers of USART…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 598. Serial communication with AVR microcontroller using interrupts In our previous articles on serial data transmission using AVR microcontroller we have demonstrated serial communication using the polling method. In Polling, the microcontroller waits for the RXC flag (in the case of serial receiver) to go then moves to the next instruction.…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 599. How to interface RFID with AVR microcontroller (ATmega16) Knowingly or unknowingly the RFID technology is used by us in our day to day life. The mo example is seen in MNCs, schools and offices for daily attendance or automatic door opening system. The RFID contains two parts, namely, tag and re modem. When…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 600. RFID interfacing with AVR microcontroller (ATmega16) using interrupts This article covers how to extract and display the twelve byte unique tag ID rece RFID module on LCD using interrupt method. Before proceeding to this article readers must have knowledge of serial interrupt and LCD. In the previo of RFID, polling method…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 601. How to use internal ADC of AVR microcontroller using interrupts This article is in continuation to AVR interrupts. There are two types of interrupts exte internal in AVR microcontroller. The aforesaid article covers external interrupts. AVR microcontrollers have seventeen internal interrupts. These intern interrupts are generated by the internal peripherals of Microcontroller like Timer,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 602. How to use inbuilt analog comparator of AVR microcontroller Analog comparator is a device which compares two input voltages and generates output accordingly. The article on IR sensor explains the use of comparator in sensor designing. Comparators form an integral part of circuit designing in maj the applications.  AVR microcontrollers have in-built analog…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 603. How to disable JTAG of AVR microcontroller JTAG stands for “Joint Test Action Group” which was standardized as the IEEE 1149.1 Standard Test Access P Boundary-Scan Architecture in 1990. JTAG is generally used in IC debugging and device programming. Atmega16 consists of one JTAG port which share pins with PORTC. Until JTAG port…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 604. How to interface LCD in 4 bit mode with AVR microcontroller This article explains interfacing of LCD with ATmega16 using 4-bit mode. In this mode only four pins are used for s data and command instructions. This mode has the advantage over the 8-bit mode as it uses less number of pins. The remaining pins of…... Listed under: LCD Projects 605. SPI (serial peripheral interface) using AVR microcontroller (ATmega16) There are different protocols for serial communication between two deceives lik SPI, I2C etc. Before selecting any communication protocol, data transfer rate is an important parameter. SPI transfers data at high speed data. AVR microcontroller contains on chip SPI interface. This article will explore…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 606. How to use fast PWM (Pulse Width Modulation) Mode of AVR microcontroller Timer This article is in continuation of PWM generation using AVR timer. previous article, PWM generation using Phase correct PWM mode is described. However, there are some applications like DAC, power regulation and rectification etc. which require high frequency PWM wave. The PWM generation…... Listed under: PWM Projects
  • 53.
    607. Phase CorrectPWM (Pulse Width Modulation) Mode of AVR microcontroller Timer Pulse Width Modulation is well known technique for controlling pow electronics devices like SCR, IGBT etc. PWM is also used in motor speed controlling. Square wave generation by using AVR timers is explained in previo The AVR timers have feature of PWM wave generation…... Listed under: PWM Projects 608. Waveform Generation using AVR Microcontroller (Atmega16) Timers At times we come across applications or situations wherein we need to generate waves with the microcontroller. The square wave can be generated by programming a pin which toggles between 0 and 1 with a certain time delay. Alternatively, the inbuilt feature of AVR…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 609. Serial communication (USART) with different frame size using AVR microcontroller The previous article explains serial communication using 8-bit data AVR microcontroller also supports serial data transfer with frame size of 5, 6, 7 and 9 data bits. The size of data frame can be adjusted according to ap For example, consider a system that…... Listed under: LCD Projects 610. How to use External (Hardware) Interrupts of AVR Microcontroller (ATmega16) This article introduces the concept of interrupts and the different types interrupts in AVR Microcontroller (ATmega16). Interrupt as the name suggests, interrupts the current routine of the microcontroller. Microcontroller ex instructions in a sequence as per the programs. Sometimes there may be a need…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 611. How to interface LED with AVR Microcontroller (ATmega16) ATmega16 has 32 I/O pins to communicate with external devices.  Before interfacing with e devices, these pins must be cofigured as input or output pin. This article demonstrates the basic I/O operation of ATmega 16 using LEDs. All the four p be configured to…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 612. How to interface keypad with AVR microcontroller (ATmega16) Keypad is most widely used input device to provide input from the outside world to the makes an application more users interactive.  The concept of interfacing a keypad with the ATmega16 is similar to interfacing it with any other microco The article…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 613. How to interface Servo Motor with AVR Microcontroller (ATmega16) Servo motors find huge applications in industries in the field of automation, contro robotics. The servo motors are well known for their precise control and work on the principle of servo mechanism. The servo motors can be made to precise angle using…... Listed under: Motor Projects 614. How to use I2C / TWI (Two Wire Interface) in AVR ATmega32 This article explores the TWI interfacing between two ATmega32 controllers. Readers are a go through TWI Communication and TWI registers of ATmega32 before going further. TWI works in four modes: 1.        MASTER as a transmitter. 2.        as a receiver. 3.        SLAVE as a…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 615. How to take input from a particular pin of ATmega16 For understanding the human needs a system must be able to take input from user. The devices be used to take input for a system are keypad, touch screen, etc. In the article LED blinking, the microcontroller drives the LED or in embedded langua Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 616. How to interface serial ADC0831 with AVR microcontroller (ATmega16) ADC is an electronics device that converts the analog signals to digital number proportional to the magnitude of voltage. The ADC chips like ADC0804, ADC0809 etc., give 8-bit digital output. The controller device needs eight pins t the 8-bit data (For more details about…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 617. How to configure Watchdog Timers of AVR Microcontroller (ATmega16) Some high end applications require multiple or critical calculations to be done microcontroller. This may lead to cases when the controller enters into wrong or infinite loops. As a result of this, the system either hangs up or gets c The solution to…... Listed under: Clock Projects 618. How to interface GPS with AVR microcontroller (ATmega16) GPS modem is a device which receives signals from satellite and provides information abo latitude, longitude, altitude, time etc. The GPS navigator is more famous in mobiles to track the road maps. The GPS modem has an antenna which rec satellite signals and transfers…... Listed under: GPS Based Projects 619. Interfacing SD Card with AVR Microcontroller This project explains how to interface the SD card with an AVR microcontroller. In this project an ATMEGA16 microcontroller is use microcontroller runs on 5V power supply with a built in crystal frequency of 8 MHz. A 2GB SDSC card from Transcend is used in this particular project,…... Listed under: Memor
  • 54.
    Storage Projects 620. Howto Program in Boot Loader Section In the AVR microcontroller the flash memory is divided into two parts, namely Application Section and Boot Lo Section.  A code can be programmed into either the Application Section or the Boot loader Section (BLS). The code programmed into the Application s runs normally and…... Listed under: LCD Projects 621. How to Initialize Peripherals from Boot Loader Section In almost all the microcontroller codes the peripheral initialization functions like uart initializati initialization are written along with the different application codes. These initialization functions are actually repetitions of the original initialization fun The same is the case with the external hardware initialization like…... Listed under: LCD Projects 622. How to Use SPM for Flash to Flash Programming The Self Programming Mode (SPM) is a feature which enables a microcontroller to program its own fl memory. Using the SPM a microcontroller can program itself with an SPM code. The SPM is commonly used with the microcontroller Boot-Loader cod help to program the…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 623. How To Use SPM To load Application from EEPROM In any microcontroller the Boot-Loader is the first code which executes before the application cod The major function of the Boot-Loader is to load the application code into the flash memory of the microcontroller and execute it. In AVR microcontro Self Programming Mode…... Listed under: LCD Projects, Memory - Storage Projects 624. How To Write a Simple Bootloader For AVR In C language The BootLoader is a code which executes when a microcontroller is powered ON or reset. It b sets an environment for the application code to execute. It is the Boot-Loader that sets the hardware and loads the application code from any storage or received…... Listed under: LCD Projects 625. LCD Scrolling Display Module A microcontroller is a device which has an inbuilt processor surrounded by few dedicated hardware modules. Once the microcontroller initializes them they start operating on their own. In case of an ADC it will do the sampling and digital to analog conversion all by itself under: LCD Projects 626. Electronic Voting Machine using Internal EEPROM of AVR The microcontroller based voting machines made the process of voting and counting the voted lot easier than before Previously the votes were marked in paper which are then stored safely in a box and inside a well secure room for days. The process of separating…... Listed under: LCD Projec 627. Setup Arduino Software for Atmega328P with Internal Crystal on Breadboard A breadboard Arduino will require an Atmega328P controller for these instructions. Note the end of the name. You cannot use an Atmega328 because it has a slightly different device id number. It will require a different board configuration. Instructions for that are under: Development Board - Kits Projects 628. Playing video on nokia color LCD using an ATmega32 video Playing video on nokia color LCD using an ATmega32 Hi, I am introducing my new video player made using an atm microcontroller and nokia color LCD. I got a 65K color LCD from an old nokia 6030 mobile phone.  I directly soldered 10 thin…... Listed under: LCD Projects 629. Make yourself a homemade clock with thermometer using ATMEGA128 In this step by step I wanna share my experiment with ATMEGA128 timer and using DS1307 and NTC to display homemade clock and thermometer. It displays hour,minute,second, day of week, day of month, month, and year, an temperature in celcius Enjoy the project...…... Listed under: Clock Projects, Home Automation Projects 630. MultiFunction LED Game Using An ATmega32 Microcontroller First are my answers to the Make-To-Learn Contest: What did you make? I made a multi- LED Array Program, like my previous one with Arduino UNO, but this time I made it with an ATmega32 microcontroller. I used regular C code to progra and…... Listed under: LED Projects
  • 55.
    631. Setup ArduinoSoftware for Atmega328P with Internal Crystal on Breadboard A breadboard Arduino will require an Atmega328P controller for these instructions. Note the “P” at the end of the name. You cannot use an Atmega328 because it has a slightly different device id number. It will require a d board configuration. Instructions for that are…... Listed under: Microcontroller Programmer Projects 632. Burn Arduino Bootloader on Atmega-328 TQFP and DIP chips on Breadboard Parts required (Hardware) Arduino Uno Board (1) TQFP 32 to DIP 28 Ada Link Atmega TQFP 32 pin chip (1) Atmega DIP 28 pin chip (1) 10K resistor (1) 16MHz crystal (1) 18pf - 22pf capacitor (2) Tact Switch (1) Jumper wires (few Listed under: Other Projects 633. Burn BootLoader into Atmega328P using Arduino Diecimila I have an old Arduino Diecimila and some new Atmega328P-PU chips. Shouldn't have but I brounght some without bootloader to save some dollars. What next? search instructables to see if I can burn bootloader to ths chips. Unluckily not working. An error message "avrdude: stk500_getsyn Listed under: Other Projects 634. Create yourself ATMEGA128 a simple tone generator Hello guys, In this project I want to share my experiment on ATMEGA128 generating a simple ton created 8 tones ( 1 octave ) Let's get started!! Step 1: Prepare the components Let's prepare the components, We need : 1. Speaker, just buy…... Listed Sound - Audio Projects 635. Bootloading and Mounting Arduino Atmega328 – I made it at TechShop This Instructable shows how to bootload and mount an Atmega328, Atmega32 Atmega328p-pu for any project. This is a great way to save money by purchasing Atmega328 DIP package microcontrollers instead of using the Arduin development board itself. I put this together at techshop to…... Listed under: Other Projects 636. Use ATmega328 Chip as a Storage Device and Store Text and Images in it Hi everyone! In this instructable, I am going to show you how to store text an in a small ATmega328P chip. Lets get started! This article is also available on Jordan's Lab Notebook! Step 1: Things Needed Things Needed: - Arduino U ATmega…... Listed under: Other Projects 637. Create yourself a message flasher with ATMEGA128 Guys, I wanna share my experiment on creating a message flasher with ATMEGA128 and LCD 16x2 done on your weekend.... Step 1: Prepare the components I prepare all the components below, The most importants are ATMEGA128 TQFP 64 and LC Another…... Listed under: Other Projects 638. Atmega16/32 Development Board With LCD This instructable shows, how to do your own development board for Atmega16 or Atmega32 processors.T Internet is full of home made development boards, but I think that, there is room left for another one. This board have been very useful on my project Listed under: Development Board - Kits Projects 639. RGB Rotary Encoder with PWM and ISRs Using an ATmega328 Description A long time ago I bought a couple RGB rotary encoders from Sparkfun beca were cheap and I was already spending a bunch on other stuff.  I thought they would be neat for some interfaces since it includes a push button.  The service routine…... Listed under: PWM Projects 640. Make yourself a speaking ATMEGA128 Guys, In previous weekend, I made myself a speaking ATMEGA128. I used ATMEGA128 and LM386 as an amplifier, Let's get started Step part I need for this project These parts are needed for this project : 1. LM386 2.ATMEGA128 3.USBISP 4.AVRStudio 5. Small…... Listed under: Sound - Audio Projects
  • 56.
    641. I2C Busfor ATtiny and ATmega I love the Atmel AVR microcontrollers! Since building the Ghetto Development System described in this Instructable, I'v with the AVR ATtiny2313 and the ATmega168 in particular. I even went so far as to write an Instructable on using switches…... Listed under: Other Proje 642. Interfacing GY 26 with atmega640 Hello friend once again with new instructable in this I will show you how to interface GY 26 with UART when I started on this very less resource where availble over internet .Thus i thought to share my piece of work .GY 26 is…... Listed under: Interfacing(USB - RS232 - I2 Projects 643. Using Atmega32 with Arduino IDE Over time I have used all kinds of Atmel microcontrollers in various projects. One of the most suitable was ATmega3 a small collection of development boards for Atmega32/16, some bought as-is, some made on stripboard. Although the original Arduino boards offers pleasant…... Listed under: Other Projects 644. Standalone Arduino / ATMega chip on breadboard Step 1: Parts needed I bought my parts from Digikey and Sparkfun Electronics - they're 2 of my favo places to buy components. Anyway, here's the list: #1 - (Qty: 1) - ATMega328 chip with Arduino bootloader pre-installed ($5.50) #2 - (Qty: 1) - 5VDC Swi Listed under: Development Board - Kits Projects 645. Burning atmega328-pu and atmega328p-pu bootloader Burning the boot loader in an atmega328 could be somewhat tricky but if u follow these steps youll be able to bootload any type of atmega328 micro controller .. Step 1: "setting up the hardware" -List of stuff you'll need: - An Arduino board…... L under: Other Projects 646. Homemade singing ATMEGA128 Hello guys, After experimenting with 8 octave tone generator, Now, I'm continuing on creating a singing ATMEGA128 started, no more delay.... Step 1: Prepare all the parts needed... Let's prepare the part we need, 1. ATMEGA128 2. The board itself, I created my…... List Home Automation Projects 647. Speech Synthesis on Atmega128 I had this one project where the device was supposed to speak out the output. And I was too Lazy to actually go and build a PC based applicat not that lazy to make it on a micro controller. So here is some of…... Listed under: Other Projects, Sound - Audio Projects 648. Standalone Atmega328 We all have a deep fondness to our Arduino with its familiar shades of blue/green, but the time has come to explore other pro options. One that involve fewer pieces, fewer parts, and fewer dollars. Building a standalone Atmega328 is far simpler than you might…... Listed unde Projects
  • 57.
    649. The BatHat Using Atmega1284 Introduction "An ultrasonic range-finding hat with variable haptic feedback for obstacle detection." -Project Sound Bite ECE 4760 final project, we designed and implemented an ultrasonic range-finding hat that uses haptic feedback to alert its wearer about obstacles in h path. The…... Listed under: Sensor - Transducer - Detector Projects 650. Ultrasonic Pathfinder Using Atmega1284 Introduction: Our final project for the ECE 4760 course consists of a wearable device to provide aid for the vis impaired. An ultrasonic distance sensor located on a hat collects data of the surrounding environment scanning the area ahead of the user, and uses Listed under: Sensor - Transducer - Detector Projects 651. Acoustic Wayfinder Using Atmega1284 Our acoustic wayfinding device utilizes ultrasonic range finders and haptic feedback to facilitate indoor navigation for the visually impai technique of acoustic wayfinding uses auditory cues, such as sounds from the natural environment or sounds created artificially, to determine an individual's surrounding phy space…... Listed under: Sensor - Transducer - Detector Projects 652. Clap-E acoustic tracking robot using atmega1284 An Introduction For the ECE 4760 final project, we designed and built a sound follower robot named its name implies, Clap-E receives a clap sound and moves toward the source of clapping. It has the ability to change its position after multiple claps….. under: Robotics - Automation Projects 653. Acoustic Impulse Marker Using Atmega1284 Introduction "A device that tracks sound impluses with a three microphone array" We designed and build dimentional Acoustic Impulse Marker system which is capable of detecting a sharp sound anywhere in its vicinity and precisely marking its source vect servo based pointer.…... Listed under: Sensor - Transducer - Detector Projects 654. Rock-Paper-Scissors-Spock-Lizard Game Using Atmega1284 Introduction This project implements rock-paper-scissors game that displays on the TV sc camera to capture human gesture and doing image processing. Rock-paper-scissors-spock-lizard game is very popular among teenagers. Our idea com a very popular American comedy: Big Bang! In this TV show we…... Listed under: Game - Entertainment Projects 655. Automobile parking simulator Using Atmega1284 1. Introduction The game consists of two levels. In each level, a LCD TV screen displays the 2-D top v a parking lot, and the player needs to park the car into the proper parking spot by operating on a fake steering wheel,…... Listed under: Car Projects, G Entertainment Projects 656. Infrared Theremin Using Atmega1284 Introduction A modern-day twist on the classic theremin musical instrument. This project uses two IR sensors a ATMEGA1284P microcontroller to create an inexepensive, easy-to-use theremin. The theremin is a musical instrument which is controlled by the electromagnetic field your body body produces naturally. One…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects
  • 58.
    657. GPS RunningWatch Using Atmega1284 Runners who have moved to a new city may get lost trying to remember the route they carefully planned at ho Instead of stopping the run to pull out a phone, wait for the map to load, find where you are, and determine where you…... Listed under: GPS Based P 658. DJ Party: A Collaborative Music Teacher using Atmega1284 Introduction "This device allows friends to learn songs, create their own songs, and collaboratively merge them." Ou project for ECE 4760 is a fully customizable button keyboard that has a variety of features to allow for collaborative music-making between friends. Each keyboard has eight….. under: Sound - Audio Projects 659. Wireless Pedometer Using Atmega1284 Introduction There’s a simple question asked by runners, walkers, joggers, and anyone who moves. How fast a going? Runners want to pace themselves, athletes are trying to train for events, and even on a day to day basis you might wonder how far you…... Liste Radio Projects 660. Stabilized Gimbal System Using Atmega1284 This webpage describes the development of a Stabilized Gimbal Control System for the CUAir team, Corn University's Unmanned Air Systems Team. The Stabilized Gimbal Control System will help the CUAir team compete at the Association for Unmanned V System International (AUVSI) Student Unmanned Air Systems…... Listed under: Security - Safety Projects, Sensor - Transducer - Detector Projects 661. Laser Tag with wireless logging using Atmega644 Introduction "A new spin on Laser Tag with Wireless Real-Time Updates" For our ECE 4760 final proje designed and built our own laser tag system. We included many traditional laser tag features, but then added our own 4760 twist. For the purposes of Listed under: Other Projects 662. Gesture Based Security Lock Using Atmega1284 Introduction Our final project is to design a security system which can be unlocked by means of a stor gesture pattern. The idea is to create a box like assembly, in which the user places his hand, makes a defined gesture and unlocks the system.…... Liste Security - Safety Projects 663. Pushup Trainer Using Atmega1284 For our ECE 4760 final project, we choose to develop an electronic push-up trainer that could monitor people's mo provide training package to optimize their push-up exercise and body health. A distance meter will be used to figure out whether the posture of the pe Listed under: Medical - Health based Projects, Sensor - Transducer - Detector Projects 664. ColdRunner – A Temperature Feedback Running Band Using Atmega1284 For our ECE 4760 final project, we designed and built a running band that provides feedback to users temperature and vibration. This provides an unique way to monitor running habits with temperature feedback. The running band attaches to a user's upper arm and counts… under: Temperature Measurement Projects 665. Servo-Controlled Fire Extinguisher Using Atmega1284 Introduction We have created an autonomous, servo-controlled fire extinguisher that is capable photo sensors and a water nozzle along two axes to detect and extinguish candle fires a short distance (about 1 ft.) away using a small burst of water. inspiration originally…... Listed under: Sensor - Transducer - Detector Projects
  • 59.
    666. The WebcamMouse Using Atmega1284 For our ECE 4760 final project, we designed and built a pointing device with webcam-color-tracking based mo control.  Our implementation allows the user to wear a set of finger-sleeves complete with buttons for clicking and scrolling and a red LED for color-tra cursor control to…... Listed under: How To - DIY - Projects 667. Automated Drink Mixer Using Atmega1284 Abstract The automated drink mixer takes orders from a push-button menu, and moves a regular 16-ounc under a series of inverted bottles while dispensing specified amounts of mixers to make perfect non-alcoholic beverages. Introduction             If you’ve been to a crowded bar or…... Listed under: Home Automation Projects 668. A Touchscreen Chinese Chess App Using Atmega1284 With the increasing popularity of smartphones and tablet computers, touchscreen has become most common user interfaces encountered today. The idea of this project came from some apps on the smart phone. It is very interesting to play a vi Chinese chess on…... Listed under: Game - Entertainment Projects 669. Beacon: A Zero Instruction Navigation Device Using atmega1284 Introduction to the Device Beac0n allows us to explore the tacit human understandin technological feedback. The Beac0n is a gps pathfinder that is designed to be completely intuitive to the user. The goal is for the user to pick up the de with…... Listed under: GPS Based Projects 670. Acoustic Modem Using Atmega1284p Data transmission over sound is used in many communication protocols, the most common being Dual-Tone M Frequency signaling (DTMF). It is used to dial phone numbers and the frequency combinations chosen for the digits are very familiar to the general pu was also used in…... Listed under: Sound - Audio Projects 671. A Moving Alarm Clock Using Atmega1284 Introduction We implemented a prototype for a moving alarm clock which runs away from the user when th all the features of a “regular” alarm clock: settable time and alarm, snooze, and alarm on/off. The alarm clock displays…... Listed under: Clock Projects 672. Precision Cooker: A Temperature Controlled Cooker Using Atmega1284 Precise time and temperature control are critical when cooking. Slight deviatio either temperature or cooking time can ruin delicate ingredients. Despite this fact, most modern day stovetops provide no data regarding their curren temperatures and do not have built in timers. The stovetops that…... Listed under: Home Automation Projects 673. Eye Mouse Using Atmega1284 Our final project moves and clicks a mouse cursor on a computer screen by tracking where the user's eye-movements u infrared eye-tracking technology and a gyroscope. The motivation for this project came from thinking about applications of infrared technology. We na our ideas down to…... Listed under: Sensor - Transducer - Detector Projects 674. Scan-E: An optical blood pressure sensor Using Atmega1284 Introduction For this project, we created a noninvasive heart rate and blood pressure measurement tool with the intention of gathering data for large-scale analysis for the automatic prediction of heart disease. In modern society, patien have access to a wealth of electronic data concerning…... Listed under: Sensor - Transducer - Detector Projects 675. Low-Budget Laser Projector Using Atmega1284 Introduction For our ECE 4760 final project, we designed a low-budget laser projector system. The proj broken into main sections: the custom hardware designed and fabricated to make up the projector, the circuitry controlling the hardware, and the cus software controlling the circuitry. We…... Listed under: CNC - Printing Machines Projects
  • 60.
    676. Autonomous Air-HockeyGoalie Using atmega 1284 This project is intended to perform the role of a goal-keeper in the popular arcade game Air Hocke project, the robot shown below senses a puck coming toward it and moves in the direction of the puck's motion so as to stop it.…... Listed under: Gam Entertainment Projects, Home Automation Projects 677. NFC Transmitter and Receiver Using Atmega1284 Introduction Our project is building one set of NFC module including a NFC transmitter and a NFC re both using ATmega1284p microcontroller. We will be using coupled coils to transmit message modulated by a high frequency carrier, whose frequenc standard frequency for Near…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 678. Remote Controlled POV Display Using Atmega1284 Introduction For our ECE 4760 final project, we designed and implemented a remote controlled persistence-of-vision (POV) that is able to display multiple patterns based on remote input. The primary components of the display are a rotor and a motor. The rotor is mainly consisted…... Listed under Projects, Sensor - Transducer - Detector Projects 679. POV Magic 8 Ball Using Atmega1284 1.Introduction In our final project of ECE 4760, we designed a magic 8 ball, which is a rotating POV (persistence of display controlled by voice commands. In our design, users can ask yes/no based questions via a small speaker, and the rotating POV part…... Listed u Game - Entertainment Projects 680. The Air Mouse Using Atmega1284 Introduction "A wireless mouse unit that requires no flat surface by using ultrasonic positioning." For our ECE 4760 fi project,we have designed a surface-less mouse interface using ultrasonic transmission as our final project in this class. The idea is to have a ultrasonic transmitter as…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 681. EEG Magic Cat Ears Using Atmega1284 Kang Li(kl694) and Zhenxuan Qiu(zq39) For our ECE 4760 final projec, we built a pair of toy “cat ears” using electroencephalography (EEG) with the AVR microcontroller. The basic function of it is that it can change the gesture of the “Ears” based on the particip Listed under: Game - Entertainment Projects 682. Drumming Teaching and feedback device Using Atmega1284 For our ECE 4760 final project, we designed and built a drum trainer that can be attached Japanese drum surface and will detect and wirelessly transmit different drum hit types to other players’ drum trainers. The trainer is able to determin the…... Listed under: Sound - Audio Projects 683. Thermistor Respiratory Monitor Using Atmega1284 Our final project for ECE 4760 is a respiratory monitor that was designed for low-resource environ The device calculates a patient's breathing rate by detecting changes in temperature when the patient breathes through a mask. Features of the devic an alarm through a piezoelectric…... Listed under: Medical - Health based Projects 684. Glove Mouse Using Atmega1284 For our ECE 4760 final project, we designed and built a wireless computer pointing device with accelerometer based movement control. Our implementation allows the user to wear a set of hardware (a glove and connected armband) and control a cursor through diff hand orientations and…... Listed under: Sensor - Transducer - Detector Projects 685. Hand-Motion Chess Using Atmega1284 An Introduction "A glove embedded with accelerometers to play a hand motion-controlled chess game" projec soundbyte For our ECE 4760 final project, our team designed and built a system with the ability to play the game of chess using embedded gloves. Eac wears a…... Listed under: Sensor - Transducer - Detector Projects 686. Color to Sound Player Using Atmega1284 Introduction We created a device that determines the RGB content of a surface and then speaks the color or musical tone at the sound frequency mapped to the color. The device can convert the color to sound directly or function as a cassette…... Listed unde Audio Projects 687. Multi-functional Music Box Using Atmega1284 Our final project is to build a multifunctional music box. This music box can generate different songs in different instrument sou piano, organ, by FM synthesis. The theme and harmony are in two different channels. Besides, the music box can also be electrical piano…... Listed un Sound - Audio Projects
  • 61.
    688. Muscle musiccontrol Using Atmega1284p Introduction For our ECE 4760 Final Project, we use an infrared LED and phototransistor armband to detect inflections in arm and wrist movement which are used to manipulate the volume and speed of pre recorded songs. By pumping your fist, you will cha the…... Listed under: Sound - Audio Projects 689. Digital Reversi board using Atmega644 Introduction For our final project in ECE 4760, we designed and implemented a Reversi board consisting of har microcontroller, and a touch screen. Sixty-four bicolor (red and green) LEDs were implemented as the black and white pieces of the game. Players cou light…... Listed under: Development Board - Kits Projects 690. Audio Spectrum Analyzer Using Atmega644 Our ECE 4760 final project was an audio spectrum analyzer that would display a histogram-style visualizat audio signal. We were able to successfully display the frequency spectrum content of an audio signal in real-time using a black and white histogram visualization with bins…... Listed under: Sound - Audio Projects 691. Virtual Archery Using Atmega644 Introduction We decided to create a virtual archery game for our ECE 4760 final project. This game consists of an ATmega1284P microcontroller, a TV for display, and multiple pieces of hardware. All of these devices communicate together to simulate a three-round archery with…... Listed under: Game - Entertainment Projects 692. Optical microphone and spectrum analyzer Using Atmega1284 We implemented an optical microphone which converts distant vibrations, including so an audio signal. Measuring the reflection of a laser beam from windows or glass, it possible to hear sounds near the target. The system also includes f spectrum analysis with a real-time display…... Listed under: Radio Projects, Sound - Audio Projects 693. IFF System for Infantry Using Atmega1284 Introduction "An encrypted laser-based friend-foe identification system to prevent friendly fire in battle" This project implements an Identification Friend-or-Foe (IFF) system for use by soldiers to prevent friendly-fire. The inspiration for the project is derived from Identification Friend-or-Foe (IFF) transponder currently used on fighter…... Listed under: Sensor - Transducer - Detector Projects 694. GPS and compass guided car Using Atmega644 For our final project, we built a self-driving car that takes in inputs for a final destination and drives its its initial location to the final destination. The idea for this final project requires an LCD to display the location that the car is…... Listed under: Car Proje 695. Persistance of Vision Clock Using Atmega644 The goal of our project was to create a persistence-of-vision (POV) analog clock using an LED display. The a visual alarm system which lights up the entire display for two seconds if it reaches an alarm time. The current time and alarm times…... Listed under Projects 696. Virtuoso: A Touchscreen Music App Using Atmega644 n our final project, we designed an electronic multifunction instrument with a LCD touch screen microphone. The user can play three kinds of instruments on it -- xylophone, flute and piano. Each instrument has a different interface and timbre. Th part has…... Listed under: Sound - Audio Projects
  • 62.
    697. NFC SecureData Storage Using Atmega644 Summary "Enabling secure storage capabilities for sensitive data through standardized methods of encryp multiple agent distribution." Our group chose to implement a secure form of storage for sensitive information such as passwords or identification num This is modeled after Shamirs secret sharing algorithm. It…... Listed under: RFID - NFC Projects 698. Ultrasound Gesture Detection Using Atmega644 Introduction In this project, ultrasound around 24kHz was used to detect movement near an object. W hand or other solid object near the source of the ultrasound (speaker) causes a shift in the frequency of the sound, which is then detected by a microp Listed under: Sensor - Transducer - Detector Projects 699. Wireless, voice-controllable, household system Using Atmega644 Motivation We design a smart home control system which allow people control their devices by voice command at home. This is a wireless, voice control system. People could control almost all the facilities at home including lights, fans back ground music. Right…... Listed under: Sound - Audio Projects 700. Solar Powered Pulse Oximeter and Heart Rate Meter Using Atmega644 Introduction Pulse Oximeter is a non-invasive medical diagnostic device used t the blood. Heart rate meter detects the number of beats per minute of the patient, normally referred to as bpm. The pulse oximeter is designed using infrared and…... Listed under: Medical - Health based Projects 701. RoboSLR Using Atmega644 Introduction Robo-SLR provides a remotely controllable stand for a Canon EOS 550D DSLR camera, allowing for adjustable pan functionality along with the ability to remotely view through the camera's viewfinder and take photos. An ATmega1284 microcontroller is used to c camera functions as…... Listed under: Robotics - Automation Projects 702. Radio Station Tracker Using Atmega644 Our project is inspired by the commercial product, PicoDopp, which uses a similar scheme for foxhunting. Fox a contest where participants try to locate a transmitter, called the fox, simply by monitoring the signals it transmits. Typically this is done using highly antennas…... Listed under: Radio Projects, Sensor - Transducer - Detector Projects 703. OBD-II Autocross/Track Data Logger for BMW E36 M3 Using Atmega644 Customer's Voice    top “Hello, I am interested in a race car logger than will be display and log crucial information during autocross and track events. I am interested in tracking vehicle speed, RPM, engine coolant temperature and forces. Ideally, the data can…... Listed under: Car Projects 704. Brain-Computer Interface Using Atmega644 Introduction Our goal was to build a brain-computer interface using an AVR microcontroller. We decided t least invasive way of measuring brain waves would be using electroencephalography (EEG) to record microvolt-range potential differences across loca the user's scalp. In order to accomplish this,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 705. Digital Saxophone Using Atmega644 Abstract My final project was the design of a digital saxophone which can reproduce the sound of an actual saxop through digitally synthesized electrical waveforms. The digital saxophone consists of a microphone to sense the user blowing into a mouthpiece, push to control the note…... Listed under: Phone Projects 706. Virtual Saxophone Using Atmega644 Our ECE 4760 final project was to create a virtual saxophone that uses Direct Digitial Synthesis (DDS) to synthesize the output notes. Push are connected to a PVC pipe to mimic the saxophone's mechanical structure, and a microphone that detects noise is used to determine…... Listed under: Phone Projects, Senso Transducer - Detector Projects
  • 63.
    707. Auto-composing keyboardUsing Atmega644 Project Overview We designed an electric piano that automatically composes a piece of music for the ECE final project. All the user need to do is to select a mood of the music and play two notes upon which the music is based, and…... Listed under: Develop Board - Kits Projects, Sound - Audio Projects 708. MicroKart 644 Using Atmega644 The Micro Kart 644 is a mobile device that provides additional capability to the traditional RC car experience. Allowab functions are recording multiple tracks, which consist of all user controls sent to the car over a 25 second interval, and replaying the tracks so the…... L under: Car Projects 709. Touchpad Figure Recognition Using Atmega644 Our project implements a touchpad input system which takes user input and converts it to a printed c Currently, the device only recognizes the 26 letters of the alphabet, but our training system could be easily generalized to include any figure of comple arbitrary shape,…... Listed under: Development Board - Kits Projects, LED Projects, Sensor - Transducer - Detector Projects 710. Battle video game Using Atmega644 Introduction Our project is a simple game where two players control tanks in a stage with the ultimate goal of de each other. User input is achieved through the use of keypads, which are used to both control the tanks and fire missiles at one…... Listed under: Gam Entertainment Projects 711. Sign language translator Using Atmega644 Introduction "A portable Glove Based Sign Language Translator with LCD Display, Speech Synthesis, and Sig Language Education Software" Sign language is a language through which communication is possible without the means of acoustic sounds. Instead, language relies on sign patterns, i.e., body language, orientation…... Listed under: Sensor - Transducer - Detector Projects 712. Evolutionary Altitude Control for a Helicopter Using Atmega644 Overview For our ECE 4760 project, we developed a self learning 1 degree of freedom helicopter using a neural network learning algorithm and infrared (IR) distance measurement. The primary goal is to increase the helicopter height to level in the quickest amount…... Listed under: Game - Entertainment Projects 713. Digital Stethoscope Using Atmega644 "A digital stethoscope that can amplify, play, and record heart signals in real-time." Project Soundbyte The purpo project was to design and implement a digital stethoscope to serve as a platform for potential computer aided diagnosis (CAD) applications for the de cardiac…... Listed under: Medical - Health based Projects 714. Power Manager: Remote Power Control Through LAN using Atmega644 Introduction Overview PowerManager is a remote power management system be controlled through a web browser on a local area network (LAN). Devices plugged into PowerManager's outlets can be turned on or off with the clic button on a webpage. PowerManager runs…... Listed under: Internet - Ethernet - LAN Projects 715. Heliowatcher solar tracker Using Atmega644 Documentation HelioWatcher: Automatic Solar Panel Control Jason Wright (jpw97) and Jeremy Blum (jeb3 Introduction We designed and built a system to automatically orient a solar panel for maximum efficiency, record data, and safely charge batteries. Us module and magnetometer, the HelioWatcher allows the…... Listed under: Sensor - Transducer - Detector Projects 716. Cooking Assistant for Automatic Temperature Control Using Atmega644 In some cooking scenarios, it is desirable to achieve a specific object tempera keep the object at that temperature. However, it is difficult to maintain a constant temperature without constant attention. To aid cooking in this scen created a device that can be…... Listed under: Temperature Measurement Projects
  • 64.
    717. SousVide immersioncooker using Atmega644 About What is this thing? For our ECE4760 Spring 2012 (Microcontrollers) Final Project at Cornell Univer decided to create a sous-vide cooker (a type of immersion cooker) that can maintain a set temperature for extended periods of time. It can auto-calcu appropriate time…... Listed under: Home Automation Projects 718. BrainMap: fNIR imaging of the brain Using Atmega644 Introduction Our project records and extracts event-related features from a 36-point relative bl oxygen concentration sensor array from the surface of the brain. We chose this project because of a combined interest in brain-computer interfaces. attempt to balance cost, complexity, and sensor density, we…... Listed under: How To - DIY - Projects, LED Projects 719. MAD-DOG Kick-Awesome Wi-Fi Audio Streamer Using Atmega644 Introduction "We developed a wireless receiver capable of receiving and playing aud transmitted over an 802.11 Wi-Fi network" project soundbyte For our ECE 4760 final project we developed a wireless receiver capable of receiving and audio transmitted over an 802.11 Wi-Fi network. Our system…... Listed under: Radio Projects 720. Remote Controlled DMM With Minimum Mass Wireless Coupler Using Atmega644 Introduction In this project, we built a digital multi-meter utilizing ne communication concept. The system established a bidirectional wireless communication between the measurement unit and the base unit. The meas unit is in charge of measurement and transmitting the result to the base, while the…... Listed under: Sensor - Transducer - Detector Projects 721. Seven day alarm Using Atmega644 Introduction The variability of a college student’s class and school work schedule gives way to an abnormal sleep/w experienced any other age group. Few lucky students have the pleasure of having all their classes start at the same time every day.…... Listed under: C Projects 722. A Budget Pachinko Machine Using Atmega644 Pachinko is a game in which a ball drops down through a large quantity of pegs and the objective is to c ball in a fixed basket. The concept behind our machine is novel in that it was built using mostly discarded and salvaged…... Listed under: Game - Enter Projects 723. Quadcopter Using Atmega644 Introduction Many embedded systems use sensors that combine an accelerometer and a gyroscope. Quadcopter is on examples of that. Already-built cheap toy-like quadcopters are available on e-bay around at $25~$30, but many hobbyists and avid AVR programmers own quadcopters. We thought…... Listed under: Game - Entertainment Projects 724. Ultrasonic Security System Using Atmega644 Introduction We were inspired to build an ultrasonic security system for our final project by our housing this summer. Security is an important part of home, especially if we are going to share a house with prior strangers without a lock on our room…... Lis Security - Safety Projects 725. Smart Trash system Using Atmega644 Introduction top For our final project, we have designed and built a 'proof of concept' prototype for Project Gre Stations, an externally funded student group with the following mission statement: Project Green Stations is all about changing the way people see th environment. Imagine the…... Listed under: Other Projects 726. GPS Tracking Device for Cornell Engineering Quad Using Atmega644 Introduction "A GPS tracking devices capable of telling the user his/her approxima distance to buildings and attractions on a map downloaded from a remote station" -Project Soundbyte For our final project in ECE4760, we designed a tracking device that has a capability of downloading…... Listed under: GPS Based Projects
  • 65.
    727. Autonomous BoardErasing Robot Using Atmega644 Abstract -A Roomba for boards For our ECE 4760 final project we created a board climbing robot capable of cleaning the b autonomously. The robot uses neodymium magnets to stick to the board and moves across it with two continuous servo motors. It has bumper…... Li under: Robotics - Automation Projects 728. Self-Reliant Power and Data Management System Using Atmega644 Introduction The tags used to monitor wildlife can either be passive or active. Pas simply identify an individual, whereas active tags may send out a radio beacon or even collect data. These active tags, more commonly referred to as “ loggers”, are typically battery powered,…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 729. A Wireless Programmable Pace Clock Using Atmega644 For our ECE 4760 final project, we designed and built a wirelessly programmable digital pace c a large format LED display and Android smartphone control and programming. This original design achieves the functionality of commercailly availabl clocks but with an intuitive user interface…... Listed under: Clock Projects 730. Rock Band Vocal Bot Using Atmega644 We have created a device that interprets the NTSC video signal from the video game Rock Band and outputs au signals via a pair of speakers to simulate a human singer playing the vocalist part. We chose to pursue this project since we were interested…... Listed Game - Entertainment Projects 731. DJ Multitouch — A FTIR Touchscreen Device Using Atmega644 Overview The DJ Touch is a portable turntable touchscreen and interactive LED display. goal was to produce a low cost touchscreen device, and demonstrate its application in a common consumer application. Out of an interest in electron and with the knowledge of…... Listed under: LCD Projects 732. FaceAccess — A Portable Face Recognition System Using Atmega644 We created a standalone face recognition system for access control. Users enroll system with the push of a button and can then log in with a different button. Face recognition uses an eigenface method. Initial testing indicates an 88 successful login rate with…... Listed under: Sensor - Transducer - Detector Projects 733. Voice decoder for vowels Using Atmega644 Introduction In our final project, we created a smart voice decoder system that is capable of recognizing vo human speech. The audio input is sampled through a microphone/amplifier circuit and analyzed in real time using the Mega644 MCU. The user can re analyze…... Listed under: Other Projects 734. Ahhhh…BIU! video game Using Atmega1284 Introduction EVERYONE LOVES GAMES! In this project, I built a video game controlled by people’s voice. The game is about jet fight People can play the game by themselves or with friends. The system recognize the command by distinguish “ahh” and “Biu”. The fighters shoot…... Listed under: Game - Entert Projects 735. Wireless, web-based, cardiac monitor Using Atmega644 Introduction "A composite personal health monitor solution bridges the gaps between patient doctors." ---Engineering Goodwill This project creates a portable device implementing wireless technology and taking full advantage of the wide-sprea Internet to provide a convenient solution to monitor human health. The health information…... Listed under: Other Projects 736. A Portable, Automated, web-based Bird Trapping Mechanism Using Atmega644 Background We designed and implemented an automated, portable b trapping mechanism, along with an associated system which is scalable Every year between early May and mid-June large amounts of tree swallows m Ithaca, NY area to mate. The study of these birds invariably require a…... Listed under: Motor Projects
  • 66.
    737. Autonomous visuallysteered car Using Atmega644 Introduction For our final project, we re-engineered a remote control car to autonomously navigat a track by detecting lanes and centering itself between them as well as detect objects in front of it and avoid collision. The RC car detects lanes throug input…... Listed under: Car Projects 738. Step Sequencer Drum Machine Using Atmega644 Overview [top] As avid audiophiles, we wanted to apply our newly acquired knowledge of microcont build a fun consumer electronic device. Our project is a step sequencer drum machine. The user is able to program a 16-step percussion pattern using wide…... Listed under: Other Projects 739. LED-Following K'NEX Car Using atmega644 Introduction In a Nutshell Our ECE 4760 final project was a car made of K'NEX that follows a LED strip. What We Did For this project a K’NEX car that follows a path made by a LED strip. We used two phototransistors to…... Listed under: Car Projects, LED Projects 740. Rock-Paper-Scissors Sensor Gloves Using atmega644 For our ECE4760 final design project, we designed and built a two player game system for rock-p scissors. Our implementation involved the use of two sensor gloves (one for each player) that tracked bends in the user’s fingers, to determine the sym out by each…... Listed under: Game - Entertainment Projects 741. Ear Trainer Using Atmega644 Introduction Our project is a self-contained system that helps people develop the musical skills of perfect pitch and relat Push buttons allow the user to navigate a graphical user interface (GUI) on a liquid crystal display (LCD). In perfect pitch training mode, a note…... Liste Sensor - Transducer - Detector Projects 742. TI Calculator Wireless Chat Using Atmega644 INTRODUCTION: Our project is a wireless communication link which interfaces to the serial ports on the TI-84 calculators. SUMMARY: Our group created a wireless communication system for the widely popular TI 83/84 calculators. The system interfaces to calculator through their 2.5mm serial…... Listed under: Calculator Projects 743. Sonar SensCap Using Atmega644 SensCap is a device that guides the visually impaired around obstacles. Introduction We designed and built a device worn on the head and around the hip to aid the visually impaired maneuver around obstacles. It provides information about obstacles near and arou Listed under: Sensor - Transducer - Detector Projects 744. A Keyboard Synthesizer Workstation using Atmega644 Our Keyboard Synthesizer project aims to create a multi-instrument keyboard that can record s different synthesized instruments and play back the track simultaneously. We took a children’s toy keyboard and adapted the printed circuit board wit play a range of notes from various musical…... Listed under: Sound - Audio Projects 745. Ultrasonic Spheroid Levitation Device Using Atmega16 Introduction The goal of this project was to design and build a gaming device capable of levitating a ping pong ball at va heights based on the proximity of the user to the device, utilizing a multi-tasking kernel on the ATMega16 platform. The project incorporates…... Listed under: Game - Entertain Projects
  • 67.
    746. Compact GuitarPedalboard Using Atmega644 Introduction For our ECE 4760 final project, we designed and built an electric guitar pedalboard that wi an analog audio signal from a guitar and add analog effects such as equalization, gain control, as well as digital effects such as distortion, compression Listed under: Sound - Audio Projects 747. Embedded Foot Pronation Detection Using Atmega644 Introduction and Rationale Our ECE 4760 design project integrates three different kinds of sen measurements to track a user�s movement speed, regularity of gait, force on impact, pronation of foot, as well as other information that may be use podiatrist. We believe there…... Listed under: Sensor - Transducer - Detector Projects 748. Human Tracking Fan System Using Atmega644 For our final project we decided to construct a human tracking rotating platform that supports a fan. T platform, using dual element Pyroelectric Infrared Sensors (PIR) sensors, rotates itself independently to direct air flow to whatever position a person m In addition, the fan…... Listed under: Sensor - Transducer - Detector Projects 749. Invisible band Using atmega644 Introduction The goal of this project is designing microcontroller operated drum set and guitar which are only consist sticks, pedals, and pick. This is done by implementing accelerometers which are connected to the microcontroller. By swinging the sticks and picking t in…... Listed under: Sound - Audio Projects 750. Sheet Music Notator Using Atmega644 Introduction We created a system that takes input from a piano and displays the musical notation for it on a television screen. The syste hardware amplification and filtering of a microphone output with code in C compiled on two Atmel Mega644 microcontrollers. The basic…... Listed under: Sound - Audio Projec 751. ToneMatrix Touch Sequencer Using Atmega644 ToneMatrix Touch by Jane Park, Michael Chin We can be reached at {jp624 | msc247} at cornell dot ed touch-based, interactive matrix that plays music corresponding to active grids and displays playback state using LEDs Introduction The ToneMatrix Tou aka Teenage Mutant Turtle)…... Listed under: LED Projects 752. Automated grapefruit segmenter Using Atmega644 Part I. High Level Design 1 Rationale and Problem Overview As regular grapefruit consumers, bot could appreciate the value in automating the cutting procedure. We saw the problem as suitable for a final project because it is [very] challenging whi requiring a combination of…... Listed under: Home Automation Projects
  • 68.
    753. Motion SensingPowerPoint Controller Using Atmega644 Introduction For our Final Project in ECE 4760, we built a controller that interfaces with a com running a PowerPoint display through USB. The device can control slide transitions based on hand motions or button presses as well as play MP3 files detects…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 754. Heat Control System Using Atmega644 Introduction This project was the first stage of developing a controller for a radiant floor heat system. The microcontroller will use inputs from thermostats, thermocouples, a flow meter, and pressure switches to control the operation of the pumps and valv achieve improved efficiency of…... Listed under: Temperature Measurement Projects 755. XBee RF Smart Energy Compliant Power Meter Using Atmega644 Motivation >A breaker-level power metering device for measuring energy on 4 different circuit lines and wir outputting that energy data onto Google PowerMeter. Useful Links Google PowerMeter Smart Energy Alliance DOE - SmartGrid Energy Efficient Products Similar Projects Zigbe Relay Control & Power Monitoring…... Listed under: Metering - Instrument Projects 756. 3D Paint Using Atmega644 "A 3D canvas on which the artist can draw using trilaterated coordinates from ultrasonic delays." Project Soundbyte For ou project in ECE 4760, we designed and implemented a three-dimensional paint program consisting of hardware, a microcontroller, and a PC running M three modules…... Listed under: Home Automation Projects 757. Hand controller for Parrot AR Drone Quadricopter Using Atmega644 Introduction Our project is a novel hand held controller in which we use an accele to wirelessly control the motion of a Parrot AR Drone Quadricopter. Rationale: The main idea of our project was building a cool glove controller for a fl platform, a quadrotor…... Listed under: Robotics - Automation Projects, Sensor - Transducer - Detector Projects 758. Human Tetris — Video object tracking Using Atmega644 We have created a real-time video object tracking / shape recognition device, and a fun game demonstrate its abilities. For our project, we wanted to push the video sampling and processing capabilities of the ATmega644 8-bit microcontroller. U high-speed analog-to-digital converter as…... Listed under: Sensor - Transducer - Detector Projects, Video - Camera - Imaging Projects 759. Auditory navigator Using Atmega644 Introduction Navigation in the past has primarily relied on the use of a map, compass or other devices that must interpreted visually. This project demonstrates the ability to navigate a user based on synthesized directional audio which allows the user to move to a Listed under: GPS Based Projects 760. USB wireless tilt mouse Using Atmega644 Introduction We created a handheld mouse device that measures its tilt and then wirelessly transmits the d base unit, which is connected to a PC through a USB cable and can be recognized by certain modern computers as an actual mouse. The purpose…... under: Interfacing(USB - RS232 - I2c -ISP) Projects 761. Automated Rock Band player Using Atmega644 Introduction For our final design project, we built an automated Rock Band player that can beat any R song by decoding the Xbox 360 video output and sending the appropriate button push and strum signals to a modified Xbox controller. This project w particularly…... Listed under: Sound - Audio Projects 762. Automated Pavlovian Classical Conditioning of Insects Using Atmega644 Introduction Several studies have shown that various insects possess learning memory abilities. One approach researchers use to demonstrate such abilities is to "teach" the insect to exhibit a specific behavior in response to a st This "teaching" process is called Pavlovian conditioning. Such studies…... Listed under: Sensor - Transducer - Detector Projects 763. CMOS Camera Rock Paper Scissors Game System Using Atmega644 Introduction We created a rock paper scissors game that utilizes a CMOS camera t determine what hand the human player plays. The player is required to wear a glove that has black tape taped on each finger. When the player plays t the camera…... Listed under: Game - Entertainment Projects 764. RFID sales checkout system Using Atmega644 Introduction The Elevator Pitch We successfully implemented a prototype RFID checkout system that wi consumers to instantly pay for their entire purchase upon arrival at the register, increasing customer satisfaction, reducing retailer costs, and ultimate lowering consumer prices. Summary Shopping in the present day…... Listed under: RFID - NFC Projects
  • 69.
    765. RFID basedMobile Payment System Using Atmega644 Introduction and Rationale We used our ECE 4760 final project as a platform to develop a proof concept for Mivo. Mivo is a low-cost, stripped down mobile payment system. Our prototype combines Radio Frequency Identification (RFID), Security P Authentication and Ethernet Data Transfer to…... Listed under: RFID - NFC Projects 766. Talking voltmeter Using Atmega644 The Handy Lab Buddy is a tool every ECE should have. The four features of this tool include a talking voltmeter, logic probe, voltage averag frequency measurer. As a cheap and accurate device that outputs whatever being measured through speakers, it's one of its…... Listed under: Meterin Instrument Projects 767. Heart Rate Display LED T-Shirt Using Atmega644 Introduction We have designed and built a LED t-shirt capable of displaying the heart rate of the wea pulsing LED heart. Largely, our project consists of two components: the plethysmograph and the LED display. How we came up with the Idea We had… under: LED Projects, Medical - Health based Projects 768. Gesture Based Touchpad Security System Using Atmega644 Introduction The purpose of the project is to present a new approach on the design of sec systems by using a touch sensitive device. Security is a permanent concern in a variety of environments ranging from physical access restriction in hom industrial settings to…... Listed under: Security - Safety Projects 769. Flexicopter Using Atmega644 Introduction The purpose of our project is to control a toy helicopter using flex sensors attached to a glove. The flex sen intended to replace the remote control that is generally used to fly the helicopter. Additionally we also created another mode which will…... Listed und - Transducer - Detector Projects 770. Acoustic Data Modem Using Atmega644 Introduction For our final design project, we designed and built a prototype acoustic modem to serve as a ph transport layer for digital communications. It converts between a digital communications scheme (RS-232) and an acoustically coupled communicatio of our own design. Our project consists…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Other Projects 771. Adaptive Alarm Clock Using Atmega644 Introduction Elevator Pitch / 1-second Description An adaptive alarm clock that chooses the optimal time to w the user using an accelerometer that detects his/her body movements. Goals The goal of our final project was to create an alarm clock that is able to… under: Clock Projects 772. Zigbee Wireless Relay Control and Power Monitoring System Using Atmega644 Introduction We designed a system for wirelessly controlling relays and monitoring current. This is used for a home load simulation. By wirelessly turning relays on and off by sending commands from a PC to a microcontro can change the total load (current) to our…... Listed under: Metering - Instrument Projects 773. Low-Cost Portable Potentiostat for Biosensing Applications Using Atmega644 Introduction This project involves the design and construction of a low-c portable potentiostat capable of performing cyclic voltammetry on three-electrode electrochemical systems. A potentiostat is an instrument used in c and biological tests that controls the voltage between two electrodes, working and reference, at a…... Listed under: Other Projects 774. Point of Sale Terminal Using Atmega644 Introduction Point of Sale systems typically can cost up to thousands of dollars we do it very simply for seven small stores, point of sale systems can be very expensive. One thousand dollars for a piece of machinery whose functionality is quintessentially simple Listed under: Development Board - Kits Projects 775. FM Radio Receiver Using Atmega644 Introduction The goal of our project was to design a low cost and user-friendly FM radio receiver. Our project use receiver integrated circuit to perform the pre-processing units that are needed before the desired audio signals can be heard. The radio frequency is… under: Radio Projects
  • 70.
    776. Mister Gloves– A Wireless USB Gesture Input System Using Atmega644 Introduction Mister Gloves is a wireless USB gesture input system that enable to use a computer by performing intuitive hand and finger motions in the air. While wearing a glove controller on the right hand, the user can move th by forming…... Listed under: Robotics - Automation Projects 777. Accelerometer Based Hand Action Recognition using Atmega644 Introduction We created a wearable game controller that uses accelerometers to acq action of the hand and then maps an action to an arbitrary keystroke. The types of actions we are trying to recognize should be suitable as input contr video games. We placed…... Listed under: Robotics - Automation Projects, Sensor - Transducer - Detector Projects 778. Home energy managment Using Atmega644a Introduction Our project implements a smart algorithm in order to power a house with a photovoltaic, b or the power grid.  For this project, we worked closely with a research team whose goal is to power a home with minimal power from the power grid. … under: Home Automation Projects 779. Self-Adaptive Hybrid Electro-Magnetic Levitation and Active Balancing System Using Atmega644 Introduction In short, our project is just an isolated flo plate. Just as our title explained, it is mainly a floating plate that is segregated from all outside vibration using electromagnetic force. This purpose of t is to design a system that complements common…... Listed under: Metering - Instrument Projects 780. Digital Oscilloscope Using Atmega644 Introduction The goal of our project is to design a digital oscilloscope with 20 kHz bandwidth. The scopes that w ECE 4760 lab cost over one thousand dollars. The motivation of our project is to produce an affordable, easy to make oscilloscope for…... Listed under - Instrument Projects 781. Optical eye tracking Using Atmega644 Introduction We have endeavored to develop a means by which eye gaze can be detected. This goal was achieve the same principles learned in Lab4, where we recorded the motor speed of a small hub fan using the combination of IR emitter plus phototransistor, under: Sensor - Transducer - Detector Projects 782. Guitar Blocks Using Atmega644 Introduction We present to you, the ultimate guitar -- no strings attached (literally)! This guitar features an infrared str with physical buttons. It sounds like a real acoustic guitar and it works like a real acoustic guitar, but in the…... Listed under: Sound - Audio Projects 783. Haptic Exercise Coach Using Atmega644 Introduction The goal of this project was to assist the user in learning the proper technique for a physical exe our case a dumbbell bicep curl. As our understanding of biology and anatomy improves, the design of physical exercises is improved by the applicatio Listed under: Medical - Health based Projects 784. ATmega644 JTAG Debugger Introduction The purpose of this project was to design and implement a debugger for the ATmega644 that communicated its JTAG interface and was capable of controlling program execution by setting breakpoints and accessing registers and memory. We have three main o in this report:…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 785. Ultrasonic Haptic Vision System using Atmega644 Introduction The ultrasonic haptic vision system enables a person to navigate hallways and around objects without sight, through the use of an ultrasonic rangefinder that haptically interfaces with the user via tiny vibrating motors mounted on the us The idea behind this project…... Listed under: Sensor - Transducer - Detector Projects 786. Haptic appointment manager Using Atmega644 Introduction The Haptic Appointment Manager manages all of an individuals appointments, ensuring arrive on time and in the right location by subtly guiding them throughout the day. This system uses a GPS receiver and a compass to maintain aware absolute and rotational…... Listed under: GPS Based Projects, Sensor - Transducer - Detector Projects
  • 71.
    787. 3D ultrasonicmouse Using Atmega644 Introduction Ultramouse 3D times the delay of high-frequency sound waves from the unit held by the user to e three receivers and passes this information along a serial cable to the computer. The accompanying open-source API provides easy functions that let Win32/C++ application…... Listed under: Sensor - Transducer - Detector Projects 788. 3D scanner Using Atmega644 Introduction This goal of this project is to make an effective, low-cost 3D scanner. Summary Our project implements the necessary for a laser triangulation 3D scanner as well as a PC user interface for controlling the scanner and acquiring data via an Ethernet connection under: Interfacing(USB - RS232 - I2c -ISP) Projects 789. Gesture Recognition Based on Scratch Inputs Using Atmega644 Contents Introduction High Level Design Program/Hardware Design Results of the Des Conclusions Appendix A: Commented Code Gesture Recognition Code PC Interface Code Appendix B: Schematics Appendix C: Cost Details Appendix D Appendix E: Gestures References Introduction Our project utilizes a microphone placed in a…... Listed under: Phone Projects 790. LED Sensor Piano Keyboard Using atmega644 Introduction Our project utilizes an array of LEDs that work as light sensors to generate a musical tone, simulating a piano keyboard. The basic idea is to use LEDs as both emitters and sensors. For our project specifically, we used a total of 63 LEDs,…... Lis under: Development Board - Kits Projects, LED Projects, Sensor - Transducer - Detector Projects 791. Touchpad/Infrared Music Synthesizer Using Atmega644 Touchpad/Infrared Music Synthesizer "Generate music with your laptop touchpad!" Wei-jiunn Kalina Jordanova The Touchpad Infrared Music Synthesizer uses a laptop touchpad and an infrared distance sensor to control tone, volume and decay musical notes. Operating in one of six modes, this…... Listed under: Sound - Audio Projects 792. Der Kapellmeister Using Atmega644 Introduction This project is implemented with a glove, resembling a conducting baton that analyzes gestures and them into musical elements. Der Kapellmeister is a simple tool that tests a user's ability in basic conducting, using a real conducting baton. As a user p a…... Listed under: Robotics - Automation Projects, Sound - Audio Projects 793. IR harp using Atmega644 INTRODUCTION Wouldnt it be cool to be this guy? Powerful laser shining into the audience, playing strings by sweeping you across the beams, rocking out in a room full of fog and fawning girls? We thought so. It turns out lasers are expensive, fog…... Listed under: LED Projec 794. Digital Receipts System Using Atmega644 Introduction Our final project is a conceptual prototype of a digital receipt system. The basic idea is when m purchase with a credit or ATM card, the transaction information is automatically packaged and sent to a webserver where it can be logged in a…... List Other Projects 795. ODB-II Automotive data interface using Atmega644 Our goal for this project was to build an OBD-II compliant device that would communicate with an enabled car and read back real time data as well as perform basic performance testing and diagnostics. If you've ever had to take your car into the…... under: Interfacing(USB - RS232 - I2c -ISP) Projects 796. Traction control system Using Atmega644 Introduction For our ECE 4760 Final project we have developed a traction control system that detects wheel adjusts the velocity of the wheels accordingly. Robotic vehicles are becoming increasingly complex and often need high levels of movement control. Sp when the wheels of…... Listed under: Sensor - Transducer - Detector Projects 797. ACL Research: Foot Acceleration Sensor Atmega324p Introduction This project was designed to aid a research study by Cornell Professors Bob Nafis a behind the higher rate of ACL injuries suffered by female athletes. This injury rate can be up to three to eight times higher than…... Listed under: Sens Transducer - Detector Projects
  • 72.
    798. Fart IntensityDetector Using Atmega644 INTRODUCTION Our project is a fart intensity detector which ranks fart magnitude on a scale from 0-9 accord sound, temperature, and gas concentrations. The inspiration for this project was to determine who could generate the worst flatulence measurable in personally unbiased manner. To…... Listed under: Sensor - Transducer - Detector Projects 799. Dual-Channel Mobile Surface Electromyograph Using Atmega644 Introduction For our final project, we built a surface electromyograph to collect and data on muscle activity, which supports two channels, implements wireless transmission, and can be worn as mobile unit. Surface electromyography ( noninvasive technique to record the activation signals of…... Listed under: Phone Projects 800. Tissue Impedance Digital Biopsy Using Atmega644 Introduction Our project measures and analyzes the electromechanical properties of tissue using a containing a microarray of electrodes, to aid as a tool in predicting the health of the tissue sample. “Despite significant efforts to develop early detecti strategies for breast cancer, the diagnostic…... Listed under: Medical - Health based Projects 801. GPS Data Logger with Wireless Trigger Using Atmega644 Introduction The goal of this project was to create a portable GPS logger that could be wirele triggered by an external device, such as a camera. Our device that we have designed operates in two modes. The first works as a basic GPS logger, wh Listed under: GPS Based Projects 802. Self-Adjusting Window Shade Using Atmega644 Introduction The self adjusting window shade will automatically raise, lower, open, and close your blin itself. A computer terminal acts as a remote to broadcast instructions to the window shade via RF. These manual adjustments are stored into the microcontrollers system along with the…... Listed under: Home Automation Projects 803. Weather Canvas Using Atmega644 Introduction The Weather Canvas is a robust outdoor weather monitoring system coupled with an indoor LED display. The outdoor system of a microcontroller, temperature sensor, humidity sensor, home-made anemometer, a Hot Wheels radar gun modified to measure precipitation, and a solar panel to measur Listed under: LED Projects 804. Autonomous Self-parking car Using Atmega644 Introduction We created an RC Car that can identify a parking space and parallel park by itself. The RC down a street searching for a parking space to its right using a distance sensor. When the car has identified a space, the car…... Listed under: Car Proje 805. The Autonomous Tennis Ball Picker Using Atmega644 Introduction and Motivation In the tennis and sports equipment market, there are very few adva electronic devices assisting in the feeding and picking of tennis balls or any other kind of balls. Tennis players do not prefer picking up over five hundr after a…... Listed under: Sensor - Transducer - Detector Projects 806. BalanceBot Using Atmega644 Introduction The Balance Bot is a singular axis self balancing robot that is capable of adjusting itself to changes in weigh position. We developed the Balance Bot (BB or B2) from a single servo and a single accelerometer. This was very much a proof…... Listed under: Motor Projects
  • 73.
    807. Multiple PIDmotor controller (with Wiimote!) using Atmega644 Introduction The main idea for our project was to implement an inexpensive solution t current CU Snake Arm motor-driving system by using a Mega644 microcontroller instead of multiple 3-Amp motor controllers as the snake arm was o intended to be driven. Since we used…... Listed under: Microcontroller Programmer Projects 808. Wireless Persistence of Vision Device with Realtime Control Using Atmega644 Introduction We set out to make an easy to interact with, highly custimiz display In deciding on a project we looked for a challenge that would have a good mix of hardware and software problems. We ended up primarily concentrating on looking at unusual…... Listed under: Microcontroller Programmer Projects, Radio Projects 809. Programmable RGB Spinning LED Display Using Atmega32 Introduction For our final project, we built a mechanism that spun a linear array of seven LEDs at a velocity that ma appear as if a message was being displayed using persistence of vision for the human eye. To accomplish this, we first had…... Listed under: LED Projects 810. Alarm clock with speech synthesis Using Atmega32 1. Introduction We designed an intelligent alarm clock which can be programmed from the compu speak custom messages and also detect whether the user is on his bed or leaving his room. Sensors are pervasive in industrial, aerospace, and medic Although they can…... Listed under: Clock Projects 811. Blackout game Using Atmega32  1       Introduction Black Out is an electronic puzzle game that is a derivative of Lights Out released by Tiger Toys in 19 with a few additional twists. The game consists of a 4 by 4 grid of LEDs with each LED having a…... Listed under: Game - Entertainment Projects 812. ESD Foam Touch Controlled Brick Blaster Using Atmega32 Introduction As technological devices become more advanced and a bigger part of our daily user interface of devices is becoming more important; intuitive and modern interface provides a real means of transferring the pure computational po device to the user experience.…... Listed under: Sound - Audio Projects 813. NES EMULATION USING ATMEGA32 OVERALL DESIGN GOAL The overall goal of our project was to recreate the Nintendo Entertainment System (NES) u Atmel Microcontrollers.  We decided early on the adding audio to the mix was likely going to be too much work in the time that we had to…... Listed un Sound - Audio Projects 814. Laser Audio Transmitter Using Atmega32 Introduction This project is a proof-of-concept device that transmits an audio signal using a laser beam, whil removing the need for the user to align the beam themselves. For our project, we created a mono-axial transmitter/receiver setup that converts an an audio signal, via a…... Listed under: Radio Projects, Sound - Audio Projects 815. Voice Tuner and its Effects Using Atmega644 Introduction Sound Bite Our project implements a tuner that continuously outputs the frequency of an in microphone signal with a high degree of accuracy. Project Summary This project's goal is to use a sensitive microphone, computer speakers and a pro designed circuit so that for…... Listed under: Sound - Audio Projects
  • 74.
    816. Wireless MusicPlayer Using Atmega32 Our wireless music player allows the user to listen to uncompressed digital audio streamed over a wireless link music player reads uncompressed audio data from an SD card in an immobile "base station." A pair of Xbee transceiver modules are used to stream d Listed under: Radio Projects 817. Multisensor Data Transmission Using Atmega32 Introduction For our final project we built a prototype of a circuit intended for a picosatellite that mea acceleration, sending the information wirelessly back to a base station receiver. The N-Prize is an amateur rocketry competition challenging groups to very small…... Listed under: Sensor - Transducer - Detector Projects 818. Heliostat Skylight Using Atmega644 Introduction With the increasing awareness of sustainable and green building, more and more people are concern the efficiency of energy use at home and at work. For our ECE 476 Final Project, we developed a microcontroller-based, interior illumination system - T Heliostat Skylight. By…... Listed under: LED Projects 819. Wii Conductor Using Atmega32 Introduction Our project can be described as a simplified implementation of Wii-Music, utilizing a Nintendo Wii Remot (Wiimote) to play a gesture-based music game with the player as a virtual music conductor.             We decided to do this project since it exploited two Wiimotes…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 820. Musical Blocks Using Atmel ATmega 644 ntroduction The purpose of this project is to create musical blocks that output music without requiring some musical talent. Musical Blocks tracks the position of the blocks on a flat surface in a range seen by the Wiimote. The path of the blocks…... Listed unde Audio Projects 821. Programmable Synthesized Guitar Using Atmega644 Introduction Our project recreates the experience of playing an acoustic guitar electrically using v sensors, push buttons and the Karplus-Strong algorithm. Our basic idea is to model an acoustic guitar as closely as possible and then implement addi functions not available to the conventional guitar.…... Listed under: Sound - Audio Projects 822. Robot Plotter Using Atmega32 Motivation Deciding a direction of the final project in ECE 4760 can be very difficult. With small Micro Controller Unit, w build anything and everything. We felt compelled to find something very creative and ingenious and had looked around our surrounding and have fou Listed under: Robotics - Automation Projects 823. PowerBox: The Safe AC Power Meter Using Atmega32 Introduction We designed a device that measures and graphs various aspects of AC power and a computer-controlled remote switch. With the recent push for green energy and environmental friendliness, more and more people are concerned abo personal daily power usage. We developed…... Listed under: Calculator Projects 824. Rhythm Ring: Interactive Rhythm Sequencer Using Atmega32 I. Introduction The Rhythm Ring interactive rhythm sequencer is an engaging musical de enables the user to create a plethora of rhythms and beat patterns with the touch of their own fingers. Besides being fun to play with, the Rhythm Rin provides a tangible…... Listed under: Sound - Audio Projects 825. Trumpet MIDI Controller Using Atmega32 The Trumpet MIDI Controller allows trumpet players the freedom of synthesizing from and composing on th instrument. The Trumpet MIDI Controller combines custom hardware and software with the Yamaha Silent Brass pickup mute to convert any standard into a fully functional MIDI controller…... Listed under: Sound - Audio Projects 826. Air Drums Using Atmega32 Introduction One Sentence Sound Bite Air Drums is an electronic drum kit played in the air that eliminates the need for tactile drum pads. Summar created an electronic percussion set with three upright percussion sounds and a floor bass drum sound. The upright instruments…... Listed under: So Audio Projects 827. Dueling Banjos Using Atmega32 Introduction Our project was to create two individual microcontrollers that can play banjo notes cooperatively to play songs using nothing but sound to communicate and synchronize. Humans have had the ability to synchronize musical instruments together to achiev coordinated multi-part song for…... Listed under: Sound - Audio Projects 828. Intelligent wireless pedometer Using Atmega32 Introduction For our ECE 476 Final Project, we have built an intelligent, wearable pedometer. This wire pedometer can calculate many useful statistics such as the number of steps a user has taken, the distance and the speed the person has walked/run, the…... Listed under: Internet - Ethernet - LAN Projects 829. Networked Biometric Authentication Using Atmega32 Introduction: Due to the increasing need for securing data and places, the biometric authentica industry is seeing large market growth.  We decided to build a scalable, small, and efficient device that can be used to secure doorways throughout a c We use a FingerPrint Cards…... Listed under: Calculator Projects, Interfacing(USB - RS232 - I2c -ISP) Projects
  • 75.
    830. Virtual KeyboardUsing Atmega32 Introduction It is becoming increasingly difficult for users to interact with the slew of portable gadgets they carry, es the area of text entry. Although miniature displays and keyboards make some portable devices, such as cell phones and PDAs, amazingly small, users do…... Listed under: Development Board - Kits Projects 831. 5x5x5 LED Cube – Orientation Independent 3D Display Using Atmega32 Introduction Our project, in one sentence, is an orientation independent 3D L display. We were inspired by various videos on youtube of similar cubes but also by the idea of creating an interactive 3-dimensional display. We built LED cube display and controller board…... Listed under: LED Projects 832. BordFree Using Atmega32 Introduction BordFree is a resurrection of the classic Microsoft hit SkiFree featuring an innovative tilt-control scheme. BordF places users in the boots of a snowboarder navigating a challenging ski slope. BordFree players will see their character on a color TV scrolling from bo top…... Listed under: Game - Entertainment Projects 833. High Speed Photography Controller Using Atmega32 The goal of this project was to build a versatile, yet easy to use, sensor-triggered camera controll speed photography. Dan Furie (djf35) Scott Linderman (swl28) High Level Design Inspiration Our motivation came from photographs that captured a v moment in time, such…... Listed under: Sensor - Transducer - Detector Projects 834. 3D Maze in a Box video game Using Atmega32 Introduction Maze in a Box is a portable game in which you tilt a TV to navigate your way around a 3D m though you were in it. We created Maze in a Box as a challenge to generate 3D looking graphics using the…... Listed under: Game - Entertainment Proj 835. 3D Video Game Control Using Atmega32 Introduction Our project is a 3-dimensional game control for a video game displayed on a black and white te set. Motivation and Overview In the recent push in technology, many new computer and game interfaces have been created, many of which include w control. Our…... Listed under: Game - Entertainment Projects 836. Gesture-driven Tetris Using Atmega32 Introduction Our project takes a classic video game and adds a twist with a handheld, gesture based controller. SUPER TERRIFIC AMAZING TETRIS EXTREEEEEEEEEEEME!!!!!!! We decided to undertake this project because the idea of combining the massive coding r for the Tetris game with the…... Listed under: Robotics - Automation Projects 837. Data Acquisition System With Controller Area Network and SD Card Using Atmega32 Introduction This project implements a high speed data acquisitio using Mega32 microcontrollers and a Controller Area Network (CAN). Recording data is essential to testing and developing a racecar. Recording what e sensor is doing can tell an engineering how the car is performing, and…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 838. Automotive On-Board Diagnostics Reader Using Atmega32 Introduction Our project is a hand-held device that is capable of communicating with any v that uses pulse-width modulation (PWM) data-link layer. Such devices are commonly referred to as On-Board Diagnostic scanners. Vehicles that typica into this category are Fords made between 1996 and…... Listed under: Car Projects 839. Adaptive 60 Hz Noise Cancellation Using Atmega32 An active noise canceler to eliminate the 60 Hz noise found in electrical signals due to AC power-lin contamination. 60 Hz noise is frustrating for anyone trying to make sensitive measurements of low voltage processes (eg. Electrocardiogram measure record audio from electrical instruments (eg. guitar…... Listed under: Sound - Audio Projects
  • 76.
    840. Neural NetHelicopter Using Atmega32 Introduction and High Level Design Our project was to design a two degree-of-freedom stationary helicopter, autonomously controlled by an evolving neural network. A normal helicopter has six degrees of freedom, which makes any form of control exceptiona let alone autonomous control. What our design…... Listed under: Game - Entertainment Projects 841. Accelerometer Controlled R/C Vehicle Using Atmega32 INTRODUCTION In our final design project for ECE 476: Microcontrollers, we decided to build a accelerometers, by a remote control that wirelessly transmits, using RF technology, data to the vehicle to move in any direction. The accelerometers w mounted on a…... Listed under: Car Projects 842. ROBOT ARM Using Atmega32 Introduction Our project is a twenty four and half inch aluminum frame robotic arm with four degrees of freedom. In ou we made the arm the second player in the classic game of Tic-Tac-Toe to demonstrate its programmable repeatable motion.  The arm consists of…... L under: Robotics - Automation Projects 843. Help Quit Smoking Watch Using Atmega32 Introduction: The Help Quit Watch is a watch that smokers can wear to help them quit smoking. The Help Q contains a smoke detector that detects whenever the smoker smokes and plays an encouraging clip to help the smoker stop. It then records statistics under: Medical - Health based Projects 844. Electronic Impact Vest Using Atmega32 Our one sentence "sound byte"... *POP* Finally, a fair and balanced way to score Tae Kwon Do matches withou moaning and groaning of everyone. The Electronic Hogu system uses piezoelectric force sensors to determine how much force is delivered by the imp a…... Listed under: Sensor - Transducer - Detector Projects 845. TriWheeler robot Using Atmega32 Introduction The TriWheeler is a radio-controlled robot with three wheels. The lack of the fourth wheel is far from th thing that renders it distinctively different from typical radio-controlled units. In addition to the capability of being freely controlled with a remote cont The…... Listed under: Robotics - Automation Projects 846. Music Wand: Real-Time Optical Scanning of Sheet Music Using Atmega32 Introduction The Music Wand is a device that optically reads printed sheet m real-time and synthesizes the notes which are read from the page. The device uses a linear image sensor mounted on the end of a handheld wand to printed sheet music…... Listed under: Sound - Audio Projects 847. Teaching an old clock Using Atmega32 While exuding retro style, the alarm clock in its original state lacked many desirable features of today's alarm cl only controls consisted of a single on/off switch. It also lacked AM/PM indication, making it impossible to sleep for more than 12 hours. Our project….. under: Clock Projects 848. Shark Tag Microcontroller Platform Using Atmega32 Introduction The goal of this project was to develop a working bench-top microcontroller platform shark tag. It is to be used for on-animal, in-situ data logging applications involving sharks and potentially other large pelagics. For this project I used th Mega32 microcontroller…... Listed under: Sensor - Transducer - Detector Projects 849. Ghost Writing Robot Using Atmega32 Summary We used two stepper motors to drive a steel ball scavenged from a ball-bearing.  These motors were c by a PS/2 mouse wirelessly using the RCR-433 and RCT-433 receiver/transmission combination mentioned in lecture.  We then took the PS/2 protocol, compact, modified existing…... Listed under: Robotics - Automation Projects
  • 77.
    850. Rocket InertialNavigation System using Atmega32 Introduction Was that a ... projectile? a rocket? an [XXXXX] missile? That was a dynamically controlle parachute guidance system looking for its target. The purpose of this project was to design a dynamically controlled parachute guidance system using ATmega32 microcontroller. A set of…... Listed under: Sensor - Transducer - Detector Projects 851. Guitar Tuner Using Atmega32 Introduction: Motivation for Design The Mechanix is a motorized guitar tuner for a standard 6-string electric or acoustic bridge guitar.  Named in honor of Megadeth guitar legend Dave Mustaine, the Mechanix is a unique and innovative product which has numerous pate possibilities.  Traditional handheld…... Listed under: Sound - Audio Projects 852. SCHEME INTERPRETER USING ATMEGA32 Introduction The purpose of this project is to create a Scheme interpreter using C language and Mega32 microprocessor. Using limited resource and memory in the microprocessor, the interpreter should function and work for basic Scheme commands. Th target of the project is to use…... Listed under: Microcontroller Programmer Projects 853. Mini-Golf Simulator Using Atmega32 Introduction This project simulates 9 holes of a minigolf course using the TV to display the course (top down view anchored plastic ball containing two accelerometers, and a putter. Summary We used a hollow plastic ball containing two accelerometers for each pla with…... Listed under: Game - Entertainment Projects 854. Battle Tank – A 3d Atmega32 Based Video Game Introduction Our project is a wireframe 3D video game based on the classic Atari arcade game, Battle (Copyright Atari Corp, 1980). For those that have never heard of the game, Battlezone is a game in which the player maneuvers a tank through a flat environment,…... Listed under: Game - Entertainment Projects 855. LaserSimon – An Innovative Take On An Exciting Game Using Atmega32 Inspiration Our project was first inspired by our shared enjoyment of classic la We initially started out with a game in mind that entailed playing two player laser tag with remote-controlled helium blimps. Due to a number of logist that came up while…... Listed under: Game - Entertainment Projects 856. Snake Arm Glove Project Using Atmega32 Introduction For our project, we designed a glove that can be used to control the Cornell University robotic S surgeon to remotely operate the snakearm as a colonoscope in conjunction with a vision guide system (aka TV goggles). The glove allows…... Listed un Robotics - Automation Projects 857. Wiimote Crane Using Atmega32 I. Introduction We used the Wiimote’s IR tracking capability and Bluetooth to wirelessly control a robotic crane arm.  T Wiimote is a powerful gadget and we wanted to build a new hack with it.  Our crane is composed of three servo motors, one of which…... Listed under Entertainment Projects, Robotics - Automation Projects 858. Radio Frequency Beacon Finder Using Atmel Mega32 This project is a radio frequency receiver that will help the user the trace the direction and distan transmitter beacon(s) operating at 433MHz frequency. In this ECE 476 final project, we have built a radio frequency receiver unit with an LCD screen th Listed under: Radio Projects 859. A portable, color, tilt-controlled video game system Using Atmega32 Introduction The Weeboy is a portable color video game system that is not depen stationary displays or external power sources and features novel tilt-based control. Our purpose for designing this project was to demonstrate that a portable video game system could be implemented…... Listed under: Game - Entertainment Projects 860. TouchPad video game Using Atmega32 Content Page 1.               Introduction 1.1       Sound-Bite Our final project recreates Rush Hour as a video game played using a touchpad implemented using 2D electric-field (E-field) sensors. 1.2              Motivation Rush Hour appealed to us as one of the better pu there.  Its level of difficulty…... Listed under: Game - Entertainment Projects
  • 78.
    861. Laser PongUsing Atmega32 Wall of Pong is a fast-moving, interactive, laser-based pong game playable on any flat surface. The system uses a digitally laser projection platform to draw a pong ball onto any flat surface. This allows for a large playing area that can be set up…... Listed under: Game - Ente Projects, LED Projects 862. Movement to Music: A Wearable Wireless Motion Sensor system Using Atmega32 Introduction In this digital age, new interfaces for musical expressio much broader musical possibilities than have ever existed before. There is a constant quest to be in harmony with one’s instrument so that music can freely from the imagination and take form effortlessly.…... Listed under: Sensor - Transducer - Detector Projects, Sound - Audio Projects 863. Music-controlled Puppet Using Atmega32 Introduction The purpose of this project was to design a dancing puppet which is musically controlled by the microcontroller. This is inexpensive dancing puppet, which can dance to any tune you want. For as little money as possible, you can bring Pinocchio to…... Listed under: Sound - Audio Projects 864. Line-following car Using atmega32 Introduction                     Our project is a battery-powered toy car that is able to follow a path against a background contrasting color. <>             The front of the car is fitted with an array of three photosensors, which allows the car to detect the path…... Listed under: Projects 865. PeanutBot, The Audio Homing Robot Using Atmega32 Introduction Sensing in autonomous vehicles is a growing field due to a wide array of military a reconnaissance applications. The Adaptive Communications and Signals Processing Group (ACSP) research group at Cornell specializes in studying var aspects of autonomous vehicle control. Previously, ACSP has examined video…... Listed under: Robotics - Automation Projects 866. Model retina: color tracker Using Atmega32 Objective and Background <> Objective: The gift of sight is precious; that is why we tried to model an artifi with the properties of color detection, saccades, and pursuit tracking. Structure of a Retina: A retina lies in the back of the eye and…... Listed under: Se Transducer - Detector Projects 867. Evolving neural robot Using Atmega32 Introduction Our final project in ECE 476 is a mobile robot with a developed neural network such that it evolves collisions into a circular vertical white wall while traveling at the fastest speed and straightest line possible without human intervention or external com …... Listed under: Robotics - Automation Projects 868. MCU MIDI synthesizer using Atmega32 Introduction Our final project is a music synthesizer that is capable of producing a variety of musical sounds, b the attack, decay, sustain, release times, and applying special effects such as a low pass filter or a halftone shifter. Our original interest for this…... List Sound - Audio Projects 869. AirJam: wearable air guitar Using Atmega2 Introduction Why a working, wearable air guitar? Bottom line, it's just that cool. Who doesn't want a machin take their jamming and turn it into rock they can hear? With just a glove, a pick and a little practice you can rock the…... Listed under: Sound - Audio Pr 870. UDP/Ethernet Controlled Temperature Regulator Using Atmega32 Introduction This project implements a microcontroller based temperature regulato Ethernet port on any common personal computer. As the world becomes more networked, the power of our ability to communicate with many differe systems instantly continues to prove it's worth…... Listed under: Temperature Measurement Projects
  • 79.
    871. Morse codeinterpreter, with speech synthesis Using Atmega32 Introduction This project implements a system that translates Morse Code to text and and translates text to Morse Code. With our limited experience with Morse Code, our first task was to do some research on the components of Morse the standards associated…... Listed under: Sensor - Transducer - Detector Projects 872. Complex impedance analyzer Using Atmega32 Introduction Our device is an impedance analyzer that determines the complex impedance of any R-C within an impedance range. Our original plan for creating this device was to develop a body fat measurer, a portable device that could allow users to m their health…... Listed under: Other Projects 873. iPod controller Using Atmel Mega32 Introduction Have you ever imagined, "What does that cable I plug into my iPod every day actually do, and how d advantage of it for myself?" We did too, and that's what we aimed to do with our 476 project. The iPod is,…... Listed under: Interfacing(USB - RS232 - I2 Projects 874. USB Magnetic Mouse/Touchpad Using Atmega32 Introduction This project implements Hall effect sensors and a magnet to mimic the function of a typ mouse (similar to a tablet pens function). Many digital artists draw with mice on computer or use tablets. However, tablets are often very expensive. U mouse…... Listed under: Sensor - Transducer - Detector Projects 875. Braille reader using Atmel mega32 Introduction BlindAid is a portable tool that reads Braille and signals close objects. It is ideal for those unfortunate who just turned blind and have not mastered Braille reading and blind cane usage. It can also be used as a learning instrument that helps…... Listed u Home Automation Projects 876. Ultrasonic ParKontroller Using Atmel Mega32 Introduction Are you afraid that your brand new Hummer is going to get scratched while parking it in a t space?  Do you have trouble backing your large Mercedez S-class into your small garage?  Fear no more!  Our ultrasonic ParKontroller can sense how f Listed under: Car Projects 877. Retractable Alarm Clock (RAC) Using Atmel Mega32 1.1  Motivation: Alarm clocks are essential in almost everyones daily life.  For most of us, we start o the sweet noise of our alarms.  While some people wake up instantaneously to the first chirp of an alarm, some struggle everyday to get out…... Listed Clock Projects 878. Automatic pet feeder Using Atmel Mega32 Introduction Our project is an automated pet feeder that is controlled by a wireless infra-red remote control. As pet lovers, we unde that the responsibilities of life sometimes inhibit pet owners from properly caring for their pets. Pet care should be fun, not burdensome, and…... Listed under: Home Automat Projects 879. Programmable medication scheduler using atmel mega32 Introduction The Newest Innovation in Patient Compliance The Portable Programmable Me Scheduler (PPMS) is a modern solution to the century old problem of patient compliance, featuring four medication bins, audio/visual alarms, a graph and serial communication with a Java Swing PC GUI. The conjunction…... Listed under: Medical - Health based Projects 880. CalcParser Using Atmel Mega32 Introduction CalcParser is a command line calculator. Controlled by a serial connection, CalcParser parses and evalua arithmetic expression and has the capabilities to perform symbolic polynomial differentiation with respect to a user-defined variable. It can also evalu differentiated expression at a given constant…... Listed under: Calculator Projects 881. Firefly synchronization Using Atmega32 Introduction This project implements a 2D matrix of bidirectional LEDs to simulate how fireflies in a populatio synchronize their flashing. Fireflies are an extraordinary species of bioluminescent animals which are able to synchronize the timing of their light emis within a flashing population. In places…... Listed under: Development Board - Kits Projects 882. Graphing calculator Using Atmel Mega32 Introduction A perfect tool for high school students that will pursue a career in engineering, the graphing and statistics calculator com functionality of a scientific calculator with graphing capabilities as well as being able to compute simple statistics. The purpose of this calculator is…... Listed under: Calculator
  • 80.
    883. Speech RecognitionJukebox Using Atmega32 Introduction For the Final Project in ECE 476: Designing with Microcontrollers, Robbins and Saha develop Speech Recognition Jukebox, comprised of a speech recognition system that activated a simple music player.   The speech recognition system was cap recognizing four commands and could cycle through…... Listed under: Development Board - Kits Projects 884. Sound Source Triangulation Game Using Atmega32 Introduction The goal of this project is to determine the time and location of a sound source in all dimensions (x,y,z) using an economical and easily reproducible setup. To accomplish this goal, we decided to try and triangulate the sound source usin Listed under: Game - Entertainment Projects 885. Touch Screen Controlled R/C Car Using Atmel Mega32 Introduction For our final design project, we chose to build a touch screen radio controlled car. Essentially, the RC car wi path drawn by the user on the touch screen as it is drawn in real time. Speed and direction of the car…... Listed under: Car Projects 886. AppleII emulator Using Atmel Mega32 The goal of this project was to develop a system capable of emulating an Apple II personal computer. This proje attempted to reconstruct a functional Apple II emulated on Atmel ATmega32 processors. Due to time constraints, a fully functional Apple II was not pr however,…... Listed under: Microcontroller Programmer Projects 887. HDD analog clock with LCD touchscreen Using Atmel Mega32 Introduction The clock is one of the oldest inventions in human history and has been us centuries as in instrument for measuring time. There are many ways to implement this ancient technology by simple and practical methods. However [caption id="attachment_18482" align="aligncenter" width="531"] HDD…... Listed under: Clock Projects, LCD Projects 888. CUAUV Voltage Sniffer Using Atmel Mega32 Introduction The Cornell University Autonomous Underwater Vehicle team (CUAUV) is an undergraduate engineering team that designs and builds a fully autonomous, robotic submarine. Over the past year, the team – of which both Manoj Lamba and Ian members – has had a stringent…... Listed under: Metering - Instrument Projects, Sensor - Transducer - Detector Projects 889. CUsat diagnostic board using Atmel mega32 1 Introduction Our final project is the CUSat Diagnostic Board (CUDB). This board will be used for monito system health as well as performing various functions allowing for easy integration and debugging of CUSat components. [caption id="attachment_18 align="aligncenter" width="600"] CUsat diagnostic board using Atmel…... Listed under: Development Board - Kits Projects 890. SearchBot Using Atmel Mega32 Introduction The SearchBot is a fully functional model car that can be controlled wirelessly through the PC or autonom search for red balls scattered on a flat surface. Autonomous vehicles are just now being realized in labs around the world and will soon have major….. under: Car Projects 891. Robotic Vacuum Cleaner Using Atmel Mega32 Introduction As our final project, we decided to design and build a robot capable of vacuuming the floo room or area without any human interaction other than just starting the unit. We realized the need for a cheap and convenient product that can…... Li under: Robotics - Automation Projects 892. Cooler-Bot Using Atmel Mega 16L Introduction Cooler-Bot is an autonomous vehicle that uses ultrasonic transducers to sense distance and direction t remote ultrasonic mobile unit that it is designed to follow. Our original goal was to design a vehicle that would carry a beverages for the user and follo Listed under: Car Projects
  • 81.
    893. MCU/FPGA colorvideo Game Platform Using Atmel Mega32 Overview: A system consisting of an ATMEL MEGA32 chip, Altera FLEX10K FPGA, and a library of source code for th processor to generate 256-color VGA video signals in real time optimized for game development. Introduction: The Nintendo Entertainment System sp of RAM…... Listed under: Game - Entertainment Projects 894. Musical Water Fountain Using Atmega32 Introduction: Our final project is a musical water fountain loosely based on the fountain in front of the famed hotel and casino. The basic idea of the project is to take an input from an iPod (or any sound source), sample the sound and…... Listed under: Sound - Projects 895. Machine de Karaoke Using Atmega32 Introduction Sound bite Our project is a karaoke recording machine which is capable of removing the voice com a music file and storing the users singing voice with the background music to an external compact flash memory.  It can also be used as a…... Listed un Sound - Audio Projects 896. Dual Control R/C Car Using Atmega32 The purpose of this project was to take a traditional remote controlled car and create our own control mechanis control the car, we used a dual-axis accelerometer and LEDs (light emitting diodes) configured as photo-detectors. The control mechanism was selecte single pole…... Listed under: Car Projects, Game - Entertainment Projects, Sensor - Transducer - Detector Projects 897. Guitar Synthesizer and Game Using Atmega32 Introduction Compose your own virtual guitar masterpiece or follow along with a preprogrammed class experience needed! We developed a guitar synthesizer with video component inspired by the popular video game Guitar Hero. The original game con only reproducing popular rock and roll songs…... Listed under: Game - Entertainment Projects 898. Self-powered solar data logger Using Atmel Mega32 Introduction: My project is a self-powered solar data logger. Put out in the sunlight, it will measure level and log this to memory to be later downloaded to a computer. The system is powered by a small solar panel and battery. Summary: The…... Liste Battery Projects 899. Lighting control system Using ATMEL Mega32 Loucetios™ is a state-of-the-art, self-configuring lighting control system solution for bedrooms, offices a perimeter areas. Under automatic operation, the system senses luminosity inside and outside a room, controls the angle of the blinds and dims the la maintain a prescribed level of illumination inside…... Listed under: Home Automation Projects 900. Intelligent Multimedia System Atmel mega32 Introduction This project implements a multi-function multimedia system that allows the user to sing wit music video and generate some fancy sound effects. In recent decades, multimedia becomes quite popular in our daily life. In fact, multimedia system existed for a long time.…... Listed under: Game – Entertainment Project Ideas, Sound - Audio Projects 901. Ultrasonic spotlight tracker using Atmel mega32 Introduction A spotlight that follows you on its own! The ultrasonic spotlight tracker is a system that u wireless beacon to track a targets location using both RF signals and ultrasound waves.  It then drives a light source to point at the location of…... Liste Sensor - Transducer - Detector Projects 902. Galvanic skin response meter using Atmel mega32 Introduction Our project measures the user's skin conductance for monitoring his or her mental st Summary Medical experiments have shown that the magnitude of the electrical conductance in a person's skin is directly correlated to their emotiona The short term changes in electrical conductances…... Listed under: Metering - Instrument Projects 903. RFID Security System Using Atmel Mega32 Introduction and Motivations: For our final project, we designed and built (and exhaustively tested) an RFID proximity security system for use with Cornell Identification cards, which have been RFID-embedded since fall of 2003. The idea for this project was so spawned from our general…... Listed under: RFID - NFC Projects, Security - Safety Projects
  • 82.
    904. VOICE RECOGNITIONSECURITY SYSTEM USING ATEGA32 When we think of programmable speech recognition, we think of calling FedEx customer serv center with automated voice recognition response systems. We also think of PC-based speech recognition Dragon NaturallySpeaking. Now we took th further. We are talking about speech recognition in…... Listed under: Security - Safety Projects 905. SecureLED: Better Access Control Using ATMega32 Introduction Overview SecureLED is an optical access control device which replaces current RFID or Strip technologies with a cryptographically secure, contact-less device which communicates over commodity Light Emitting Diodes (LEDs). Project Sum project started with one central premise: current physical access control systems…... Listed under: LED Projects 906. Capacitance sensor MIDI keyboard Using Atmel mega32 Introduction The objective of this project was to build a keyboard based on capacitive sensors use the MCU to create MIDI encodings for all notes played. The output from the sensors is detected by the MCU using its ADC capability. The sound is under: Sensor - Transducer - Detector Projects 907. The Grillzilla Using ATMega32 Introduction: One Sentence Sound Byte: “Grillzilla - A wireless meat grilling thermometer which alerts the user whether their entrée is cooked ac USDA recommendations via LCD and voice feedback.” Summary of what we did: As the weather starts to get warmer a common type…... Listed under: Home Automation Proje NFC Projects 908. Sign language coach Using Atmega32L  Introduction Objective The goal of this project is to design a useful and fully functional real-world product that translates the movement of the fingers into the American Sign Language. Background The American Sign Language (ASL) is a visual language based on gestures. It…... Listed under: LCD Projects, Robotics - Automation Projects, Sensor - Transducer - Detector Projects 909. Radial Chalker Using Atmel Atmega32 Introduction We developed a new way for student groups to chalk advertisements for events. This project is a ra printing device for drawing with chalk/markers on flat surfaces. High-Level Design dea Rationale and Sources Anyone who has done any sidewalk chal knows that it is…... Listed under: Motor Projects 910. GoConn Bicycle Computer Using Atmega 32 Introduction This project is a bicycle computer that includes velocity monitoring, calorie computation, an audio/visual alarm, and a wireless remote. Bicycles are great for transportation as well as exercise. Unfortunately, many bicycles across campus and a world are stolen everyday. We designed a computer…... Listed under: How To - DIY - Projects 911. Handwriting Recognition System Using Atmel Mega32 I.       Introduction Simply write; your computer will undersand! We have designed and impleme Handwriting Recognition System using a touch screen from a Palm Pilot m125, a black and white TV and a Mega32 microcontroller. Unfortunately, due lack of specifications regarding the built-in…... Listed under: LCD Projects, Sensor - Transducer - Detector Projects 912. Programmable remote control Using Atmega32 Introduction The goal of our project was to develop a remote control whose buttons would be readily programmable by recording the signal from another remote control. After revising several standards on infrared signals, we determined that the appr take was to record the signal…... Listed under: Sensor - Transducer - Detector Projects 913. Flat Bed Scanner Using Microcontroller Introduction     Quite possibly the slowest and lowest resolution of any scanner on the market today, but it sur mesmerizing to watch.. and it actually works!      That's about the best way to describe this behemoth of a project, which involved countless hours of b …... Listed under: CNC - Printing Machines Projects 914. Digital Stethoscope Using Atmega32 Introduction Our project is a digital stethoscope that displays your heartbeat on any television. It also calculates b minute and alerts you if your rate falls out of a specified range. [caption id="attachment_17908" align="aligncenter" width="234"] Digital Stethoscope U Atmega32[/caption] At the highest level, the…... Listed under: LCD Projects, Medical - Health based Projects, Sensor - Transducer - Detector Projects
  • 83.
    915. TRISHUL -Autonomousnavigating robot Using Atmel Mega32 Introduction We decided to do this project due to our keen interest in the robotics. We were also looking for a pro involved a perfect mix of hardware and software complexity. This project enabled us to use new hardware such as sensors, stepper motors…... Listed under: Robotics - Autom Projects 916. Nova Strike video game Using Atmega32 Introduction Nova Strike is a 2D space shooter game implemented with an Atmel ATmega32 microcontroller. inspiration came from our love of video games and fond memories of playing space shooters on our TI-89 graphing calculators in high school (instead attention in calculus…... Listed under: Game - Entertainment Projects 917. Digital Compass Using Mega 32 I. Introduction The goal of this project is to build a digital compass that displays both the direction and cardinal points television. Other functionalities were added to complement the sensor interface, such as, temperature display, magnetic declination input and disabil At the…... Listed under: Sensor - Transducer - Detector Projects, Temperature Measurement Projects 918. MiniGolf video game with putter Using Atmel Mega32 Our project is creating a miniature golf game, complete with a putter and golf ball to simulate a putting stroke. We chose to construct a mini golf game because not only is it interesting, but it has a large balance of computer programming as…... Li under: Game - Entertainment Projects 919. Electr-O-Sketch Using Atmega 32 Introduction We created a project in which a user could control the movement of an Etch A Sketch using a typical ser The public was introduced to the EAS in 1960 and since then it has stayed virtually the same.  This nostalgic toy is…... Listed under: Sensor - Transduce Detector Projects 920. Pong2 Using Atmel Mega32 Our final project is a portable, dedicated PONG2 video game unit for use with a home television. Introduction PONG, a vid that simulates a game of Ping-Pong between two players, has a long and pervasive history, and is said to be the first video…... Listed under: Game - Entertainment Projects, LCD Projects 921. Handheld Ultrasonic Rangefinder Using Atmel Mega32 Introduction Our ultrasonic rangefinder is capable of allowing the user to determine his or her from an object or wall. When deciding on what type of project to design and construct, we decided that we wanted to create something that would ha practical…... Listed under: LCD Projects, Sensor - Transducer - Detector Projects 922. Beverage Monitor Using Mega32 Introduction We created a wireless device to affix to the bottom of a pitcher that alerts the wait staff when the pitche empty. We used the a priori knowledge that when a pitcher is empty the pitchers bottom is perpendicular to the ground. By…... Listed under: Sensor - Transducer - Detector Projects 923. The Ultimate MP3 Radio Using ATMega32 Introduction Perusing through the impressive list of past projects, we decided to make our final project a co of two technologies—wireless technology and the MP3 player. Specifically, we decided to create an MP3 player that broadcasted the songs to an FM d this…... Listed under: Internet - Ethernet - LAN Projects, Sound - Audio Projects 924. SmartBlinds Using Mega32 Overview The SmartBlinds system uses a microcontroller to control the angle of a set of miniblinds used at home, in the cl or on the job. Using SmartBlinds, a user can more effectively control the light coming into the room, or have an alarm that…... Listed under: Home Aut Projects 925. Keypaw Using Atmel Mega32 1 Introduction The Keypaw is a 12-button input device that provides computer users with an ergonomic, fully-configurab alternative to the traditional QWERTY keyboard. The Keypaw is a microcontroller-driven device with 12 buttons mounted on two handsets; 1 button is for each finger, and 2…... Listed under: Development Board - Kits Projects
  • 84.
    926. Home SecuritySystem Using Atmel Mega32 Introduction This is a digital home security system with voice feature which can monitor room temperatu motion, and windows & doors. The goal of this project is to utilize the after-market parts and build an integrated home security system. Besides tradit magnetic switch equipped…... Listed under: Security - Safety Projects 927. A Wand Based Barcode Scanner Using Atmel MEGA32 Introduction: Our project is a UPC-A Barcode Scanner complete with a pricing/description datab interface. Our original goal for this project was to build a standard barcode scanner from scratch, but as the project evolved so had to our specificatio project.  We initially sought…... Listed under: Metering - Instrument Projects, Sensor - Transducer - Detector Projects 928. Implementation of a (31, 16) BCH code on a Microcontroller Using Atmega32 Introduction: Error correcting codes are used throughout digital commun systems today. Cell-phones, CD players, satellites, digital pagers and many other communication devices all use varying amounts of error control to ac certain degree of accuracy in transmitting information. The idea behind error control codes…... Listed under: Radio Projects 929. The Breath-o-Matic Using Atmega32 Introduction Let us introduce the Breath-o-Matic alcohol sensor. The Breath-o-Matic is an electronic, non-invasive of measuring a human’s blood alcohol content (BAC). Its elegant, yet discombobulated design embodies a cheerful mix of mechanical and semiconduc components. Simply blowing into the mouthpiece causes the Breath-o-Matic…... Listed under: Sensor - Transducer - Detector Projects 930. TV/Keypad Interface for Winamp Using Atmel MEGA32 MP3 is presently a household term; the reader will likely own a few, barring any intervention fro RIAA. Since it's not always practical to sit in front of a monitor and keyboard when you want to listen to music (e.g. in a car, on…... Listed under: Interfa RS232 - I2c -ISP) Projects 931. Eye in the Sky Security System Using Atmel Mega32 Introduction We have used the Atmel Mega32 AVR microcontroller to construct an affordable, high security system designed to protect valuables in a single room of a house or property. According to national surveys conducted by the department of J property crimes are ten times…... Listed under: Security - Safety Projects 932. Xylophone Using Mega32 Introduction Our final project is a programmable, self-playing xylophone with random melody generation and a pitch detect interface. From early mechanical devices to todays musical greeting cards, history has seen numerous examples of automated music machines. This p represents a quick, modern take on…... Listed under: Sound - Audio Projects 933. Scorched Earth video game using Atmel Mega32 For our design project, we decided to replicate the video game known as Scorched Earth: The Mother Games where two tanks fire missiles at one another by adjusting angles and power while adjusting for variable wind. The objective of Scorched Earth Listed under: Game - Entertainment Projects 934. Wonderswan Development Cartridge Using Atmel Mega32 Introduction Short Summary This project allows a Wonderswan developer to upload 64 kB code/data and execute it on real Wonderswan handheld gaming hardware. Long Summary We started by opening up one of our Wonderswan cartridg identifying the various chips and circuitry found inside.…... Listed under: Game - Entertainment Projects 935. Star Duel video game Using Mega32 1.  Introduction 1.1  Project Summary Our project is a space dogfighting video game where two players attempt to each other using a variety of ships and weapons.  The battlefield is a 128x100 pixel area on a TV, and a small planet resides in the…... Listed under: Ga Entertainment Projects 936. The Big Red Guide Using Atmel AVR Mega32 If this is your first time on the Cornell Campus, you need not worry! Cause we have the best guide for you Introduction The Cornell Campus is quite large, and finding your way around can get a bit frustrating. The Big Red Guide is a…... Listed under: GPS Bas Projects, Security - Safety Projects 937. MISSILE COMMAND USING ATMEL MEGA 32 Introduction For my ECE 476 Design Project, I built Missile Command using the Atmel Mega 32 microcontroller.  My version of Miss Command is based on Ataris 1981 version.  After looking at some of the past ece476 final projects, I noticed no one had tried to…... Listed under: Game - Entertainment Projec
  • 85.
    938. 3D gForceMouse Using Mega32 Introduction "Our 3D gForce Mouse will enable use to move the curser in the air freely with the capacity of scrolling" T rationale for this design is two fold. We wanted to do this design because we wanted to make a zero-impact pointing device for…... Listed under: Senso Transducer - Detector Projects 939. Stationary Helicopter Using Atmel Mega32 Intro Summary Thinking about what a CDE (culminating design experience) should be, we devised a project combines the microcontroller programming principles learned in ECE 476: Microcontroller Design with the control theory concepts learned in ECE 472 Feedback Control Systems to create an academically viable…... Listed under: Motor Projects, Sensor - Transducer - Detector Projects 940. INFRARED TRACKING SYSTEM USING ATMEGA32 Introduction Infrared (IR) Our project is an infrared (IR) tracking system. A beacon, placed on the obje tracked, continuously emits infrared signals in all directions. The signals coming from the beacon are detected by 2 IR receivers mounted on 2 stepper which rotate…... Listed under: Featured, Game – Entertainment Project Ideas, Sensor - Transducer - Detector Projects 941. Arkanoid Video Game using Atmega32 Introduction [caption id="attachment_16604" align="aligncenter" width="224"] Arkanoid Video Game using Atmega32[/caption] High Level Design After working with the ATmega family of processors for the first six lab assignments, and working extensively w generating television screen images, we decided that a video game would be a viable…... Listed under: Game - Entertainment Projects 942. Reversi Video Game Using ATmega32 Introduction "Our project implements the game, Reversi, on TV with a smart artificial intelligence and a host of o features!" It's our childhood game. We were so excited when we found out that we can actually build it for our 476 final project. We looked…... Listed u Game - Entertainment Projects 943. Guitar Special Effects Using Atmega32 <Introduction> In the last few decades technology has constantly pushed music further and further into the dig Digital technology has infiltrated all aspects of music-making, from its creation to its recording, editing and production. We have decided to join this te movement by fitting…... Listed under: Sound - Audio Projects 944. Tap the Dance using Atmel Mega163 Introduction Nowadays in the video gaming industry, one of the most popular categories of game is music and m simulation game. There are games where players are required to play the drum according to the matching signals and the music of the game; there a Listed under: Game - Entertainment Projects 945. kaOS operating system and loader using atmega32 Introduction We have created a real-time, multithreaded, preemptive operating system called kaO Atmel Mega32 microcontroller, which loads and executes programs from a Secure Digital or MMC card. We wrote this OS and created the SD/MMC ca as a final project for Cornell's…... Listed under: RTOS - OS Projects 946. Keyboard mania using Atmega32 INTRODUCTION “Keyboard mania gives users an opportunity to learn and gain a unique taste of playing an electron music teacher.” Summary of our Project We designed an electronic musical instrument, called keyboard mania, able to play an octave of…... Listed und - Audio Projects 947. ECE 476 Spring 2005 by Arthur Zhang (ayz2) and Yewen Ying (ydy2) using atmega32 Introduction Soundbyte TV Jezzball with dangling mouse, created b ECE476 students Arthur Zhang and Yewen Ying, is a hot, new, cool, retro look back to when times were simpler, computers were slower, and TV’s were white. Overview From the beginning, because of…... Listed under: Game - Entertainment Projects
  • 86.
    948. Duckhunt videogame using Atmel Mega32 Introduction to Duck Hunt For our final project in ECE476, we implemented a multi-duck and multi-player v the Nintendo classic Duck Hunt on the Atmel Mega32 microcontroller. In 1985, Nintendo released a game for the Nintendo Entertainment System (NE Duck Hunt, and it…... Listed under: Game - Entertainment Projects 949. The Contender video game using Atmel Mega32 Introduction The pitch "The Contender" is an interacting boxing game in which the player actively par the game with real time punching, ducking, dodging, etc. The Description and Motivation This game is a twist of a popular arcade game called "Mocap short for…... Listed under: Game - Entertainment Projects 950. The Big Red Juicer using Atmel Mega32 Introduction The Juicer is a wirelessly controlled, programmable juice maker which will mix each ingredient of a the exact proportions every time. The Juicer will take a recipe selection serially via either the keyboard or the wireless remote and dispense the juices Listed under: Home Automation Projects 951. Color Tetris video game using ATMega32  Color TET Brief DescriptionThe project is a color "Tetris" based game compatible with NTSC TV. Summary an motivationThe project basically utilizes a Mega32 chip, along with a RGB-NTSC converter and a sync generator to produce color on a standard NTSC TV code for a…... Listed under: Game - Entertainment Projects 952. WeatherDog Using ATMega32 Introduction Our project was a real-time weather update system that accepted an airport code from the user via a keyb looked up the code on an internet database, and displayed the resulting weather information on a television screen. We used the PS/2 protocol, betw Listed under: LCD Projects, Metering - Instrument Projects 953. AirMouse using ATMega32 I. Introduction The Cornell University Airmouse Initiative is a motion sensing glove with buttons on it that plugs into your co to function as a mouse. Many tasks that are performed on the computer require the use of both a keyboard on the mouse, and…... Listed under: Sens Transducer - Detector Projects 954. Neural net robot using ATMega32 Introduction Our project consisted of an elementary eight neuron network that used Hebbian Learning to train a robot to respond intelligen input light stimuli. First, we decided upon a task that would accurately denote Hebbian learning. One of the most common examples of conditional…... Listed under: Robotics - Automation Projects 955. Wireless Electromyograph using ATmega32 Introduction This project implements a wireless surface electromyograph that displays the signal using a t as an oscilloscope. Electromyography detects the electrical signals that the human body generates to contract muscles. Detecting very low voltages in milliVolt range on the skin surface is not…... Listed under: Internet - Ethernet - LAN Projects, LCD Projects 956. Stepper Motor Indexer & Decoder ECE 476 Using ATmega32 1. Introduction For our final project we built an ATmega32 based stepper motor controller measures the angular position of the motor shaft using an optical encoder and quadrature decoder. Our system performs 3 basic functions: (1) Comm with a PC by means of a…... Listed under: Motor Projects 957. A Microcontroller Based Turbidity Meter using AtmelMega32 Introduction Low-Cost Turbidity Meter for Underdeveloped Countries Our project is a col with an independent research project being conducted by senior civil and environmental engineering student James Berg. The goal of this project is to low cost turbidity meter for use in under…... Listed under: Metering - Instrument Projects, Temperature Measurement Projects 958. A Motion Capture System Using Accelerometers using AVR Mega32 By: Kris Young and Dan Li See the results section for movie clips of the motion cap system in action. Abstract Human-Computer interface may perhaps be both the most limiting and liberating aspect of humans working with compute for instance, limit the input complexity…... Listed under: Metering - Instrument Projects, Video - Camera - Imaging Projects 959. Wireless Telemetry using Atmel Mega32 I.Introduction Soundbyte:A Wireless Data Telemetry system that receives acceleration, proximity and external temperature data from a remote vehicle and displays them on an NTSC television screen. The rationale behind this project is to provide the user with information regarding the vehicles acceleration, proximity to other…... Listed under: Metering - Instrument Projects
  • 87.
    960. Portable SecuritySystem Using ATMega 32 Introduction Consider you are in a research lab that handles highly hazardous material. You don't want any enter the room, to even come close to the door. Or consider yourself doing something highly confidential in a room that you would like to know if…... under: Security - Safety Projects 961. Blood Pressure Monitor Using Mega32 Introduction Our final project is to design and build a portable blood pressure monitor device that can measur blood pressures and heart rate through an inflatable hand cuff. The device is consisted of three main parts: external hardwares (such as cuff, motor, v Listed under: Medical - Health based Projects 962. Missle Command video game using Atmega32 1. Introduction Brian Smith and Cem Ozkaynak, two Seniors enrolled in ECE 476 at Cornell University, s rekindle the mood of impending nuclear annihilation by distant ‘Evil Empires’ through the classic 1980’s video arcade sensation Missile Command. [ca id="attachment_16403" align="aligncenter" width="600"] Missle Command video…... Listed under: Game - Entertainment Projects 963. BlindBot usisng Atmel Mega32 MCU Introduction    Our project is an autonomous toy car that tracks a high pitched audio signal. Using two microphon microcontroller, and two DC motors on an existing remote controlled car and, we implemented our own control logic to detect high pitched 3.5kHz au signals…... Listed under: Game – Entertainment Project Ideas, Robotics - Automation Projects 964. Super Breakout using Atmel Mega32 Get ready for the next generation of the classic game Breakout which features a standalone device, interactive us control, and new and improved game modes including two player cooperative and competitive modes. Introduction Breakout is a game of speed, skill anticipation.  The player will…... Listed under: Game - Entertainment Projects 965. Connect Four with Programmable Infrared Receiver Atmel Mega32 We have designed a programmable infrared receiver which can utilize any pulse co signal to play Connect Four from a remote distance. The programmable infrared receiver device we have created can decode any pulse-width modula of an IR remote control, store it in…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Radio Projects 966. MIDI DRUM CONTROLLER USING MEGA 32 MICROCONTROLLER [ INTRODUCTION ] MIDI Drum Controller Our Final Project for ECE476 was to build a M machine using the MEGA 32 microcontroller. We wanted to make an actual product that can produce “good-quality” percussion sounds. Our drum ma would be played via a keyboard…... Listed under: Sound - Audio Projects 967. Inverted Pendulum Balancer Using Atmel Mega32 Introduction The goal of this project was to build and implement an inverted pendulum balancer, in vertical two dimensional plane, using Proportional-Integral-Derivative (PID) feedback control. [caption id="attachment_16620" align="aligncenter" widt Inverted Pendulum Balancer Using Atmel Mega32[/caption]           The inverted pendulum balancer is a radio controlled car…... Listed under: Game - Entertainment Projects 968. Vocal Trainer Using Atmel Mega32 Introduction With the Vocal Trainer, expect to resurrect your singing, and ultimately become a vocal expert! The pu this Vocal Trainer, designed by Anderson Lin and Jerry Chiang, is to train people in singing accurate pitches, and ultimately become a vocal expert. Also Listed under: Sensor - Transducer - Detector Projects, Sound - Audio Projects 969. Variable Traffic Controller Introduction Our project is a Traffic Controller that is sensible to traffic condition and adjust the traffic lights accordingly. Ou tries to simulate the traffic at an intersection, and with the use of sensors (Hall Effect in our case), we adjust the traffic of…... Listed under: Car Projects 970. RoboDog using ATMega32 Introduction The project, Robodog?is an autonomous car that follows sound. The car can follow almost any audible sound t human can create by using three onboard microphones. This project was possible because of the fact that the speed of the sound is relatively slow co Listed under: Game - Entertainment Projects, Robotics - Automation Projects 971. PC temperature control using Atmel Mega32 Abstract Our project is a standalone temperature and fan monitoring and control unit for the PC. It uses fan speeds in order to regulate temperature and noise. The system is flexible in that it can be configured to be either…... Listed under: Temperature Measurement Projects 972. MOS 6502 Emulation on an Atmel Mega32 ECE 476 - Spring 2003 Christopher Foster and Jeff Puchalski When Chris and I first started tossing around p ideas, I sputtered out: 'Hey! Wouldn't it be cool if we could emulate a Nintendo using some Atmel chips?' Chris replied 'Ooh, that'd be awesome, then… under: Other Projects
  • 88.
    973. A PortableBattery-Powered Roguelike Video Game Using Atmel MEGA32 I. Introduction This project is a portable battery-powered video game based o 1984 cult classic PC game "Rogue". I designed a hardware-based roguelike video game because I am a long-time Rogue addict and thought it would be make a portable plug-and-play imitation.…... Listed under: Game - Entertainment Projects 974. Dual control RC car using Atmel Mega32 Introduction We have always liked playing with remote controlled (RC) cars, so we decided it would be fun to certain aspects of it. This led us to the idea of changing the remote control so that the car responds to different types of input.…... Listed under: Game Entertainment Projects 975. Digger video game using Atmel Mega32 Introduction Sound Bite We implemented a black-and-white video (TV) game adaptation of the old DOS classi as Digger, by Windmill Software. Summary On the Game Start screen, a choice between a multiplayer mode and an AI mode is offered. The multiplaye supports three…... Listed under: Game - Entertainment Projects 976. Digital voice recorder using Atmel Mega32 microcontroller Our project is a digital voice recorder with distortion abilities that stores multiple tracks ont DataFlash memory card. We programmed an Atmel Mega32 microcontroller to sample a microphone, and store the samples into an external memory We give the user the option of…... Listed under: Sound - Audio Projects 977. Digital Guitar Tuner Introduction We constructed an analog-to-digital guitar that captures an input signal and uses the waveform zero-crossings to det whether the note is at the correct frequency. The hope was that this frequency tuner could be used in a home setting where each of us can…... Listed Sound - Audio Projects 978. Voting Machine Using Atmel Mega32 Introduction Our project is an electronic voting system. The system allows for quick and accurate voting electron system uses a client/server architecture, which allows voters to cast ballots on the client terminal. Each client interfaces with the server, which keeps t entire…... Listed under: CNC - Printing Machines Projects, Home Automation Projects 979. Frequency Division Multiplexing for a Multi-Sensor Wireless Telemetry System Using Atmel MEGA32L Our System acquires several different sensor inputs, FM modulates each manipulating Direct Digital Synthesis increment values, transmits the resulting signal on a commercial FM radio band, and receives and decodes the original sensor levels. Intr The problem of encoding multiple input signals into…... Listed under: Sensor - Transducer - Detector Projects 980. CubeSat Diagnostics board using Mega128 Introduction Sound Byte This project is a proof of concept diagnostic & testing board for use with the powe the Cubesat Satellite and will be developed further to become a component of the CUSat Satellite. Summary of What We Did and Why This…... Listed u Radio Projects 981. Gauntlet of uComputation using Atmel Mega32 Introduction  The project involves an experiment in implementing a human-computer interface by tra finger and wrist motions. Brief: "Ever wish you could control a computer just by moving your fingers or your hand?" We did. The primary goal is to des build a functional…... Listed under: Sensor - Transducer - Detector Projects 982. Laser Communications System Using ATMega32 Introduction Laser communications systems are wireless connections through the atmosphere. They similarly to fiber optic links, except the beam is transmitted through free space. While the transmitter and receiver must require line-of-sight condition have the benefit of eliminating the need for broadcast rights…... Listed under: Internet - Ethernet - LAN Projects 983. Digital Mirror Message Machine Introduction For our final project, we decided to build a digital message machine which displayed on a mirror.  This is variation from other digital message machines we had seen in stores and in past final projects.  Instead of quickly moving a wand of LED's…... Listed u Projects 984. Memory Video Game Using Atmel Mega32 Introduction The main goal of this project was to write and develop a graphical version of the card game co referred to as Memory for use on an Atmel Mega32 microcontroller unit. Memory is a card game where the player tries to match pairs of…... Listed un Game - Entertainment Projects
  • 89.
    985. TREASURE HUNTOF THE HIGH SEAS ATMEL MEGA32 INTRODUCTION Sail the high seas searching for treasure and protecting your ship from pirates in game in which a system of lasers discerns the direction of wind and you specify wind magnitude, sail height, and rudder position. Originally, we had th of…... Listed under: Game - Entertainment Projects 986. PacMan Video Game Using Atmel AT90S8515 microcontroller Introduction The goal of our project was to replicate the great arcade classic Pac-Man on in black and white. The inspiration for this project came from our love of video games and our introduction to NTSC TV signal generation in Labs 3 and Listed under: Game - Entertainment Projects 987. SpaceInvaders Video Game Using Mega32 Introduction Our final project is the classic Atari version of space invaders on the MEGA32. The story: A horde of space invaders are attempting to land on the planet’s surface. You play a heroic pixilated thing on the ground trying to stop them one bullet…... Listed under: Game - Entertainment Projects 988. Space Fighter Video Game Using ATMega32 Introduction Our project is a fighter game. The user controls a fighter, which moves around the TV screen starts the game with a defined number of lives. It has two kinds of enemies: the asteroids and the monsters. Asteroids drop randomly from the…... Lis under: Game - Entertainment Projects 989. Frogger Video Game Using Atmel Mega32 Introduction Sound Bite One word: FROGGER!! Why Frogger? We chose Frogger for several reasons. First, we that it is an entertaining game, which is complex enough to implement as a project. Second, Frogger allows us to use knowledge that we have acquire this…... Listed under: Game - Entertainment Projects 990. MIDI synthesizer Using Atmega32 Introduction: MIDI Synthesizer Our Final Project for ECE 476 was building a MIDI synthesizer using a MEGA 32 microcontroller.  At first we wanted to tear apart an old keyboard and use the MCU to decode directly from the sensors which detected key presses.  W then…... Listed under: Development Board - Kits Projects 991. Radio Control Car using Mega32 Introduction: We like car and we like to build our own Atmel Mega32 MCU based radio-controlled NSX.  We set three g the initial project proposal and they are as the following: (1)  Build a RC NSX with the same performance as the original car. …... Listed under: Car Proje 992. Sound Effects Processor Using Mega32 Introduction As you can see from the title, our project, in a nutshell, is a Sound Effects Processor (for the lack o name), which is capable of taking an audio input, adding effects to it digitally and passing an analog output to an…... Listed under: Sound - Audio Proje 993. BattleShip Game using Atmel Mega32 Introduction : For our final project, we decided to create the classic game of Battleship that was displayed on a T controlled by keypad inputs. We both enjoyed playing the board game when we were young and we occasionally would do battle against each…... Liste Game - Entertainment Projects 994. Wireless Keyboard Using Atmega32 Introduction: For our project, we designed a wireless keyboard that uses RF to transmit signals to the computer. In design, we use a regular, 102 key ps/2 keyboard and connect it to our transmitter circuit. On the computers side, we connect our receiver circuit…... Lis under: Internet - Ethernet - LAN Projects 995. TV Minesweeper Using Atmel MEGA 32 Introduction For our final project, we have decided to build a minesweeper game with a microcontroller and a PS/2 mouse to be display TV. Minesweeper is a famous game that comes with the MS-Windows operating system, and the objective of the game is…... Listed under: Game - Entertainment Projects
  • 90.
    996. Vehicle PerformanceMeter Using Atmel Mega32 INTRODUCTION The DomMeter is a car performance meter that measures acceleration to compute v important to car enthusiasts. Specifically, the DomMeter calculates the 0-60mph time, 0-30mph time, 0-100mph time, quater mile, eighth mile time an time, the max acceleration during that interval, distance travelled…... Listed under: Metering - Instrument Projects, Temperature Measurement Project 997. Tetris Video Game Introduction For our 2003 ECE476 Design Project, we designed a Tetris game that was playable via a 16 button keypad and was disp a black and white television at a resolution of 128x100.� The heart of the hardware system consists of the ATMEL Mega32…... Listed under: Game - Entertainment Projects 998. Cornell Hockey Using Atmel Mega32 News April 27, 2003 The project is due for us tomorrow, since we have the Monday evening lab slot. We spent a li in the lab fixing the last few bugs, tweaking a little, and taking some pictures. We have an enclosure for the…... Listed under: Game - Entertainment Pro 999. Gray-scale Graphics: Dueling Ships A 4-bit gray-scale video system demonstrated by a multiplayer game Our project displays a 128-by-96-pixel image i gray-scale (16 intensities) by using a memory-map compression scheme. The equivalent uncompressed display would require 6-KB of memory (128 � � 4 bits/pixel = 6,144…... Listed under: Game - Entertainment Projects 1000. Laser Light Show Using Atmega32 Introduction Single sentence summary A programmable laser light show that allows the user to specify the pattern via three motor speeds and the length of time that this pattern is held. Project Summary For this project, we designed a system to guide a laser…... Lis under: Sensor - Transducer - Detector Projects 1001. Wireless Drawing Device Using Atmel Mega163 Introduction: For our final project, we want to build a wireless drawing device. The user uses a keypad mouse to draw on the TV through a wireless communication medium (RF - 433.92 MHz). The user should be able to move the drawing pointer…... Liste Internet - Ethernet - LAN Projects 1002. IntelliBOT Using Mega 32 Introduction For our final project we decided to build a robot that could navigate from one location to any given target and a obstacles in its way. The robot body used a very primitive design that included a cardboard box for the body and Minute…... Listed under: Robotics - A Projects 1003. Sheet Music Generator using Mega32 Microcontroller Introduction If you are a music buff, then our sheet music generator will be the answer to your dreams. You plug in the i of your choice and as you play the keys our system will create the sheet music that attests to your musical…... Listed under: Sound - Audio Projects 1004. Multi-Zone Fire Alarm System Using Mega32 Microprocessor Introduction We designed a multi-zone fire alarm system with a VT100-compatible user i The system is microprocessor controlled using the Mega32 microprocessor. The system communicates to the VT100-compatible user interface via a R connection. A fire is detectable by a number of fire detection devices…... Listed under: Security - Safety Projects 1005. PC-CONTROLLED SCANNING TUNNELING MICROSCOPE Using ATMega163 INTRODUCTION For our final project, we designed a scanning tunneling mic (STM) that could be used to gather information about the surface topography of metals and semiconductors at the sub-micron scale. The STM is cont from a graphical user interface running on a PC. The…... Listed under: Other Projects 1006. Tic-Tac-Toe on TV Using Atmel Mega163 Adventures in TV land             The goal of this project was to play a simple game outputted to a television via d signal generation into a composite video input of a television.  Obviously, the outputting of material to a television is the most challenging…... Listed u Game - Entertainment Projects 1007. Hard Drive Based AVR Programmer Using Mega163 The project which we are presenting is not the project we presented in our proposal. We initially p build a WWVB time-code receiver, which would demodulate a 60 kHz signal and extract an extremely precise time according to the National Institute o Standards and…... Listed under: Microcontroller Programmer Projects 1008. Autonomous Car Introduction Let us begin with one key observation: cars are cool.   From consumer transportation to manufacturing to childrens' toy in their many forms are some of today's most influential machines.   Autonomous vehicles are already in use in many manufacturing facilities, and the also…... Listed under: Car Projects
  • 91.
    1009. Safety-sensor vehicleusing Mega163 Introduction cars and vehicles have been integrated into society as one of the most efficient, easiest, accessible transportation available. But while it is a convenient and common means of transportation, it is also an incredibly dangerous mode of transport. Thou people die…... Listed under: Car Projects 1010. MP3 Player Using Atmel Mega103L Introduction Using MPEG Layer-3 compression, 40 MByte audio files have been compressed to approximately 3.5 M With the wide availability of MP3 files via the Internet, portable MP3 players have become increasingly popular. MP3 players are currently available tha either Compact Discs, SmartMedia, Compact…... Listed under: Sound - Audio Projects 1011. Digital Music Synthesizer Using Atmel 90s8515 chip Introduction: Our ECE 476 Spring 2002 final project is a musical synthesizer that mimics the sound produced by a piano and a clarinet.  We wanted to create a device that could produce different musical signals by direct digital synthesis.  Using Fourie of the signals,…... Listed under: Sound - Audio Projects 1012. The Rotating Globe Using Atmel Mega163 Introduction For years scientists and scholars alike have been plagued by one common obstacle which, until now, has proven to be i to overcome.  How do you find the country you want on a globe?  Sure, the easy answer is to just use the longitude…... Listed under: Motor Projects 1013. Spring 2002 Gmouse Using Atmel ATMEGA163 Introduction With all focus of computer technology advancement placed on processors and memory, s the most simple of components are overlooked.  This is especially the case with the mouse, a device that has changed very little since its conception b still retains its…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 1014. Laser Tag Introduction What is Snipertag? Snipertag is a variation upon the very popular ‘Lasertag’ game. In 1986, a company called Worlds of Wonder with the idea for a combat game that worked around a set of commercially produced toy laser guns and sensors. As…... Listed under: Game - Entertai Projects 1015. Fish: Video Controller Introduction: The basis of this project is to create the game fish on the Atmel board. In the game fish, the big fish eat the small fi your job is to eat the fish smaller than you while not getting eaten by those bigger…... Listed under: Game - Entertainment Projects, Video - Camera - I Projects 1016. Fertilizer Feed Rate Controller Abstract For a final project for EE 476 at Cornell University under the instruction of Bruce Land I designed and built a fe flow rate control unit tailored to the needs of Lin Davidson. Instead of conventional mechanical drive methods, the delivery rate was controlled…... Lis Home Automation Projects, Motor Projects 1017. gEECShip Introduction Sound byte For our final project, we are redesigning the classic battleship game to suit the needs of engineers. We are removin need for communication, but keeping the feel of battleship. So what are we really doing? Instead of having engineers mumble battleship…... Listed un - Entertainment Projects 1018. Final Project EKG Monitoring System Introduction Unexpected cardiac death, also known as sudden death is a frequently fatal form of arrhythmia whi more than a quarter of a million people each year in the United States. Confronted with the devastating effects of unexpected cardiac death and with pursuit…... Listed under: Medical - Health based Projects 1019. Larry Pellach and Brian Silverstein Introduction Imagine being able to monitor the status of a given room or area from anywhere in the world, at anyti today�s booming technological atmosphere, this dream doesn�t sound so far off.  However, imagine being able to do this cheaply, while not sacrific efficiency…... Listed under: Temperature Measurement Projects 1020. Analog Modem Design Project Introduction: We thought it would be interesting to try and construct a simple modem out of the ATMEL 8535. The main test some DSP theories about the effects of transmission power, noise, and modulation technique on the bit error…... Listed under: Phone Projects
  • 92.
    1021. Security EntranceSystem Overview: Our security system is a stand alone device that allows access to registered users identified by their magnetic card project, "access" is represented by a lit LED, showing how the system could be used to control an external locking mechanism.)The system includes fea Listed under: Security - Safety Projects 1022. EE476 – Final Project Hummer RC Truck Introduction: For our final project, we decided to enhance the controls of a Hummer RC truck. Our main objec to demonstrate that an Atmel microcontroller together with basic hardware building blocks can replace all of the car's original circuitry. Improving the handling…... Listed under: Car Projects 1023. EE 476 Final Project Portable MP3 Player Introduction In the recent years, the MPEG Layer III (MP3) music compression format has become an extreme popular choice for digital audio compression. Its high compression ratio, and near CD quality sound make it a logical choice for storing and distributin especially over…... Listed under: Sound - Audio Projects 1024. Autonomous Vehicle INTRODUCTION As technology develops, computers are making people's lives progressively easier and safer. Someday they will b drive automobiles, resulting in reduced deaths and accidents. We decided to make a prototype of a self controlled car. We started with a Hot Shot II…. under: Car Projects, Radio Projects 1025. Design of a REE476 Final Project: eal-Time Digital Guitar Tuner Introduction The goal of this project is to design an algorithm for a real-time digital guit and implement it using an Atmel AT90S8535 microcontroller. Each of the six strings of a guitar has a unique fundamental frequency, and our goal is to this…... Listed under: Microcontroller Programmer Projects, Sound - Audio Projects 1026. Whack-A-Cap: miniature representation of a popular amusement game Introduction: Our final project code calls for the implementation of an amusem game often bannered as "Test-Your-Strength" or less accurately (but more commonly) known as "Whack-a-Mole." Our machine is in essence a minitur version of what can be found in most theme parks across the…... Listed under: Game - Entertainment Projects 1027. CU Organizer Introduction: One of the newest and fastest growing additions to the digital age in the 1990s has been the handheld personal computer little flash memory and a good LCD, anything is possible and commercial products like the 3Com PalmPilot� and IBM Workpad� are…... Listed under Projects 1028. Automatic Etch-A-Sketch Controller Introduction For our final project, we set out to write a Controller for the classic toy, the Etch-A-Sketch. What this basically means, is that we Atmel micro controller to control two stepper motors connected to the knobs of the Etch-A-Sketch. Thus, an order…... Listed under: Microcontroller Programmer Projects 1029. EE476 Final Project Real-time Debugger By Emre Tezel & Cagdas Ozgenc Objective: To design a debugger that is capable of tracing AT90S1200 user pro while the micro-controller is attached to external peripherals. The debugger will be able to display I/O activities, and dump the values of the registers. Required: Atmel STK-200 starter kit (kit includes…... Listed under: Microcontroller Programmer Projects 1030. Clifford Systems JI1000 Car Alarm System Introduction The design philosophy behind the JI1000 is a simple, yet powerful microcontroller based mobile system. At the heart of the JI1000 is the Atmel AT90S4414 8-bit RISC microcontroller. We used the 4414 for this design because a microcontroller is we for a security…... Listed under: Car Projects, Security - Safety Projects 1031. Eye Snake Soundbyte If you ever thought you couldn�t control things with your eyes, think again � here�s the game Snake that allows 4 modes of m game play with buttons or with your eyes, using electro-ocular potential. Project Summary While brainstorming for a 476 final project…... Listed under Entertainment Projects
  • 93.
    1032. Hangman! IntroductionFor our final project, we used an Atmel AT90S8535 microprocessor to create a hangman game. The letters are displayed on a character LCD, and are input ("guessed") using a 16-button keypad. The 8 LED's on the Atmel development board are used as our "hanging…... Listed u Game - Entertainment Projects 1033. Programming the Game Simon Introduction Many of the simpler electronic games of the past decade can be easily programmed on the AVR microcon we are using this semester, using only the lights and switches available on the evaluation boards. For our final project we programmed the game Simo using…... Listed under: Game - Entertainment Projects 1034. A m -Controller Based Thermostat Using Atmel AT90S8535 microcontroller Introduction The goal of our final project was to design a thermostat using AT90S8535 microcontroller. The thermostat was to compute the current temperature once per second and then send an on/off signal to a heating dev would then regulate the temperature to…... Listed under: Temperature Measurement Projects 1035. Bar Inventory System: Drinking for Class Instead of Because of Class Introduction Project Summary Our project is an expandable bar inventory system implements wireless communication. The bar inventory system was an interesting project, because it involved both hardware and software together, are comprised of one analog designer and one computer programmer, both of…... Listed under: Arduino Programmer Projects 1036. RC Car Controller Using Atmel 4414 chip Overview: We decided to build transmitter and receiver modules for a radio-controlled (RC) car, as well as imp variable-speed motor control and a continuous steering function.  The simple speed controls included in most RC kits seldom offer more than three fo speeds and one reverse…... Listed under: Car Projects 1037. Sine Wave Synthesizer Introduction Every group wants their final project to be something that will be remembered long after they're gone. Some do h sophisticated and complex projects that entail upwards of a hundred hours to complete. Yet others go out of their way to develop something 'cool'….. under: Sound - Audio Projects 1038. Temperature and Pressure Control using the AT90S8535 Overview: This project involves the implementation of control and monitor for dual processes variables monitored are pressure and temperature. The input control is a 16 button keypad and the output is monitored in a 16 character LCD The de be widely deployed as…... Listed under: Temperature Measurement Projects 1039. Automated Juice Mixer Introduction Sound Bite The Automated Juice mixer is a juice mixing device that allows user to create desired drinks with up to different ingredients through a user friendly interface. Summary Mixing juices can be a very tedious job.  We have created a juice mixer…... Listed und Automation Projects 1040. Leonardo Arduino clone a single-sided PCB using ATmega32U4 DESCRIPTION This project is to make a clone of Arduino Leonardo in a simple way.That the distribution of the pin does not match the standard Arduino (have to make many jumpers on the motherboard or use both sides). However, most Leonardo characteristics are…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1041. Head-Controlled Keyboard And Mouse using ATmega32 Easy Input is a head-controlled keyboard and mouse input device for disabled users. The syste accelerometers to detect the user's head tilt in order to direct mouse movement on the monitor. The clicking of the mouse is activated by the user's e blinking through…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Sensor - Transducer - Detector Projects 1042. How to drive 595 shift registers with ATmega168 Driving a shift register using an AVR chip’s built-in hardware is really quite easy. Most of their offering SPI module, or Serial Peripheral Interface. A shift register is exactly that, a peripheral device that communicates via a serial line. All we need to…... Liste AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects
  • 94.
    1043. HexiLogger, anArduino based data logger using ATmega328 The purpose of this project was to create a simple, portable device that would periodicall sensor data so it could be retrieved later. The result is the HexiLogger, "hexi" because it can support up to six different sensor inputs…... Listed under: ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1044. Enhancing An FM Transmitter’s Firmware using ATmega48 This hack is about rewriting the firmware of PLL FM transmitters based on AVR microcontrollers to add more functionalities. They're commonly available on eBay from various sellers and for prices ranging from $40 to $80, depending mostly on the RF output power. If you don't….. under: AVR ATmega Projects, Radio Projects 1045. 4-key keyboard using ATtiny85 Introduction: A good while back, I made the 1-key-keyboard project. Ever since it has always been in the back of my min ATTiny microcontroller, which I used in this project, had still 3 IO ports which were unused. Only recently I’ve found the…... Listed under: AVR ATmega P Interfacing(USB - RS232 - I2c -ISP) Projects 1046. RSS Reader using ATmega8 microcontroller I spent part of an afternoon developing a hardware RSS reader (most of my time was spent on the python things). It’s pretty simple and uses an AVR microcontroller connected to a computer via a serial cable. Hardware I am using the Dragon…... Listed unde ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 1047. Virtual Archery using ATmega1284P Introduction We decided to create a virtual archery game for our ECE 4760 final project. This game consists of an ATmega1284P microcontroller, a TV for display, and multiple pieces of hardware. All of these devices communicate together to simulate a three-round archery with…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1048. Arduino – Modifying a Robot Arm using ATmega328 Essentially another tutorial involving controlling DC motors. In this post I’m going to first alter a ro had built previously from a beginners kit so that it can be controlled from Arduino. Then I’m going to write a series of posts on different…... Listed und ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Robotics - Automation Projects 1049. Honey I Shrunk The Arduino using ATmega328p As you might be able to tell from recent posts, I've been doing quite a bit of work with an Arduino. I've at least one project that I'd like to make a little more permanent, rather than it just being a bunch of…... Listed under: AVR ATmega Projects, Interfacing RS232 - I2c -ISP) Projects 1050. Homemade VGA Adapter using ATmega644 Introduction Motivation The goal of our project is to create a VGA video adapter. This “homemade video card” should be able to co any monitor that subscribes to VGA standards with a standard connector and display the desired material reliably. The challenges involved here…... Listed under: AVR ATmega How To - DIY - Projects, LCD Projects 1051. DIY Polygraph Mask using ATmega32 Introduction A polygraph (often and incorrectly called a 'lie detector') is a machine which plots in real time severa biological signals such as pulse rate, galvanic skin resistance (GSR), blood pressure, and breathing rate. This machine, in conjunction with a certified ex then…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1052. USB Sensors with ATtiny Microcontrollers Working with embedded electronics, you will eventually ends up with some sensor between your hands, her how to make a graph out of it! This project involves a light sensor, a tiny 8-pin AVR USB key with the V-USB stack, a GNU/Linux system…... Listed under ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Sensor - Transducer - Detector Projects 1053. An electronic dice using ATmega8 Abstract: Travel to outer space sounds very exciting but now we are here in our space ship and we have about 10 sq meters for 5 people. It will take another week until we reach the first space station. I took my mp3 player with…... Listed under: AVR ATmega Projects, O Projects
  • 95.
    1054. Algorithmic 8-bitworkshop using ATMega328 I was asked to give a workshop regarding sound art in Super Public Art School that is held at Titanik-galle Turku. As I have been working lately with microcontroller based sound synthesis I searched for a good topic around this area. So the idea…... Listed un ATmega Projects, Other Projects 1055. Watch controlled robot using AVR microcontroller Here is my Chronos watch controlled rover. The rover has a CC1110 minikit that receives SimpliciTI m from the watch and sends this to an Arduino (AVR) over serial. The Arduino controls the motors and the servo controlling the robot arm. I have called Listed under: AVR ATmega Projects, Robotics - Automation Projects 1056. Solar Power / Panel Inverter – Grid-Intertie Inverter using Attiny45 For the last year I've been working on a prototype for a Solar Inverter that can be G Intertied. A solar inverter takes the 12V DC (or other voltages) from the solar panels and converts it to 120V AC which is the power that most…... Listed AVR ATmega Projects, Battery Projects 1057. DigiThermo 0-100.0 °C using AT89C4051  Introduction The DigiThermo is a device designed for measuring time and temperature used in chemistry lab The circuit of Digithermo employs a 89C4051, 20-pin CMOS Microcontroller with built-in 4kB code memory. Temperature was measured by LM35D, Na Semiconductor Temperature sensor producing 10mV/°C. The CA3162, 3-digit…... Listed under: AVR ATmega Projects, Temperature Measurement Proje 1058. Clock ControllerV1.1 using AT89C2051 Builda digital clock that turns AC load on/off with preset time. sourcecode with sdcc for 8051. The Clock Controller V1.1was designed exemplary of using 'C' language to control timer0interrupt, 7-segment LED and keypad scanning. It provides 1-bit sink currentdriving output, for driving a…... Listed under: ATmega Projects, Clock Projects 1059. Night Light Saver V5.0 using AT89C2051 Introduction The Saver V5.0 runs simple clock emulation program, turns a night light on and off with preset tim 19:00 to 22:00 everyday. The design features low cost, easy installation, no battery backup and no EMI. The AT89C2051 uses external oscillator genera schmitt…... Listed under: AVR ATmega Projects, Home Automation Projects 1060. Experimenting the 2051 withC Programming using 89C2051 Learn yourself, how to write a simple program using Clanguage for the 89C2051/89C4051 source program, compile,and download the HEX code to the chip directly, connect DC adapter, seewhat happen after power up the board. No need IC circuit programmer,everything can be made…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1061. MakeYour Own Single-Side PCB for Easy-Downloader V1.1 using AT89C2051 The EasyDownloader V 1.1 , a Flash Writer for 89C2051/4051 which was d Wichit Sirichote, used  a Double-SidePCB. I think, it's difficult to make my ownPCB by myself. So that I decided to design a Single-SidePCB instead. My fi prototype board wasmade using hand-writing with…... Listed under: AVR ATmega Projects, Other Projects 1062. Easy-DownloaderV1.1 for ATMEL89C2051 Build your own a personal writer forprogramming HEX code into Flash based microcontroller AT89C2051(2k) andAT89C4051(4k). hardware and Easy use software in DOS and Windowversion. Single-side and double side PCB files included.sourcecode with sdcc version! Introduction The first version of Downloaderwas designed in 1997…... Listed under: AVR ATmega Projects, Other Projects 1063. Easy-Downloader V1.1 with SDCC using AT89C2051 Complete schematic, orcad pcb layout of Easy-Downloader V1.1 and modified firmware with sdcc. happy to use sdcc for writing firmware of my project. The compiled code is very compact and nice. After I succeeded writing a new firmware of xtimer downloader…... Listed under: AVR ATmega Projects, Other Projects 1064. AT89C2051 PROTO BOARD This single sided proto board provides an economical solution for developing and testing the projects around Atmel 20 pin controllers (89Cx051 & AVR) Figure 1 shows the circuit diagram of proto board. All port connections are available for user interface around the proto a Listed under: AVR ATmega Projects, Development Board - Kits Projects 1065. xTimer V1.0 using AT89C4051 microcontroller My wife asked me to find another timer for using in the kitchen. She got one already with analog setting needs one AA size battery. Digital setting may not easy for human interface. However I will make it for easy time setting. When…... Listed under: AVR A Projects, Clock Projects 1066. Night Light Saver V6 using AT89C2051 This new version has internal Ni-MH battery backup, reset button and simple time setting. Now the circuit board was embedded with lam Preset turn on period is from 18:00 to 22:00 everyday. You may let the saver turn on whenever you want. The period…... Listed under: AVR ATmega Projects, Home Automation
  • 96.
    1067. AT89C4051 towork as a Real time Digital clock Its a digial clock which make use of AT89C4051 to work as a Real time clock. Figure 1 shows the circuit d for the digital clock. Port 1 of the controller (AT89C4051) is used as the data lines for the LCD (starting from pin 7-…... Listed under: AVR ATmega Projec Projects 1068. xTimer with 4094 using ATMEL89C2051 microcontroller The original version of xTimer used MAX7219 for driving 7-segment. This new design uses a ch CMOS shift register, 4094 for LED interface. Each 4094 drives a 0.5" 7-segment without the need of limiting resistor. The left-hand LED is timer functio buzzer alarm output.…... Listed under: AVR ATmega Projects, Clock Projects 1069. AT89C4051 to work as a Real time clock Its a digial clock which make use of AT89C4051 to work as a Real time clock. Figure 1 shows the circuit diagram digital clock. Port 1 of the controller (AT89C4051) is used as the data lines for the LCD (starting from pin 7-…... Listed under: AVR ATmega Projects, Cloc 1070. Mathematical Manipulation of Pure Sine Wave Inverter Using Atmel 89S2051 Introduction Approach used for creating the pure sine wave described in paper is done through manipulation of mathematical representation of the original sine wave. It is done by dividing half the  sine wave into m (even n segmentations, where area under a quarter of…... Listed under: AVR ATmega Projects, PWM Projects 1071. Testing Device for DiSEqC-Switches using ATtiny13-20PI This is my first AVR-project on this page. The DiSEqC-Tester allows to test DiSEqC-switches that or 1.1 protocols. (DiSEqC-Switches with 2.0 and 2.1 protocol have backwards compatibility with 1.0 & 1.1 respectively and also may be tested). The dev second sends a…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1072. Atmel AVR Infrared Downloader using ATmega8 AVR IR Downloader is one of final assignments at Electrical Engineering Brawijaya University of Malang Indonesia. The basic idea was came from our lecturer at campus, Ir. Nanang Sulistyanto. If this project was successfully made, it will be used to progra automatic machine’s uC…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1073. Flickr images on a Nokia LCD using ATmega48 LCDs are often used in microcontroller projects. Most used are these green character displays with two rows to display menus, status or debug messages. With mass production of mobile phones, color LCDs get that cheap, that they can be used as replac Some…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects, Phone Projects 1074. USB AVR in-system Programmer using ATtiny2313 Introduction. Nowadays, USB is the most popular connection between PC and peripherals such as AVR programmers, printe scanners etc. For that reason I had to modify my old serial AVR In-System-Programmer (ISP) to work with USB connection. You can say, "use a USB to Serial adaptor to…... Liste AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Microcontroller Programmer Projects 1075. USB controlled DDS signal generator with ATmega88 A simple signal generator which produces sine waves (or any waveform really) at audio frequenc DDS and is controlled a USB serial connection. Only 2 chips are used in this circuit. The AVRATmega88 which produces the signal, and an FT232R for th interface.…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects, Radio Projects 1076. AvrUsb500 — an open source Atmel AVR Programmer using ATmega8 Why Stk500 and USB? Until the beginning of this year a simple parallel port prog was the only good programmer as it could be used for any device. All device dependent information is stored in the programmer software on your co The problem is however…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Microcontroller Programmer Projects 1077. HVProg using ATmega8535 microcontroller Compatible with AvrStudio Supports all AVR Controllers Parallel and serial High-Voltage-Programming Sma easy layout with only a few parts STK500 protocol Schematics and board layout available   Introduction The project started as an enhancement of Mar Thomas  Evertool project. He has rebuilt the AVRISP…... Listed under: AVR ATmega Projects, Development Board - Kits Projects
  • 97.
    1078. The WhereAVRusing ATmega8 microcontroller Introduction The WhereAVR is a small, lightweight, low-power, and low-cost APRS tracker with a full com of analog and digital I/O, as well as the ability to decode ax.25 packets. This allows for the reception of remote commands without the need for a "real Listed under: AVR ATmega Projects, Sound - Audio Projects 1079. Video Overlay using ATmega8 microcontroller A few years ago I set about trying to design a very cheap and simple way to superimpose flight data on being transmitted over amateur television. Specifically, the data would include things like Latitude, Longitute, and Altitude, among other text including identifier…... Listed under: AVR ATmega Projects, Video - Camera - Imaging Projects 1080. Stealth USB CapsLocker using Tiny45 microcontroller This device plugs into a USB port and implements a USB HID keyboard. Instead of doing anythin waits between 30 seconds and 8 minutes and sends the scancode for the Caps Lock key. This will toggle the Caps Lock status on or off.…... Listed unde ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1081. etherrape using ATmega644 microcontroller Project Overview short description: microcontroller with ethernet usability status: beta start: April 2006 p Atmel ATmega644 Abstract With this project, we'll be creating hard- and software for enabling ethernet on an Atmel microcontroller. fd0 first built a pr of it on lochraster and then made…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1082. AVR DDS signal generator V2.0 using ATmega16 Finally second and improved AVR DDS signal generator is here. First AVR DDS V1.0 generator was only an attempt of running D algorithm without any amplitude control. This time I still wanted to keep things simple like minimum count of widely accessible components circuit, single…... Listed under: AV Projects, Radio Projects 1083. Atmel AVR-firmware based universal USB-Interface using ATTiny2313 Scanning the web on microcontroller based USB solutions, I stumbled over Obje Development's freeware USB solution based on Atmel's  AVR architecture. I decided to build up their reference design PowerSwitch with an ATTiny231 Since I never used AVR chips before, the first challenge was…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1084. A Portable Battery-Powered Roguelike Video Game using ATmega32 I. Introduction This project is a portable battery-powered video game based on th cult classic PC game "Rogue". I designed a hardware-based roguelike video game because I am a long-time Rogue addict and thought it would be cool portable plug-and-play imitation.…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1085. Evertool using ATmega16 microcontroller Evertool is an AVRISP/STK500-protocol and JTAGICE compatible Programmer/JTAG debugger. ISP Programme compatible with Atmel AVRISP, directly accessable with AVRStudio and avrdude JTAG debugger compatible with Atmel JTAGICE, directly accessable with AVRStudio and AVaRice Evertool supports all AVR devices Atmel supports with their AVRISP and JTAGICE.…... Listed under: AVR ATmega Projects, Develo Board - Kits Projects, Microcontroller Programmer Projects 1086. The Tuxgraphics AVR NTP clock using ATmega168 The Network Time Protocol (NTP) has revolutionized the world. Suddenly one could have anywhere world accurate time and date. NTP is a simple UDP based protocol and can be implemented in a Microcontroller. Using the tuxgraphics ethernet boar LCD display we…... Listed under: AVR ATmega Projects, Clock Projects, LCD Projects 1087. Printed circuit board 'Multiuse tiny1' using ATmega8 Project overview This small PCB, which I named Multiuse tiny1 was originally designed to convert controllers to USB. Since there is not a lot of space availabe inside an SNES controller, I designed the PCB to be as small as necessary. The PCB has…... under: AVR ATmega Projects, Development Board - Kits Projects 1088. Cheap and Simple Learning Board using AT89S51 Build your own a cheap simple Microcontroller learning board S-52. The board is based on ATMEL's n chip AT89S51, AT89S52, or AT89S53. This board can be used by beginners for learning Assembly and C language programming. Single sided PCB file in Introduction I…... Listed under: AVR ATmega Projects, Development Board - Kits Projects
  • 98.
    1089. Sensor Interfacingusing ATmega8 microcontroller If you've ever tried to hook up a 3.3V sensor to a 5V micro, you know what I'm talking about - conne these two can be a problem! There are several ways in which a 3.3V device can be safely connected to a 5v microcontroller.…... Listed under: AVR ATme Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Sensor - Transducer - Detector Projects 1090. The Prototino™ using ATmega168 microcontroller What is a Prototino™?   The Prototino™ is an Arduino clone with a built in prototyping area.   Designe make a permanent version of your project once you have perfected it on a breadboard but without the expense of embedding your original Arduino i Listed under: AVR ATmega Projects, Development Board - Kits Projects 1091. How-To: Super simple serial terminal using ATMEGA128 This hack shows how to make a dumb terminal out of a keyboard, LCD screen, and an 8-bit microcontroller. From time to time, a portable dumb terminal can be handy for when you have to rescue a headless server that’s acting up or if you…. under: AVR ATmega Projects, How To - DIY - Projects, LCD Projects 1092. The Game of Life using ATtiny2313 microcontroller The reason for making this project is that I was always fascinated by Conways Game of Life. It's a g demonstration of the fact that simple things with a very simple set of rules can do wonderful things: spawn more of them, modify themselves, do…... under: AVR ATmega Projects, Game - Entertainment Projects, LCD Projects 1093. HappyJTAG2 – JTAG AND SPI AVR8 interface using ATmega32 New version released ! V2.45 (Check version list for details) This construction is based on HappyJTAG Idea, to implement JTAG interface into target avr system and debug it remotly via USB, without specific JTAGICE hardware. All job is done by softraware. HappyJTAG version is…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1094. Tetrapuzz – Tetris clone for AVR using ATmega168 This is a projected that I finished development on over a year ago and I’m just now getting around to documenting it. I wanted to program Tetris from scratch and make it modular so it could be used with different displays. Right now I know…... Listed u ATmega Projects, LCD Projects 1095. Dot Matrix Arduino Clock using ATMega168 The great adventure that is building clocks continues.  Points of interest in this build is that it was the first got to play with the dot matrix display I picked up over winter break, and it's the first time I've soldered and used…... Listed under: AVR ATmega Project Projects 1096. ATtiny breadboard headers using ATtiny2313 These tiny controller boards are build to provide a quick start for projects with 8 and 20 pin AVR microco e.g. ATtiny13, ATtiny45, ATtiny85 and ATtiny2313. They don’t include any fancy stuff, they are just as simple as possible. Where is the problem? Whenev Listed under: AVR ATmega Projects, Development Board - Kits Projects 1097. Arduino-based master clock for schools using ATmega128 If your school, or kids school, or other location relies on a central master clock that is broken, you may have a use fo device. New master clocks are available of course, but school budgets are under extreme pressures, and it really is a…... Listed under: AVR ATmega Projects, Clock Projects 1098. FabISP, a fab-able in-system programmer using ATtiny44 The FabISP is an in-system programmer for AVR microcontrollers, designed for production wi FabLab. That is, it allows you to program the microcontrollers on other boards you make, using nothing but a USB cable and 6-pin IDC to 6-pin IDC cab based on…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1099. SD/SDHC Card Interfacing with ATmega8 /32 (FAT32 implementation) Hi friends, Here is my project on interfacing of SD Card (microSD). microSD cards available very cheap nowadays, a great option for having a huge memory in any embedded system project. It is compatible with SPI bus, so the interfa easy. SD card…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Memory - Storage Projects
  • 99.
    1100. AT89LP2052 /AT89LP4052 Parallel Port Programmer Programming the AT89 LP2052/LP4052 Flash Memory, Lock Bits and User Fuses The AT 89LP2052 89LP4052  microcontroller provide two interfaces with same command format for device programming. The serial ISP Programming interface of the n 2052/4052 microcontroller needs one additional SS Signal for device programming. This SPI signal will…... Listed under: AVR ATmega Projects, Microco Programmer Projects 1101. Batwatch using ATtiny13V microcontroller Overview Batwatch is a simple monitor for a solar panel battery charger, using an Atmel ATtiny13V. It period measures the charge current and battery voltage, and shows them by blinking two LEDs. I built this circuit into the plug of a VW solar charger panel….. under: AVR ATmega Projects, Battery Projects 1102. Minimalist Arduino using ATMega328P microcontroller Overview Here at the Transistor, we love the Arduino platform, so we decided to make our own Clone. The Minimalist Arduino is designed for use in permanent or custom circuits on solderless breadboards, stripboard, or custom PCBs. It contains bare minimum parts…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1103. AVR DDS signal generator V1.0 using ATmega8 Sometimes when tuning various electronic hardware we need simple signal generator with various wav and frequency. One of the options is to by a professional with variable gain professional coating and many additional functions. But if you are an ama might want to build…... Listed under: AVR ATmega Projects, PWM Projects 1104. GSM Remote Control – GSM Module This GSM Mobile is used for our Remote Control (for example Gate Control, Temperature Control….). We use the w ‘module’ because, unlike what we did in our remote control projects, this time around the mobile phone is not mounted on a printed board, but rathe Listed under: AVR ATmega Projects, Phone Projects 1105. HUB ISP – Solving the USB-Only "Chicken or Egg" Problem using ATMEGA328P Many excellent ISP (In System Programming) designs exist for 8 bit AVR microcontrollers. Howeve require a pre-programmed microcontroller, or the "Chicken or Egg" problem: you can't program microcontrollers unless you have one already program Parallel Port or Serial Port solutions have existed, but many…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1106. Interfacing Atmel AVR with Graphics Liquid Crystal Displays using ATmega32 AVR SED1520 Library This is a C-library for avr-gcc/avr-libc to access SED1 graphics-LCDs. The modules used to develop the library only support "write to LCD", read-modify- write on the display RAM is not possible. So this Lib a "framebuffer" which holds the display-content in…... Listed under: AVR ATmega Projects, LCD Projects 1107. AVR Thermometer using AT90S2313 microcontroller Introduction I bought the LED module from BanMor' last week, just 30Baht. The moduleprovide a multiplex of 4-digit common anode LED, that's great.See the soldering pad of these signal in the 1st picture below. I thought,my friend gave me the AT chip, and with…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1108. Signal Microcontroller Simulator using AT90S8515 Introduction: The purpose of this project was to extend the Mixed Signal AVR simulator written in Fa that any single-issue microprocessor could be included in the simulation environment rather than limiting the simulations to systems based around A AT90S8515 series microcontrollers. In order…... Listed under: AVR ATmega Projects, Radio Projects 1109. Air-Mouse using ATmega32 microcontroller I. Introduction The Cornell University Airmouse Initiative is a motion sensing glove with buttons on it that p your computer to function as a mouse. Many tasks that are performed on the computer require the use of both a keyboard on the mouse, and…... Lis AVR ATmega Projects, Home Automation Projects, Sensor - Transducer - Detector Projects 1110. kaOS operating system and loader using ATmega32 Introduction We have created a real-time, multithreaded, preemptive operating system called kaO Atmel Mega32 microcontroller, which loads and executes programs from a Secure Digital or MMC card.We wrote this OS and created the SD/MMC car as a final project for Cornell's ECE…... Listed under: AVR ATmega Projects, RTOS - OS Projects 1111. RFID security system using ATmega32 microcontroller Introduction and Motivations: For our final project, we designed and built (and exhaustively test RFID-based proximity security system for use with Cornell Identification cards, which have been RFID-embedded since fall of 2003. The idea for this pr sort of spawned from our general…... Listed under: AVR ATmega Projects, RFID - NFC Projects, Security - Safety Projects
  • 100.
    1112. The ReflowSoldering Oven with LCD Display using ATmega32 Introduction Our project consists of making a reflow soldering device using a normal toaster oven with a graphic display for control and GUI. Soldering is an important and difficult task for custom printed circuit board design especially for integrated circuits that come as chip…... Listed un ATmega Projects, Home Automation Projects, LCD Projects 1113. Self-powered solar data logger using ATmega32 Introduction: My project is a self-powered solar data logger. Put out in the sunlight, it will measure the and log this to memory to be later downloaded to a computer. The system is powered by a small solar panel and battery. Summary: The…... Listed und ATmega Projects, Battery Projects, Metering - Instrument Projects 1114. Wall of Pong using ATmega32 microcontroller Wall of Pong is a fast-moving, interactive, laser-based pong game playable on any flat surface. The syste digitally controlled laser projection platform to draw a pong ball onto any flat surface. This allows for a large playing area that can be set up…... Listed AVR ATmega Projects, Game - Entertainment Projects 1115. A Wearable Wireless Sensor System using ATmega644V Introduction In this digital age, new interfaces for musical expression provide much broader m possibilities than have ever existed before. There is a constant quest to be in harmony with one’s instrument so that music can flow freely from the im and take form effortlessly.…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Sensor - Transducer - Detector Projects 1116. Design a Customizable Virtual Keyboard using ATmega32 Introduction It is becoming increasingly difficult for users to interact with the slew of portabl they carry, especially in the area of text entry. Although miniature displays and keyboards make some portable devices, such as cell phones and PDAs, amazingly small, users’ hands do…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1117. Adaptive Cancellation of Periodic 60 Hz Noise using ATmega32 An active noise canceler to eliminate the 60 Hz noise found in electrical signals due to A line contamination. 60 Hz noise is frustrating for anyone trying to make sensitive measurements of low voltage processes (eg. Electrocardiogram measurements), record audio from electrical instruments (eg. guitar…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1118. The Self-Driving Toy Car using ATmega1284 microcontroller "A car that can track its own location and calculate the direction and distance needed to ge destination given by user inputs." Elevator Pitch For our final project, we built a self-driving car that takes in inputs for a final destination and…... Listed AVR ATmega Projects, Game – Entertainment Project Ideas 1119. RFID Checkout System Design using ATmega644 microcontroller The Elevator Pitch We successfully implemented a prototype RFID checkout system th enable consumers to instantly pay for their entire purchase upon arrival at the register, increasing customer satisfaction, reducing retailer costs, and u lowering consumer prices. Summary Shopping in the present day usually…... Listed under: AVR ATmega Projects, RFID - NFC Projects 1120. Project Development Board using ATTiny2313 microcontroller This is my first time using the AVR. I like to learn using the ATTiny 2313, because it is fas circuit is very simple. The chip has only 20 pins. I was interested because I want to build a simple…... Listed under: AVR ATmega Projects, Development Kits Projects 1121. Data Acquisition System using ATmega8 Introduction We can use a PC for connecting the homemade data acquisition hardware and produce the GUI friendly graphical presentation easily. One of the project that uses Visual Basic is the Data Acquisition & Logging System using AT89C51 made by Abba In…... Listed under: AVR ATmega Projects, How To - DIY - Projects, Temperature Measurement Projects
  • 101.
    1122. ATMEL AVRATMega 8535/16/32 and ATMEL AT89S5x Family Learning Kit Both Mainboard Features Pin compatible for 40-pin AVR and AT89S5x family Microcontrollers Single sided PCB, header for 4 I/O ports, ISP port and RS-232 port Built in +5V voltage regulator LM7805 with heatsink Built in +5V and (depend on input voltage) with terminal screw…... Listed under: AVR ATmega Projects, Development Board - Kits Projects, Home Automation Projects 1123. AVR Programmer using ATTINY2313 microcontroller INTRODUCTION AVR910 is a very useful programmer. It can program almost complete range of AV The original version made by Klaus is here, http://www.mikrocontroller-projekte.de/Mikrocontroller/AVR-Prog/AVR-Programmer.html. The programme capability of AVR chips. AVR910 first appeared in AVR910 application note by ATMEL. It is one…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1124. 4×4 keypad example using AVR-GCC C language This is as simple routine how to read 4x4 keypad keys using AVR-GCC language. The keypad is connect microcontroller 8 bit port. In this example it is B port. You can change ports depending on your needs – this is only an example…... Listed under: AVR A Projects, How To - DIY - Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1125. Servo motor control using Atmega8 microcontroller Servo motors are so called “closed feedback” systems. This means that motor comes with control which senses if motor mechanism is in desired location and if not it continuously corrects an error until motor reaches proper point. Servo motors are used in robotics,…... Listed under: AVR ATmega Projects, Motor Projects 1126. AVR LCD menu routine using ATmega8 microcontroller Lets have some practice and write simple AVR LCD menu routine. For this we need to write LCD library. I decided not to use one from AVRLIB. LCD controlling isn't difficult just a few lines of code unless you want to make it more…... Listed under: AV ATmega Projects, LCD Projects 1127. Simplified AVR LCD routines using ATmega8 microcontroller Controlling numeric LCD isn't so tricky as it may look like. O course you can find numbers libraries. One of more universal you can find in AVRLIB library for WinAVR AVR GCC compiler. Main disadvantage of such universal libraries that they c all…... Listed under: AVR ATmega Projects, LCD Projects 1128. Measuring motor speed and display result on LCD using ATmega8 microcontroller For measuring motos speed there can Optical interrupter used like LED and photo-transistor is coupled in to plastic housing. The gap between then allows interrupting signal with opaque material and this way switchin output from ON to…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects, Motor Projects 1129. AVR-GCC 4 bit and 8 bit LCD library using ATmega8 microcontroller Standard alphanumeric LCD display controlled by 74HC164 LCD controller can acce data bytes or 4 bit nibbles. Earlier my 4 bit and 8 bit LCD libraries were split in separate files as they were used in different projects. Now they are mer Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 1130. Output number when button is pressed using Atmega16 microcontroller This is simple demo program of reading button state, lighting LEDs, sending information via USART. 8 buttons are connected to Atmega16 port A, 8 LEDs to port B via current limiting resistors. While none of buttons arent presse running light on LEDs performed,…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1131. Simple signal drawing on graphical LCD routines using Atmega8 microcontroller During spare time I have been playing with graphical LCD. This time I display simple signals that are stored in microcontroller memory. The idea was to read signal values from look-up table and display waveform on Grap To make things more interesting…... Listed under: AVR ATmega Projects, LCD Projects 1132. Programming AVR ADC module with WinAVR using Atmega8 microcontroller Most of AVR microcontrollers have Analog to Digital Converter (ADC) integ to chip. Such solution makes embedded designers life much easier when creating projects and programming them. With no need external ADC PCB ta space, easier to create programs – it saves time…... Listed under: AVR ATmega Projects, How To - DIY - Projects, Interfacing(USB - RS232 - I2c -ISP) Proje Sensor - Transducer - Detector Projects
  • 102.
    1133. Running TX433and RX433 RF modules with AVR microcontrollers using Atmega8 Sometimes in embedded design you may want to go wireless. Might will want to log various readings of remotely placed sensors, or simply build a remote control for robot or car alarm system. Radio communications be two AVR microcontrollers can be easy when…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Radio Projects 1134. Interfacing rotary encoder to Atmega32 Recently I was working on a project that involved rotary encoder. I thought I'd share some thoughts on how rotary encoder can be inte and programmed. Actually it is easy to work with rotary encoders - interfacing is simple – only three wires are required…... Listed under: AVR ATmega Projects, Interfacing(USB I2c -ISP) Projects 1135. Temperature sensor with time and date display on graphical LCD using Atmega32 Some time ago I've build a prototyping board with graphical LCD. It served for various small projects and prototypes. Had a spare temperature sensor DS18B20 and decided to put simple temperature display project. G board is equipped with Atmega32 microcontroller running at 16MHz. DS18B20…... Listed under: AVR ATmega Projects, LCD Projects, Sensor - Transduc Detector Projects 1136. AVR-GCC LCD library – mixed pin support using Atmega328P Some time ago we have posted alphanumeric AVR-GCC LCD library. It works fine in 8-bit a modes. But it has some limitations that some people may find annoying. One of them is requirement that LCD pins has to be byte aligned for instance Listed under: AVR ATmega Projects, LCD Projects 1137. Led Blink Code – Hello World Led using atmega16 in C Configuring the microcontroller before running it the first time: Fuse bytes : high and low Progra once before you start using the micro-controller Disable JTAG to free up PORTC for normal use Set the correct clock clock option With the hardware se run…... Listed under: LED Projects 1138. Remote Control based Robot using C language Concept The customer’s demands were to develop and build a kit, consisting of a small mechatronic sy educational concept. In particular, he asked for a driverless robot for training purposes abroad. The idea behind this is that our customer needs a kit f sending…... Listed under: Game - Entertainment Projects, Robotics - Automation Projects 1139. On/Off Controller – Interfacing Touch LCD LC7981 using ATMega Microcontroller Concept of Touch LCD LC7981 using ATMega An on-off controller is th simplest form of a temperature control device. The output from the device is either on or off, with no middle state. An on-off controller will switch the only when the temperature crosses the…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 1140. Multichannel USB Analog Sensor using ATMega48 Microcontroller Sometimes it’s tempting to re-invent the wheel to make a device function exactly the want. I am re-visiting the field of homemade electrophysiology equipment, and although I’ve already published a home made electocardiograph (ECG) revisit that project and make it much…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Sensor - Transducer - Detector Projects 1141. Door Chime Privacy Sentry using Attiny12 An ATtiny12 controller as a timer and some switching circuitry turns the doorbell off for 10 hours at the same time each day. The stri resistors across the top of the board are series connected to make a 728 Ohm 2 watt resistor. The…... Listed under: Home Automation Projects, Security - Safety Projects
  • 103.
    1142. DIY USBpassword generator using ATtiny Microcontroller Having done half a dozen V-USB tutorials I decided it’s time to whip up something cool. As U keyboards were an area untouched, I decided to make a small USB HID keyboard device that types a password stored in EEPROM every time it’s attach Listed under: How To - DIY - Projects 1143. Barker Code-Locked Loop Synchronous Demodulator using ATtiny2313 microcontroller A simple, low component count phase locked loop that locks o detects the amplitude of an incoming baseband 7 bit Barker code using a switched resistor demodulator that is driven directly by a microcontroller's o pins. • Balanced modulators using resistors and a microcontroller's…... Listed under: Other Projects 1144. Prime Calculator is Complete using ATMega8 Microcontroller My microcontroller-powered prime number generator/calculator is virtually complete! Al I’m planning on improving the software (better menus, the addition of sound, and implementation of a more efficient algorithm) and hardware (a bett enclosure would be nice, battery/DC wall power, and a few LEDs on the…... Listed under: Calculator Projects 1145. LED Dog Collar using ATTINY2313 Microcontroller LED Dog Collar So this is a pretty simple project, but I thought it was a clever idea. I have 2 dogs, a la lab mix. The lab "Sunshine" likes to runaway a lot if we let her outside at all. She always…... Listed under: LED Projects 1146. Making a USB based AVR Programmer using ATMEGA8 Microcontroller Around time when I was beginning to learn about microcontrollers I had excha laptop with a senior at college for his desktop - that's because the only way I knew how to program an ATMEGA chip was through either a serial port o Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Microcontroller Programmer Projects 1147. BUILD A SIMPLE SERIAL PROGRAMMER FOR AVR DEVICES using ATtiny2313 Microcontroller Atmel described a simple programmer based on the AT90S (NOT the AT90S1200A) controller in their application note, AVR910 (a modification to use the AT90S2313 is also given below).The circuit is so small and was able to put two of them together without using…... Listed under: Microcontroller Programmer Projects 1148. LED DOT Matrix Pong using ATMega16 Microcontroller The classic pong game. Two players. Press the buttons to move paddles up/down. Ball bounces forth. If you fail to catch it, your opponent gets one point. Score difference is showed with blue LEDs. Blue LED = lead by one point. If you…... Listed un Projects 1149. How to control Stepper Motor using AT89C51 Microcontroller As explained in earlier article, Stepper motor is operated by energizing the stator coils in an ordered sequence. W input sequence of signal is applied to the motor leads, it starts rotating in steps. AT89C51 microcontroller has a current rating of 50mA. It can…... Liste How To - DIY - Projects, Motor Projects 1150. LED Menorah using ATtiny13 microcontroller Last week on hack-a-day I saw their post on an LED Menorah that was powered by a 9v battery with the l controlled by dip switches. I thought to myself, “gee, that’s not a very creative design”. There was redemption in the minimalist designs linked…... Liste LED Projects 1151. PS/2 to C64 Mouse Adapter using ATmega8 microcontroller A pixel artist friend of mine wanted a mouse to try his skills on a real C64. I thought I could by making an adapter that would allow a regular PS/2 mouse to be used with a Commodore 64. The most popular and…... Listed under: Development Kits Projects 1152. MP3 Player using ATMega128 microcontroller History I decided to do this project for several reasons: first I like music, second I have a huge collection and third I wanted to be able to play them anytime in my living room. I began the project with one major restriction,…... Listed under: Interfacing(USB I2c -ISP) Projects, Sound - Audio Projects 1153. How to drive 595 shift registers with AVR hardware SPI using ATmega168 microcontroller Driving a shift register using an AVR chip’s built-in hardware i quite easy. Most of their offerings have an SPI module, or Serial Peripheral Interface. A shift register is exactly that, a peripheral device that communic serial line. All we need to…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1154. ATtiny12 fuse restorer using microcontroller This restores the fuses in an ATtiny12 via High Voltage Serial Programming. Plug an ATtiny12 into the 8 pin and hold down "GO!" button. The LED will come on at the end of the programming process, which only takes a couple hundred millisecond. The…... Lis under: AVR ATmega Projects
  • 104.
    1155. LED MatrixDisplay using TD62783 microcontroller Last Sunday I gave a workshop in TOG as part of it’s Engineers Week 2011 activities. We spent the d assembling a 8×8 Red/Green LED Matrix Display circuit which I designed in strip board. The circuit forms an interface between a micro controller and a Listed under: LED Projects 1156. 3 channel, 8 bit EEPROM DAC with DS interface using ATtiny12 microcontroller •Low power •EEPROM memory for autonomous operation, 16 bytes ava general purpose use. •Low cost This device provides three channels of 8 bit pulse-width modulation. Output pulse duty cycle ranges from 0 to 255/256 steps. DACs may be loaded by the DS…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 1157. AvrPhone using ATmega128 microcontroller AvrPhone is a simple mobile phone with touchscreen. His brain is AVR ATmega128 microcontroller (128 kB flash, 4 kB SRAM) and u interface, the 2.4 "LCD display with touch foil and ILI9325B controller, equipped with a 16-bit bus. The communication with the old GSM module…... Lis under: Phone Projects 1158. Real Time Clock/Calendar/Alarm with Interpreter for battery backed-up and battery powered operation with DS interface using ATtiny12 Based on the ATtiny12L-4PI microcontroller -A real Time Clock/Calendar for less than US$1.50 in moderate quantity.   This is the timekeeping test circuit. It includes transistor circuit to switch in the 5V power supply when present and drop back to the 3v battery…... Listed under: Battery Projects, Clock Projects 1159. DS interface test tool using ATtiny2313 microcontroller The DS protocol was designed to provide firmware-based bidirectional host-to-slave inter proc communications for situations in which no hardware solution is available and the host and/or the slave in incapable of tending the interface in real tim only specialized hardware required is two bidirectional…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 1160. Audio Spectrum Monitor using S1D15200 microcontroller This is an evaluation use of a small graphics LCD module. Last summer, SG12232C graphic L module has been sold sold for 1500 Yens from Akizuki Denshi and I bought it. However I could not find good application for the LCD module and it wa Listed under: Sound - Audio Projects 1161. Minimum Mass Waveform Capture using AVR microcontroller Capturing repetitive waveforms at 1 million samples per second using PWM and a comp Download AVR Studio Source wfcao 030326 .asm The impetus for developing this technique came from my own need to capture repetitive waveforms least expensive and lowest part-count means possible.…... Listed under: Metering - Instrument Projects 1162. AVR mod player using ATmega325 microcontroller In 2006, I took part in an electronic demo competition on a Dutch forum (see this topic). Because co demos like they used to have on old machines like the Amiga or Commodore are harldy made anymore since hardware has come such a long way,….. under: Sound - Audio Projects 1163. Longboard Wheel Display using AVR microcontroller If you're a resident of Seattle, I highly recommend you check out the Bubble events group. One of regular events over the summer is something called "Nocturnal Push" where you can get decked out in your best glow gear and cruise the Alki Beach… under: LED Projects 1164. AttoBasic HOME using Atmega168 microcontroller This is the central location for resource for all versions of AttoBasic for Atmel AVR controllers and A computers Devices directly supported include ATMEGA328, ATMEGA168, ATMEGA88M, ATMEGA32U4, ATMEGA32, ATMEGA163, ATMEGA8515, ATTINY2 AT90S8515,  AND AT90S2313   Versions of AttoBasic run on several AVR controllers with 2K…... Listed under: Home Automation Projects 1165. A Superhet/Direct Conversion AM receiver for 181.818 kHz using Attiny2313 Downloads Download the AVRStudio assembly source  vlflo13041105A.as format) Download the AVRStudio Hex file vlflo13041105A.hex (html format) Photo of completed receiver. Its pocket sized, but not intended to be used because the antenna is a highly directional ferrite loopstick. Its only a matter…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects, Sound - Aud 1166. 1750 Meter Lowfer Band amplitude modulated RF source using ATtiny2313 microcontroller Download the firmware: mor040220BBeacon.asm [caption align="aligncenter" width="389"] The oscillator board is not much more than the 74HC4060 oscillator/divider. The crystal is in a socket. made by cuttin an IC socket.[/caption] This is a low power signal source I put together one evening to…... Listed under: Metering - Instrument Projects
  • 105.
    1167. Frequency Meterwith 100 MHz RF desktop channel using ATtiny2313 microcontroller This basically the frequency meter section of the frequency mete generator based on the AT90S2313 described elsewhere on this site, combined with the 100 MHz RF interface described in the page about the RS-232 MHz RF desktop channel adapter. Built and align this…... Listed under: Metering - Instrument Projects 1168. RS-232 to 100 MHz RF desktop channel adapter using ATtiny2313 microcontroller Downloads AVR Studio assembler source code 2jun2002version.asm Studio hex file 232lin.hex This is an adapter that allows a terminal to communicate via a 100 MHz data channel with peripherals on the same desk top Keystrokes from the terminal are are received through the RS-232…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 1169. Low cost RF for simple data link and remote control using ATtiny12 microcontroller Wireless data links don't have to be difficult to build or adjust They built quickly using inexpensive and readily available parts. Overview This is a simple, low cost RF data link that can send data reliably over a distance o two…... Listed under: Interfacing(USB - RS232 - I2c -ISP) Projects 1170. Minimum Mass Wireless LCD Display using ATtiny2313 microcontroller A 2 line X 16 character LCD display that is battery operated and works without external connection. The basic MinThe basic Minimum Mass Wireless Coupler technology is described and links to other projects on this site that use Minimum Mass Wireless Coupler are…... Listed under: Internet - Ethernet - LAN Projects, LCD Projects 1171. A Low Power PLL FM Transmitter using LMX1601 and ATtiny2313 microcontroller An LMX1601 Phase locked loop, a discreet  FET VCO, and an AVR micr controller combine to make a stable, easy to use monophonic FM transmitter that includes a an audio activated switch that turns the transmitter on o its being used. Notice: Before operating…... Listed under: Radio Projects 1172. A Simple FM Stereo Transmitter using ATTINY12 microcontroller The parts to the right of the green capacitor are the FM radio transmitter. The parts b the 8 pin DIP and the transmitter are the resistor matrix. One capacitor, C5, is mounted on the back of the board, and one other capacitor, C11, had…. under: Radio Projects 1173. DIY mobile phone – Create your own mobile phone This DIY cell phone created at MIT manages to have something for just about every major contem subculture or hipster subset I can think of. Nerds and tinkerers? Check. Wooden case for the steampunk set? Check. Huge antenna for the retro, skinn wearing set? Check. Big…... Listed under: How To - DIY - Projects, Phone Projects 1174. Are you being spied – A Simple Field Strength Indicator (field strength meter) This project is a broadband field strength sensing probe that has a 15cm It is able to detect radio energy and read the output on a common multimeter millivolts scale. It can be used to test 4MHz, 35 MHz, 55 MHz, 100 MHz, …... Listed under: Blog, Circuits 1175. What is a stun gun – How to Make Stun Gun What is Stun Gun An electroshock weapon is an incapacitant weapon used for incapacitating a person by administering electric shock aimed at disrupting superficial muscle functions. One type is a conductive energy device (CED) fires projectiles that admin shock through a thin, flexible wire. Other electroshock weapons such as stun guns, stun batons,…... Listed under: Blog, Circuits 1176. How a Microwave oven works? Bill details how a microwave oven heats food. He describes how the microwave vacuum tube, called a magnetron, gene radio frequencies that cause the water in food to rotate back and forth. [caption id="attachment_8043" align="aligncenter" width="563"] microwave in structure[/caption] He shows the standing wave inside…... Listed under: Blog, Circuits 1177. Multifunction 330 MHz Remote Control With an ATTINY2313 Simulating the PT2264 Encoder This 330 MHz remote control sends timed sequences of c pulses to accomplish complicated tasks. You can probably tell that I used a lot of solder flux on this board. Lots of flux not only helps the solder wet to copper, but it also…... Listed under: AVR ATmega Projects, Radio Projects
  • 106.
    1178. Circuit andfirmware to support Seiko-Epson G1216B1N000 dot graphics display using ATtiny2313 A serial interface and bias supply for the Seiko-Epso G1216N000 using an AT90S2313 because there just aren't enough applications examples for this display on the web. Download Assembler source cod looking for an LCD display that I could use to display waveforms on…... Listed under: AVR ATmega Projects, LCD Projects 1179. A serial interface for the Truly MTC-C162DPLY-2N using ATmega8515 The 10k potentiometer, just above the ISP connector near the lower middle of th used to adjust the display contrast according to your vertical viewing angle. DOWNLOADS ATTINY2313/AT90S2313 AVRStudio assembler source, LDCbutons040904Ca.htm ATTINY2313/AT90S2313 AVRStudio assembler source, UPDATED FOR COMPATIBILITY WITH NEWER VERSIONS OF THE…... Lis AVR ATmega Projects, LCD Projects 1180. Simplest LED Flasher Circuit As simple as it gets and still works This LED flasher occurred to me while reading about negative resistance in transistors. reported that Leona Esaki, who was at Sony at the time, had been surprised to see a negative resistance region while investigating…... Listed under: AV Projects, LED Projects 1181. A 1.5 Volt, 1970's Style LED Flashing Red Caboose Marker Light using tiny microcontroller A circuit that drives a red LED from a 1.5 volt battery and simulates an incandescent l cycle can be changed by selecting resistor values. Photo 1. This printed circuit board is 3 cm long. The first prototype was made with through hole parts.…... Listed under: AVR A Projects, LED Projects 1182. White LED Stroboscope Finally, white LED's are bright enough to use in a practical stroboscope. This circuit can operate as a bench-top stroboscope th conjunction with an oscilloscope or frequency meter and bench top power supply can accurately measure rotational speeds, or it can be operated han held…... Listed under: AVR ATmega Projects, LED Projects 1183. White LED Battery Powered Power Failure Light Overview Where I live most of the time, the AC power drops out upon occasion. This used to leave me around in the dark for a flashlight. I could have bought a battery-backed up "emergency light" for about US$35, but being basically metal boxes…... Lis AVR ATmega Projects, Battery Projects, LED Projects 1184. Atmega8 Pinout Diagram ATmega8 is an atmel's low-power 8-bit AVR RISC-based microcontroller combines 8KB of programmable flash memory, 1KB o 512K EEPROM, and a 6 or 8 channel 10-bit A/D converter. The device supports throughput of 16 MIPS at 16 MHz and operates between 2.7-5.5 volts. [ id="attachment_7971"…... Listed under: Blog, Circuits 1185. SKL14 -1A Schottky diode will fit everywhere SKL14 can be used in switch-mode power supplies or as protection diodes and thanks their really miniatu dimensions, they are also suitable at the lack of PCB space.  SMT Technologies enable a substantial increase of current density thanks to a very good h transfer from…... Listed under: Blog, Circuits, News 1186. A White LED Night Light Design BUT FIRST AN IMPORTANT NOTE: This project uses lethal voltages.  If you are not experienced in working with lethal vo read this project, but don't build it. You only have one life, and AC power can take it from you very quickly, or leave you…... Listed under: AVR ATmega P Home Automation Projects, LED Projects 1187. Series Connected Voltage Boost Circuit for a Battery Operated LED Lantern Photo. This is the test circuit -the basic driver is only two transistors, two re the circuit was evaluated using a white LED, but when it was time to button it up and archive it, I replaced the expensive white LED with a cheap green under: AVR ATmega Projects, Battery Projects, LED Projects
  • 107.
    1188. FAST PRECISIONLED DRIVER What it is The circuit allows a precision regulated drive current to be set to drive an LED, and in response to a TTL level sig LED is switched on and off with rise and fall times of less than 500 nanoseconds and less…... Listed under: AVR ATmega Projects, LED Projects 1189. Remote Controlled (R/C) Airplane LED Flasher using ATTINY12 microcontroller Downloads Download the AVRStudio assembly source for the program: AVRStudio assembly source for the include file: T12astrobe081028A.hex Find updates at www.projects.cappels.org Overview This was designed to flas LEDs to be mounted on the wing tips of a Parkzone Citabria…... Listed under: AVR ATmega Projects, LED Projects, Radio Projects 1190. Single and Two Cell White LED Drivers Without Inductors Three inductor-free circuits that allow a white LED or UV LED to be driven from one (1.5 volt) flashlight cells (3 volts total) are described. The circuits on this page are: The two cell (3 volt) circuit four transistors. The simple single cell…... Listed un ATmega Projects, Battery Projects, LED Projects 1191. 1 Watt White LED Power Supply Circuit for battery operation Download FreePC project file, gerber and png copper and silk-screen: 1wattledbuck.zip Introduction I have some 1 watt warm white LEDs left over from a project and the application for them was obvious: A better battery operated lamp fo when the power fails, which it does…... Listed under: AVR ATmega Projects, Battery Projects, LED Projects 1192. Attention-Getting Auxiliary Warning Light Flasher/Driver Overview The circuit shown in Figure 1 is capable of driving an LED array requiring up to seve with a burst of flashes before coming on until power is removed. It is intended to be used as an auxiliary warning light driver. The initial…... Listed und ATmega Projects, LED Projects, Security - Safety Projects 1193. White LED Drive Circuit using Tiny microcontroller Be Careful About Peak Current A note of caution: These LEDs are comparatively expensive, so I sugg putting a small resistor (1 to 10 Ohms) in series with the cathode of the LED and measuring the peak current as inferred from the IR drop using…... Lis AVR ATmega Projects, LED Projects 1194. Low Capacitance Scope Probe Adapter An adapter to allow low capacitance probing of high frequency circuits. Overview My boss, Dave, said "Just hold probe close to the cathode lead." Dave had worked at Tektronix for many years, and his ability to make difficult measurements was second only to his under: AVR ATmega Projects, Metering - Instrument Projects 1195. AC Current Probe for Oscilloscopes Overview I needed several current probes when designing the deflection circuits and high voltage supply for a com display monitor, and the lab in which I was consulting only had one current probe, which I shared with the other four engineers on the project.  We….. under: AVR ATmega Projects, Metering - Instrument Projects 1196. A Portable Precision Voltage Reference using microcontroller Introduction It has been said that a man with one watch knows what time it is, but a man with two watches is nev The same can be said for a person who has more than one voltmeter.  In my situation, I have several…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1197. Simple LM335 Thermometer using microcontroller Not too many parts. When a voltmeter is connected across the outside terminals of the output con display reads out in degrees C. I've been fascinated by the LM335 for some time -maybe my obsession with stability finally gave way to my fascination Listed under: AVR ATmega Projects, Metering - Instrument Projects
  • 108.
    1198. Minimum MassWaveform Capture and Display using AT90S2313 microcontroller A 128 x 64 graphic LCD is in the clear plastic box at the top. It is conn the waveform capture and control unit in the green pencil box below the display.   Downloads AVR Studio 3.5  ASSEMBLY SOURCE for the waveform ca controller.…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1199. Broadband RF Field Strength Probe using Atmel AT90S1200A AVR controller Download auto-zero assembly code This broadband probe has a small an (about a 15 cm length of insulated wire). Radio Frequency energy coupled to the antenna is detected and made available to drive millivolt level signals input of a DVM (Digital Volt Meter).…... Listed under: AVR ATmega Projects, Radio Projects 1200. A Field Strength Meter Using A Biased Schottky Detector using microcontroller Downloads Download the Download FreePC files in and the detector bo layout png file in zipped forma: schottkydedtector080309 Find updates at www.projects.cappels.org Starting to do a little work at 330 MHz, I decided t existing field strength meters were not adequate for for my…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1201. Precision Audio Frequency Peak Detecting Probe using microcontroller This is a handy companion for a digital voltmeter. Its allowed me to do a lot of used to use my oscilloscope for, and in addition it measures voltages to much greater precision.Using an LM324 quad op amp, this peak detector prov …... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1202. Cellphone Operated Robot using ATmega16 AVR microcontroller This Instructible is entered in the Category: 13 - 18 of the National Robotics Week Rob Contest MY URL-http://avadhutelectronics.blogspot.com/ MY Email-avadhut.deshmukh@gmail.com   Video :Cellphone Operated Robot Step 1 Compo Required   Component Required: IC1 - MT8870 DTMF decoder IC2 - ATmega16 AVR microcontroller IC3 -…... Listed under: AVR ATmega Projects, Phone Robotics - Automation Projects 1203. HF AC Millivoltmeter Adapter using microcontroller Encased in a pencil box to keep the point-to-point wiring on the back of the board from shorting to and things on the workbench, the plastic case also holds the offset and gain post as well as the input connector and the switches that…... Listed under ATmega Projects, Metering - Instrument Projects 1204. PHduino pH Meter Using Arduino About This project describes an open software open hardware pH meter using an Arduino/Freeduino board. In othe this is an electronic circuit to be connected with a glass electrode pH sensor. It was possible by the idea from my friend Mr. Denis Vidal, the…... Listed AVR ATmega Projects, Metering - Instrument Projects 1205. A Microcontroller Based Digital Lock-In Milliohmmeter using ATtiny2313 microcontroller Download: assembler source mhm031002A.asm A milliohmmeter is just the tool for c trace resistance on a printed circuit board, tracking down shorted traces, and measuring the contact resistance of a switch or connector. Its the kind o would come in real handy occasionally,…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1206. Dutchtronix AVR Oscilloscope Clock using Atmega328 microcontroller Hardware features:   Connects to your analog scope in X-Y mode using BNC cab probes (1x, 10x) Uses the Atmel AVR Atmega328p with 32KB flashmemory On board 5V power regulator for use with user provided wall adapter (8-15V center positive) Power plug (5.5mm…... Listed under: AVR ATmega Projects, Clock Projects 1207. I2C Tiny USB using ATtiny45 microcontroller Attach any I2C client chip (thermo sensors, AD converter, displays, relais driver, ...) to your PC via USB ... q and cheap! Drivers for Linux, Windows and MacOS available. The i2c-tiny-usb project is an open source/open hardware project. The goal of i2c-tiny-us Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1208. TRUE RMS-TO-DC Adapter For DVM using microcontroller Specifications Input: AC, DC or AC+ DC to > 10 KHz Ranges: 200 mv, 2V, 20V, 200V, 600V full s Accuracy: ±1%, depending on divider resistor selection Crest Factor: 1 to 3, up to 5 with degraded accuracy Input impedance: 1 Megohm shunted by 2 Listed under: AVR ATmega Projects, Metering - Instrument Projects 1209. MMC/SD/SDHC AVR Interface using ATMega8 microcontroller MMC/SD/SDHC card library This project provides a general purpose library which implem and write support for MMC, SD and SDHC memory cards. It includes low-level MMC, SD and SDHC read/write routines partition table support a simple FAT16/FAT32 read/write implementation The circuit The circuit which…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects - Storage Projects, Security - Safety Projects 1210. A Pretty Good Wattmeter For Bench Use using microcontroller Briefly, • AC True Watts using two quadrant multiplier • Optimized for 120 VAC (can be changed) • 15 watt full sca changed) • Uses DVM floating on AC Neutral as display • Requires moderately high level of analog circuit skill • Very…... Listed under: AVR ATmega Projects, Metering - Instrume
  • 109.
    1211. RS-232 Freq.Meter/Pulse Generator Based on Atmel ATtiny2313 using microcontroller Simplicity in circuitry was the design direction. Zero mass (firmw with no physical components) would the ultimate achievement. This instrument doesn't have any front panel controls because the user interacts via a terminal program at 9600 baud. I needed a frequency meter for…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1212. Analog audio panel for PC using ATMega328 microcontroller Have you ever struggled with audio settings in control panel in middle of a VoIP call? Or, wondered if the other gu you properly? I have. My work requires great deal of remote conference calls using PC. The first thing I wonder always…... Listed under: AVR ATmega Projects, Sound - Audio Pr 1213. Preamp and 330 + MHz Prescaler for A Little More Serious Frequency Meter using microcontroller A preamp that drives the CMOS counter input and a 10 prescaler to extend the range of A Little More Serious Frequency Meter(elsehwhere on www.projects.cappels.org). (Above) Enclosed in a 16 cm x 16 plastic box, the preamp has a 60 cm cable…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1214. A Little More Serious Frequency Meter using ATtiny2313 microcontroller This is design for a frequency meter based on AVR microcontrollers. Maximum frequency is specified to be 30 MHz in the multi-chip configuration, and in single-chip configuration, there are both 5 MHz and 10 Mhz versions operat 10 and 20 MHz crystals, respectively.…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1215. HF/VHF/UHF TEST OSCILLATOR using microcontroller Its built into a plastic project box with an aluminum cover (on the bottom). The controls are as fo Large golden knob is coarse tuning, small black knob with a blue index stripe is fine tuning, the green LED is the power on indicator, the…... Listed und ATmega Projects, Metering - Instrument Projects 1216. RF Inductance Meter using microcontroller I needed a way to measure hand-wound RF inductors in my second lab, and since I would only be doing th occasionally, I didn't need anything fancy, and since once a friend finishes his AT90S1200-based design, I plan to make one myself, I figured I'd…... Liste AVR ATmega Projects, Metering - Instrument Projects 1217. LC Determination by Resonant Frequency Measurement using microcontroller A well known L/C measurement circuit is pressed into service to make a bones measurement circuit. Download the AVRStudio assembly source: lgm031227I.asm Download the AVRStudio hex file: lgm031227.hex Left-to-righ volt regulator, the LM393 oscillator (a 0.047 uf capacitor is mounted on the…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1218. Battery Checker Circuits using microcontroller The "Battery Good" checker. When the button is pressed, the green LED will glow if the battery voltage is above the preset thresh version has a higher parts count than the "Battery Low" version, but a bonus is that it can drive an LED…... Listed under: AVR ATmega Projects, Battery Projects 1219. A 1 Khz Digital Sine Wave Signal Source using ATmega8515 microcontroller • 1 Khz From a Quartz Crystal • 1 V P-P Sine Wave Calibrated Output • 1 KHz Wave Output • 900 mv Inverted Sine Wave Output (Uncalibrated) Downloads Download the WINAVR main source for the 2313 version of the firmware 2313sine.c Download the…... Listed under: AVR ATmega Projects, PWM Projects
  • 110.
    1220. A NoiseGenerator per IEC 268-1, IEC 268-5, and IEC 268-7 A related article on this site: True RMS-To-DC Adaptor for DVM Introduction This project cam when I needed to perform some reliability tests on some headphones according to IEC 268-7. The test requires operating the headphones at their rate power for a number…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1221. MAX038-Based Sweep/Function Generator With Markers using AVR ATtiny2313 microcontroller Take Maxim's MAX038 function generator chip, add so and you have a pretty nice tool for the bench. Downloads: Main Circuit Schematic Power Supply Schematic You can build this with switches instead of you don't want to use a micro controller. Here…... Listed under: AVR ATmega Projects, PWM Projects 1222. An Isolated Adjustable Auto transformer using microcontroller This is a means of testing AC mains operated circuits at variable AC voltages, and it also isolation to allow safe measurements of that circuit.   A fused isolation transformer and a variable auto transformer connected together in a grounded box. What…... Listed under: AVR ATmega Projects, Home Automation Projects 1223. A 10 Bit LED Digital Panel Meter With Auto Ranging Based On The ATMEGA8 Downloads Download the AVRStudio assembly source for the program: M8DPM091109A.asm Download the AVRStudio hex file: M8DPM091109A.hex Find updates at www.projects.cappels.org Overview - A 10 bit digital pan for positive voltage only. - Input resistance: about 130k - Ranges: 0 to 10.20 volts and 0…... Listed under: AVR ATmega Projects, LED Projects, Metering - Instrument Projects 1224. Photocell Amplifier using microcontroller This is a low frequency amplifier with an adjustable transimpedance that is intended to be used to take relat measurements of a wide range of photo currents. Not having many parts, this amplifier can be put together in a short amount of time. Find updates… under: AVR ATmega Projects, Solar energy projects 1225. A SIMPLE MANUAL CURVE TRACER using microcontroller Measure current vs voltage or voltage vs current over limited range with good accuracy   This was built on a phenolic which was mounted on a plastic box. The box serves two purposes: It holds the circuit off the workbench, and it makes a…... Listed under: AVR ATmega Metering - Instrument Projects 1226. A Pretty Good LC Meter Based on the AVR using ATTINY2313 Microcontroller Calculates and displays L and C from oscillation frequency using referenc components. No relays, no range switching, a minimum of controls. And it is pretty accurate too! Note: After reading this article, check out the improve modified An Even Better LC Meter... The 2 line…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1227. An Even Better LC Meter Based on the AVR ATTINY861 An improvement over "A Pretty Good LC Meter."  Enhanced capacitance self calibration, accurat operation without precision components, and only one micro controller. Downloads Download or view the WINAVR main source file: lcm.c Download t complete package including the LCD library: Even-Better_LCM.zip (LCD Library provided with…... Listed under: AVR ATmega Projects 1228. GSM GPS module shield for Arduino Shield for Arduino designed and based on the module GSM/GPRS SIM900 or the GSM/GPRS & GPS module SIM90 make calls, voice and data connections via GPRS  allow maximum customization and provide many configurations. With a microphone and a headset w mm jack (just the standard…... Listed under: AVR ATmega Projects, GPS Based Projects
  • 111.
    1229. Interfacing DRAMMemory using AVR microcontroller Is it possible to use DRAM with microcontroller AVR? Yes, it is possible. Jesperh has proved it. He up a DRAM to a small processor (in this case an Microcontroller Atmel 8515), and handle the RAS/CAS sequencing and refresh in software. The type of under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1230. Ponyprog Circuit for AVR & PIC16F84 using microcontroller Comments: All resistors are 1/4W.The circuit is powered by 9...15V DC or AC. When In Circu Programming (ISP) connectors are used, is possible the programmer to be powered from target’s power source. Diodes D2 and D6 protect the regulat LM7805, when target’s power is used.…... Listed under: AVR ATmega Projects 1231. Ponyprog Circuit for ATMEL'S AVR using microcontroller The ATMEL AVR programmer works with the Windows program "Ponyprog" which works unde XP, ... and can be found at http://www.lancos.com/prog.html On board the AVRs that can be programmed are those in the schematic. For other memb family or the rest…... Listed under: AVR ATmega Projects 1232. EPROM adapter for ATMEL 89 Series Flash Microcontroller Programmer Devices The EEprom programmer software supports the following devices. 28 28C256 28C17 29C256 28C64 Hardware Diode D1 and resistor R1 provide the VDD isolation when programming the 24 pin devices. The jumper J3 mu shorted for 24 pin devices, and open circuit for 28…... Listed under: AVR ATmega Projects 1233. PCB Exposure Box with Countdown timer using ATMEGA8 microcontroller Tired of spending hours and hours in wire soldering? Do your circuits look u you are looking for a way to produce professional-like PCBs? Then you had better try photoetching. And the first step to do that is to have the right eq that…... Listed under: AVR ATmega Projects, Other Projects 1234. 89Sxx Development Board using microcontroller Introduction of 89Sxx There are some 89Sxx development board, here is another one. I have designe single side development board to be used as a tool for learning MCS-51 Microcontrollers, and for easy microcontroller project development. The 89Sx development board features : 89Sxx 40-DIL based…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1235. Wireless Coupler Terminal Interface using AVR microcontroller This is a Minimum Mass Wireless Coupler that connects a terminal, or PC running term software, to other Minimum Masss Wireless devices by means of a 1200 baud data channel at 181.818 kHz. The basic Minimum Mass Wireless Couple technology is described and links to…... Listed under: AVR ATmega Projects 1236. RF Field Strength meter using AVR microcontroller The hot melt glue that covers the circuit serves multiple purposes: It helps to keep the temperature among the three transistors (to minimize thermal drift), it protects the components from physical damage, and it holds the battery holder on the boar used…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1237. Digital Telemetry using ATMega8 microcontroller The ATmega8 microcontroller-based Low-Cost Telemetry Device (LTD) is an efficient telemetry keyer. measures the voltage levels of up to four analog channels via its on-chip 10-bit ADC, converts the measurements to numbers, and then sends the data code to an external…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1238. LC Resonant Frequency Meter using AVR microcontroller A well known L/C measurement circuit is pressed into service to make a bare bones measure circuit. Download the AVRStudio assembly source: lgm031227I.asm Download the AVRStudio hex file: lgm031227.hex Left-to-right: The 5 volt regulator LM393 oscillator (a 0.047 uf capacitor is mounted on the…... Listed under: AVR ATmega Projects 1239. AVR LED RF Field Strength using microcontroller Useful as a transmitter tune-up meter or an RF sniffer, this is an RF field strength indicator that is loosely based on the Broad B Field Strength Probe, described elsewhere. It detects RF via a square law detector, basically its a crystal set with…... Listed under: AVR ATmega Projects
  • 112.
    1240. Control RelayCard with USB port Atmel using Atmega8 microcontroller Once upon a time, though a circuit of this type of calling Searches Banim made Microchip PIC Series devreydi 6 pcs rörele control pcb computer program code can be done via usb port usb drive and 9-12 volts AC regulated power s section of…... Listed under: AVR ATmega Projects 1241. Temperature Sensor Thermometer using AT89C51 and DS1621 microcontroller DS1621 temperature sensor circuit digital thermometer to tell if using. Operation of the circuit is simple, as are as follows: temperature sensor from the numeric value being sent to the microcontroller and the micro using the I2C serial communication protocol, this value will more basıyor.Biraz If the LCD tomicrocontroller interprets…... Listed under: AVR ATmega Pr Sensor - Transducer - Detector Projects, Temperature Measurement Projects 1242. About Atmel and Combination Lock Application using AT90S2313 microcontroller Microcontroller Microcontroller 's (MCU) is a kind of CPU (CPU) can b as. MIB MCUs from slower and less capable of addressing memory, but they are designed for the implementation of real-time control problems both c and easier to use. The major difference between CPU and…... Listed under: AVR ATmega Projects, Security - Safety Projects 1243. Led Animation Circuit with PC Connectivity using AT90S2313 microcontroller Animator is a device, rather 5 × 16 matrix LED , which are used to display animation. Initially, the device serves to something completely different and it was controlled directly from the parallel port for the program is written Pascal. The idea has proved to be a…... Listed under: AVR ATmega Projects 1244. Color Sensor Circuit with AT89S52 ADC0808 This color of the surface color to red when you bring to the surface, a sensor to read the LDR, yellow, blue yellow and blue lights in different surface finishes as a different yansıtmalarını works by taking a foothold. Will be reflected from the surface to…... List AVR ATmega Projects, Sensor - Transducer - Detector Projects 1245. Serial interface with 2X16 LCD display using ATMega8515 microcontroller The 10k potentiometer, just above the ISP connector near the lower middle board,is used to adjust the display contrast according to your vertical viewing angle. DOWNLOADS ATTINY2313/AT90S2313 AVRStudio assembler sourc LDCbutons040904Ca.htm ATTINY2313/AT90S2313 AVRStudio assembler source, UPDATED FOR COMPATIBILITY WITH NEWER VERSIONS OF THE…... Lis AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1246. G1216B1N000 dot graphics display using AT90S2313 microcontroller Download Assembler source code I was looking for an LCD display that I could us workbench. The selection criteria for the display module itself was straight forward: 1. Dot graphic with sufficient resolution to display a simple wavefo Available…... Listed under: AVR ATmega Projects 1247. LCD Date Time Application using AT89S52 microcontroller This application can be installed at the same time an alarm indicating the date and time pro Atmel with 8051 -based microcontroller AT89S52 tasarlanmıştır.Uygulamamızın using the Keil compiler using the C programming language using code in different types of intervention. Proteus simulation of the application program, Isis has…... Listed under: AVR ATmega Projects 1248. Dot Matrix Display Applications using AT89C2051 microcontroller 4 Piece AT89C2051 micro-controller matrix display has a project carried out with proteus isis simulation and has asm hex code files Atmel AT89C2051 • Compatible with MCS ®-51Products • 2K Bytes of reprogrammable Flash Memo Endurance: 10,000 Write / Erase Cycles • 2.7V to 6V Operating…... Listed under: AVR ATmega Projects, Other Projects 1249. 100 MHz RF oscillator using ATtiny12 microcontroller I needed a frequency reference for tuning up the RS-232 to 100 MHz RF desktop channel adapte elsewhere on this site, when I found this Saronix crystal oscillator in my junk box.  A few minutes with AVRStudio produced an ATtiny12 to make a tone Listed under: AVR ATmega Projects 1250. Atmel Test Card using ATmega32 microcontroller PCB and the schema (sch) P-CAD 2004 Schematic drawings prepared by V18.00.2690 also c languagecode through the test ha prepared with an alternative link ATMEGA-32 Development Board Power 7V to 12V (4mm sockets) protected against reverse polarity Visualization by 8 LEDs Statements of eigh
  • 113.
    outputs…... Listed under:AVR ATmega Projects 1251. Computer connected Flower Water Circuit using ATmega8 microcontroller Interestingly, I understand a project is determined by the required hours of irrigation data via a computer data exchange rs232 com port are made out of a project source code and is not easily implemented scheme, For more detail: Computer connected Flower Water Circuit using…... Listed under: AVR ATmega Projects 1252. Multimeter with Atmel using Atmega8-16pu microcontroller Atmega8 Multimeter "Multimeter" was the only title to einfiel to me first. Voltmeter (only DC) 0.00 - 9.99 volts and 10.0 - 30.0 volts with automatic range switching. Frequency counter 0 .. 7999 MHz (Theoretische) with automatic Switching tim Logic tester L - prohibited area…... Listed under: AVR ATmega Projects 1253. Decoding 4 buttons with two I/O's on AVR using ATtiny12 microcontroller Just the solution for AVR applications in which I/O is tight, such as the ATtiny1 should work well on other kids of controllers that have independently controlled I/O direction registers, such as PIC and 6805 controllers. This is a solu devised for those…... Listed under: AVR ATmega Projects 1254. EEPROM Driver for AVR with RAM using ATtiny15 microcontroller Download the test program with driver:  i2cm030710F.asmI had been putting off writing a driver for some 2 24LC256 EEPROMS I was thinking about using, when I came across a temperature logger application written by Sean Ellis. The Temperature logger was posted on on www.avrfreaks.net…... Listed under: AVR ATmega Projects, Other Projects 1255. ATtiny12 fuse restorer using microcontroller Plug an ATtiny12 into the 8 pin socket and hold down "GO!" button. The LED will come on at the end of th programming process, which only takes a couple hundred millisecond. The fuses are now restored to their factory default states. This picture was…... under: AVR ATmega Projects, Other Projects 1256. Analog Multiplexer using AVR microcontroller This technique uses digital  I/O pins to multiplex analog voltages into an analog input on the microcontro method is most suitable for signals that do not need to be sampled frequently and it may be extended to accommodate a large number of inputs, tho Listed under: AVR ATmega Projects 1257. PWM Waveform Capture using AVR microcontroller Described are the waveform capture method, example firmware and hardware designs. This mate formed the basis of an article that was first published in the October, 2003 issue of Circuit Cellar magazine. The only components added to the operat AT90S2313 circuit (one capacitor and two…... Listed under: AVR ATmega Projects, PWM Projects 1258. 1 KHz Synchronous Detector using AVR microcontroller Downloads: Assembler source  deco030511C.asm AVR Studio hex file is deco030511C.hex         Overview This circuit employs a synchronous demodulator to separate a 1 KHz signal from noise and measures  the amplitude of the 1 kHz signals on second at about 60 microvolts per count then…... Listed under: AVR ATmega Projects 1259. Morse Code Alarm Clock using ATtiny2313 microcontroller Morse Code Alarm Clock Modification (Almost) Trivial application of an AT90S2313 or ATtiny an alarm clock to change the alarm from "BEEP BEEP BEEP BEEP BEEP BEEP BEEP BEEP..." to "WAKE UP" in Morse code. This was designed in response request and…... Listed under: AVR ATmega Projects, Clock Projects 1260. 89C517 Segment Display using the Digital Time Data from Port0 7447 entegresinde and 7-segment displayreaches ' s.7447 -integration mikrodenetley from binary code to show in the 7 segment displayis used. So when it comes to 0000 a, b, c, d, e, f LEDs lights up g edi fireproof.7 segment displayis co in parallel to each other ' s.Using the same…... Listed under: AVR ATmega Projects 1261. 8 Channel PWM using AVR microcontroller The assembly code given here was written to see what it would take to make an AT90S1200 generate 8 cha proper PWM. In this case, by proper, I mean with the maximum high frequency content consistent with the needed duty cycle and give clock.…... Listed AVR ATmega Projects, PWM Projects 1262. AVR Programmer with ATMega8-16 About AVR Programmer   This simple AVR Programmer will allow you to painlessly transfer hex programs to most A microcontrollers without sacrificing your budget and time. It is more reliable than most other simple AVR programmers available out there and can be in…... Listed under: AVR ATmega Projects
  • 114.
    1263. AT89C52 DS1302DS18B20 LCD On Time-Temperature Original Atmel micro controllers to use the at series with a good example of ds1302 ds18b20 circuit 2 × 16 lcd indica set with 4 buttons on The first button press and a bout at 2 minutes (time) setting with the buttons 2 and…... Listed under: AVR ATmega Projects 1264. Capacitance Meter using AVR microcontroller Digital Capacitance Meter This is a simple capacitance meter which can measure capacitance value easy some measurement methods for capacitance, at one time the capacitance was measured with a impedance bridge or a dip meter. Recently typical ca meters can measure capacitance and…... Listed under: AVR ATmega Projects 1265. Atmel Avr Project Circuit Archive 360 MB using ATmega8 microcontroller I collected a lot of site in the internet for various atmel avr projects will not wo the idea of a day's archive is a grown up pretty. Atmel will be a solid resource for people interested in the firm. Atmel AVR Project Circuit Archive; …... L under: AVR ATmega Projects, Memory - Storage Projects 1266. PC Temperature Meter using ATtiny15 microcontroller Port-Powered Temperature Meter This is a four-channel temperature measurmet adapter that w without external power supply. It will suitable for measureing temperature and logging its data with a PC. The circuit diagram is very simple and no ad is required, everybody will able to build…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects, Temperature Measurement Pr 1267. Computer controlled marquee at90s2313 74hc595 With all the details on a circuit different from that to which the shared a marquee computer contro atmel at90s2313 source software image format you have the source schema and pcb, orcad drawings. Marquee on a circuit different from that to whi Marquee in…... Listed under: AVR ATmega Projects, Home Automation Projects 1268. Frequency counter using AVR microcontroller Universal Counter The frequency counter is the most popular instrument in the home maid instruments that the reason why it is built widely is: it can be built easily because it is digital circuit, it is generic measurement and many construction kits are…... Li under: AVR ATmega Projects 1269. 8 channel LCD Teperature meter using microcontroller Description This is the fully featured, jammed packed temperature readout unit. I can measure temperature from up at 8 DS1820 digital temperature sensors all on the same 1-wire bus. That's right only 3 wires are needed to go to all the tempera sensors, GND, VCC…... Listed under: AVR ATmega Projects, LED Projects, Temperature Measurement Projects 1270. Packet Radio using AVR microcontroller Here is some experimental hardware and software to transmit and receive AX.25 packets. It is essentially a PIC designed around a Atmel AT90S2313 with a few extra bells and whistles. I had picked up a couple of MXCOM MX-614s at the TAPR display (I…... Listed AVR ATmega Projects, Radio Projects 1271. Nixie Clock with AVR using ATmega48 microcontroller Introduction:  This is the hardware and source code for an Atmel ATmega48 based four digit Nix Clock. Description: This was my second Nixie clock project. I wanted something a little smaller / cheaper / simpler then my rather large B-7971 clock. I post…... Listed under: AVR ATmega Projects, Clock Projects 1272. Atmel AT89C2051 hardware keylogers circuit with using AT89C2051 microcontroller Atmel On the PC keyboard PS 2 AT89C2051 keylogers circuit connection cable connects to t between what is written in the wake of the program running on the pc upon AT24C512 writes eeprom eeprom reading with KeeLog has decided to release an early version of… under: AVR ATmega Projects 1273. AVR terminal for serial port using TSOP1738 microcontroller description (hardware) Above and below you can see the terminal. The LCD display is rep by the connector X1. It has a HD44780 compatible LCD controller and I'm using the 4-bit interface to send data to the LCD controller. The LED's are mu I've seen…... Listed under: AVR ATmega Projects 1274. Atmel atmega projects l35 heat time display keypad using ATMega microcontroller Atmel ATMEGA series of three projects are made with micro-contro delivering projects bahramelectronic.ir Thank you brother Bahram's administrator. 1 - ATMEGA16 LCD display temperature measurement (LM35) 2 - ATmega8 application of the keypad display with 7 segmet 3 - ATMEGA32 with a thermometer (LM35) hours. For more detail: Atmel atmega projects l3 time display keypad using ATMega…... Listed under: AVR ATmega Projects 1275. Atmel Bascom avr 8051 project, the circuit archive using AT89S8252 microcontroller Atmel series (AT89C2052, AT90S2313, AT89S8252, etc.). wide range microcontrollers with an archive of high-quality circuit atmel version you can find a lot of. Usb, alarm, lcd, nokia 3310, nokia 6100, display, LED, sms, te and so on. schema files to Protel PCB circuit has a lot of…... Listed under: AVR ATmega Projects, Other Projects 1276. Heart of LEDs using microcontroller One of the requests we received after publication of the Christmas Star was "can you do different shapes?" Well, with Mother’s Day comi soon, we thought a heart would be appropriate. Now you can have something different to give to that special Mum or…... Listed under: AVR ATmega Projects, LED Projects
  • 115.
    1277. Atmel atmega128clock ds1307 tda5410 hard disk using atmega128 microcontroller Previously called " Corrupted HDD Evaluate under the heading "co hard disks to evaluate the application, I mentioned a couple of hours on the web projects I had used it with emery hardisk hours now, but quite profes and all of the shared resources, shared project Circuit atmel ATMEGA…... Listed under: AVR ATmega Projects, Clock Projects 1278. Lux meters attiny26-16 light measurement circuit using attiny26 microcontroller Lux meter circuit atmel attiny26-16 microcontroller based on the valu LED displays on the display lux with LEDs placed on 2sk1061 MOSFETs. Interestingly, all of the source files in an application (pcb, diagrams, code) calib circuit is shared also provided information to  Lux meter circuit diagram: The Lux…... Listed under: AVR ATmega Projects 1279. Atmel avr usb programmer using ATMEGA8 microcontroller A lot of programmers are growing for a USB programmer for Microchip PIC controllers are avr usb programmer circuit atmelcilerde not idle in addition to the USB communication does not require a material ATmega8  ATMEGA48 can be done either the source code of software…... Listed under: AVR ATmega Projects 1280. LCD Car Accelerometer using microcontroller Introduction The circuit is drawn for measurement of acceleration from  –1000 mg until + 1000 mg. It ca placed in kantra'n the car and be supplied from the sheath of electric lighter. The circuit includes one indicative LED and a screen LCD. Description The under: AVR ATmega Projects, LCD Projects, Sensor - Transducer - Detector Projects 1281. AVR LCD Microcontrolled Oscilloscope using ATmega32 microcontroller Features Frequency measurementVoltage input Power supply Liquid Display Crystal Measurement disp Information displaying area: Auto triggering 10Hz - 7.7 kHz (firmware  2.0 and above)24V AC / 30V DC 12V DC 128x64 pixels 100x64 pixels 28x64 pixels from firmware  2.0 and above) Auto   Introduction A…... Listed under: AVR ATmega Projects 1282. VGA Monitor adaptor using AVR microcontroller Background of the project.   Several months ago I tried to connect a microcontroller system to a VGA m output data in the form of text. I was surprised to find little on this subject on the internet, to assist me in achieving this…... Listed under: AVR ATmega Video - Camera - Imaging Projects 1283. Midi Generator using ATtiny26-8PI microcontroller This circuit based on ATtiny26 but it could be anyone microcontroller of AVR family.  Produce stable tone and you can change it by press some keys like to change midi channel 0-15 , velocity 0-127, pitch 0-127. It is start from center tone…... Listed und ATmega Projects 1284. USB Pinout All Types of USB Pinout Diagrames Universal Serial Bus connectors. These USB connectors let you attach mice, printers and other accesso your computer quickly and easily. The operating system supports USB as well, so the installation of the device drivers is quick and easy, too. Compare ways of…... Listed under: Blog, Circuits 1285. USB AVR programmer using ATtiny2313 microcontroller Introduction. Nowadays, USB is the most popular connection between PC and peripherals suc programmers, printers, scanners etc. For that reason I had to modify my old serial AVR In-System-Programmer (ISP) to work with USB connection. You "use a USB to Serial adaptor to…... Listed under: AVR ATmega Projects 1286. 10 Bit analog to digital converter using ATtiny26 microcontroller Study the Analog to Digital capabilities of Atmel ATtiny26. This tiny but mighty IC is rea miracle. One special thing is the internal 10-inputs multiplexed ADC circuit which can covert analog voltages to bytes. This check circuit uses only 3 inp course you…... Listed under: AVR ATmega Projects 1287. SMS control 4 way remote control relays using ATtiny2313 microcontroller Introduction   With this circuit we can control up to 8 devices (4 devices in o example project), by sending a specific SMS message with any mobile phone. It's very useful in the case that, at the place we have the devices, we hav Listed under: AVR ATmega Projects, Phone Projects 1288. RF 2 channel remote control 418MHz using AVR microcontroller Introduction How many times you needed some remote control to handle some electric device ? Many times. T lot of remote controls like infrared, RF, SMS (like my other circuit) and more. The basic small-range remote controls are 2, Infrared and RF (Radio Frequency).…... Listed under: A ATmega Projects
  • 116.
    1289. RCEN fuseprogrammer using AT90S1200A microcontroller   Introduction: As you know the AT90S1200 microcontroller includes an internal RC oscillato disabled by default. If you want to change it (enable or disable) you must to program it with parallel mode. The most programmers work on serial mod not possible to…... Listed under: AVR ATmega Projects 1290. 80×32 LED matrix display using ATmega32 microcontroller The LEDMATRIX interface News: Now with lcd4linux driver I recently purchased 10 SLM1608 (SLM1606) LED matrix display units from Ebay (you might also contact the seller directly at op16@gmx.de). These are 16x16 LED matrix units with a gr red LED per pixel allowing…... Listed under: AVR ATmega Projects, LED Projects 1291. i2c interface to USB interface using attiny45 microcontroller Attach any I2C client chip (thermo sensors, AD converter, displays, relais driver, ...) to your USB ... quick, easy and cheap! Drivers for Linux, Windows and MacOS available. The i2c-tiny-usb project is an open source/open hardware project. The i2c-tiny-usb is to…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1292. Acceleration sensing USB interface using Atmega8 microcontroller Contents The hardware The USB interface Calibration PC assisted calibration Self ca Software Drivers Joystick drivers Maemo drivers The input event subsystem Setting permissions Enigma FAQ Downloads The TiltStick is a small accele sensing device in form of a USB stick. It's using a two…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1293. Wireless Lan for AVR microcontrollers The complete WLAN solution for AVR and other CPUsThe page is about equipping an Atmel AVR microcontroller system with a Prism WLAN interface. This document is intended for people that already have experiences with the AVR microcontrollers and teaches t to add a…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1294. AVR Compiler toolchain for MAC using ATmega8 microcontroller The following instructions are from early 2007 and are pretty outdated by now. They are still here for referen they are not maintained anymore and very likely won't work with recent versions of MacOS anymore. After having developed software for the AVR under Windows…... Listed u ATmega Projects 1295. Java virtual machine for the Atmel AVR ATmega8 The NanoVM is a java virtual machine for the Atmel AVR ATmega8 CPU, the member of the AVR CPU f used e.g. in the DLR Asuro robot, manufactured by AREXX engineering. With the NanoVM, the Asuro can be programmed in the popular Java language Listed under: AVR ATmega Projects, CNC - Printing Machines Projects 1296. EPROM adapter for ATMEL 89 Series Flash Microcontroller Programmer Ver 2.0 Devices The EEprom programmer software supports the following dev 28C16 28C256 28C17 29C256 28C64 Hardware Diode D1 and resistor R1 provide the VDD isolation when programming the 24 pin devices. The jumper be shorted for 24 pin devices, and open circuit for 28…... Listed under: AVR ATmega Projects, Other Projects 1297. Digital Stop Watch with ATmega8 using microcontroller Hello Friends, In this tutorial we will make a "Digital Stop Watch" using an AVR ATmega8 Microcontroller. This will help y many concepts like Multiplexed Seven Segment Display Interfacing Using AVR Timers Using Interrupts And many others too. The code is written in C… under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1298. Relay Timer with ATmega8 AVR MCU Timers are widely used in industrial and domestic application for automating tasks. Microcontrollers can be used versatile and accurate timers with ease. Here I present a simple timer that can be used to turn on/off a load after user specified time. The Timer…... Li under: AVR ATmega Projects, Home Automation Projects 1299. Remote Controlled Fan Regulator using ATmega8 microcontroller This device can be used to remotely control the speed of an AC fan and to switch it o The remote control is a cheap NEC Format remote, usually supplied with small DVD players. Three buttons are used to command the circuit. The…... L under: AVR ATmega Projects, Home Automation Projects 1300. ATmega8 based RPM Meter Hello All, Today I will show you how you can make a simple RPM Meter using AVR ATmega8. The RPM meter we will be ma contact less type, i.e. it measures the RPM of a rotating object without actually making any contact with…... Listed under: AVR ATmega Projects, Meteri Instrument Projects 1301. ATmega8 Based Smart Code Lock Here is a project for beginners using Atmel AVR ATmega8. The project uses some techniques that are very useful for designers to learn and u Alphanumeric LCD Module Interfacing. 4x4 Keypad interfacing. PWM Control of LED (Used to dim the back-light of LCD, like in…... Listed under: AVR ATmega Projects, Interfacin
  • 117.
    RS232 - I2c-ISP) Projects 1302. ATmega8 Based Multi channel IR Remote Hi Friends, Today I will present an easy to build Multi channel IR Remote control system. It can control heavy to AC 220V 6 Amps or smaller) with a touch of remote control. A total of 5 devices can be controlled from a…... Listed under: AVR ATmega Projects, Oth Projects 1303. AVR RGB LED and Sound Show using ATmega168 microcontroller Here is a nice and entertaining project created by http://www.ermicro.com . The auth very good programming, teaching, drawing and artistic skills. The tutorial is well planned and executed. I really liked the RGB LED and Sound show give end. I will…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1304. Visualize ADC data on PC Screen using USART AVR Project using microcontroller ADC (Analog to digital converter) is a commonly used peripheral. We use it everyday to interfac several analog sensors. Many times a nice visualization of ADC data is required during learning about new sensors. For example you just bought a analog sound sensor, and… under: AVR ATmega Projects, Sound - Audio Projects 1305. PC Controlled Robot using ATmega32 In this tutorial we will discuss a simple PC controlled robot. The Robot PC link will be a RS232 serial line. The robo have only five commands. Move forward (RS232 char 'F' or 'f') Move backward (RS232 char 'B' or 'b') Turn Left (RS232…... Listed under: AVR ATmega Pro Robotics - Automation Projects 1306. AVR ATmega8 Project LED Moving Message Display using ATmega8 microcontroller An interesting project that can be done using Microcontroller is a L message scroll er. It teaches you a quite lot of things. So I decided to make one. I made the hardware design modular and cascadeble That means the display is made up…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1307. PS2 Keyboard Interface with AVR MCU using ATmega8 microcontroller A PC keyboard is an old and trusted human machine interface. Most peoples ar with it. When a text entry is required it is the best method. If we can interface the PC keyboard with an AVR MCU we can create a whole lot…... Listed u ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1308. Line Following Robot using AVR ATmega8 One of the most basic autonomous robot you can build is a line following robot(LFR). This type of robot is ru white surface which has an arbitrary path drawn over it by using back paint. The task of the robot is to run…... Listed under: AVR ATmega Projects, Rob Automation Projects 1309. SMS Based Voting System – AVR GSM Project using ATmega32 microcontroller Hi friends ! Here I am showing a microcontroller based project called the Based Voting System". Using this system you can ask your users to vote for any of the four options. Four available options are identified by a letters 'A and…... Listed under: AVR ATmega Projects, Phone Projects 1310. Interfacing TCS3200 Colour Sensor with AVR ATmega32 Detecting colour of an object can be an interesting and useful electronic application. It can be using a colour sensor like TCS3200 and a general purpose microcontroller like AVR ATmega32. TCS3200 Colour Light to Frequency Converter Chip TCS3 is designed to detect the…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1311. AVR Music Player with Alarm Clock using AT90USB1286 microcontroller This music player project built based on AT90USB1286 microcontroller. It uses music decoder which integrates music file decoding and digital-to-analog output. Other main part including 16×2 character LCD display, ST7066/HD44 compatible, using 3.3V instead of 5V and DS1307 real time clock. By finishing this…... Listed under: AVR ATmega Projects, Clock Projects 1312. AVR Power Usage Logger using ATmega168 microcontroller This ATmega168-based project monitors household power usage and logs it to an SD card from voltage and current detectors amplified LMC6484AIN quad op-amp and then AVR microcontroller computes the power consumption using the fo P=VxI. The voltage and current are each sampled at 9615…... Listed under: AVR ATmega Projects
  • 118.
    1313. Energy MonitoringTransmitter using Atmega328 microcontroller This energy monitoring transmitter, known as emonTx, is an Atmega328-based small wireless energy monito It also fully compatible with Arduino IDE. EmonTx is designed to take inputs from multiple CT sensors, optically from a pulse-output utility meter and f multiple one-wire temperature sensors. The…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1314. Wireless Human Health Monitor using ATmega644 microcontroller The aim of this ATmega644-based project is to build a portable device implementin technology and taking full advantage of the wide-spreading Internet to provide a convenient solution to monitor human health. The health informatio acquired on the portable side transmits to the server wirelessly…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects, Medical - He Projects 1315. AVR Digital Hum Nuller using ATmega168 microcontroller This ATmega168-based digital comb filter built to clean a realtime audio signal. It can remove ubiquitous 60Hz (50Hz in some countries) hum noise caused by power lines and household electrical wiring. Since the noise is not strictly sinusoidal it necessary to remove all…... Listed under: AVR ATmega Projects, Other Projects 1316. DC Servomotor Controller System Meter using ATtiny2313 microcontroller The ATtiny2313-based project is an experiment on the closed loop DC servo control system (SMC) by Elm Chan. It can be used for practical use with/without some modifications. The closed loop servo mechanism requires real-t operations, such as position control, velocity control and torque…... Listed under: AVR ATmega Projects, Motor Projects 1317. Low Picofarad Capacitance Meter ATtiny2313 microcontroller This little instrument, named as Pico C, can be used to measure capacitances down to fr a picofarad. It built based on ATtiny2313 microcontroller. It has range: <1 pF to 2000 pF (guaranteed); 2500 pF possible and resolution: 0.1 pF. To read …... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1318. Ear Trainer using ATMega644 microcontroller The goal of project is to helps people develop the musical skills of perfect pitch and relative pitch. Push b allow the user to navigate a graphical user interface (GUI) on a liquid crystal display (LCD). In perfect pitch training mode, a note is played…... Listed un ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1319. AVR Data Logger with MicroSD using ATmega32 microcontroller This project shows you how to store data into microSD card in files with FAT32 format microcontroller AVR ATmega32. The MCU receives sensor’s data through internal ADC. You can connect up to 8 different sensors to the system. In this Dharmani uses one…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1320. AVR Code Debugger using AVR microcontroller AVR Code Debugger is useful tool to help you debug code without require resource in the MCU you are debugging. It only use 1 and is connected to a serial port from the host PC. Using a VT100 terminal to capture the output…... Listed under: AVR ATmega Projects, RTOS - OS Projects 1321. Electric Spinning Wheel using ATmega8 microcontroller The Electric Eel Wheel is a smart electric spinning wheel which helps you spinning the fiber of y choice into yarn easily instead of traditional wheel. This Electric spinner is lighter and smaller, making it easier to take your spinning with you. You can control…... Listed under: AVR ATmega Projects, Motor Projects 1322. Rechargeable Battery Capacity Tester using ATMega168 microcontroller This ATMega168-based battery tester allows you to find out the overall capacit rechargeable battery. It can shows how long will a battery last from the time it’s fully charged to the time that the “low battery” indicator comes on you It can…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1323. Simple Automatic Battery Discharge Analyzer using ATmega48 microcontroller The project allows you to analyze characteristics of unknown/junk batte especially the capacity and variation of the voltage on discharge. It is controlled with a PC via a serial port. No external power supply is required becau powered by RS-232C signals. It uses…... Listed under: AVR ATmega Projects, Battery Projects
  • 119.
    1324. AVR SecurityKeypad Lock using ATtiny2313 microcontroller The Security Keypad Lock Project is a basic access control system based on ATtiny2313. It c modified to protect just about anything. The “Code Lock” ability will allow the rightful user to deploy the platform to any property that requires simple password-protection. The “AVR”…... Listed under: AVR ATmega Projects, Security - Safety Projects 1325. Speaking Calculator using AVR ATmega88 microcontroller This Speaking Calculator project is an interesting device built just by three chips that can be useful to blind people. The system has four basic operations (addition, subtraction, multiplication and division), and the functions: clear all, change of inverse (1/x), square root…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1326. Handy Password Managing System, Lord of the Keys using AVR ATmega168 The Lord of the Keys is password managing system that able to store man usernames and passwords inside a Java Card™ smart card (one of the most secure methods to store confidential information). Whenever a dialog box in an application or web browser requesting…... Listed under: AVR ATmega Projects, Security - Safety Projects 1327. AVR LED Candle using ATtiny85 microcontroller This LED candle is built to mimic the look of a traditional candle without the dangers associated with a flame. It uses high brightness LED and is controlled by ATtiny85. It could be useful as movie props where you cannot afford to have a…... Listed under: ATmega Projects, Home Automation Projects 1328. Mini Logic Analyzer using ATmega8 microcontroller Mini Logic analyzer is ATmega8-based electronics tool that can be used to watch and analyze logic transitions 0 or 1 of a dig signal. It comes with Nokia 3310/5110 LCD to display signal and it has 4 channel inputs. A digital data signal can…... Listed under: AVR ATmega Projects, Other Projects 1329. Clever Clapper using ATtiny2313 microcontroller A “Clapper” is a device that will turn on or off an AC appliance that is plugged into it, such as a lamp o when it “hears” you clap twice in approximate succession. Pete has built a Clever Clapper with various task. If user…... Listed under: AVR ATmega Proje Projects 1330. AVR Ultrasonic Spheroid Levitation Device using ATMega16 microcontroller The goal of this project was to design and build a ‘gaming’ device capable o levitating a ping pong ball at varying heights based on the proximity of the user to the device. The project based on ATMega16 microcontroller. The pr incorporates a fairly complex…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1331. AVR Based Mobile Phone using AVR ATmega128A microcontroller AvrPhone is ATmega128A-based simple mobile phone with touch screen and SIM100 module. The display uses 2,4″ LCD with a resistive touch screen and ILI9325B driver (16 bit parallel bus). The LCD breakout board contains SD card slot XPT2046 touchscreen controller. They both are…... Listed under: AVR ATmega Projects, Phone Projects 1332. AVR Wide Range LC,F, ESR Meter using AVR ATMega88PA-PU microcontroller LCFesR meter is a precise, wide range meter that can measure inductivity capacity (C), frequency (F) and equivalent series resistance of a capacitor in-circuit (ESR) based on AVR ATMega88PA-PU microcontroller. It can be easily with homemade one or double-faced PCB and available electronic…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1333. AVR Touchpad Handwriting Recognition using ATmega644 microcontroller This ATmega644-based project implements a touchpad input system which handwriting input and converts it to a printed character. Currently, the device only recognizes the 26 letters of the alphabet, but it could be easily gene include any figure of completely arbitrary shape,…... Listed under: AVR ATmega Programmers, AVR ATmega Projects, LCD Projects 1334. AvrX, Real Time Kernel using AVR microcontroller AvrX is a Real Time Multitasking Kernel for AVR microcontrollers written in assembly. Total kernel size from ~500 to 700 words depending upon which version is being used. Since the kernel is provided as a library of routines, practical applications take u space…... Listed under: AVR ATmega Programmers, AVR ATmega Projects 1335. AVR High Voltage Programmer Using Arduino AVR microcontroller AVR microcontroller uses fuse bits to set its operational parameters like watchdog t settings and change speed of the internal oscillator. Most fuse bits can be set or reset without worry. You can flash it into one state and then flashed b using an…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1336. STK500 Compatible ISP using AVR microcontroller AVR-Doper is an STK500 compatible In System Programmer (ISP) and High Voltage Serial Programm It comes with a built-in USB to Serial adaptor to connect to modern host computers which often don’t have a serial interface. The project implements speed USB device…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects
  • 120.
    1337. TinyRealTime, SmallReal Time Kernel for AVR using atmega644 microcontroller Real-time kernel (RTK) is useful to run several task or protocol on one only one task at a time can be executed by MCU, RTK used to make each task think it owns the whole machine. RTK will handle which task has to…... L under: AVR ATmega Programmers, AVR ATmega Projects 1338. Ultrasonic Security System using Atmega644 microcontroller This portable security system is built based on Atmega644 microcontroller. It can detect based on their physical presence. The system uses URM37v3.2 ultrasonic sensor which is connected to MCU through rs232 serial communication. To r sensor for wide coverage range, the system is equipped…... Listed under: AVR ATmega Projects, Security - Safety Projects 1339. Auto Sensing Sous-Vide Cooker using AVR microcontroller This low cost AVR-based Sous-Vide Cooker is able to auto-calculate the appropriate time for certain thickness of meat using heat transfer equations. It can maintain a set temperature for extended periods of time. The project implements adva features such as a water level…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1340. AVR Thermocouple Temperature Meter using ATmega164 microcontroller The benefit using thermocouple sensor for measure temperature is it has w measurement (-200 °C to +1350 °C / -328 °F to +2462 °F range for Type K), inexpensive, interchangeable, and is supplied with standard connectors. To temperature value from output of a…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1341. AVR Based Car Diagnostic Tools using ATmega169 This project focuses on tapping into GM pre-1996 car and light truck diagnostic information. These s are commonly referred to as OBDI, or ALDL (Assembly Line Diagnostic Link). They are based, in part, on the GM-specific 8192-baud ALDL standard tha used starting in the…... Listed under: AVR ATmega Programmers, AVR ATmega Projects 1342. 5 Channel USB Analog Sensor with AVR using ATmega48 Microcontroller This project demonstrates how to build a simple module to read analog senso send the data to PC using USB connection. The project uses ATmega48 as main processor and USB FTDI serial-to-usb cable. Simply put header pins on device which you can plug…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1343. AVR Switch Timer using ATmega8 Microcontroller To get better UV expose, Andrianakis has built new Switch Timer that will turn of his UV exposure bo some time. The timer uses ATmega8 as main processor and two 7-segments LED as display. There are two buttons for set and start the timer.…... Liste AVR ATmega Projects, Calculator Projects 1344. Wireless Internet Radio Receiver using AT90CAN128 Microcontroller This stand-alone internet wireless music player, named as Wireless MP3 (WMP3), Atmel AVR AT90CAN128 microcontroller as main ‘brain’. The device can play music from internet radio stations like Shoutcast (www.shoutcast.com), co shared network drives and play mp3 files. Ubiquitous 802.11b wireless link is…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1345. Low-cost AVR programmer Before using this programmer.... Be carefull with using this programmer, because it has no insulation circuitry! Especially w high voltages e.g. 110/230 Vac on your project. One mistake and your day can be ruined, your expensive PC distroyed! Part list: 7x 220 ohm 1x…... Liste AVR ATmega Programmers, AVR ATmega Projects 1346. SP12 serial programmer software SP12 supports the following devices: AT90S1200, AT90S2313, AT90S8515, AT90S4414, AT90S2323, AT90S4434, AT90S8535, AT90S2343, ATtiny2 AT90S2333, AT90S4433, ATtiny12, ATtiny13, ATtiny15L, ATtiny26, ATtiny25, ATtiny45, ATtiny85, ATtiny2313, ATtiny861, ATmega103, ATmega603, ATmega ATmega162, ATmega163, ATmega168, ATmega8515, ATmega8535, ATmega8, ATmega16, Atmega32, ATmega48, ATmega88, ATmega128, ATmega2561, AT90PWM3. Source: Pitronics Download the…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1347. AVR assembly language What is an AVR ? First of all AVR stands for: Advanced Virtual RISC, the founders are Alf Egil Bogen Vegard Wollan RISC (also for An AVR is a small microcontroller (chip, IC) which is switching digitally (controller) by means of so called i/o's…... Listed under: AVR ATmega Projects, Clo Projects 1348. White 7-segments clock ATtiny26 Part list 1x ATtiny26 1x xtal 4.096MHz 2x 27pf ceramic 4x 7-segment white CC 2x pushbutton 1x 78L05 1x 47uF/16V e 1x 0.1uF/16V tantalium 1x 10k 1x 100n multilayer 8x 150 Ohm 4x 6k8 Ohm 4x BC327-25 PNP Features (BETA) 1. Select Hrs/Min or Min/Sec…... Listed u ATmega Projects, Clock Projects
  • 121.
    1349. Controlling internalDAC AT90PWM3 using microcontroller Part list 1x AT90PWM3-16SQ 2x SLO2016 LED display 1x 22uF/25V elco SMD 2x 0.1uF/16V ta 2x 10 kOhm 1206 3x 100n multilayer 1206 1x coil 10uH SMD 1x rotary encoder (Sharp)   Digital voltage control unit his is how a value is stored into…... under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1350. Controlling SpeakJet with an AVR microcontroller using ATmega88 microcontroller Core Features: · Programmable, 5 channel synthesizer. · Natural pho speech synthesis. · DTMF and other sound effects. · Programmable control of pitch, rate, bend and volume. · Programmable power-up or reset annou · Multiple modes of operation. · Simple interface to microcontrollers. · Simple…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1351. Modular User Interface System using ATMega88 microcontroller The IOSTRING is a modular physical user interface system which consists of a series o basic board modules designed around the Atmel AVR AtMega88 MCU. Each module type can handle switches, pushbuttons, rotary selector switches, r shaft encoders, potentiometers, LED’s, LCD displays, and an…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1352. Switching between Red, Green and Blue (or Blue1 or/and Blue2 for an RGBB type) using AVR microcontroller Switching between Red, Green and Blue ( or/and Blue2 for an RGBB type): An RGB LED is a LED which has three (or four for an RGBB type) semi-conductor LED's in one normal housing i.e. stan mm. The Red LED is made of…... Listed under: AVR ATmega Projects, Other Projects 1353. AVR Based Operating System using ATMega32 microcontroller kaOS project is real-time, multithreaded, preemptive operating system for the Atmel Me microcontroller. It can loads and executes programs from a Secure Digital or MMC card. The system waits for a card to be inserted and a reset button pressed, at which point…... Listed under: AVR ATmega Programmers, AVR ATmega Projects 1354. 3D Color LED Graphics Display using ATmega32 microcontroller This 3-dimensional graphics display system which named as MaJaTron consists of 125 arranged in a cube of 5x5x5 dimension. Each LED is a multicolor Red, Green and Blue LED and the control circuit of the system can individually contro intensity of each…... Listed under: AVR ATmega Projects, LED Projects 1355. A GLCD connected to an AVR microcontroller using ATmega8 microcontroller A GLCD connected to an AVR microcontroller The PVG120602EGE is a 128 graphic (grey) LCD with lightblue EL backlight and two KS0108 controller chips and one KS0107 line (colums) driver (64 display lines COM1 - COM64) Th KS0108 drives segments 1 to 64…... Listed under: AVR ATmega Projects, Video - Camera - Imaging Projects 1356. Open Source AVR Temperature Controller using ATmega48 microcontroller The open source project allows you to control DC appliances based on the temperature of two thermistor inputs. It uses AVR ATmega48 as main processor. The controller has both green and white LEDs to indicate status. The output is connected to N-Channel MOSFET, AOD444,…... Listed under: AVR ATmega Projects, LCD Projects, Temperature Measurement Projects 1357. Pinning LCD display 1601 using microcontroller Pinning LCD display 1601A: Pin no. Symbol Function 1 Vss GND 2 Vdd + 5V 3 Vo Contrast Adjustment 4 Register select signal 5 RW H/L Read/write signal 6 E H->L Enable signal 7 DB0 H/L Data bus line 8 DB1 H/L Data…... Listed under: AVR ATmega Projects Projects 1358. Simple USB AVR programmer, USBasp using ATMega8 microcontroller USBasp is low cost USB in-circuit programmer for Atmel AVR micontrollers. The consists of an ATMega88 or an ATMega8 and a couple of passive components. The programmer uses a firmware-only USB driver, no special USB contr needed. Its programming speed is up to…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects
  • 122.
    1359. Controlling 7-segmentsLED displays using AVR microcontroller The many posibilities....Non Multiplexed: 1. One or two displays directly to the i/o's 2. O display with a 74LS247 3. Two displays with a 74HC595 and two 74LS247 Multiplexed: 1. Two displays with a 74LS247 and 2 i/o's 2. Two displays with a and…... Listed under: AVR ATmega Projects, LED Projects 1360. Programming AVR ATxMega using USBasp and ATxmega microcontroller ATxmega programmer has different interface than 8-bit AVRs. It uses PDI inte instead of ISP. If you don’t want to buy new programmer for ATxmega you can try this little hack done by Szu. He uses USBASP (USB in-circuit program Atmel 8-bit AVR controllers)…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1361. TIL311 / INL0397-1 Hexadecimal Display usning AVR microcontroller Pin numbers: PIN 1 LED SUPPLY VOLTAGE PIN 2 LATCH DATA INPUT B PIN 3 LATCH INPUT A PIN 4 LEFT DECIMAL POINT CATHODE PIN 5 LATCH STROBE INPUT PIN 6 OMITTED PIN 7 COMMON GROUND PIN 8 BLANKING INPUT PIN 9 OM PIN…... Listed under: AVR ATmega Projects, LED Projects 1362. Head-Controlled Keyboard And Mouse For Disabled, using AVR and ATMega32 microcontroller Easy Input is a head-controlled keyboard and mouse in for paralyzed users. The system is built based on AVR ATMega32. It uses user’s head movement to control mouse movement on the monitor and user blinking to activate mouse click. Two main sensor used…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1363. Advance Fire Alarm through Mobile Phone using microcontroller An automatic fire  alarm system is designed to detect  the unwanted presence  of  fir monitoring  environmental  changes  associated  with combustion.  In  general,  a  fire alarm  system  is  classified  as  either automatically  actuated,  actuated,  or both. Automatic  fire  alarm systems  are  intended  to  notify …... Listed under: AVR ATmega Projects, Phone Projects 1364. 93C66 EEPROM chip with an AVR microcontroller How to program a 93C66 EEPROM chip with an AVR microcontroller? The 93C66 is a serially (MICROW Electrically Erasable Programmable ROM (EEPROM) chip with 4 kbit (4096 bit, can be ORGanized as 256 x 16bit or 512 x 8bit) memory space. Here a DI version…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1365. DS1669 Digital Potmeter UP/DOWN using microcontroller Part list:1x AT90S1200-12PI 1x DS1669 (Dallas) 1x 78L05 2x 1N4007 1x 4MHz X-tal 2x 27pf 1x 47uF/16V 1x 100n polycarbonate 3x 100n multilayer 1x 100 ohm 1x 10k ohm 1x 820 ohm 1x 100k trimpot 1x 10k lin. potmete DS1669 Digital Control: Listed under: AVR ATmega Projects, Metering - Instrument Projects 1366. DS1802 Digital Volume Control using microcontroller Part list: 1x AT90S1200 1x DS1802 (Dallas) 1x 78L05 1x 8MHz ceramic resonator 1x 22pF 1x 47uF 47n polycarbonate 4x 100n multilayer 1x 100 ohm 1x 10k ohm 1x 820 ohm 1x 100k trimpot 1x 10k lin. potmeter Digital Controlled Potmeter: (also kno Listed under: AVR ATmega Projects, Metering - Instrument Projects 1367. Helianthus: The Solar Tracking System using ATmega16 microcontroller Renewable energy solutions are becoming increasingly popular. Photovoltaic ( systems are but one example. Maximizing power output from a solar system is desirable to increase efficiency. In order to maximize power output fro solar panels, one needs to keep the panels aligned with the…... Listed under: AVR ATmega Projects, Other Projects 1368. 16 LED Knight Rider using 74HCT138 microcontroller Part list: 8x LED (red) 1x 180 ohm 1x 10k ohm 1x 33k ohm 1x 2u2/16V 1x 74HCT191 1x 74HCT132 74HCT138 1x 78L05 1x 47uF/16V 1x 100n 2x 1N4007 Yet another version: Here an example with 4 TTL ICs. This is I think the…... Listed under: AVR ATm Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LED Projects 1369. 8 LED Knight Rider using AVR microcontroller Part list: 8x low-current LEDs 1x 1k ohm 1x 10k ohm 1x AT90S1200 2x 1N4007 1x 100n 1x 47uF/16V 1x 78L05 Another version: In version I took PORTB of the AT90S1200 AVR microcontroller as you can see in the diagram, because this makes it…... Listed under: AVR ATmega Projects, Other Projects 1370. 6 LED Knight Rider using ATtiny22 microcontroller Part list: 6x high eff. LED 2x 330 ohm 1x ATtiny22* 2x 1N4007 1x 100n 1x 47uF/16V 1x 78L05 * The A obsolete, replace with one of the folowing AVRs: AT90S2343 / ATtiny13 / ATtiny45. History of the back and forth flashers.... In the…... Listed under: AVR Projects, Other Projects 1371. Temperature Sensor Using ATmega8 and display using LCD(16×2) STEP 1: Circuit Diagram LCD other Pin's 1,2,3,15,16 as usual not shown. Temperature Sensor (LM35) Circuit ST Programming Code Compile Using Codevision AVR View C Code STEP 3: Burn The Hex In ATmega8 View Hex Code (Make Sure grounds are common otherwise it will…... Listed u
  • 123.
    AVR ATmega Projects,Sensor - Transducer - Detector Projects 1372. PCM Audio Based Door Bell using Atmega32 microcontroller This is a simple procedure to play PCM audio on any AVR microcontroller. AVR's high spee used to play the audio. It almost sound fine and can be used for simple projects that require sound effects. The code is compiled in winavr GCC…... Lis under: AVR ATmega Projects, Sound - Audio Projects 1373. AVR Based CRO using Atmega16 microcontroller STEP 1: Circuit Diagram Components ATmega16 MAX232 0.1uf Capacitor ----- 4pcs DB9 Connector 780 power supply STEP 2: Programme Code (Compile using Codevision AVR & Burn in Atmega16 ) View C Code STEP 3: Here We have used ADC5 of ATmeg connect…... Listed under: AVR ATmega Programmers, AVR ATmega Projects 1374. Dotmatrix using ATtiny2313 microcontroller On this page you will find a scrolling LED sign based on the ATtiny2313 AVR microcontroller, which you can yourself (when finished) Other names for this device can be: Moving message sign, Message crawler, Scrolling message, message display, etc. The idea let…... Listed under: AVR ATmega Projects, Other Projects 1375. Easy Breadboarding using ATMega microcontroller When I'm fiddling about with electronics I want to be comfortable about it. Therefore I built some t make by breadboarding life a little simpler. One example is the Network Breadboard Interface. Another one is this little project. These little pcb's can b Listed under: AVR ATmega Projects, Development Board - Kits Projects 1376. Monochrome Composite Video using Atmega8 This article describes the design of a Text on TV project. It takes serial data and displays text on a TV sc hardware part of this project is pretty simple. It uses an Atmega8 microcontroller that runs with a 16 MHz crystal. The article…... Listed under: AVR ATm Projects, Video - Camera - Imaging Projects 1377. Tea Timer using ATTiny2313 microcontroller I usually drink a lot of tea, and sometimes the tea tastes a lot better than average, which means that mos make tea I fail at least partially. The taste of the tea depends on a lot of variables: The make of the…... Listed under: AVR ATmega Projects, Home Autom Projects 1378. Kitchen Timer using ATTiny2313 microcontroller At the moment I do not have a kitchen timer. Not because I do not want one, (they're cheap enough t because it seems impossible to buy a kitchen timer with a decent user interface. That means I have to build my own,…... Listed under: AVR ATmega Pro Home Automation Projects 1379. Power usage monitor using Atmel AVR using Atmega168 microcontroller This project uses Atmega168 microcontroller to compute the power usage at and logs it to an SD card. It has a graphical LCD display too that shows the power usage as a strip chart. Besides, the voltage and current waveforms c displayed…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1380. Programmer UsbAsp using AVR microcontroller This morning (2009-12-31) I built my 4th AVR programmer. USBasp. I built this one because I wasn't co happy with my 3rd programmer and because I want to play with a software USB stack. I do know that it works (I just reprogrammed 2 old…... Listed un ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1381. Programmer using ATMEGA8 microcontroller The programmer I use is built from a kit I bought at Tuxgraphics. There are several reasons I bought this open source, works with avrdude. It connects to USB. It is a lot faster then my old programmer (Programs an ATMEGA8 in…... Listed under: AVR ATmeg Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1382. Beamer Control using attiny2313 microcontroller Beamer Control: Schematic Source code I made this project for Henk. He has a beamer for watching and a motor controlled screen. The purpose of this project is very simple. If he turns his beamer on, the screen must to down. And if the…... Listed und ATmega Projects, Home Automation Projects
  • 124.
    1383. Door Openerusing ATTiny2313 microcontroller Door Opener: Schematic Source code I made this little project for Hans, yet another brother of mine. ( brothers.) He had a garage door to control and bought a little RF transmitter and receiver to control his door. Leo made a nice cabinet…... Listed unde ATmega Projects, Home Automation Projects 1384. Dimmer using ATTiny2313 microcontroller Dimmer: Schematic Source code I made this project for Leo, a brother of mine. We had an old remote control of a video recorder lay around and he wanted some dimmers for all the lights in his house. I didn't have much experience with programming…... Listed under: AVR ATmega Projects, Home Automatio 1385. 2 Bit u Stepper using microcontroller This is the second stepper motor driver circuit I build. The first one had 4 linear current sources and got so hot it barely usable. It had some cool leds though. When I was searching for a better schematic on the internet I couldn't…... Listed under: AVR ATmega Proje Motor Projects 1386. Oscilloscope using AVR microcontroller Designing a professional digital oscilloscope is a pretty complex task wich makes them also pretty expensive. T concluded it's nothing more than a daydream to design one of those. It's far more realistic to limit the design of this instrument to something a bit…... under: AVR ATmega Projects, Metering - Instrument Projects 1387. LC Meter using AVR microcontroller LC Meter:  Schematic Source code This is the project I am currently working on (2010-01-23). The LC meter is base Elmcie or Elsie and other similar LC meters. This project is in a very early prototype stage and is at the moment only capable…... Listed under: AVR ATm Projects, Metering - Instrument Projects 1388. Power Supply using AVR microcontroller Katja & Guido at Tuxgraphics sell a very affordable little AVR controlled power supply. That power supply can controlled by sending it commands by I2C. Because I already have a pretty universal network connected to my PC it seems very logical to me to…... Lis AVR ATmega Projects, Other Projects 1389. Looking for expanding RAM for your Atmega128 An Atmega128 microcontroller has got 4K of built in static RAM, which is pretty enough for small and range projects that do not involve huge amount of data processing. But if you think you need more than that for your application, you can expand…... under: AVR ATmega Projects, Other Projects 1390. Cellphone controlled robot vehicle using ATmega16 microcontroller When we talk about wireless robot vehicles, we usually think about the RF circuits project is different. It uses a mobile phone to control the motion of a robotic vehicle, and therefore, the range of operation is as large as the coverage Listed under: AVR ATmega Projects, Phone Projects 1391. Multi-channel temperature logger using Atmega48 microcontroller This project describes how to use all the 8 ADC channels of an Atmega48 microcon read temperature sensors and the measured data to a PC for logging by using the built-in USART capabilities of the chip. For demonstration, the temp sensor used is LM335…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1392. Turn your TV into a Digital Voltmeter using Atmel’s AVR 90S1200 microcontroller This is an interesting voltmeter project that display the measured voltage on a TV screen, in gia as well as with analog bar. It also records the maximum and minimum values of measurements. The project was built by Alberto Ricci Bitti and was published…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1393. A physical display device for website visitors based on Atmega168 If you have a blog or website and want to make a physical device to display the num visitors, this project might be interesting to you. It describes about a similar device that can be directly connected to the internet via router and counts under: AVR ATmega Projects, Internet - Ethernet - LAN Projects
  • 125.
    1394. A multifunctiondigital meter using Atmega128 microcontroller This is a multifunction bench test instrument built using an Atmega128 microcontrolle incorporate a lot of functions like voltmeter, ammeter, logic analyzer, frequency generator, frequency counter and also provides regulated DC power s This device is interfaced with a Windows PC to display the measurements.…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1395. AVR digital clock with white seven segment LED display using ATtiny26 microcontroller This is a digital clock project based on an ATtiny26 microcontrol displaying time on four seven segment LEDs. The seven segment LEDs glow bright white and are multiplexed through PORTB pins, whereas the segme driven by PORTA pins. The time is normally shown in…... Listed under: AVR ATmega Projects, Clock Projects 1396. Portable 2.4 GHz Spectrum Analyzer using Atmega8 microcontroller There are plenty of wireless devices available on the market that broadcast in the ISM band. Such devices include Bluetooth, WiFi, Zigbee, wireless USB, cordless phones, wireless mice and keyboards, etc. This project describes a wire spectrum analyzer to examine the surrounding radio…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1397. VGA monitor tester using ATTiny2313 microcontroller If you are a computer technician and want to avoid the need of a PC on your desk to generate te this is something you need to build. This is an embedded monitor tester that you can use to test if a VGA monitor…... Listed under: AVR ATmega Projec Projects 1398. Digital oscilloscope GLCD using Atmega32 microcontroller This project describes how to make a digital oscilloscope using an Atmega32 microcontrolle graphics LCD. The GLCD used has 64*128 pixel dots (GDM12864A with KS0108 processor) and the AVR runs at 16 MHz using an external crystal oscilla enhance the speed further,…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1399. AM radio transmission using AVR using Atmega324 microcontroller When you think about building a radio transmitter circuit, the first thing that come is it requires too many analog components. But wait a minute, this guy demonstrates an AM transmission using a microcontroller. The interesting par a plant as…... Listed under: AVR ATmega Projects, Radio Projects 1400. Open source color video game development system based on AVR This project describes an open source color game development platform based on an AVR microcontroller. code a color, high resolution, smooth video game, like Super Mario Bros or Commander Keen on this system. All video processing is done by software in background using…... under: AVR ATmega Projects, Video - Camera - Imaging Projects 1401. USB business card with a computer chip board using ATtiny85 microcontroller Have you ever seen a business card with a computer chip embedded o one does. It has an ATtiny85 microcontroller chip that stores all your personal details. You plug it into an USB port of your computer, and find the deta the…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1402. Experimental board using ATTiny2313 microcontroller This is an experimental board for ATTiny2313 microcontroller that provides a 10-pin connector circuit serial programming, and other header pins to access I/O pins. The AT2313 microcontroller runs on an external 10Mhz crystal. The board has a p button reset switch for resetting the…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1403. Automate lights in your kitchen area using ATTiny84 microcontroller This project describes an automatic light system for kitchen sink where you need light to properly clean your dishes and vegetables. It uses an ATTiny84 microcontroller with a PIR motion sensor. When motion is detected, the microc turns on the light. The light source…... Listed under: AVR ATmega Projects, Home Automation Projects 1404. AVR displays body temperature on a Nokia 3310 LCD using Atmega8 microcontroller This project describes how to measure temperature with Atmega thermistor and display it on a Nokia 3310 LCD. A thermistor is a device that changes its resistance with temperature. With a proper resistor divider net temperature can be measured by measuring the…... Listed under: AVR ATmega Projects, Phone Projects
  • 126.
    1405. Open SourceUSB AVR Programmer for Students and Hobbyists using Atmega8 microcontroller If you cannot afford to buy a USB programmer for AVR worry, you can make one by yourself. This programmer uses a Atmega8 microcontroller with a few external passive components. The good thing is yo need any USB controller because it is implemented…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1406. AVR based remote controlled fan regulator This project is from Extreme Electronics that describes an AVR-based (Atmega8) remotely controlled fan reg The control commands are received through a DVD player remote control. With three buttons on the remote control, you can turn the fan On and Off conotrol the…... Listed under: AVR ATmega Projects, Video - Camera - Imaging Projects 1407. 50 MHz range frequency counter using ATtiny45 microcontroller A wide range frequency meter is an useful tool for an electronics lab. This projects de frequency meter based on AT90S231 microcontroller that can measure input frequencies up to 50 MHz. The measured frequency is displayed on 6 dig multiplexed seven segment displays. It…... Listed under: AVR ATmega Projects 1408. Easy Data Logger with Virtual USB using ATtiny45 microcontroller “V-USB is a software-only implementation of a low-speed USB device for Atmel’s AVR microcontrollers, making it possible to build USB hardware with almost any AVR® microcontroller, not requiring any additional chip.” For further detai USB and licensing, visit http://www.obdev.at/products/vusb/index.html This is a data logger…... Listed under: AVR ATmega Projects, Interfacing(USB - R -ISP) Projects 1409. Tetris and Snake with one AVR using Atmega168 microcontroller This project describes two games – Tetris and Snake, both programmed inside an Atm plug this device to a PAL TV and have fun playing the games. The circuit diagram is very simple and uses resistors to generate composite video output Listed under: AVR ATmega Projects, Game - Entertainment Projects 1410. Build an AVR Xmega Prototyping Board using AVR microcontrollers The AVR ATXmega chip is a newer offering in Atmel's AVR line.  The Xmega is billed hybrid 8/16-bit MCU, which means you can use your normal development environment to program Xmegas (as compared to AVR32 and Atmel's ARM Because the Xmega uses…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1411. Development Board With LCD using Atmega16 microcontrollers This instructable shows, how to do your own development board for Atmega16 or Atm processors.The Internet is full of home made development boards, but I think that, there is room left for another one. This board have been very usef projects and I…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1412. Blinking, Singing, Marioman using Attiny microcontrollers Use an attiny13a, two LEDs and a greeting card speaker to create a blinking Marioman that p Super Mario Brothers theme song. This can be an easy low-cost project for anyone who is looking for a fun way to break into AVR programming! The… under: AVR ATmega Projects, Sound - Audio Projects 1413. Reading Switches with using Attiny microcontrollers There have been several Instructables dealing with outputs from the ATtiny2313 and similar AVR d For example, http://www.instructables.com/id/Ghetto-Programming%3a-Getting-started-with-AVR-micro/, http://www.instructables.com/id/Drive-a-Ste Motor-with-an-AVR-Microprocessor/. Working on the latest one from The Real Elliot, which showed how to control stepper motors, I found that it wou really helpful to be…... Listed under: AVR ATmega Projects, Other Projects 1414. Halloween Robot using Attiny microcontrollers Halloween Robot controlled by an old wingman joystick. I don't reccommend this for beginners with ele only because some things like joysticks and power adapters are not all the same and must be modified. Additionally I provide programming code whic be useful for…... Listed under: AVR ATmega Projects, Robotics - Automation Projects 1415. The simple joule thief using AVR microcontrollers The Joule Thief is such an easy and simple device, but what it does is amazing. It can use a battery th usable in any other electronic device and give it life again. It can even take a battery that won't even power…... Listed under: AVR ATmega Projects, Batt Projects 1416. ISP Breadboard Header using AVR microcontrollers When I was first working with AVR microcontrollers, I relied a lot on tutorials I found on the web, b all of them raised the question of how to attach a programmer to the microcontroller when you aren't using a development board. Most of the time,… under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1417. Portal "Still Alive" on using ATMega16 microcontrollers Yet another Portal-related instructable , but Different ! This one shows you how to :   1)Build a very cheap device that pla bit version of Still Alive from Portal 2)On the same hardware , but with a different chip , play the "radio tune"…... Listed under: AVR ATmega Projects, Ra Projects
  • 127.
    1418. Atmega8 measuresambient temperature and relative humidity using HSM-20G sensor In one of my previous posts, I discussed about Sensirion’s SHT SHT75 sensors, which are capable of measuring both temperature and relative humidity. They are digital sensors and provide fully calibrated digital ou temperature and relative humidity. I also illustrated how to interface those…... Listed under: AVR ATmega Projects, Temperature Measurement Project 1419. A complete starter guide to AVRs using attiny2313 microcontroller Have you played with Arduino's and now have a taste for microcontrollers? Have yo go beyond Arduino but got stopped by the dense datasheets? This is the instructable for you! I was working on an instructable for the epilog contest w would wirelessly…... Listed under: AVR ATmega Projects, Other Projects 1420. An universal programming adapter for the Atmel STK500 using AVR microcontroller You have an STK500 development board for the AVR controllers fr Atmel? And you want to use it with a newer AVR controller which is not supported by any of the 8 sockets on board? And you do not own an STK505 ex board? Welcome…... Listed under: AVR ATmega Projects, Development Board - Kits Projects, LED Projects 1421. Building a digital light meter with a calibrated LDR using Atmega8 microcontroller Measurement of light intensity is a prime necessity in several occasi diversity of such needs make their way to various branches of physics and engineering as well as in media. For instance, in engineering, such kinds of measurements are needed to design optimum lighting…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1422. Intelligent temperature monitoring and control system using AVR microcontroller Controlling temperature has been a prime objective in various appli including refrigerators, air conditioners, air coolers, heaters, industrial temperature conditioning and so on. Temperature controllers vary in their com and algorithms. Some of these use simple control techniques like simple on-off control while others use…... Listed under: AVR ATmega Projects, Tempe Measurement Projects 1423. AVR acoustic spectrum analyzer using Atmega8 microcontroller AVR acoustic spectrum analyzer, based on Atmega8 AVR microcontroller, operational a and few other components. Use any HD44780 compatible LCD or VFD, connect audio signal, and enjoy the effect You can build in this into your am car-audio, or other device. On this…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1424. Wireless Accelerometer Controlled rgb-LED's using atmega168 microcontroller MEMS (Micro-Electro-Mechanical Systems) Accelerometers are in widespread use as tilt-senso mobile phones and cameras. Simple accelerometers are available both as ic-chip's and cheap development pcb-boards. Wireless chips are also affordable and available in asse circuits, with matched antenna-network and decoupling-caps onboard. Hook both wireless…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1425. Mini RGB Light Cube using AVR microcontroller This is basically a knockoff of the Hypnocube, instead of being 64 LEDs, thus costing at least $150 to make, I made a smaller ver LEDs for under $30. The result is a 2x2x2 cube where each light is independently controllable. I'm not…... Listed under: AVR ATmega Programmers, AVR ATmega Projects, LED P 1426. Control Anything with one AVR pin using Attiny2313 microcontroller This instructable shows how to control a group of led's with one microprocessor o The micro I will be using is an Atmel Attiny2313. Step: 1 Parts and Tools Parts: Attiny2313 (got 5 free samples from Atmel) 20 pin socket Resistors (any work,…... Listed under: AVR ATmega Projects, Other Projects 1427. Color Sensor using Atmega16 microcontroller This is a simple color sensor using  Atmega16 MCU and can sense Red ,Green and Blue color. How it works: the sensor consist sensor and RGB LED ,so when the object putted on the sensor the light that emitting  from RGB LED will reflected from the object  to…... Listed under: AVR ATmega Projects, Se Transducer - Detector Projects 1428. Ambient Light Gift Badge using ATTiny13 microcontroller After Christmas I was in the situation that my nephew's birthday celebration came near. I ask he had a special on his wish list and he told me that he doesn't have a wish at all, for the moment. He still had not…... Listed under: AVR ATmega Proje Projects 1429. 3 Easy Holiday Gifts using ATTiny microcontroller Every year the holiday season rolls around and I get stuck on what to give for my friends and family. always say that it's better to make the gift yourself than buy it at a store so this year I did just that.  The…... Listed under: AVR ATmega Projects, LED Projects
  • 128.
    1430. YAFLC (YetAnother Flickering LED Candle) using Tiny45 microcontroller There are numerous posts on Instructables about how to make a flickering LED This is my version. The project requires the following components: 1. Tiny45 AVR Microcontroller (Tiny13 would also do) 2. 1W Warm white (or yellow) Perspex tube 4. AA or…... Listed under: AVR ATmega Projects, Home Automation Projects 1431. Rechargeable Battery Capacity Tester using ATMega168 microcontroller Do you have a pile of AA rechargeable batteries in your drawer? Some are old new, but which sets would you bring with your camera on your next trip, and which ones are past their useful life? I like using rechargeable batteries, b Listed under: AVR ATmega Projects, Battery Projects 1432. Power your Arduino/AVR with a Hand-Cranked Battery using ATmega8 microcontroller If you've ever wanted to power your Arduino or AVR from a batt development testing (batteries have different power delivery qualities than, say, transformed AC or even a regulated wall wart in DC) testing but were going through batteries (Hey, I admit…... Listed under: AVR ATmega Projects, Battery Projects 1433. Arduino FTDI Header using ATmega8 microcontroller So, you want to program a bootloaded AVR. Or possibly, you have an Arduino Lilypad and no way program it. There are a few solutions available to you: You could buy a USB to FTDI adapter (available at Adafruit, Sparkfun, etc), you could buy…... List AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1434. Autonomus Wall Following Obstacle Avoiding Arduino Rescue Bot I'm an Electrical Engineering major and each year my college's branch of IEEE competes in a student hardwar competition. Last year's competition was inspired by the natural disasters in Haiti and Chile (the competition was held one week after the earthquake This was…... Listed under: AVR ATmega Projects, Robotics - Automation Projects 1435. How to use a 74HC595 Shift Register with a using AVR ATtiny13 microcontroller If you have been playing with microcontrollers and electronics then yo likely seen LED dot matrix displays and other projects that use shift registers like 7-segment displays and more. This instructable goes over a quick int 74HC595 8-Bit Serail to Parallel Shift…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1436. $10 ATtiny85/45 POV display!! (works really well) Hey guys! This is an Instructable for making your own ATtiny85/45 5 LED POV (Persistence Of Vision) d This is my second Instructable, also for the Elemental LED contest, so drop a comment and vote it up! The total parts cost for this POV display…... Liste AVR ATmega Projects, LED Projects, Video - Camera - Imaging Projects 1437. The $9 Quasi-duino (Almost-duino) using ATmega328 microcontroll Do you currently have an Arduino and want to make it smaller for cheap?  The Qua is for you (Italian for almost-duino).  This makes a functional "almost" Arduino, in a very small form factor using the narcoleptic library for pico-power on a pico-space breadboard.…... Listed under: AVR ATmega Projects, Other Projects 1438. Soldering an SMT MOSFET Driver with a hotplate using microcontroller Soldering SMD components isn't as hard as you might think. In fact it's easy. If this instructables you'll soon see just what great results you can obtain at home using just a hotplate. It's not just being able to make small circuit boa Listed under: AVR ATmega Projects, PWM Projects 1439. $1.50 Arduino TV Annoyer!! (Turns TVs on when you want them off) using microcontroller Hey Arduino fans! Here is an 'ible for making a device that tu on when you want them off, and off then you want them on! If you hide it in something inconspicuous, it would make a great April Fools joke or gag g Listed under: AVR ATmega Projects, Video - Camera - Imaging Projects 1440. Programming Arduino Bootloader without Programmer using ATmega168 microcontroller OH NO!!! You've screwed up and now the Arduino bootload 'duino is gone!  What are you going to do? Go spend money for a programmer??? Well don't! I've got a solution that only requires your 'duino and som So its not the…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1441. Jar of Fireflies using AVR ATTiny45 microcontroller This project uses green surface-mount LED's along with an AVR ATTiny45 microcontroller to simulat behavior of fireflies in a jar. (note: the firefly behavior in this video has been greatly sped up in order to be easier to represent in a short film. The…... L under: AVR ATmega Projects, Game - Entertainment Projects 1442. Music Playing Alarm Clock using ATmega644 microcontroller This Instructable will be about designing a music player from using various building blocks. You will understand th communication between the microcontroller, memory, computer, LCD display, RTC, IR remote, and the music file decoder. I will try my best to to teach you in a…... Listed unde
  • 129.
    ATmega Projects, Sound- Audio Projects 1443. Door Activated LED Lighting using Hall Effect Sensors using Attiny85 microcontroller I've been meaning to make something cool for my dorm room th semester and decided that some custom closet lights would look great. In this Instructable, I'll show you how to make some nice-looking LED lights tha on automatically using a hall…... Listed under: AVR ATmega Projects, Home Automation Projects 1444. Getting Started with Atmel AVR and BASCOM using attiny26 microcontroller I have seen plenty of Instructables showing how to work with microproces they all assume that you have worked with them before and know what you are doing. I have not seen an Instructable that takes you from nothing an on each step.…... Listed under: AVR ATmega Projects, Other Projects 1445. How to use the Dragon Rider 500 with your AVR Dragon using ATtiny2313 microcontroller This instructable is a crash course in how to use some of the of the Dragon Rider 500 from Ecros Technologies. Please be aware that there is a very detailed User's Guide available on the Ecros website. The Drago a interface board…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1446. Make a breadboard adapter for your AVR microcontroller using attiny2313 If you like to play around with micro controllers you know this hustle: You w test a part of a program and first you need to completely wire up the uC on the bread board. Not with these handy parts any more! These are…... Liste AVR ATmega Projects, Metering - Instrument Projects 1447. How to program a AVR (arduino) with another arduino using attiny2313 microcontroller * you've got your arduino with atmega168 and you bought an atmega328 at you local electronics store. It doesn't have an arduino bootloader * you want to make a project that doesn't use arduino - just a regular (like the USBTinyISP) - you…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1448. Creating a charlieplexed LED grid to run on ATTiny85 This instructable was inspired by my first AVR microcontroller project that I've been working on fo time now. I wanted to start learning more about the AVR microcontroller and see how much I could do with the minimum amount of hardware... no ex …... Listed under: AVR ATmega Projects, LED Projects 1449. How to control a 16×2 LCD using an AVR ATtiny2313 If you are just getting into microcontrollers there's alot to know as you have likely found out. Ther good online tutorials for the Atmel AVR's and chances are you have see a few of those by now. I recently got into microcontrollers and…... Listed under ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 1450. How to program a AVR (arduino) with another arduino using atmega168 microcontroller This instructables is usefull if: * you've got your arduino with atmega168 and you boug atmega328 at you local electronics store. It doesn't have an arduino bootloader * you want to make a project that doesn't use arduino - just a regular AVR chip…... Listed unde ATmega Projects, How To - DIY - Projects 1451. Singing Pumpkins/ Arduino using microcontroller Lets start off by saying that I am a noob to micro controllers like Arduino. After looking through instr for a while I saw the things that arduino could do. That is when I realized that I had to get one and learn the whole…... Listed under: AVR ATmega Proje - Audio Projects 1452. Turn a TV-B-Gone into a super camera remote! Intro: My Nikon DSLR has an infrared remote function (remote sold separately) that is really handy, but limited in range. A while ago, I bought a TV-B-Gone Kit from it's inventor Mitch Altman, and it can turn TV's off from a great distance. I…... Listed under ATmega Projects, Video - Camera - Imaging Projects 1453. Vintage Toothbrush Timer using ATMega328p My last visit to the dentist convinced me that I should really brush my teeth at least two minutes. I decid build a special toothbrush timer: it would detect when a brush is taken out, measure two minutes and notify when the time is…... Listed under: AVR AT Projects, Medical - Health based Projects 1454. Custom Tron Disc Mod using ATMega328 In this Instructable, I cover modding the store-bought Deluxe Identity Disc to an upgraded version with 64 le controlled by an AVR MCU. The upgraded version is costume-ready and would be an excellent addition to your Tron costume - it'll also look great on y Listed under: AVR ATmega Projects, Other Projects
  • 130.
    1455. Build YourOwn BARBOT using AVR microcontroller Ever wanted a robotic liquor server?I purchased a Lynxmotion robotic arm last year and an Arduin play around with. I had it serial controlled with a joystick and it was a great way to start in robotics. More recently I wanted to take…... Listed under: AV Projects, Robotics - Automation Projects 1456. Ard-e: The robot with an Arduino as a brain using microcontroller Hopefully after reading this instructable you will be able to take your first step into r Ard-e cost about $90 to $130 depending on how much spare electronics you have lying around. The main costs are: Arduino Diecimella- $35 https://www.makershed.com/ProductDetails.asp?ProductCode=MKSP1 Bulldozer kit- $31 http://www.tamiyausa.com/product/item.php?product-id=70 Servo-…... Listed under: AVR ATmega Projects, Robotics - Automation Projects 1457. Turn signal biking jacket using microcontroller This tutorial will show you how to build a jacket with turn signals that will let people know where you're when you're on your bike. We'll use conductive thread and sewable electronics so your jacket will be soft and wearable and washable when you're…... under: AVR ATmega Projects, Game - Entertainment Projects 1458. The 74HC164 Shift Register and your Arduino using GD74HC164 microcontroller Shift registers are a very important part of digital logic, they act as glue in between the paralle serial worlds. They reduce wire counts, pin use and even help take load off of your cpu by being able to store their data. They come…... Listed under: AVR ATmega Projects, How Projects 1459. Using a Dot Matrix LED with an Arduino and Shift Register The Siemens DLO7135 Dot matrix LED is one amazing piece of optoelectronics. It's billed as Matrix Intelligent Display (r) with Memory/Decoder/Driver. Along with that memory, it's got a 96-character ASCII display set with upper and lower case characters, a built-in character generator…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1460. Arduino EMF (Electromagnetic Field) Detector A while back I saw an EMF (Electromagnetic Field) Detector at makezine.com that used a led bargraph. I modify it to use a 7-Segment LED Display! Here's my project. Sorry I don't have any pictures of it in use. Hopefully I can post…... Listed under: AVR ATm Projects, Sensor - Transducer - Detector Projects 1461. Arduino magnetic stripe decoder using microcontroller This instructable shows how to use some freely available code, an arduino, and a standard ma stripe reader to scan and display the data stored on magnetic stripe cards such as credit cards, student IDs, etc. I was inspired to post this after readin Listed under: AVR ATmega Projects, Memory - Storage Projects 1462. Arduino XMAS hitcounter using AVR microcontroller Christmas is coming closer, so here is my contribution to put you in the right mood. It is a blog hit that rings a bell. Literally. It puts a smile on your face, every time someone hits your blog. It consists of an Arduino board,…... Listed under: AVR ATmeg Game - Entertainment Projects 1463. The Lightning Simulator/Breathalyzer/Graphic Equalizer – Using Arduino Powered The LED strips are mounted on an outdoor trellace which functions lightning simulator, outdoor breathalyzer, graphic equalizer synced to music, and a few other effects with sound. Materials:   8 12v RGB Waterproof Fl Strips 10ft long (usledsupply.com) - $800 8 RGB 4A/Ch Amps…... Listed under: AVR ATmega Projects, Home Automation Projects, LED Projects 1464. Make a Web Connected Robot (for about $500) (using an Arduino and Netbook) This Instructable will show you how to build your own Web Connected (using an Arduino micro-controller and Asus eee pc). Why would you want a Web Connected Robot? To play with of course. Drive your robot from acro room or across the country,…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects, Robotics - Automation Projects 1465. Interfacing ATmega32 with an LCD and a DAC Hi techies!! This is one more of my circuits, interfacing ATmega32 with an LCD and a DAC. it also includes general purpose push-buttons and In System Programming connector. The controller is operating with 14.7456 MHz frequency crystal, convenient for generating standard baud rates (for…... Listed under: AVR ATmega Projects, How To - DIY - Projects, LCD Projects
  • 131.
    1466. Arduino andTouchpad Tic Tac Toe using microcontroller Or, an exercise in input and output multiplexing, and working with bits.  And a submission for Arduino contest. This is an implementation of a tic tac toe game using a 3x3 array of bicoloured LEDs for a display, a simple resistive touchpad, and an under: AVR ATmega Projects, Game - Entertainment Projects 1467. The 4x4x4 LED cube (Arduino) In this instructable I will show you how to make a 4x4x4 LED cube that will be controlled by an Arduino Demulionove. n you might say" that Arduino has only 14 I/O pins well also the 6 analog pins can be used as pins…... Listed under: AVR ATmega Projects, LED Projects 1468. Arduino Laser Tag – Duino Tag Duino tagger- General introduction Duino tag is a laser tag system based around the arduino. Finally a laser tag system be tweaked modded and hacked until you have the perfect laser tag system for office ordnance, woodland wars and suburban skirmishes. Laser tag… under: AVR ATmega Projects, Other Projects 1469. Ardu-pong! the Arduino based pong console A while back the instructables robot made a post on Facebook about some guys who played pong on an (http://wayneandlayne.com/projects/video-game-shield/games/#pong) but after looking around, i saw that everyone who did this was only worried ab making it work. and often resulted as a very hard…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1470. How to make a multi-layered acrylic and LED sculpture with variable lighting levels Here you can find out how to make you very own n as made for the exhibition www.laplandscape.co.uk curated by art/design group Lapland. More images can be seen at flickr This exhibition runs from Wednesday 26 N - Friday 12 December 2008 inclusive, and had…... Listed under: AVR ATmega Projects, How To - DIY - Projects, LED Projects 1471. Garduino Upgrade, Now with more Twitter! A couple months ago I came across two great instructables.  The first was the Garduino, an arduino contro garden to help you grow plants at home.  The second was the Tweet-a-Watt, a project that teaches you how to monitor your home power usage using Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1472. Garduino: Gardening + Arduino Garduino is a gardening Arduino. So far, Garduino: -Waters my plants whenever their soil moisture level drops below a predefined value. -Turns on grow lights, but only when it's dark out and only long enough to make the plants get 15 hours of total light…... Listed unde ATmega Projects, Development Board - Kits Projects 1473. Control a Schlage electronic deadbolt with an arduino! This instructable will walk you through the process of dismantling and hacking a Schlage electro deadbolt in order to control it with an arduino. Step 1 Purchase the lock and unpack it I got mine on sale for $99 at Lowe's. Remove it from the…... List AVR ATmega Projects, Other Projects 1474. The Arduino Weather Station / Thermostat using ATmega328 microcontroller I've always been interested in monitoring my local weather, and noticed weather.com and accuweather.com think my local weather is, and what I see out the window. I also wanted better control over my heating and A/C sy computer and…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects, Temperature Measurement Projects 1475. Arduino All-in-One Getting Started Guide An all-in-one tutorial to getting started with the Arduino open-source electronics prototyping platform. This g meant for the beginner but should be also be useful to you if you already tinker with electronics but want to get started with the Arduino. I'll cover: -… under: AVR ATmega Projects, How To - DIY - Projects 1476. Arduino Powered Binary Clock using ATmega168 microcontroller This instructable will help you to build an Arduino Binary Clock.  The orignial idea for instructable was designed by Daniel Andrade.  My instructable uses surface mount components, but can easily be adapted to through-hole componen wish.  You can follow my other Instructable…... Listed under: AVR ATmega Projects, Clock Projects 1477. Interface a rotary phone dial to an Arduino An old rotary phone can be used for a number of purposes in your Arduino projects - use it as a novel input device, or use the Ardu interface a rotary phone to your computer. This is a very basic guide describing how to…... Listed under: AVR ATmega Projects, Phone Projects
  • 132.
    1478. Digital WindowSticker (Arduino Controlled) using ATMega328 microcontroller A bumper-sticker sized L.E.D. matrix that displays images in sequence fr card, to produce an animated sign or "window sticker." Arduino controlled! Also includes Windows, Mac, and Linux code for converting .xbm image file Digital Window Sticker files. Perfect for a shop…... Listed under: AVR ATmega Projects, Other Projects 1479. Arduino Watch Build Instructions The Arduino Watch provides augmented sensing of temperature and range, 16-bit color drawing program, Breakout and also tells the time in your choice of digital, binary, or analog.  Additional sensors, devices, and programs are easy to add as any standard Arduino. source code…... Listed under: AVR ATmega Projects, Clock Projects 1480. Mushroom Environment Control – Arduino Powered This is my first Arduino project aimed at helping me with my other hobby which is growing oyster shiitake mushrooms indoors. In a nutshell, the controller takes in two temperature readings, 1 Humidity reading and 1 Co2 reading and triggers a set Listed under: AVR ATmega Projects, Medical - Health based Projects 1481. How to connect Arduino and RFID On this instructable I will try to show how to interface a RFID sensor with the Arduino. I am using the RFID sensor fr seeedstudio the serial version of it. There are a few parts you will gonna need. I also bought some RFID keys.…... Listed under: AVR ATmega Projects, H DIY - Projects, RFID - NFC Projects 1482. How To Smell Pollutants This Instructable explains how to use a gas sensor with your Arduino. This lets your Arduino smell (and hence you program responses to) overall gas l variety of nasties, including ethanol, methane, formaldehyde, and a bunch of other volatile organic compounds. My cost…... Listed under: AVR ATmega Sensor - Transducer - Detector Projects 1483. Temperature Control For Kitchen Appliances In this Instructable, I will step through controlling the temperature of most kitchen appliances. As an exam use an old Westbend Poppery popcorn maker (aka. coffee roaster), but these same techniques will be applicable to most hot plates, coffee makers, an irons.…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1484. Wireless Altoids Display This Instructable will show you how to modify an Altoids tin for a wireless 2x16 character display. Using an Altoids tin was insp the need to have a small yet protective enclosure for a pair of Xbee modules recently bought from Sparkfun. I purchased the…... Listed under: AVR ATm Projects, Internet - Ethernet - LAN Projects 1485. Secret Knock Detecting Door Lock Protect your secret hideout from intruders with a lock that will only open when it hears the secret knock. This starte bit of a joke project, but turned out to be surprisingly accurate at judging knocks. If the precision is turned all…... Listed under: AVR ATmega Projects, S Safety Projects 1486. Gmail and RSS Notifiers using the Arduino I’ve been really interested in doing J4mie’s Physical Gmail Notifier ever since it came out in February. I only r dropped into the project and got to learn a lot about python, plists, and arduino auto-reset functionality. I’m going to share what I’ve learned because… under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1487. Magnetic Levitation using the Arduino It’s been only a couple weeks since I discovered Arduino, an open source microcontroller platform. I was looking cheap interface between my laptop and electronic circuits. Arduino with its price $35 and easy to use development environment was the best choice. after…... Listed under: AVR ATmega Projects, Sensor - Transducer - Detector Projects 1488. Wi-Fi Enabled Coil Gun with iPhone App We’ve covered loads of airsoft, nerf, and gun projects, and here’s another superb pr0ject to add to our collecti coil gun placed on a turret which is triggered via Wi-Fi.   Additionally, it uses remote targeting and shooting through an iPhone, iPod Touch or…... Listed AVR ATmega Projects, Internet - Ethernet - LAN Projects, Phone Projects
  • 133.
    1489. Superb DIYRetro Lighting Design What is it? It is a decorative lamp; a very, very impractical decorative lamp employing a few vintage display devices and a couple of LEDs too. A mine was one of a group of artists who produced Ascension (the giant origami-crane tent) at…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1490. A credit card sized Ethernet Arduino compatable controller board using ATmega168 microcontroller I love the Arduino as a simple and accessible cont platform for many varied projects.  A few months ago, a purchased an Ethernet shield for my Arduino controller to work on some projects with a mate it was a massive hit -…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1491. Light for life: Glowing button cycling jacket Not everyone wants to look like an athlete while cycling to work or school. This cycling-jacket, made of hem wool, is equipped with lots of shining bright LEDs. It looks just as good during the day as it does during the night. Embedding the…... Listed under: AVR Projects, Game - Entertainment Projects 1492. The Word Clock – Arduino version using ATMega168 microcontroller Major updates - A much better enclosure for this clock has been designed - check http://www.instructables.com/id/The-Wordclock-Grew-Up/ Last month I wanted to build a special gift for my beautiful wife, Megan.  She has a teaching background in English, so what better present to make for…... Listed under: AVR ATmega Projects, Clock Projects, LED Projects 1493. Arduino R/C Lawnmower (painted) using Atmega168 microcontroller What this is: This instructable will show you how to make your Arduino into an R/ interface that you can use for just about anything requiring remote control. I will also show you how I built an R/C lawnmower using my Arduino, a che transmitter and…... Listed under: AVR ATmega Projects, Robotics - Automation Projects 1494. How to have fun with Arduino (and become a Geek in the process) Do you wish to earn your geek card - pronto? Lets get started! This guide will start y path to the dark side using the open source Arduino development and prototyping platform. It will introduce you to microcontrollers, get you started w Listed under: AVR ATmega Projects, How To - DIY - Projects 1495. Control Electronics using an Arduino and Infrared LEDs Learn how to use infrared LEDs to send signals to your TV and other electronic devices via an A First, the Arduino will interpret IR pulses sent out by the TV remote, save them to memory, then “replay” them upon the user’s command. You can…... under: AVR ATmega Projects, LED Projects, Other Projects 1496. Arduino animatronics- make your awesome costumes more awesome! using ATmega328 microcontroller Here's how to add lights, sound and action t favorite Halloween project using the open source Arduino microcontroller. Arduino is easy to learn to use and it opens up a whole new world for costu builders and creature creators. If you want to learn…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1497. Using the iRobot Create's Command Module with Linux using avr microcontroller Since iRobot hasn't provided linux users with a way to use the comm myself. Don't be intimidated, its not hard at all, really. All you need to do is run a couple of scripts. Lets get started, shall…... Listed under: AVR ATmega Microcontroller Programmer Projects, Robotics - Automation Projects 1498. Use Visual Studio 2010 to Compile AVR Hex Files using AVR microcontroller I'm not a huge fan of Microsoft, but man, they do make one slick programm In searching around for a solution to use the IDE to program AVR's I came across some scattered instructions.  As I love the intellisense feature of Visu (VS)…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1499. Laser Tripwire takes a Photo, Uploads it to Twitter This instructable will show you how to construct a laser tripwire that can twitter and grab an image webcam, as well as execute any command you can put in a bash script. This instructable is actually quite simple and is even suitable as a beginner…... under: AVR ATmega Projects, Video - Camera - Imaging Projects
  • 134.
    1500. The HouseholdInformer using atmega168 microcontroller Who wants to go outside to see if the mail has arrived? In the cold winter or rain I’d rather n to put on a jacket and shoes, only to find that there was no mail. This project will notify you of the mail…... Listed under: AVR ATmega Projects, Home Automation Projects 1501. The $9 Quasi-duino (Almost-duino) Do you currently have an Arduino and want to make it smaller for cheap?  The Quasi-duino is for you (Italian for al duino).  This makes a functional "almost" Arduino, in a very small form factor using the narcoleptic library for pico-power operations on a pico-space breadboard.…... Listed under: Circuits 1502. Turn Your Arduino Into an ISP Learn how to turn your Arduino into an AVR In System Programmer. This will allow you to burn bootloaders onto new ch program AVRs without a bootloader. Step 1: Materials To begin you will need: * Arduino (I will be using the Uno) *…... Listed under: AVR ATmega Projec Camera - Imaging Projects 1503. GuGaplexed Valentine LED Heart using ATTiny13V Microcontroller GuGaplexing is a new LED display multiplexing technique. Compared to Charlieplex GuGaplexing allows you to control twice as many LEDs, with just a few additional components. GuGaplexed Valentine LED Heart project has 40 LEDs a an 'Arrow Piercing a Heart" arrangement using only 5…... Listed under: AVR ATmega Projects, Game - Entertainment Projects, LED Projects 1504. Smoke & Fume Absorber Demo video Smoke & Fume Absorber A Long History The ancient Egyptians produced lead and other important metals like g silver as early as 5000 BC. In the Roman era, lead was used for coinage, jewelry and other everyday items including the production of…... Listed under ATmega Projects, Other Projects 1505. Use Google Voice Search through Arduino & Bluetooth With Google announcing the launch of Voice Search for desktop, we couldn’t help thinking that even more fun to be had with talking to a computer. So, we went ahead and built an open source dev board to inspire people to build their…... Listed AVR ATmega Projects, Internet - Ethernet - LAN Projects 1506. Arduino powered hangman giftbox/lockbox using ATmega328 microcontroller A medium sized box that requires the user to succeed in a game of han order to gain access to the contents of the box.  Great gift Idea!!! my Arduino sketch will be included in this instructible sorry for the poor quality pictu Listed under: AVR ATmega Projects, Game - Entertainment Projects 1507. Beginner's Guide – AVR Programming You will get this done in 30 min. Step 1: Parts 1. 1 X  any type of circuit board 2. 1 X Atmel AVR Atmega16 microco 3. 8 X 330 ohms Resistors 4. 8 X LEDs 5. 1 X AVR Programmer (just use for download…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1508. Assembling the ZIFduino USB 1.2 using ATMEGA168 microcontroller The ZIFduino, for all intents and purposes, is an Arduino with a ZIF socket. It's gea toward those that want to do prototyping on the platform, but then move the ATMega chip to a stand-alone environment. The pin layouts are exactly t so it…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1509. Assembling the Dragon Rider 500 for use with the AVR Dragon using ATmega88 microcontroller Not long ago the Atmel company came out with a grea use with the AVR line of microcontrollers called the AVR Dragon. This small USB device provides professionals and hobbyists alike the ability to use: In Programming (ISP), JTAG, Debug Wire, and…... Listed under: AVR ATmega Projects, RTOS - OS Projects 1510. Fun Hackable Speaker Timer using ATMega328 microcontroller This is a fun speaker timer I made for some upcoming conferences.  It uses a 4-digit charlieplexed LED (pseudo 7-segment) display and is driven by a AVR ATMega328 or an Arduino.  It allows a default time to be set, can be paused, and put…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1511. Slaveflash with Attiny24 ver. 2.0 You might have noticed the Slaveflash I built with an Attiny 24, the instructable can be found here: Slaveflash-trigger-f with-Attiny24   After building the first prototype I collected all my old flashes I got over the years and had four more slaveflash-triggers to built. I alread figured…... Listed under: AVR ATmega Projects, Memory - Storage Projects
  • 135.
    1512. Build aComplete AVR System and Play Mastermind using ATmega328p microcontroller The game Mastermind has been around a long time, and I rem getting a board version with colored pegs when I was a kid. I love this game, as it is solvable simply by pure logic. One player (or a computer/microcon chooses a sequence of…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1513. Getting started with LCD's and Microprocessors using ATmega8 In this Instructable, find out how to control LCD's with a ATmega8 and Bascom. Demo You will need: - Breadboa - ATmega8 - Programmer - Bascom AVR (There is also a demo version for Free) - 10k resistor - 100k resistor - 10k…... Listed under: AVR ATmega Projects, LCD Projects 1514. Programming adapter from 10 pin to 6 pin for AVRs This is the last one of my 'Things that make life easier' series, I published in the last few days. It's v simple, but most of the time the simple things are the most helpful. I always used the big 10 pin jack for programming…... Listed under: AVR ATmega P Microcontroller Programmer Projects 1515. Direction Aware Messaging LED Spin Top using Tiny44 microcontroller We recently built a LED spinning top with message display. Its an improved vers similar top published by Elektor in their December 2008 issue. The Elektor top can be spun only in one direction. The synchronization required to prin on the LEDs…... Listed under: AVR ATmega Projects, LED Projects 1516. Annoying Beeper using Microcontroller ATtiny13 Play a prank on your friends (enemies?) by hiding a high-pitched beeper which sounds off at random intervals. This instructable uses minimal parts. All that is required is: battery microcontroller speaker Why don't I just use a 555 timer chip? You certain I…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1517. Open Source Temperature Controller- Appliance Heat Exchanger video Open Source Temperature Controller- Appliance Heat Exchanger Here's a heat exchanger demo using the open source temperature controller. Full heat exchanger available here Intelligent controller, schematics, and code availab The open source temperature controller allows you the flexibility to control DC appliances based…... Listed under: AVR ATmega Projects, PWM Projects 1518. Instalacion del controlador USBasp (USBasp drivers setup) – Dark Side Electronics English version available at the bottom Se enseñara paso a paso co instalar los controladores (drivers) necesarios para el correcto funcionamiento del programador USBasp para microcontroladores AVR. Primero, mencionaremos algunas consideraciones para evitar fallos por usos indebidos del programador. También se mencionará  el protocolo y…... Listed und ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1519. How to Read Binary/Hex Thumbwheel Switch with an AVR Microcontroller This instructable will show you how to read the number on a binary pushwh thumbwheel switch using LED's or an AVR microcontroller (I'm using an ATmega328p but this can be adapted for any AVR or probably another microco of your choice). Multiple thumbwheel switches…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1520. DIY Digital Thermometer Using ATMega8 This instructable will show you how to make a thermometer that displays the temperature of the air. It's not accurate thermometer in the world, but for this price and the fact that it was homemade... This instructable will show you how to make…... Listed und ATmega Projects, Temperature Measurement Projects 1521. Power Your Arduino From Your Car The Arduino -- and AVRs in general -- have a wide range of power supply options ranging from around 1.8V to 5.5V choice of voltage is usually determined by the desired clock speed or power consumption requirements. The Arduino and its many variants have…... L under: AVR ATmega Projects, Car Projects
  • 136.
    1522. Build thePenguin game system using ATMega32/644 microcontroller Gotta love microcontrollers.They do lots of stuff ... you can find them in compute traffic lights , toys , and almost all electronic devices nowadays. Well , this is a project that pushes an 8-bit ATMega32 microcontroller to the limits. As y guessed…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1523. Electronic Tic-Tac-Toe with RGB LEDs video Electronic Tic-Tac-Toe with RGB LEDs RGB LED game to play Tic-Tac-Toe for two players. Uses 2 AVR Microco Mega16 and Mega8. RGB LEDs allow each user to choose his/her color to represent Cross/Nut.   For more details, click: Electronic Tic-Tac-Toe with RGB Listed under: AVR ATmega Projects, Game - Entertainment Projects 1524. Drive a Stepper Motor with an AVR Microprocessor using ATTiny2313 microcontroller Got some scavenged stepper motors from printers/disk drives/e around? Some probing with an ohmeter, followed by some simple driver code on your microprocessor and you'll be stepping in style. Step 1 Get to Kn Steppers Basically, you're going to need to figure out where…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Motor P 1525. Getting started with LCD's and Microprocessors In this Instructable, find out how to control LCD's with a ATmega8 and Bascom. You will need: - Breadb Wires - ATmega8 - Programmer - Bascom AVR (There is also a demo version for Free) - 10k resistor - 100k resistor - 10k variable…... Listed under: AVR A Projects, How To - DIY - Projects, LCD Projects 1526. Slaveflash-trigger for digital cameras with Attiny24 When flashing with digital compact cameras, the camera usually uses several small flashes before m the actual picture. This is o.k. if the built-in flash is the only flash you have, but if you want to use an external second flash you have a problem:…... List AVR ATmega Projects, Other Projects 1527. Apple-style LED pulsing using a $1.30 MCU using ATTiny85 microcontroller The Atmel ATTiny85 chip is an 8-pin MCU that is totally awesome.  If you've programming with the bigger boys (the ATMega series), these are a nice adventure - you're rather limited in the number of output pins, but a creative gives us a…... Listed under: AVR ATmega Projects, LED Projects 1528. Debugging AVR code in Linux with simavr I recently started programming AVR chips, namely the ATTiny85.  They can be programmed using C, compile readily available in Ubuntu, and you can do a LOT with them - just search for avr on this site!  Anyway, I was having some trouble with my…... Listed un ATmega Projects, RTOS - OS Projects 1529. Watch futurama on an 8×8 pixel screen using atmega168 microcontroller here's how to convert otherwise reasonable quality video into pixelated garb play it on a 2 color 8x8 led matrix, with no sound and only moderate sync. ingredients: - (1) 8x8 2 color led matrix - (1) atmel avr atmega168 - (2) 74hc5 shift…... Listed under: AVR ATmega Projects, LCD Projects 1530. AVR/Arduino RFID Reader with UART Code in C RFID is the craze, found everywhere - from inventory systems to badge ID systems. If you've ever been department store and walked through those metal-detector-looking things at the entrace/exit points, then you've seen RFID. There are several places good information on…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, RFID - NFC Projects 1531. How To Make A Grounding Wrist Band In my life i deal with lots of sensitive electronics every day and frying these electronics is a big concern when to them. Most people think its hard to fry electronics with static electricity. Its not, one touch could send your $100 graphics card down…... Listed under: ATmega Projects, How To - DIY - Projects 1532. Telnet to your Arduino/AVR! The other day I was wanting to check on one of my AVR's but I was upstairs and god knows it was too much of a hassle to downstairs to where the microcontroller was. But, there were two idle computers sitting upstairs next to…... Listed under: AVR ATmega Projects, Intern Ethernet - LAN Projects 1533. A protective case for the Atmel AVR Dragon using AVR This instructable will show you how to easily modify a readily available plastic case to hold and p your AVR Dragon PCB. Atmel promotes their AVR Dragon as a low cost development product tool for use with their AVR microcrontollers. While the pro does come…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1534. Ghetto Development Environment Using Microcontrollers A while back, I posted up a quick and dirty "el cheapo" method of getting started programm Atmel AVR series chips: Ghetto Programmer (version 1.0) Since then, I've vamped, re-vamped, and otherwise improved my setup. Thought it'd be nice document it. The goal…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects
  • 137.
    1535. USB RFIDReading Keyboard using USnooBie video USB RFID Reading Keyboard Demo   This is a step by step tutorial on how to build a RFID tag readin keyboard using the USnooBie. This tutorial is provided with the project files. The code files are heavily commented with references to relevant…... Liste AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, RFID - NFC Projects 1536. New Jar of Fireflies When I ran across the Jar of Fireflies Instructable sometime this past summer, I knew I had to build it.  Full credit to Keso for an exc of instructions!  I wouldn't have gotten to the point of developing the firefly behavior without such a solid base for…... Listed under: AVR ATmega Proje - Entertainment Projects 1537. FanBus Digital Fan and LED Interface for PC using ATMega168 microcontroller Last year I modified a blue LED fan with RGB LED's to enhance the look server case.  Last summer I built a gaming computer and ever since I wanted to light it up with multiple controlled lights and fans.  I finally figured out under: AVR ATmega Projects, LED Projects 1538. Augmenting a Microcontroller using AVR Microcontrollers (MCUs) are fantastic little ICs that give an extra element of versatility to your electronics, robotics or other project. Bu really not much use on their own. To function, all MCUs need some sort of support components, and a board to live on…... Listed under: AVR ATmega Other Projects 1539. Development system for PIC and AVR microcontrollers After testing many systems development for PIC and AVR microcontrollers, none satisfy me. So this system with breadboard that has satisfied me. Step 1: More space free In this development system, I put two protoboards turned 180 degrees fro other. The space…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1540. VUSBTiny AVR SPI Programmer Using ATtiny85 after making a usbtiny isp programmer and using it for 6 months, i was looking at making another one carrying around. i like the simplicy of the usbtiny isp design but would like to make it even smaller and take less parts. one thing…... Listed under: AVR Projects, Other Projects 1541. Direction Aware Messaging LED Spin Top video Direction Aware Messaging LED Spin Top We recently built a LED spinning top with message display. Its improved version of a similar top published by Elektor in their December 2008 issue. The Elektor top can be spun only in one direction. The synchroni Listed under: AVR ATmega Projects, LED Projects, Other Projects 1542. Tiny AVR Microcontroller Runs on a Fruit Battery Some of the fruit and vegetables we eat can be used to make electricity. The electrolytes in many frui vegetables, together with electrodes made of various metals can be used to make primary cells. One of the most easily available vegetable, the ubiqu lemon…... Listed under: AVR ATmega Projects, Battery Projects 1543. Fire-free LED Matchstick Using a Tiny13 microcontroller video Fire-free LED Matchstick I just completed a new project: a fire-free and fire-safe LED mat light this matchstick you strike it against a normal matchbox filled with neodymium magnets. The LED matchstick has an inductive sensor that detects magnetic field as you…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1544. How to use an LED Array Module using AVR With a single LED you can indicate the state of something: on or off. That might be a little boring. With an LEDs you can display characters or even some simple blocky graphics. That might add a little pizzaz to a small microcontroller…... Listed under: AVR AT Projects, LED Projects 1545. Programmable LED using Atmel ATtiny13v Microcontroller Inspired by various LED Throwies, blinking LEDs and similar instructables I wanted to do my version of an LED contro microcontroller. The idea is to make the LED blinking sequence reprogrammable. This reprogramming can be done with light and shadow, e.g. you could…... Listed under: AVR Projects, LED Projects
  • 138.
    1546. Hacking yourDigg Button with a Removable Interface Cable using AVR The Digg Button from adafruit industries www.adafruit.com is a very simple DIY electronics kit suitable for beginners. It consists of a microprocessor, a 3-digit display, a button and some available i/o pins. As it comes from adafruit, counter that displays the number of…... Listed under: AVR ATmega Projects, Internet - Ethernet - LAN Projects 1547. Getting started with VMUSIC2 The VMUSIC2 is a complete MP3 player module from FTDI, Inc. which makes it easy to integrate MP3 functionality in to y microcontroller project. It has two interfaces: SPI or UART (serial) Some example applications: 1. Make your robot talk and play sound effects…... Listed AVR ATmega Projects, How To - DIY - Projects 1548. Jar of Fireflies using AVR ATTiny45 Microcontroller This project uses green surface-mount LED's along with an AVR ATTiny45 microcontroller to simulate behavior of fireflies in a jar. (note: the firefly behavior in this video has been greatly sped up in order to be easier to represent in a short film. The…... L under: AVR ATmega Projects, Game - Entertainment Projects 1549. I2C Bus for ATtiny and ATmega168 I love the Atmel AVR microcontrollers! Since building the Ghetto Development System described in this Instructable no end of fun experimenting with the AVR ATtiny2313 and the ATmega168 in particular. I even went so far as to write an Instructable on using switche Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1550. 16-key Keypad Decoding with an AVR MCU This instructable will show you how to interface a 16-key keypad to your AVR microcontroller and read the k a key is pressed. I'll introduce the keypad first, then the 74HC922 16-key decoder IC as a pin-saving mechanism, then finally how to take the…... Listed AVR ATmega Projects, How To - DIY - Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1551. Connecting Nokia 3310 LCD to USB using AVR What do you do with an old phone, a microcontroller and lots of time? You hook the old phone's LCD sc the computer USB of course! In this project we're going to communicate with a Nokia 3310 LCD display over USB! How are we…... Listed under: AVR AT Projects, LCD Projects, Phone Projects 1552. Repair dead AVR's – Attiny fusebit doctor (HVSP) Did you make a mistake while programming fusebits, or purposely disabled reset pin (RSTDISBL) or IS programming (SPIEN)? No need to buy or make inconvenient HV programmer only for unlock couple of Tiny AVR’s. This Attiny fusebit HV doctor will cu dead tiny microcontrollers,…... Listed under: AVR ATmega Projects, Other Projects 1553. ATtiny programming with Arduino After this Instructable you should be able to program an A Ttiny85/45 with an arduino. It may sound complex but it isn't. After doing some research I could not find to much info on how this could be done. I however did find http://www.instructables.com/id/Program with-Arduino/. This Instructable…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1554. ISP 6 pin to 8 Pin Socket Using ATTiny45 The reason i mainly built this project was to program the ATTiny45, which has a 8 pin connection, while my US (from Ladyada) only has a 10 pin and 6 pin connection. After snooping around the internet for about 3-4 weeks i found nothing what…... Listed under: ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1555. Micro controller programming: Making a set of traffic lights using Microcontroller ATTiny2313 So you wana learn how to programme a micro controlle tutorial has been designed as a next step, following the fantastic tutorial 'Ghetto Programming: Getting started with AVR microprocessor on the cheap Real Elliot link you should read this before progressing onto…... Listed under: AVR ATmega Projects, LED Projects 1556. Instalacion del controlador USBasp (USBasp drivers setup) – Dark Side Electronics using AVR microcontroller English version available at the bottom Se enseñara paso a paso como instalar los controladores (drivers) necesarios para el correcto funcionamiento del programador USBasp para microcontr AVR. Primero, mencionaremos algunas consideraciones para evitar fallos por usos indebidos del programador. También se mencionará  el protocolo y under: AVR ATmega Projects, How To - DIY - Projects, Microcontroller Programmer Projects
  • 139.
    1557. How toRead Binary/Hex Thumbwheel Switch with an AVR Microcontroller using ATmega328p microcontroller This instructable will show you how to re number on a binary pushwheel or thumbwheel switch using LED's or an AVR microcontroller (I'm using an ATmega328p but this can be adapted for an probably another microcontroller of your choice). Multiple thumbwheel switches…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1558. AVR LCD Namebadge Using ATtiny2313 So, you're going to a conference/meetup/nerdfest and you want to do something that sets you apart from nor people.  An LCD namebadge powered by an ATtiny2313 is a great way to do that.  This is a general purpose LCD display unit powered by a 9V…... Listed AVR ATmega Projects, LCD Projects 1559. Power Your Arduino From Your Car using AVR microcontroller The Arduino -- and AVRs in general -- have a wide range of power supply options ranging around 1.8V to 5.5V. The choice of voltage is usually determined by the desired clock speed or power consumption requirements. The Arduino and its variants have…... Listed under: AVR ATmega Projects, Battery Projects, Car Projects 1560. Making a set of traffic lights Using Arduino This tutorial will step you through the process of creating a set of controllable and configurable traffic lights also teaching you the basics of Arduino. Some knowledge is needed and I highly recommend reading and following through on most if not all of the…. under: AVR ATmega Projects, LED Projects 1561. LoveBox – The box of love using ATtiny2313 Microcontroller As most guys I don't tell my wife that "I love you" as often as I should, but this little gadget will at least improve that as bit. So by combining a nice box and some hardcore electronics nerdiness I've made a nice christmas…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1562. Stripboard Arduino using ATMega168 microcontroller In this, my first Instructable I'm going to show you how to make a stripped down Arduino for a f the price, using Stripboard/Veroboard. Material List: 1x Atmel ATMega168 = �2.65 1x Stipboard = 72p 1x 7805 Voltage regulator = 26p 2x LEDs =…... L under: AVR ATmega Projects, How To - DIY - Projects 1563. Build a Complete AVR System and Play Mastermind Using Microcontrollers The game Mastermind has been around a long time, and I remember getti board version with colored pegs when I was a kid. I love this game, as it is solvable simply by pure logic. One player (or a computer/microcontroller) ch sequence of…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1564. Using Arduino to communicate with embedded project using AVR ATMEGA microcontroller Building a stand-alone AVR ATMEGA project sometimes lea with no easy to read output from your project. But you can use an Arduino to act as a communications bridge between your embedded project and yo Serial Monitor program! I'm building an embedded multi-channel…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1565. Low speed AVR oscilloscope V2.00 (Is updated on 19 Mar 2011) >> The firmware was updated on 19 Mar 2011 << A few months ago a friend of mine -c mechanical at profession- told me that he had problem with some car sensors. He couldn't check, with a simple multimeter, if a sensor was working p …... Listed under: AVR ATmega Projects, LCD Projects, Metering - Instrument Projects 1566. AVR mini board with additional boards using attiny2313 microcontroller Somewhat similar to PIC 12f675 mini protoboard, but extended and with addi boards. Using attiny2313. Step 1 Scheme Let us first start with a scheme. The scheme is pretty obvious since it only connects attiny2313 with the pins only additional elements are resistors…... Listed under: AVR ATmega Projects, Development Board - Kits Projects
  • 140.
    1567. How toadd more Outputs to your Microcontroller using 74HC595 microcontroller This Instructable will show you step-by-step how to add 8 extra digit outputs, using only 3 of your microcontroller's digital outputs. Step 1 Which Microcontroller Should You Use? In order to do this Instructable with your microcontroller, you will need to make sure that it has the…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1568. Guia para programar uC AVR – Dark Side Electronics using AVR microcontroller La forma más sencilla y rápida de programar un micro-controlador (uC) de la familia AVR, usand programador USBasp, es utilizado el programa eXtreme Burner - AVR de Extreme Electronics. En esta guía te detallaremos como programar tu propio esto necesitarás lo siguiente:…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1569. Getting started with ubuntu and the AVR dragon using atmega8 microcontroller Here's what i did to get started using the AVR Dragon to program ATM microcontrollers using ubuntu (This is aimed at beginners, I myself am also being a beginner, so any improvements from more experienced users are appreciated). After finally switching my laptop and…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects, RTOS - OS Projects 1570. Led dimmer 2 channels using Attiny13 microcontroller This is Attiny13   2 channels dimmer with 5 program modes and speed control: 1. Dim between channels 2. Dim 2 channels together 3. Blink mode 1 4. Blink mode 2 5.Blink mode 3 Step 1 Hardware Dimmer is based ot Attiny13V: - 1k flash…... List AVR ATmega Projects, LED Projects 1571. Adding ICSP header to your Arduino/AVR board using ISP10PIN microcontroller So you may have been playing with Arduino's, or rather, Hackduino's. I made your own Hackduino or similar project, you may be wondering how to add the ICSP header. Basically, using the ICSP header will allow you to use external programmer to 'upload'…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1572. Synchronizing Fireflies using Microcontroller ATtiny13 Have you ever asked yourself how do hundreds and thousands of fireflies are able to synchroniz themselves? How does it work, that they are able to blink all together without having a kind of boss firefly? This instructable gives a solution and show this…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1573. The Arduino LED Cube using LED microcontroller Are you bored? Do you want to make something amazing to impress your friends with? Let's try mak LED cube..... A work of art, that lights up..... Step 1 What in the world is and LED? LED is an acronym for Light Emitting Diode,…... Listed under: AVR ATm Projects, LED Projects 1574. LED matrix using shift registers This instructable is meant to be a more complete explanation than others available online. Notably, this will provide m hardware explanation than is available in the LED Marquee instructable by led555. Goals This instructable presents the concepts involved with shift re and high side drivers.…... Listed under: AVR ATmega Projects, LED Projects 1575. Charlieplexing 7 segment displays using Atmel Tiny26 microcontroller Charlieplexing of discrete leds has been the topic of a few other instructables. T Charlieplexing LEDs- The theory and the How to drive a lot of LEDs from a few microcontroller pins comes to mind. They are both excellent and should by anyone…... Listed under: AVR ATmega Projects, LED Projects 1576. AVR32 Development Board at Home This is my first instructable.So plz comment and help me out with any mistakes i might commit . I have created a pcb for avr 32 ,its a deve board .I saw that there none online with pcb that could be done at home so…... Listed under: AVR ATmega Projects, Development Board - Kits Projects 1577. Faraday For Fun: An Electronic Batteryless Dice using Microcontroller ATTiny13 There has been a lot of interest in muscle powered electronic devices, d large part to the success of Perpetual Torch Perpetual Torch, also known as battery-less LED torch. The battery-less torch consists of a voltage generat power the LEDs, an electronic circuit…... Listed under: AVR ATmega Projects, Game - Entertainment Projects
  • 141.
    1578. DIY ElectronicBirthday Blowout Candles Step 1 The Circuit Step 2 Building the Circuit board Step 3 Soldering the Circuit board Step 4 Programming the Micro Step 5 Using the To power the circuit, you need 4 batteries of 1.2V, AA or AAA size or 3 batteries of 1.5V…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1579. Buggy – A Crafty Programmable LED Creature using Microcontroller Atmel Attiny44v Buggy is a programmable LED craft project using a homemade, si sided, PCB board, and a programmable AVR Attiny44v microcontroller. Buggy has two bi-colored LED eyes and can sense visible and IR light and emit s using a piezo speaker. Not counting the board, there is…... Listed under: AVR ATmega Projects, Microcontroller Programmer Projects 1580. LED Hanukkah Menorah using Microcontroller ATtiny13 I wanted to make an LED menorah for a friend. In planning this I decided I wanted to keep the count very low and use components I had on hand. I think I have achieved my goals and couldn't be happier at the outcome of…... Listed under: AVR A Projects, Game - Entertainment Projects 1581. How to choose a MicroController It used to be that the number of different microcontroller chips available to the hobbyist was pretty limited. You got whatever you could manage to buy from the mail-order chip dealer, and that narrowed down the choice to a small number of chips.…... Listed under: ATmega Projects, How To - DIY - Projects 1582. Swiss AVR Knife using Microcontroller ATtiny84 The Swiss AVR Knife bundles a number of AVR programming projects together in a single convenient A Gum Tin. Because of the flexibility afforded by microcontroller programming, it also provides a starting point for any number of projects based on LED sound output. The…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1583. How To Communicate With An Alien Artifact or . . . Close Encounters of the Curiously Minty Kind. This Instructable will show you how to build an Altoids version of the 'Close En mothership, and how to interact with it. This may be vital training for that day when the Bright White Beam comes to suck…... Listed under: AVR ATmega Projects, LED Projects 1584. LED Microcontrolled Stained Glass Firefly Pendant using Microcontroller ATTiny45 chip This Instructable will walk you through the steps needed to ma stained glass pendant with anLED that blinks in a pattern using a microcontroller. The blink pattern is an actual firefly song of a type of Japanese firefly scaled down version…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1585. AVRSH: A Command Interpreter Shell for Arduino/AVR. Ever wanted to be "logged in" to your AVR microcontroller? Ever thought it would be cool to "ca register to see its contents? Have you always wanted a way to power up and power down individual peripheral sub-systems of your AVR or Arduino in under: AVR ATmega Projects, RTOS - OS Projects 1586. Build your own (cheap!) multi-function wireless camera controller using Microcontroller AVR ATMega8 Introduction Ever fancied building your own cam controller? IMPORTANT NOTE: Capacitors for the MAX619 are 470n or 0.47u.  The schematic is correct, but the component list was wrong - updated. T entry into the Digital Days competition so if you find it useful, please rate/vote/comment…... Listed under: AVR ATmega Projects, Internet - Ethernet - L Projects, Video - Camera - Imaging Projects 1587. A sunrise and sunset lamp with LEDs You know it, in the winter time it is hard to get up, because it is dark outside and your body just won’t wake up in middle of the night. So you can buy an alarm-clock that wakes you up with light. These devices…... Listed under: AVR ATmega Projects, LED Projects 1588. Ghetto Programming: Getting started with AVR microprocessors on the cheap. Microprocessors are so cheap these days. If only there were a way to p them up just as cheaply... *wavy dream-sequence lines* In this instructable, find out how to build up a complete AVR microprocessor toolchain: comp programmer software, programmer hardware, and some simple demos…... Listed under: AVR ATmega Projects, How To - DIY - Projects
  • 142.
    1589. Servo ControlledLabyrinth using Microcontroller ATmega32 Do you know this classic wooden labyrinth game with two knobs for X and Y rotation? So, decided to modify one by connecting two standard servos to the knobs and let a microcontroller (ATmega32) play the game. Credits: - To CarlS www.instructables.com/id/Servo-Controlled-Marble-Maze/ for inspiration.…... Listed under: AVR ATmega Projects, Motor Projects 1590. LED Scolling Dot Matrix Font & Graphics Generator 5×8 5×7 8×8 using the AVR ATtiny2313 and AVRStudio If you are into geeking it out with projects of the electronical kind, the have likely wanted to create a dot matrix display or a POV. To do this you will need to have a font file or table to read the characters from.…... Listed un ATmega Projects, LCD Projects, LED Projects 1591. Color Changing Digital PC Fan Controller using Microcontroller ATMega168 We've all seen LED fans that you can put in your computer to make it look usually come in blue, sometimes red or green and consist of a basic PC fan with 4 bright LED's mounted in the 4 corners.  They source their…... Listed AVR ATmega Projects, Game - Entertainment Projects, LED Projects 1592. Atmel Xmega USB/Serial Arbitrary Waveform Generator This instructable walks you through programming and using the Boston Android Xmega evalu board to work as a simple arbitrary waveform generator taking advantage of the integrated 12bit DAC and high speed DMA controller. I have provided precompiled firmware as well as source code which…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1593. LED Cube 4x4x4 using Microcontroller Atmega16 Amazing 3 dimensional LED display. 64 LEDs makes up this 4 by 4 by 4 cube, controlled by an Atmel A microcontroller. Each LED can be addressed individually in software, enabling it to display amazing 3d animations! 8x8x8 LED cube now available, by p demand:…... Listed under: AVR ATmega Projects, LED Projects 1594. Infrared Proximity Sensing Coffee Table Module & Color Changing Glowing Faucet using Microcontroller ATMEGA48 This is merely an instructable to ex this device operates. I hope everything is not too obfuscated. This prototype consists of three 8x8” modules. Each module operates independently of e other. Each module consists of 4 “pixels”. Each pixel is 4 inches square and…... Listed under: AVR ATmega Projects, Home Automation Projects 1595. The Multi-format Clock – Gift contest I tend to have good ideas when I don't need them but when I need them I always face the black wall of no inspira had to come up with an idea for a present for Jeff-O. After a long week without inspiration, I came…... Listed under: AVR ATmega Projects, Clock Project 1596. Make a 8×10 L.E.D Matrix using the Arduino and 4017 decade counter In this instructable I will show you how to build a quite fancy 8 by 10 L.E.D matr scrolling text and animations) using the Arduino and 4017 decade counter. This type of matrix is easy to make and program and it is a good way…... Li under: AVR ATmega Projects, LED Projects 1597. LED Binary Calculator using Microcontroller ATtiny2313 You can't calculate binary values "as is" on most handheld calculators and using the windows one is just a pain, so i dec make my very own (binary only) calculator. This calculator supports all the basic functions like : NOT,OR,AND,XOR, addition,subtraction,multiplication,division and modulo. So j we…... Listed under: AVR ATmega Projects, Calculator Projects, LED Projects 1598. Debugging AVR code in Linux with simavr using Microcontroller ATTiny85 I recently started programming AVR chips, namely the ATTiny85.  They can be programmed using C, compilers are readily available in Ubuntu, and you can do a LOT with them - just search for avr on this site!  Anyway, I was havin trouble with my…... Listed under: AVR ATmega Projects, RTOS - OS Projects 1599. Power your Arduino/AVR with a Hand-Cranked Battery If you've ever wanted to power your Arduino or AVR from a battery for development testing (ba have different power delivery qualities than, say, transformed AC or even a regulated wall wart in DC) testing but were tired of going through batteries admit…... Listed under: AVR ATmega Projects, Battery Projects
  • 143.
    1600. USB controlledhome automation hack using Microcontroller ATmega8 Hack a wireless home automation system to be USB controlled using two AVR microcontrollers! Check out the video! The system is really more responsive, but the browser on my phone is slow. Skills ans tools There are two ways hacking an RF remote to…... Listed under: AVR ATmega Projects, Home Automation Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1601. Music Playing Alarm Clock using Microcontroller AT90USB1286 This Instructable will be about designing a music player from using various building blo will understand the communication between the microcontroller, memory, computer, LCD display, RTC, IR remote, and the music file decoder. I will try to to teach you in a…... Listed under: AVR ATmega Projects, Clock Projects, Game - Entertainment Projects, Sound - Audio Projects 1602. Rechargeable Battery Capacity Tester using Microcontroller ATMega168 Do you have a pile of AA rechargeable batteries in your drawer? Some are old new, but which sets would you bring with your camera on your next trip, and which ones are past their useful life? I like using rechargeable batteries, b Listed under: AVR ATmega Projects, Metering - Instrument Projects 1603. Mechanized Android Figure using Microcontroller ATtiny44A These Android figures are cute, but they don't actually do anything. Let's change that. Hav at the video: These are the steps to make an Android that reacts to sound, moves it's head, sends out Morse Code messages and displays some cool l Listed under: Android Projects, AVR ATmega Projects, Internet - Ethernet - LAN Projects 1604. Numitron clock & thermometer using Microcontroller atmega48 I really like nixie and numitron clocks, but I never worked with them before. So I decid it a go. I choose numitrons because of 2 reasons: first of all nixies need a higher voltage than numitrons to work. Nixies need around 170V…... Listed u ATmega Projects, Temperature Measurement Projects 1605. Yet Another Daft Punk Coffee Table (5×5 LED Matrix) Yes, I know this has been done before, but I wanted to build my own, using as few parts as possible.  I built this as a table mount model, but it can be scaled up to make a coffee table.  I built…... Listed under: AVR ATmega Projects, Home Automation Projects 1606. Build your own Wifi radio using Microcontroller ATmega16 The internet hosts lots and lots of online radiostreams, most of them with a certain theme, from old time classics to Tibetian riverdancing. I must admit that I love to listen to them while I'm building stuff, as I can choose the music I…... Listed u ATmega Projects, Internet - Ethernet - LAN Projects, Radio Projects 1607. How to get started with Eclipse and AVR Programming AVRs is fun, but sometimes the manufacturers development environments make code mainten chore. If your looking for a free, cross platform, high quality piece of software for programming AVRs Eclipseis a good choice.Moving to an Integrated Development Environment (IDE), such as Eclipse is…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1608. Lampduino – an 8×8 RGB Floor Lamp Lampduino is a computer-controlled free-standing floor lamp, comprised of an 8x8 RGB LED matrix. The lamp st high and 18" wide.  Light emanates from both sides.  It has various display modes, as well as an included editor for creating animations.  The lamp is controlled…... Listed under: AVR ATmega Projects, LED Projects 1609. Rainbow glowing ping pong Using ATTing 13 While I was finalizing e-snowflake project, I imagined that single RGB 5050 LED would create nice rainbow placed inside a ball like ping-pong. You can find plenty of such projects on the net, this one was heading to embed everything within ping-pong, batter Listed under: AVR ATmega Projects, Game - Entertainment Projects 1610. Charlieplexing 7 segment displays using Microcontroller This instructable describes how to charlieplex a bunch of 7-segment led displays. Charlieplexi discrete leds has been the topic of a few other instructables. The Charlieplexing LEDs- The theory and the How to drive a lot of LEDs from a few microc pins comes…... Listed under: AVR ATmega Projects, LED Projects
  • 144.
    1611. How ToUse a Nokia Color LCD using an AVR Nokia manufactures a wide variety of cell phones and many of their cheaper phones contain simple LCD's may be used in microcontroller projects.  There is one particular LCD model that is used in a wide variety of their phones and is often referred to…... L under: AVR ATmega Projects, LCD Projects 1612. How to Read Many Switches with One MCU Pin Have you ever been chugging away at a project(s) and the project keeps growing and growing, while you add more things to it ( that a Feaping Creaturism)? On a recent project, I was building a frequency meter and added a five function signal…... Listed under: AVR ATmega Projects, Other Projects 1613. Cellphone Operated Robot Using Microcontrollers Component Required: IC1 - MT8870 DTMF decoder IC2 - ATmega16 AVR microcontroller IC3 - L293D driver IC4 - 74LS04 NOT gate D1 - 1N4007 rectifier diode R1, R2 - 100-kilo-ohm R3 - 330-kilo-ohm R4-R8 - 10-kilo-ohm C1 - 0.47μF ceramic disk C2, C3, C Listed under: AVR ATmega Projects, Phone Projects, Robotics - Automation Projects 1614. An Absolute Beginner's Guide to 8-Bit AVR Programming-AVR Dragon If you'd like to test the waters of microcontroller programming, the new AVR Dra Atmel Corporation is a nifty, low-cost entry-level development tool. Unfortunately, right out of the box, the AVR Dragon is not the definitive answer for beginner looking for an all-in-one…... Listed under: AVR ATmega Projects, How To - DIY - Projects 1615. ATTiny2313 Multi-mode LED Matrix Clock This is a mutli-mode clock project based on attiny2313. it employs a 8x8 led matrix as display. with the limite resolution, this 12 hour clock shows time in 6 different modes. The circuit employs row and column multiplexing to drive the leds, one row at…... Listed AVR ATmega Projects, Clock Projects, LED Projects 1616. Temperature Indicator Using attiny2313 micrcontroller Description Features: Measures temperatures from -55°C to +125°C Three LED's to indicate in w range the temparature is. User definable thermostat with high and low settings Output via a relay to control a heater element or a blower fan (or som else) Power supply ......................4.5…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1617. Stepper motor Driver Using AT2313 microcontroller Description With this circuit you can drive a unipolar stepper motor. It operates in full step mode. get a stepper motor from an old 5.25 disk drive. The AVR attiny2313 micro controller controls the pulses for the stepper motor. The pulses are amplifi Listed under: AVR ATmega Projects, Motor Projects 1618. Relais Board Using AT2313 Description This is a peripheral board with 4 relais, rated at 5A/250V each. The board has a ML10 output connector for con with the AT2313 Project board. It has also 4 LED's for indication which relais is switched on. Hardware The circuit is simple, it…... Listed under: AVR ATm Projects, How To - DIY - Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1619. DS1820 Temperature Controller using atmega8515 microcontroller This project displays the temperature on an LCD display with an resolution of 0.06 DS1820 is used for sensing the temperature. It can measure temperature range from -55deg to +125deg. But i take care of only the possitive tempera There are 3 switches to change…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1620. Real Time Clock PCF8583 Using AVR microcontroller Description The PCF8583 is a clock/calendar circuit based on a 2048-bit static CMOS RAM organize words by 8 bits. Addresses and data are transferred serially via the two-line bidirectional I2C-bus. The built-in word address register is incremented automatically after each written or read…... Listed under: AVR ATmega Projects, Clock Projects 1621. 8×8 Dotmatrix Scrolling LED display using atmega8515 microcontroller Here's an another project, which makes an Scrolling LED display. Here 64 leds w connected to an Matrix display. The Anodes are drived through an Driver IC UDN2981 and the cathodes are drived through ULN2803. The Atmega851 in this project to control…... Listed under: AVR ATmega Projects, LED Projects 1622. Bluetooth Based Smart Home using atmega8 microcontroller This project is used to automate the home appliances through Bluetooth enabled PC. You can use the USB Bluet the PC side and an Serail Bluetooth converter is used at the microcontroller side. The sparkfun bluetooth module is used here, but you can use…... Listed under: AVR ATmega P
  • 145.
    Home Automation Projects 1623.Multipattern Running light using ATtiny2313 microcontroller Here's an another project with LED. It can show different patterns. There are 11 channels Circuit Diagram For more Detail: Multipattern Running light using ATtiny2313 microcontroller... Listed under: AVR ATmega Projects, LED Projects 1624. Real Time Clock ATMega16 Description The ATMega16 chip in the M16 has a real-time counter that operates asynchronously when a 32,768hz watch c connected to it, providing a real-time clock. Bascom has built-in support for the RTC, making it very easy to use time functions. The watch crystal…... Li under: AVR ATmega Projects, Clock Projects 1625. PC Thermometer Using ATTiny2313 Description With this project you can show the temperature on you PC. This thermometer plugs in on any free ser gives temperature readings accurate to 0.5°C with no calibration.The project consists of the ATTiny2313 RS232 Project board and the DS1621 Thermom board and…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1626. PC Steppermotor Driver Using AT2313 µ-controller Description With this circuit you can control two unipolair stepper motors in full step mode via the serial port of your PC. A terminal program such as Hyperterminal can be used to control the stepper motors. The stepper motors can be driven one at under: AVR ATmega Projects, Motor Projects 1627. LCD Thermometer TCN77 Using AVR Microcontroller Description The TC77 is a digital temperature sensor with a Serial Peripheral Interface. Temperat converted from the internal thermal sensing element and made available at anytime as a 13-bit two’s compliment digital word. Communication with t accomplished via a SPI and…... Listed under: AVR ATmega Projects, Temperature Measurement Projects 1628. LCD Thermometer TCN75 Using ATTiny2313 Description This small thermometer board uses the Microchip TCN75 device. It is a cheaper clone of the LM75, it costs about 2,50 TCN75 comes in a SO8 packaging. The TCN75 is a serially programmable temperature sensor. It has an output that is programmable…... Listed under: ATmega Projects, Temperature Measurement Projects 1629. LCD Thermometer LM35 Using AT Mega8 Description The LM35 of National Semiconductors that is used in this project is a precision centigrade tempe sensor, which has an analog output voltage. It has a range of -55ºC to +150ºC and a accuracy of ±0.5ºC . The output voltage is 10mV/ºC . The…... Listed AVR ATmega Projects, Temperature Measurement Projects 1630. AVR GPS Locator using avr microcontroller In this project i have interfaced an GPS with AVR microcontroller, the ATtiny2313 gets the location from the display it over the LCD display. This project also have the feature of marking a place with its name. For entering the Name of the…... Listed under: AVR Projects, GPS Based Projects 1631. MMC card based WAV player using atmega32 This projects gives you a simple wav player with help of the MMC card connected to ATmega32. You can AVR microcontroller. The MMC card works on 3.3v so a 3.3v regulator is used and the 5v to 3.3v level conversion is done by…... Listed under: AVR ATme Projects, Sound - Audio Projects 1632. LCD Message Display Using AT Mega8 microcontroller Description This LCD message display can show text with large characters on an 20*4 LCD mod display can show five characters at a time. Each characters is build from twelve characters of the display module. The text on the display can be read f Listed under: AVR ATmega Projects, LCD Projects 1633. LCD Interface Board Using ATTiny2313 Description This board can directly connected to the STK 500 board or the ATTiny2313 ISP program board with flatcable on the 10 pin header of the STK500 and the 10 pin header of the LCD/Switch board. The display has 16*2 character positions…... Listed unde ATmega Projects, LCD Projects
  • 146.
    1634. 8 MHzfrequency meter using AVR microcontroller This project can measure the clock pulses fed to the Timer input of the AVR microcontroller. The Ba code counts the clock pulses for 1 second and display it over the LCD display. The frequency is displayed in Hertz and this project can measure a…... Li under: AVR ATmega Projects, Metering - Instrument Projects 1635. LCD Display On Glass Interface Using AT2313 Description Liquid Crystal Display on Glass is the newest in LCD technology. The display's are very compa measures 55x27 mm and the height is only 2mm without LED backlight and 5.8mm with LED backlight. The display's can have different LED backgrou instead of…... Listed under: AVR ATmega Projects, LCD Projects 1636. Temperature controlled fan using PWM microcontroller This project gives you a simple temperature controlled fan. If the difference between real temperature and the user tem is high then the fan will run at full speed and if the difference is low then the fan will rotate at slow speed. The speed…... Listed under: AVR ATmega Pro PWM Projects, Temperature Measurement Projects 1637. SMT160 based Temperature indicator There are lot of temperature sensors both with analog & digital outputs. This project gives you an another temp indicator which has been done with a digital sensor SMT160. Although it is a digital sensor it does not gives out the temperature directly. The output… under: AVR ATmega Projects, Temperature Measurement Projects 1638. Digital Melody player using atmega16 microcontroller Here' s an melody player with Atmega16. The command "Sound Speaker" is used to generate so is the inbuilt command in Bascom AVR. For more Detail: Digital Melody player using atmega16 microcontroller... Listed under: AVR ATmega Projects, So Audio Projects 1639. Stepper motor Control with Atmega16 With this project you can control a unipolar stepper motor. You can control both the speed and the direction of motor. The speed and direction and can changed with help of the keypad. The data's are displayed over the LCD display. A 4x4 keypad…... Listed unde ATmega Projects, Motor Projects 1640. Graphical LCD with KS108 controller Description The Graphical LCD 128x64 controlled is with the ATMega16, the graphic LCD GLCD HG1286418C-VA w S6B0107/S6B0108 controller is used. See below for the pinout of the display. The display has 8 data bits and 5 control bits. The databits are hooked to PORTB…... Listed under: AVR ATmega Projects, LCD Projects 1641. Simple calculator using avr microcontroller Atmega16 Here's a simple calculator with the Atmega16 microcontroller. It have an LCD display and a 4x4 You can also download the proteus simulation file on the downloads Bascom Code   $regfile = "m16def.dat" $crystal = 1000000 Config Kbd = Portd , D 30…... Listed under: AVR ATmega Projects, Calculator Projects 1642. Transform a cheap RC Transmitter with Custom Firmware using ATMEGA64 Microcontroller The Turnigy 9x is a cheap Chinese radio transmitter widely by hobby king and other retailers under a variety of names. This is a computerized radio transmitter and is already a great deal for the price ($53 curr pretty capable if you can figure out how to…... Listed under: AVR ATmega Projects, Radio Projects 1643. ATTiny2313 Board RS232 Description This board is a small controller board on which you can build your projects. It is suited for educational use, expe prototyping. The board uses the AT2313 microcontroller with a 10Mhz crystal. The board contains the ISP 10-pin connector for in circuit serial…... Liste AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1644. Make an automatic plant light using ATTiny26 Microcontroller This light helps your plants grow. I got the idea from the Garduino, but nothing is taken from it. The schematic an program are mine. This plant light gives your plants 4 additional hours of light per day. When it gets dark, it turns…... Listed under: AVR ATmega Projects, Game - Entertainmen 1645. LED wind indicator Using atmega8 Microcontroller I have something with the weather. I always like to know how warm or cold it is, how much rain has how hard the wind blows and from what direction,... and so there are lots of sensors around our house to keep me up…... Listed under: AVR ATmega P LED Projects
  • 147.
    1646. Ghetto Pixels– Building an open source BlinkM Using ATTiny45 Microcontroller Unless you've been living under a digital rock for the last few years, or simply aren't interested in flashing lights, you'll already know about the awesomeness that is the BlinkM from ThingM. It's a very small PCB featuring a power LED that responds very easily…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1647. USB PCB Business Card Using ATtiny85 Microcontroller This is a business card that will type out some text when you plug it into a USB port. It uses a A microcontroller with V-USB based code to emulate a keyboard. The typing is triggered by the CAPS LOCK status LEDs being toggled 3…... Listed under: ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Other Projects 1648. Using ATMega328 Microcontroller Custom Tron Disc Mod In this Instructable, I cover modding the store-bought Deluxe Identity Disc to an upgraded ve with 64 leds, controlled by an AVR MCU. The upgraded version is costume-ready and would be an excellent addition to your Tron costume - it'll also lo on your…... Listed under: AVR ATmega Projects, LED Projects 1649. DIY TiX Clock using ATMEGA16 AVR microcontroller Here's my instructable for a DIY TiX clock.  It is powered by an AVR microcontroller.  The display is m using a piece of reflector grid you find covering office lights, some smoked perspex, a diffuser and a bunch of LED's.  The Idea came from…... Listed un ATmega Projects, Clock Projects 1650. Starry Ceiling for Kids Bedroom Using AT90S8538 microcontroller When my little girl was born I wanted to make her a special night light for in her roo her a ceiling light with twinkling stars. It is made up of a piece of custom wood with 100 LEDs mounted in it. An…... Listed under: AVR ATmega Projects, Entertainment Projects, Home Automation Projects 1651. Using max7219 microcontroller Build an electronic score keeper/storage box The instruction manual for each of the MANY munchkin series of card ga always includes a phrase like "you will need a 10 sided die for each player or some other device to keep score." 10 sided dice are not hard to find in m Listed under: AVR ATmega Projects, Other Projects 1652. Using AtTiny2313 microcontroller Build an electronic polyhedral die Dice are fun. Polyhedral dice used in D & D are even more fun, particularly in big handfuls of different sizes handful isn't always practical. Ever since I saw the dragon bone electronic die wand advertised in the back pages of Dragon magazine…... Listed under ATmega Projects, Other Projects 1653. Turn a TV-B-Gone into a super camera remote Intro: My Nikon DSLR has an infrared remote function (remote sold separately) that is really handy, but limited in range. A while ago, I bought a TV-B-Gone Kit from it's inventor Mitch Altman, and it can turn TV's off from a great distance. I…... Listed under ATmega Projects, Video - Camera - Imaging Projects 1654. How to drive a lot of LEDs from a few microcontroller pins. Using the fact that many microcontroller pins have three states (+V, GND, or "high impeden can drive N*(N-1) LEDs from N pins. So the little 8 pin microcontroller like a PIC12Fxxx or an ATtiny11 can drive 20 LEDs on its five available output pin Listed under: AVR ATmega Projects, LED Projects 1655. Hack a Toaster Oven for Reflow Soldering using ATmega32 microcontroller As I get more serious into my electronics hobby, I need to work with more S components. Some component packages are very difficult or impossible to solder with a traditional soldering iron. To solve this problem, I decided to toaster oven to become…... Listed under: AVR ATmega Projects, CNC - Printing Machines Projects 1656. Using the 8Pin ATTINY programming shield with an external clock Instructables author extraordinaire Randofo created a great programming shield to Arduino to program 8 pin ATTINY processors. He was even generous enough to give 50 copies of it out to people who authored instructables using AV processors. It works great on brand new ATTINYs and…... Listed under: AVR ATmega Projects, Other Projects
  • 148.
    1657. Picopter usingMicrocontroller ATmega128RFA1 Update May 4 2012: I am still working very hard on version 3 of Picopter. The new version's hardware done. There are new 3D printed motor holders. I've done some measurements with regards to mass and radio spectrum. I've posted stuff to http://ww zhao.com/picopter_forum/index.php including…... Listed under: AVR ATmega Projects, Robotics - Automation Projects 1658. Box with a Music Lock using ATMega328P Microcontroller There are a lot of locks out there. There are locks open with a key, with a combination of digits, with various bodily pa with a correct geolocation. I decided to make a lock that I have not seen yet. Since I am learning…... Listed under: AVR ATmega Projects, Game - Entertainment Projects 1659. Measure negative temperature with Lm35 LM35 can measure temperatures from -55deg to 150deg and we need negative supply voltage for measurin negative temperature. This circuit eliminates the negative voltage power supply and this project can measure the negative temperature Download the file to simulate the project on your…... Listed under: AVR ATmega Projects, Metering - Instrument Projects, Temperature Measurement Projects 1660. DC Motor Speed Control using PWM This project gives a speed control of DC motor through PWM method. The Dc motor is derived by the L298 driver can also control the direction of the motor. There are three buttons to control the motor. Also a bar graph Led display…... Listed under: AVR ATmega P Motor Projects 1661. ISD4004 based voice recorder So far we  have seen various devices that are talking, such us cars, dolls etc.This project is also like one of them. you can various projects such us IVS, robots etc. There are various voice recording IC's. They have different recording time…... Listed under: AVR ATmega Projec - Audio Projects 1662. Thermometer with Clock using ATmega16 This project will display the temperature and time over the LCD display. LM35 is used to sense the temperat the analog out of the LM35 is converted to digital by using the inbuilt ADC on the ATmega16 chip. An software clock is generated and…... Listed under: ATmega Projects, Temperature Measurement Projects 1663. Scientific Calculator using AVR Microcontroller This project gives you a nice and simple scientific calculator using AVR microcontroller. It has 2 keypads in the circuit diagram and the results are shown on the 16x2 LCD display. You can do sin,cos, tan functions using this project. The code is…... Listed un ATmega Projects, Calculator Projects 1664. Traffic light controller using avr microcontroller Here's a traffic light controller using avr microcontroller. It can be adopted for a four way road. The cod written in Codevision C. You can download the C code and the proteus file from the download. For more Detail: Traffic light controller using avr…... List AVR ATmega Projects, LED Projects 1665. ATTiny Board For AVR ATTiny microcontrollers Description With this small board you can program most of the AVR ATTiny microcontrollers or you can projects to use it in a stand alone application. It can be powered with a 9V battery because it has 5V voltage regulator on it. The…... Listed under: AVR A Projects, How To - DIY - Projects 1666. DS1307 based Clock using lcd This project gives you a real time clock with the RTC chip DS1307. This RTC chip has inbuilt oscillator for clock and it has registers for full calender. In this project we dont take care about the days and we just use the…... Listed under: AVR ATmega Projects, Clock Projects
  • 149.
    1667. Digital dimmerusing Microcontroller atmega8 This project is used to control the brightness of the lamp or can be used to control the speed of the fan system consists of 3 block they are Zero crossing detector Microcontroller (Atmega8) Load Driver (BT136)As the name implies the zero crossing detect Listed under: AVR ATmega Projects, Home Automation Projects 1668. Digital Voltmeter using Microcontroller Atmega8 This project gives you a digital voltmeter which can measure voltage from 0v to 25V DC. The values ar displayed over the 7segment display. Atmega8 is used and the internal ADC is used to measure the DC voltage. The resistor network is used to reduce under: AVR ATmega Projects, Metering - Instrument Projects 1669. Make-Yourself ATmega32 Starter's Kit with LCD, I2C, SPI, RTC, ADC interfaces Here is my home-made kit of ATmega32 microcontroller interfacing. The A controller is rich with features like onboard 32kB in-System programmable flash, 1 KB EEPROM, 2KB SRAM, 10bit ADC (8 channel), SPI bus inteface, TW (compatible with I2C bus) interface, an USART, analog comparator, etc.…... Listed under: AVR ATmega Projects, Development Board - Kits Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1670. Capacitance and Inductance meter using Atmega8 This project can measure capacitance and inductance using the Atmega8 microcontroller and the c written in Bascom AVR. The limitations of this project is Inductance Range: 0.1?H to 2H Capacitance Range: 1pF to 2.5?F Electrolytic Capacitor Measure Range: 0.1?F to 30000?F Circuit Diagram: For…... Listed under: AVR ATmega Projects, Metering - Instrument Projects 1671. SD/SDHC Card Interfacing with ATmega8 /32 (FAT32 implementation) Here is my project on interfacing of SD Card (microSD). microSD cards are availab cheap nowadays, a great option for having a huge memory in any embedded system project. It is compatible with SPI bus, so the interfacing is easy. S adapters are…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Memory - Storage Projects 1672. LPH7319 controlled via I2C I recently obtained a very old mobile phone from a friend. The battery was dead, so I dismantled it and to my surprise foun display with soldered contacts. In other mobile phones the display was connected via a conducting polymerpad, which was extremly difficult…... Listed AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects 1673. microSD FAT32 testing using Visual C++ This post presents a way for testing and learning the FAT32 system on microSD/ SDHC cards without building t hardware with microcontroller, thanks to Henry Yiu. This project uses the FAT32 library available in my previous post, but does away with the microcon part. So,…... Listed under: AVR ATmega Projects, Memory - Storage Projects 1674. Ultrasonic range finder using ATMega8515 This project is used to measure the distance using ultrasonic sensors. The ultrasonic signal passes through the atmosphere to a bar which we want to measure the distance. Part of this signal is reflected and travels back to the receiver. The time delay between sending…... Listed under: AVR ATmega Projects, Projects, Sound - Audio Projects 1675. 4×4 LED Display The 4×4 LED Display was my first project with a two-layer circuitboard layout. The alignment was not 100% optimal, but sufficent. I wa make the board as small as possible, so the parts had to be stacked at some places. The square LED’s were…... Listed under: AVR ATmega Projects, How - Projects, LED Projects 1676. microSD ATmega32 Data-Logger Aim of this project is to present a way to store a large quantity of data into microSD card in files with FAT32 format. H ATmega32 is used for data collection and microSD interface. The data is received from in-build 8-channel ADC of ATmega32. One…... Listed under: AVR Projects, Memory - Storage Projects 1677. UV Exposure Unit & Etching Manufacturing circuitboards containing SMD-parts with toner-transfer is nearly impossible. The thin traces almost never g transferred completely to the copper. One solution to this problem is to use photoresist boards and expose them with UV light. The layout is printed o transparency, which is…... Listed under: AVR ATmega Projects, Other Projects
  • 150.
    1678. 8×8 BicolorLED Matrix using MAX6964 For a long time I had a layout for this circuit, but could never build it, because the layout was to small to be ma tonertransfer. So it was the first layout I made with my new exposure unit. It’s quite small, so it…... Listed under: AVR ATmega Projects, LED Projects 1679. Thermometer using DS1621 and Nokia 3310 LCD interfaced with ATmega8 I am presenting one application with the Nokia 3310 LCD: Designing a ther using DS1621 temperature sensor IC. DS1621 is 8-pin sensor from Maxim, with temp range of -55 to +125 degree C, which can be interfaced with microcontroller over two-wire serial i2c bus. It…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, Temperature Measur Projects 1680. EPROM Display using ULN2308A microcontroller Due to university and work it has been a while since the last post. But I just completed a little project that’s worth posting. Sev 27C256 EPROMS were lying around unused. So I thought about a purpose for them. As I also had some…... Listed under: AVR ATmega Projects, Interfacing(USB - RS232 - I2c -IS 1681. CNC Update 2 Using atmega32 microcontroller Another update on the CNC. The interfaceboards are etched, soldered and tested. IO / Control Boards directionsignals are generated by an ATmega32 which is controlled over RS232. This is only for testing purpose. In the final version a PC will control the movement.…... Listed under: AVR ATmega Projects, CNC - Printing Machines Projects 1682. Delta Robot using atmega32 micrcontroller And now for something completely different: A little robotics project for the weekend. The described robot build entirely from model making supplies and materials from the hardware store. Also only very few tools are needed. A metal saw, a drill press, a vic Listed under: AVR ATmega Projects, Robotics - Automation Projects 1683. Simple PWM DC motor control using MOSFET H-Bridge with AVR ATmega8 Here is a very simple project of controlling a small DC-motor (taken from an personal cassette player) with ATmega8. The ATmega8 is having three PWM channels, out of which two are used here. PWM waveforms are fed to MO (RFD3055) H-bridge. Here, direction is…... Listed under: AVR ATmega Projects, PWM Projects 1684. circuit schematic symbols circuit schematic symbols: Download High Quality circuit schematic symbols images of common electrical and electronics  components, for creating any schematic diagram. Basically Electrical components can be divided in two categories Passive components and Active Components. This post will have following schematic symbols. Click on Image…... Listed under: Blog, Circuits 1685. 4 bit interfacing of a 16X2 LCD display to PIC16F877A, Atmega16/32 & MSP430 16x2 LCDs are most commonly used display units in microcontroller ba projects. I got much information about LCD, LCD commands, LCD initialization etc from the below link and I hope, it will be very much helpful for begin more Detail: 4 bit interfacing of…... Listed under: AVR ATmega Projects, LCD Projects 1686. My own AVR ISP programmer using PIC16f877a and python! Introduction: (don't skip to read the note below) I recently purchased few AVR microcontro don't know much about AVR since I am using it for first time. Any way, I have some experience on working with PIC and MSP430. To program AVR usin Listed under: AVR ATmega Projects, Microcontroller Programmer Projects
  • 151.
    1687. 4×4 MatrixKey-board Interfacing with ATmega32 Here is a project for beginners to interface a 16-key (4x4) keypad with ATmega32 using 8-pins i.e. one port of the microcontro useful particularly where we need more keys but don't want to spend more uC pins for interfacing. The 4x4 keypad is…... Listed under: AVR ATmega Projects, Interfacing(USB - I2c -ISP) Projects 1688. NOKIA 3310 LCD interfacing with ATmega8 Using graphic LCD in a project gives it really a good look and flexibility of displaying different characters and But, the graphic LCDs are quite costly. The NOKIA 3310 LCD provides a really low-cost solution to add a small graphic display into your project…... Liste AVR ATmega Projects, Interfacing(USB - RS232 - I2c -ISP) Projects, LCD Projects 1689. DIY AVR Programmers For those who are trying to make AVR kit at home, an AVR programmer which can be simple to make will be really useful, as it'll buying the programmer!! Here I'm giving a few webpage links on how to make a programmers yourself. -…... Listed under: AVR ATmega Projects, How T Projects 1690. TV remote controller 160KHz High Quality Stereo MMC WAV player using ATMEGA32 Introduction: This is my first AVR based hobby project and the mo successful one compared to my all previous stuff. I am 100% satisfied with this work. Few months ago, I tried to make a wav player using a PIC16F877A worked anyway, but the…... Listed under: AVR ATmega Projects, Sound - Audio Projects 1691. Multitasking in AVR (A demo to run 7 tasks on an atmega32) Introduction:      Switching multiple tasks on a same CPU is the one of the major function operating system. What I did now is a time sharing multitasking (time multiplexing) on an AVR. Here an atmega32 is configured to use Round-Robin Multitasking. Round-Robin allows…... Listed under: AVR ATmega Projects, RTOS - OS Projects 1692. An attempt to show grayscale images on an LED dot matrix display with software PWM using PIC16F877A Introduction: This is just a time pass hobby p am trying to display some pictures (JPEG/PNG/BMP etc) on my 8x8 led dotmatrix display.  You can see photos of my 8x8 led dotmatrix display showing grayscale pictures. The main thing which you may notice…... Listed under: AVR ATmega Projects, PWM Projects, Video - Camera - Imaging Projects 1693. AVR based monochrome signal generation for a PAL TV using atmega16 micrcontroller Introduction: I have learned some thing about TV in one of my semester but I forgot most of them. Now I refreshed a few basics and tried to implement a monochrome PAL TV signal generator using an AVR micrco was using PIC earlier…... Listed under: AVR ATmega Projects, Video - Camera - Imaging Projects 1694. Drawing geometric figures on a PAL TV using ATmega32 (128×64 resolution) Introduction: I am interested to draw lines, square, rectangle, circle etc on screen. At first I was confused where to start. While thinking about it, a pencil and an eraser came to my mind. If we have a good pencil, eraser and a… under: AVR ATmega Projects, Video - Camera - Imaging Projects 1695. Running PYTHON (pymite-09) on an Arduino MEGA 2560 using atmega16 micrcontroller Now it is the first time I am using an arduino board. Arduino m is really a great product. The chip got a flash of 256KB, RAM of 8KB and EEPROM of 4KB. Also, the data sheet of Atmega2560 says that we can extend… under: AVR ATmega Projects, How To - DIY - Projects 1696. Generating AUDIO ECHO using Atmega32 microcontroller Introduction: But now I can do this very easily by a simple digital signal processing using a microcontroller. It's concept is very simple, ie we need to apply a proper delayed feedback in digital samples with in a circular buffer. I did this using a Listed under: AVR ATmega Projects, Sound - Audio Projects 1697. Implementing Discrete Fourier Transform in Atmega32 to make an audio spectrum analyzer "All waveforms, no matter what you scribble or observe in universe, are actually just the sum of simple sinusoids of different frequencies." Hi, I am just refreshing the basics of fourier transform. I am not an ex I did a small audio spectrum…... Listed under: AVR ATmega Projects, Sound - Audio Projects
  • 152.
    1698. Arduino Mega2560 What is Arduino Mega 2560: The arduino mega 2560 is a microcontroller board in line with the ATmega2560 (ATmega2560 datashe having 54 digital input/output hooks (of which 14 can be used PWM results), 16 analogue inputs, 4 UARTs (Universal asynchronous receiver/transmitte interface with…... Listed under: AVR ATmega Projects, Blog, Circuits, How To - DIY - Projects 1699. Homage UPS Schematic Circuit Diagram Homage UPS: Homage UPS is one of the top selling brand. Homage UPS/Inverter is based on chopper techno having modified sine wave. It has overload output protection, with batter and output volts measurements displayed on LCD interface. Further specific mentioned in undergiven table Homage…... Listed under: Blog, Circuits 1700. PCM UPS Schematic Diagrams PCM Powercom was founded in 1987, a leading provider of power protection products with ISO 9001 certificate. There 2,600 employees around the world.  Powercom designs, manufactures, markets and services UPS systems. PCM UPS Schematic Diagram for Model UL 700/1000/1500VA POWER Features : LED/LCD…... Listed under: Blog, Circuits 1701. PowerMan UPS Schematic PowerMan UPS/Inverters Uninterruptible power supplies and voltage regulators Business founded in 1993. Prior to 2000. c engaged in distribution of products of famous brands. In the year 2000. the idea of creating his own brand POWERMAN, and from that period, the com exclusively OEM…... Listed under: Blog, Circuits 1702. APC UPS Schematic Diagrams APC by Schneider Electric, formerly referred to as American Energy Conversion Corporation, is really a manufacturer of uninterruptible energy su electronics peripheral devices and data center items. In 2007, Schneider Electric acquired APC and combined it with MGE UPS Systems to create Schne Electric's Critical…... Listed under: Blog, Circuits 1703. UPS Schematic Circuit Diagram UPS is an abbreviation of Uninterpretable Power Supply. It is an electronic product used to provide backup power for s devices in case their normal power failure or blackout. Given UPS Schematic Circuit Diagram with its component list is a complete guide to build stand Listed under: Blog, Circuits, Featured You and 21K others like this.Like