Syllabus A. Nature ofSoftware B. Software Process C. Software Engineering Practice D. Software Myths E. Generic Process model F. Process Assessment and Improvement G. Perspective Process Models H. Specialized Process Models I. Personal and Team Process Models Agile Process models: J. Agile process K. Extreme programming
3.
Software engineering involvesa process, a collection of methods (practice) and an array(collection) of tools that allow professionals to build high quality computer software. The IEEE definition of Software Engineering (1) The application of a systematic, disciplined, quantifiable approach to the development, operation, and maintenance of software; that is, the application of engineering to software. (2) The study of approaches as in (1). 1 General definition of Software Engineering
4.
THE NATURE OFSOFTWARE Defining Software Software is: (1) instructions (computer programs) that when executed provide desired features, function, and performance; (2) data structures that enable the programs to effectively manipulate information, and (3) descriptive information in both hard copy and virtual forms that describes the operation and use of the programs. software characteristics 1. Software is developed or engineered; it is not manufactured in the classical sense. 2. Although the industry is moving toward component-based construction, most software continues to be custom built. 3. Software doesn’t “wear out.” But it does deteriorate! 4. Although the industry is moving toward component-based construction, most software continues to be custom built.
5.
Figure 1: Failurecurve for hardware Figure 1.2: Failure curves for software
6.
Software ApplicationDomains • System software a collection of programs written to service other programs. Some system software (e.g., compilers, editors, and file management utilities) processes complex, but determinate, information structures. Other systems applications (e.g., operating system components, drivers, networking software, telecommunications processors) process largely indeterminate data. • Application software stand-alone programs that solve a specific business need. Applications in this area process business or technical data in a way that facilitates business operations or management/technical decision making
7.
• Engineering/scientific software characterizedby “number crunching” algorithms. Computer-aided design, system simulation, and other interactive applications have begun to take on real-time and even system software characteristics. • Embedded software software—resides within a product or system and is used to implement and control features and functions for the end user and for the system itself • Product-line software designed to provide a specific capability for use by many different customers. Product-line software can focus on a limited and esoteric marketplace (e.g., inventory control products) • Web applications called “WebApps,” this network-centric software category spans a wide array of applications. In their simplest form, WebApps can be little more than a set of linked hypertext files that present information using text and limited graphics
8.
• Artificial intelligencesoftware - makes use of nonnumerical algorithms to solve complex problems that are not amenable to computation or straightforward analysis. Applications within this area include robotics, expert systems, pattern recognition
9.
New Challenges •Open-world computing •Netsourcing •Opensource Legacy software (A poor quality software) •Some other programs are older, in some cases much older. •Legacy software systems . . . were developed decades ago and have been continually modified to meet changes in business requirements and computing platforms. The production of such systems is causing headaches for large organizations who find them costly to maintain and risky to evolve. 1
10.
Legacy Software 1 • Manylegacy systems remain supportive to core business functions and are ‘essential’ to the business. What to do? • What types of changes are made to legacy systems? The software must be adapted to meet the needs of new computing environments or technology. The software must be enhanced to implement new business requirements. The software must be extended to make it interoperable with other more modern systems or databases. The software must be re-architected to make it feasible within a network environment.
11.
THE SOFTWARE PROCESS Aprocess is a collection of activities, actions, and tasks that are performed when some work product is to be created. A generic process framework for software engineering encompasses five activities: Communication important to communicate and collaborate with the customer and other stakeholders. The intent is to understand stakeholders’ objectives for the project and to gather requirements Planning planning activity creates a “map” that helps, guide .The map—called a software project plan—defines the software engineering work by describing the technical tasks to be conducted Modeling creating models to better understand software requirements and the design that will achieve requirements. Construction This activity combines code generation (either manual or automated) and the testing that is required to uncover errors in the code. Deployment The software (as a complete entity or as a partially completed increment) is delivered to the customer who evaluates the delivered product and provides feedback based on the evaluation
12.
Software engineering processframework activities are complemented by a number of umbrella activities Software project tracking and control allows the software team to assess progress against the project plan and take any necessary action to maintain the schedule. Risk management assesses risks that may affect the outcome of the project or the quality of the product. Technical reviews assesses software engineering work products in an effort to uncover and remove errors before they are propagated to the next activity. Software quality assurance defines and conducts the activities required to ensure software quality. Measurement Measurement—defines and collects process, project, and product measures that assist the team in delivering software that meets stakeholders’ needs
13.
Software configurationmanagement manages the effects of change throughout the software process Reusability management defines criteria for work product reuse (including software components) and establishes mechanisms to achieve reusable components. Work product preparation and production encompasses the activities required to create work products such as models, documents, logs, forms, and lists.
14.
SOFTWARE ENGINEERING PRACTICE The Essence of Practice • Understand the problem (communication and analysis). • Plan a solution (modeling and software design). • Carry out the plan (code generation). • Examine the result for accuracy (testing and quality assurance). General Principles 1. The Reason It All Exists -A software system exists for one reason: to provide value to its users . “Does this add real value to the system?” If the answer is “no,” don’t do it. 2. KISS (Keep It Simple, Stupid!) All design should be as simple as possible, but no simpler. This facilitates having a more easily understood and easily maintained system. 3. Maintain the Vision A clear vision is essential to the success of a software project
15.
4. What YouProduce, Others Will Consume always specify, design, and implement knowing someone else will have to understand what you are doing 5. Be Open to the Future system with a long lifetime has more value. systems must be ready to adapt to these and other changes. Never design yourself into a corner. Always ask “what if,” and prepare for all possible answers by creating systems that solve the general problem. 6. Plan Ahead for Reuse Reuse saves time and effort. Achieving a high level of reuse is arguably the hardest goal to accomplish in developing a software system. Planning ahead for reuse reduces the cost and increases the value of both the reusable components and the systems into which they are incorporated. 7. Think! Placing clear, complete thought before action almost always produces better results. When you think about something, you are more likely to do it right. You also gain knowledge about how to do it right again
16.
Software Myths Management Myths i)Myth:We already have a book that's full of standards and procedures for building software, Reality: but is it used? Are software practitioners aware of its existence? Is it complete ii)Myth: My people have state-of-the-art software development tools, Reality: Computer-Aided Software Engineering (CASE) tools are more important than hardware for achieving good quality and productivity, yet the majority of software developers still do not use them effectively. 1
17.
iii)Myth: If weget behind schedule, we can add more programmers and catch up Reality: “Adding people to a late software project makes it later”. However, as new people are added, people who were working must spend time educating the newcomers. People can be added but only in a planned and well-coordinated manner. iv)Myth: If I decide to outsource the software project to a third party, I can just relax and let that firm build it. Reality: If an organization does not understand how to manage and control software projects internally, it will be problematic to build that project. 1
18.
Customer’s Myths i)Myth: Ageneral statement of objectives is sufficient to begin writing programs, we can fill in the details later. Reality: A poor up-front definition is the major cause of failed software efforts. A formal and detailed description of the information domain, function, behavior, performance, interfaces, design constraints, and validation criteria is essential which is determined only after thorough communication between customer and developer. ii)Myth: Project requirements continually change, but change can be easily accommodated because software is flexible. Reality: It is true that software requirements change, but the impact of change varies with the time & cost is increases. 1
19.
Practitioner Myths (Related ToPractitioner or Programmer) i)Myth: Once we write the program and get it to work, our job is done. Reality: “ The sooner you begin 'writing code', the longer it'll take you to get done”. ii)Myth: The only deliverable work product for a successful project is the working program. Reality : A working program is only one part of a software configuration that includes many elements. Documentation provides a foundation for successful engineering and, more important, guidance for software support. 1
A GENERIC PROCESSMODEL A generic process framework for software engineering defines five framework activities—communication, planning, modeling, construction, and deployment. In addition, a set of umbrella activities—project tracking and control, risk management, quality assurance, configuration management, technical reviews Defining a Framework Activity -What actions are appropriate for a framework activity, given the nature of the problem to be solved, the characteristics of the people doing the work, and the stakeholders who are sponsoring the project? - action encompasses are: 1. Make contact with stakeholder via telephone. 2. Discuss requirements and take notes. 3. Organize notes into a brief written statement of requirements. 4. E-mail to stakeholder for review and approval. Identifying a Task Set - number of different task sets—each a collection of software engineering work tasks, related work products, quality assurance points, and project milestones
22.
Process PatternsA process pattern describes a process-related problem that is encountered during software engineering work, identifies the environment in which the problem has been encountered, and suggests one or more proven solutions to the problem. Ambler has proposed a template for describing a process pattern: Pattern Name The pattern is given a meaningful name describing it within the context of the software process (e.g., TechnicalReviews). Forces The environment in which the pattern is encountered and the issues that make the problem visible and may affect its solution. Type-three types: 1. Stage pattern—defines a problem associated with a framework activity for the process . 2. Task pattern—defines a problem associated with a software engineering action or work task and relevant to successful software engineering practice (e.g., R equirementsGathering is a task pattern). • Phase pattern—define the sequence of framework activities that occurs within the process.Ex: SpiralModel or Prototyping.
23.
PROCESS ASSESSMENT ANDIMPROVEMENT Standard CMMI Assessment Method for Process Improvement (SCAMPI) - provides a five-step process assessment model that incorporates five phases: initiating, diagnosing, establishing, acting, and learning. The SCAMPI method uses the SEI CMMI as the basis for assessment. CMM-Based Appraisal for Internal Process Improvement (CBA IPI) - provides a diagnostic technique for assessing the relative maturity of a software organization; uses the SEI CMM as the basis for the assessment. SPICE (ISO/IEC15504) - a standard that defines a set of requirements for software process assessment. The intent of the standard is to assist organizations in developing an objective evaluation of the efficacy of any defined software process. ISO 9001:2000 for Software - a generic standard that applies to any organization that wants to improve the overall quality of the products, systems, or services that it provides
• The waterfallmodel, sometimes called the classic life cycle, suggests a systematic, sequential approach to software development that begins with customer specification of requirements and progresses through planning, modeling, construction, and deployment. • A variation in the representation of the waterfall model is called the V-model . • As a software team moves down the left side of the V, basic problem requirements are refined into progressively more detailed and technical representations of the problem and its solution. • oldest paradigm for software engineering. • serve as a useful process model in situations where requirements are fixed and work is to proceed to completion in a linear manner.
• The incrementalmodel combines elements of linear and parallel process flows. • When an incremental model is used, the first increment is often a core product. That is, basic requirements are addressed but many supplementary features (some known, others unknown) remain undelivered. • The core product is used by the customer (or undergoes detailed evaluation). As a result of use and/or evaluation, a plan is developed for the next increment. • The plan addresses the modification of the core product to better meet the needs of the customer and the delivery of additional features and functionality. • This process is repeated following the delivery of each increment, until the complete product is produced. • focuses on the delivery of an operational product with each increment.
• The prototypingparadigm begins with communication. • You meet with other stakeholders to define the overall objectives for the software, identify whatever requirements are known, and outline areas where further definition is mandatory. • A prototyping iteration is planned quickly, and modeling (in the form of a “quick design”) occurs. • A quick design focuses on a representation of those aspects of the software that will be visible to end users (e.g., human interface layout or output display formats). • The quick design leads to the construction of a prototype. • The prototype is deployed and evaluated by stakeholders, who provide feedback that is used to further refine requirements . • prototype serves as a mechanism for identifying software requirements. If a working prototype is to be built, you can make use of existing program fragments or apply tools . • The prototype can serve as “the first system “
• Originally proposedby Barry Boehm, the spiral model is an evolutionary software process model that couples the iterative nature of prototyping with the controlled and systematic aspects of the waterfall model. • It provides the potential for rapid development of increasingly more complete versions of the software. • risk-driven process model generator that is used to guide multi- stakeholder concurrent engineering of software intensive systems. • It has two main distinguishing features. One is a cyclic approach for incrementally growing a system’s degree of definition and implementation while decreasing its degree of risk . • Software is developed in a series of evolutionary releases. During early iterations, the release might be a model or prototype. During later iterations, increasingly more complete versions of the engineered system are produced. • divided into a set of framework activities defined by the software engineering team. • The spiral model is a realistic approach to the development of large-scale systems and software
• called concurrentengineering, allows a software team to represent iterative and concurrent elements of any of the process models. • All software engineering activities exist concurrently but reside in different states. • Concurrent modeling defines a series of events that will trigger transitions from state to state for each of the software engineering activities, actions, or tasks . • Concurrent modeling is applicable to all types of software development and provides an accurate picture of the current state of a project.
34.
SPECIALIZED PROCESS MODELS thesemodels tend to be applied when a specialized or narrowly defined software engineering approach is chosen. Component-Based Development • Commercial off-the-shelf (COTS) software components, developed by vendors who offer them as products, provide targeted functionality with well-defined interfaces that enable the component to be integrated into the software that is to be built. • The component-based development model incorporates many of the characteristics of the spiral model. • It is evolutionary in nature, demanding an iterative approach to the creation of software. However, the component-based development model constructs applications from prepackaged software components. • Modeling and construction activities begin with the identification of candidate components.
35.
model incorporates thefollowing steps: 1. Available component-based products are researched and evaluated for the application domain in question. 2. Component integration issues are considered. 3. A software architecture is designed to accommodate the components. 4. Components are integrated into the architecture. 5. Comprehensive testing is conducted to ensure proper functionality. • leads to software reuse, and reusability provides software engineers with a number of measurable benefits.
36.
The FormalMethods Model • encompasses a set of activities that leads to formal mathematical specification of computer software. Formal methods enable you to specify, develop, and verify a computer-based system by applying a rigorous, mathematical notation. A variation on this approach, called cleanroom software engineering • The development of formal models is currently quite time consuming and expensive. • Because few software developers have the necessary background to apply formal methods, extensive training is required. • It is difficult to use the models as a communication mechanism for technically unsophisticated customers. Aspect-Oriented Software Development • provides a process and methodological approach for defining, specifying, designing, and constructing aspects—“mechanisms beyond subroutines and inheritance for localizing the expression of a crosscutting concern”. • Common, systemic aspects include user interfaces, collaborative work, distribution, persistency, memory management, transaction processing, security, integrity and so on. Components may provide or require one or more “aspect details” relating to a particular aspect
37.
PERSONAL AND TEAMPROCESS MODELS Personal Software Process (PSP) The PSP model defines five framework activities Planning High-level design High-level design review Development Postmortem Team Software Process (TSP)
AGILE PROCESS WhatIs An Agile Process Agility Principles • The Agile Alliance defines agility principles for those who want to achieve agility: • Our highest priority is to satisfy the customer through early and continuous delivery of valuable software. • Welcome changing requirements, even late in development. Agile processes harness change for the customer’s competitive advantage. • Deliver working software frequently, from a couple of weeks to a couple of months, with a preference to the shorter timescale.
40.
• Business peopleand developers must work together daily throughout the project. • Build projects around motivated individuals. Give them the environment and support they need, and trust them to get the job done. • The most efficient and effective method of conveying information to and within a development team is face-to-face conversation. • Working software is the primary measure of progress. • Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely. • Continuous attention to technical excellence and good design enhances agility.
41.
•The best architectures,requirements, and designs emerge from self– organizing teams. At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly. The Politics of Agile Development Human Factors - Agile development focuses on the talents and skills of individuals, molding the process to specific people and teams Competence. - Skill and knowledge of process can and should be taught to all people who serve as agile team members. Common focus - focused on one goal - the team will also focus on continual adaptations (small and large) Collaboration. - team members must collaborate—with one another and all other stakeholders.
42.
Self-organization (1) theagile team organizes itself for the work to be done, (2) the team organizes the process to best accommodate its local environment. (3) the team organizes the work schedule to best achieve delivery of the software increment. Decision-making ability. - team is given autonomy—decision-making authority for both technical and project issues. Fuzzy problem-solving ability - team must accept the fact that the problem they are solving today may not be the problem that needs to be solved tomorrow. Mutual trust and respect
43.
EXTREME PROGRAMMING (XP) XP Values - communication, simplicity, feedback, courage, and respect. Each of these values is used as a driver for specific XP activities, actions, and tasks The XP Process Planning -begins with listening—a requirements gathering activity that enables the technical members of the XP team to understand the business context . - creation of a set of “stories” (also called user stories) that describe required output, features, and functionality for software to be built. Each story is written by the customer and is placed on an index card. - assign a cost—measured in development weeks—to it. Design Coding Testing
45.
Industrial XP -IXP isan organic evolution of XP. - customer-centric, test-driven spirit. - IXP differs most from the original XP in its greater inclusion of management, its expanded role for customers, and its upgraded technical practices. Readiness assessment (1) an appropriate development environment exists to support IXP, (2) the team will be populated by the proper set of stakeholders, (3) the organization has a distinct quality program and supports continuous improvement, (4) the organizational culture will support the new values of an agile team, and (5) the broader project community will be populated appropriately.
46.
Project community -people on the team must be well-trained, adaptable and skilled, and have the proper temperament to contribute to a self-organizing team Project chartering - examines the context of the project to determine how it complements, extends, or replaces existing systems or processes Test-driven management - requires measurable criteria for assessing the state of the project and the progress Retrospectives -IXP team conducts a specialized technical review after a software increment is delivered. Called a retrospective Continuous learn - XP team are encouraged (and possibly, incented) to learn new methods and techniques that can lead to a higher quality product. The XP Debate