Embed presentation
Download to read offline




The document discusses the necessity of validation for collected data in asset data management and integration projects. It emphasizes that such validation should occur alongside reconciliation and involves domain experts for accuracy and verification. This integration is crucial for effective project execution in the chemical engineering field.


